The applicant is proposing to discharge 1,600 cubic yards of backfill.
Full Public Notice Project Plans
PROJECT DESCRIPTION: The applicant is proposing to discharge 1,600 cubic yards of backfill associated with the construction of a 3,175-linear-foot driven steel sheet pile bulkhead within the Victoria Barge Canal. The applicant is also proposing to mechanically dredge the area in front of the installed bulkhead to a depth of -12 feet mean high tide to remove 3,250 cubic yards of material. The dredged material will be placed as fill behind the constructed bulkhead.