SWG-2020-00804 - Waste Management of Texas

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The applicant proposes to discharge fill material during the construction of a commercial waste management facility, including amenities.

Public Notice Plans Mitigation Plan

The applicant proposes to permanently discharge fill material into 0.63-acre of palustrine forested (PFO) wetlands, 0.16-acre of palustrine shrub scrub (PSS) wetlands, 1.13-acres of palustrine emergent (PEM) wetlands, 0.16-acre of manmade ponds, and 2,103-linear-feet of streams. Additional temporary impacts include the discharge of fill material into 0.07-acre of PFO wetlands, 0.03-acre of PSS wetlands, 0.09-acre of PEM wetlands, 0.8-acre of manmade ponds, and 1,409-linear-feet of streams on a 32-acre tract for a multi-use, commercial waste management facility, including amenities such as a two-story office building, refueling stations, a maintenance shop, visitor and employee parking lot, container shop, container storage area, and two stormwater water retention/detention basins.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice