You can copy from here when filling out the rest of the page.
PROPOSED MULTI-FAMILY RESIDENTIAL DEVELOPMENT NEAR DENHAM SPRINGS in LIVINGSTON PARISH
NAME OF APPLICANT: Tower Capital, c/o Hydrik Wetlands Consultants, Attn: Mike Henry, 2323 Hwy 190 East, Suite 2, Hammond, LA 70401.
LOCATION OF WORK: In an approximate 14.94-acre site located along and east of Juban Road, in Section 9, Township 7 South, Range 3 East, near Denham Springs, Louisiana, in Livingston Parish, within the Pontchartrain Basin in hydrologic unit (HUC 08070202), as shown on the attached drawings (Latitude 30.45795 N, Longitude-90.91287 W).
CHARACTER OF WORK: The applicant has requested Department of the Army authorization to clear, grade, excavate and deposit fill to construct and maintain an approximate 118-residential duplex lot residential subdivision (Oakview Village Residential Development) to include approximately 59 total building units, infrastructure, greenspace, onsite detention pond, utilities and drainage infrastructure. Approximately 12,310 cubic yards of clean silt fill from onsite excavation and 5,960 cubic yards of hauled in clean clay fill material would be placed as fill material in jurisdictional areas. Approximately 5.2 acres of jurisdictional forested wetlands would be directly impacted as a result of project implementation. The applicant claims that the proposed project has been designed to avoid and minimize direct and secondary adverse impacts to the maximum extent practicable but is currently considering minimization options. The applicant is proposing to utilize best management practices for erosion and siltation control during and after the construction phase of the project, to install and maintain LDOTD approved culverts along Juban Road to ensure adequate drainage is maintained and is proposing to install an earthen berm along the project boundary line. If authorized, the project will receive approval from all appropriate local drainage authorities and sewerage agencies. As compensation for unavoidable wetland impacts, the applicant proposes to use a Corps approved mitigation bank within the watershed of impact.