The U.S. Army Corps of Engineers, Nashville District (USACE) is completing a review in accordance with the National Environmental Policy Act (NEPA) to assess impacts of a proposed revision to the J. Percy Priest Dam and Reservoir Master Plan.
The U.S. Army Corps of Engineers, Nashville District (USACE) is completing a review in accordance with the National Environmental Policy Act (NEPA) to assess impacts of a proposed revision to the J. Percy Priest Dam and Reservoir Master Plan. J. Percy Priest Dam, completed in 1968, is located on the Stones River, 6.8 miles above its confluence with the Cumberland River (Figure 1). J. Percy Priest Reservoir was authorized for flood control, hydroelectric power production, and recreation by the Flood Control Act of 1938 and the River and Harbor Act of 1946. It is also operated to encourage and develop collateral uses such as water quality, fish and wildlife conservation and other purposes in the public interest. The reservoir is composed of
33,054 acres of land and water under the administrative control of the USACE. The normal summer pool (elev. 490.0 mean sea level) consists of 14,200 acres of water surface area and the reservoir is surrounded by 18,854 acres of public lands. The reservoir includes portions of Davidson and Rutherford counties, and a very small portion of Wilson County in Tennessee (Figure 2).
A preliminary Master Plan for J. Percy Priest was prepared in July 1963 and approved in August 1963. A Master Plan update was approved in December 1986. This update redefined some of the original objectives of the project and expounded on the impacts of overuse at some recreation areas. A second Master Plan update was approved in May 2007 that incorporated the 2003 Nashville District Recreation Excellence at Army Lakes Program and evaluated existing and future needs required to
protect and improve the value of project resources.
The following alternatives would be evaluated: Alternative 1- (No Action) and Alternative 2 - (Revision of the Existing Master Plan). The term "No Action" means that there would be no change to the existing 2007 Master Plan and no new resource classification, assessment, and inventory would occur. Revising the Master Plan would include:
A comprehensive description of the project resources, as well as factors influencing resource management and development (Chapter 2)
Resource Objectives and goals from the Headquarters, Division, District and Local levels (Chapter 3)
Land Allocation and Classifications (Chapter 4)
Resource Plan with detailed descriptions of classified areas (Chapter 5)
Special topics relevant to J. Percy Priest Lake (Chapter 6)
A synopsis of public involvement and input in the master planning process (Chapter 7)
Conclusions and Recommendations (Chapter 8)
The associated compliance with the National Environmental Policy Act of 1969, as amended, and other related data (Appendices).
The update would result in permanent changes to the document that could reclassify and change management of lands and/or resources. The revision would ensure the Master Plan is compliant with current Engineering Regulation and Engineer Pamphlet (EP) 1130-2-550.
This letter serves to solicit scoping comments from the public, federal, state, local agencies and officials, Indian Tribes, and other interested parties in order to consider and evaluate the impacts of this proposed activity as part of USACE planning process and in accordance with the NEPA process. We encourage comments not only about resources in the immediate project area, but also of plans or proposals for any other development that may impact or influence project resources. Comments would be used to assess effects of the proposed action to the human environment. This letter also serves to initiate the public involvement requirements of Section 106 of the National Historic Preservation Act of 1966, as amended.
We request comments be sent by email to cody.a.flatt@usace.army.mil, no later than thirty calendar days from the date of this letter. If you are unable to access an email account, you may send written comments to the address listed on the letterhead, ATTN: CELRN-PMP (Cody Flatt). For additional information regarding the proposed project, please contact Cody Flatt at (615) 736-7954. Your participation is greatly appreciated.
Figure 1: Vicinity Map of Project Location
Figure 2: J. Percy Priest Dam and Reservoir