STATE - West Virginia **** APPLICANT - Alpha Met Resources **** PURPOSE - The applicant has requested to discharge dredged and/or fill material into a total of 20

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

STATE - West Virginia **** APPLICANT - Alpha Met Resources **** PURPOSE - The applicant has requested to discharge dredged and/or fill material into a total of 20,356 linear feet (2.45 acres) of perennial, intermittent, and ephemeral stream channels and 1.79 acres of wetlands, in conjunction with the construction, operation and reclamation of the Turkeyfoot Surface Mine

TO WHOM IT MAY CONCERN: The following application has been submitted for a Department of the Army (DA) Permit under the provisions of Section 404 of the Clean Water Act for the proposed discharge dredged and/or fill material into waters of the United States (U.S.).

APPLICANT: Jeremy Crist

Alpha Met Resources

Post Box Office 69

Pax, West Virginia 25904

LOCATION: The proposed project would be located approximately 2.9 miles south of the community of Clear Creek, in Raleigh County, West Virginia at latitude 37°52’29” and longitude -81°11’19”. The proposed surface mine would be constructed in McGraw Fork, Workman Creek and its unnamed tributaries, Wingrove Branch and its unnamed tributaries, unnamed tributaries of Stover Fork, and palustrine emergent (PEM) wetlands adjacent to Workman Creek. All of the streams are indirect tributaries of Clear Fork Creek and Marsh Creek, which flow into the Big Coal River, a traditional navigable water of the U.S. See attached Sheets 1 and 2 for a depiction of the proposed project location.

DESCRIPTION OF THE PROPOSED WORK: The applicant has requested a DA permit to discharge dredged and/or fill material into a total of 20,356 linear feet (2.45 acres) of perennial, intermittent, and ephemeral stream channels and 1.79 acres of wetlands as indicated on attached Sheets 3-17 and Table 1 and as described below, in conjunction with the construction, operation and reclamation of the Turkeyfoot Surface Mine. The activities would include re-mining of existing pre-law contour areas via area, contour, and highwall mining methods.

The original public notice for this proposal was advertised on May 19, 2021 and expired on June 17, 2021. The public notice was reliant upon an approved jurisdictional determination conducted under the June 2020 Navigable Waters Protection Rule (NWPR). On August 30, 2021, the NWPR was vacated by the U.S. District Court for the District of Arizona in the case of Pascua Yaqui Tribe v. U.S. Environmental Protection Agency. In light of the order, the Corps and the United States Environmental Protection Agency halted implementation of the NWPR nationwide and are now interpreting “waters of the United States” consistent with the pre-2015 regulatory regime. Because the Corps can no longer rely on an AJD issued under the NWPR to make new permit decisions, we will rely on the preliminary jurisdictional determination dated January 14, 2015. This public notice reflects the addition of ephemeral stream channels that would be filled as a result of the proposal.

Valley Fill No. 1 and Sediment Ponds 1A and 1B: The construction of Valley Fill No. 1 and its associated durable rock underdrain would result in the permanent discharge of approximately 496 cubic yards of non-toxic, durable rock fill material into 3,809 linear feet (0.62 acre) of an intermittent segment of McGraw`s Fork and five (5) intermittent tributaries of McGraw Fork. The construction of Sediment Ponds 1A and 1B would proceed prior to the construction of the valley fill and would be located below a reclaimed refuse area. Water from the toe of Valley Fill 1 would be diverted through an existing diversion ditch associated with the reclaimed refuse area. There would be no discharges of dredged and/or fill material into waters of the U.S. in conjunction with the diversion ditch. The construction of Sediment Pond 1B would result in the temporary discharge of 61.3 cubic yards of earthen fill into 209 linear feet (0.04 acre) of an intermittent tributary of McGraw Creek. Sediment Pond 1A would be located outside of waters of the U.S. The valley fill would be constructed and certified after the sediment ponds have been constructed and certified.

Valley Fill No. 2, Sediment Pond No. 2, and Access Road 2: The construction of Valley Fill No. 2 and its associated durable rock underdrain would result in the permanent discharge of approximately 574.4 cubic yards of non-toxic, durable rock fill material into 2,100 linear feet (0.39 acre) of an intermittent segment of Stover Fork, two (2) intermittent tributaries of Stover Fork, and an ephemeral tributary of Stover Fork. The construction of Sediment Pond No. 2 would result in the temporary discharge of approximately 856 cubic yards of clean earthen and rock fill material into 845 linear feet (0.147 acre) of an intermittent segment of Stover Fork, two (2) unnamed tributaries of Stover Fork, and 0.27 acre of PEM wetland (WL-SF3). The construction of infrequently used Access Road #2 (IUAR #2) would result in the temporary discharge of 44 cubic yards of durable, non-toxic material and two (2) 36” culverts into 119 linear feet (0.02 acre) of one (1) intermittent tributary of Stover Fork. Construction of the valley fill would occur after the pond has been constructed and certified.

Valley Fill No. 3, Sediment Pond 3, and Access Road 3 and 3A: The construction of Valley Fill No. 3 and its associated durable rock underdrain would result in the permanent discharge of approximately 491 cubic yards of non-toxic, durable rock fill material into 3,660 linear feet (0.38 acre) of a perennial segment of the Right Fork of Workman Creek, 1,540 linear feet (0.11 acre) of four (4) intermittent tributaries of the Right Fork of Workman Creek, and 907 linear feet (0.07 acre) of two (2) ephemeral tributaries of the Right Fork of Workman Creek. The construction of Sediment Pond No. 3 would result in the temporary discharge of approximately 57 cubic yards of clean earthen and rock fill material into 605 linear feet (0.06 acre) of one (1) perennial segment of the Right Fork of Workman Creek and 18.7 cubic yards of clean earthen and rock fill material into 360 linear feet (0.03 acre) of an intermittent segment of the Right Fork of Workman Creek. The construction of the pond would also result in the excavation of 1.52 acres of a PEM wetland. The construction of the infrequently used Access Road #3 (IUAR #3) would consist of two (2) separate road crossings. The first road crossing would result in the temporary discharge of 1.79 cubic yards of durable, non-toxic material and the installation of one (1) 36” culvert into 70 linear feet (0.003 acre) of a tributary of Right Fork of Workman Creek. The second road crossing would result in the temporary discharge of 3.11 cubic yards of durable, non-toxic material and the installation of one (1) 36” culvert into 70 linear feet (0.004) of one (1) intermittent segment of Right Fork of Workman Creek. Construction of the valley fill would occur after the pond has been constructed and certified. The proposal would also result in mine-through activities within 100 linear feet (0.004 acre) of an ephemeral tributary of Right Fork of Workman Creek.

Valley Fill No. 4, Sediment Pond 4, and Stream Crossings 1-5 associated with Access Road 4: The construction of Valley Fill No. 4 and its associated durable rock underdrain would result in the permanent discharge of approximately 66.9 cubic yards of non-toxic, durable rock fill material into 1,680 linear feet (0.06 acre) of an intermittent segment of Wingrove Branch, 2,117 linear feet (0.13 acre) of four (4) intermittent tributaries of Wingrove Branch, and 182 linear feet (0.004 acre) of two (2) ephemeral tributaries of Wingrove Branch. The construction of Sediment Pond No. 4, which would be located below the toe of Valley Fill No. 4, would result in the temporary discharge of approximately 32 cubic yards of clean earthen and rock fill material into 1,316 linear feet (0.10 acre) of three (3) intermittent tributaries of Wingrove Branch. The construction of Stream Crossings 1 and 2 would result in the temporary discharge of 96.8 cubic yards of durable, non-toxic material into 140 linear feet (0.03 acre) of a perennial tributary of Wingrove Branch to construct two (2) in-stream drive-through stream crossings. The construction of Stream Crossings 3, 4, and 5 would result in the temporary discharge of approximately 44 cubic yards of durable, non-toxic fill material into 240 linear feet (0.039 acre) of three (3) intermittent tributaries of Wingrove Branch. Each crossing would affect 80 linear feet of stream channel. Construction of the valley fill would occur after the ponds have been constructed and certified.

After the removal of vegetation within the footprint of each valley fill and the construction of the sediment ponds, the toe/foundation of each valley fill would be constructed. The construction/installation of the terraces would occur from the bottom up with progressive construction of terraces and permanent drainage in increments not to exceed 100 feet. The outer slope of face of the valley fills would not exceed a vertical slope of 2:1 and would be constructed at a maximum of 50 feet above the toe of the valley fills. The bench width of each terrace would be no less than 20 feet wide with a 3-5% slope toward the face of the valley fill and would be constructed with 1% slope toward the groin ditch. All materials placed into the valley fills would be durable rock consisting of a minimum of 80% by volume of sandstone, limestone, and other rock that does not slake in water. Non-cemented rock, such as clay, shale, etc., would be mixed with durable rock spoil in such a manner as to limit unit concentrations of non-cemented rock. All fill material would be generated on-site by drilling and blasting of overburden. As the valley fills are constructed, topsoil or an approved topsoil substitute would be spread over the completed slope and bench areas and seeded/mulched per the re-vegetation plan included in the approved Surface Mining Control and Reclamation Act (SMCRA) permit. The re-mining activities at the site would reclaim approximately 394 acres and 85,794 linear feet of un-reclaimed pre-law highwall at the site.

The purpose of the project is to remove approximately 11.2 million tons of metallurgical coal reserves within the 1086-acre SMCRA permit area. The proposed surface mine operation would use a combination of area, contour, and highwall mining techniques to recover the coal reserves. The mining plan, inclusive of reclamation, would occur over a period of eight (8) years. The post-mine land use is forestland. The applicant has applied to the West Virginia Department of Environmental Protection (WVDEP) for the required SMCRA permit (S-3014-19). Plans of the proposal are attached to this notice (Sheets 1-17). A copy of the application, including all supplemental materials (alternative analysis, compensatory mitigation plan, environmental information documents, etc.), is available for review in the Huntington District Office, by appointment, or via the Freedom of Information Act.

ALTERNATIVE ANALYSIS: Approximately 20,356 linear feet (2.45 acres) of stream channels and 1.79 acres of two (2) PEM wetlands are proposed to be permanently and temporarily filled as a result of the mining activities. No other special aquatic sites would be affected by the discharge of dredged and/or fill material. No permit will be issued unless the alternatives analysis clearly demonstrates that practicable upland alternatives are not available to achieve the overall project purpose. The applicant has submitted the required alternative analysis for review. A complete copy of the applicant’s submittal can be reviewed, by appointment, at the above address or a copy may be requested under the Freedom of Information Act.

AVOIDANCE AND MINIMIZATION: In evaluating a project area containing waters of the U.S., consideration must be given to avoiding impacts on these sites. If waters of the U.S. cannot be avoided, then impacts must be minimized. Approximately 84,413 linear feet of perennial, intermittent, and ephemeral stream channels and 2.45 acres of PEM wetlands exist at the site as determined by a Preliminary Jurisdictional Determination dated January 14, 2015. The applicant indicated the proposed project cannot be located in an area that would avoid all discharges of dredged and/or fill material into waters of the U.S. The applicant stated the mine plan and developmental sequence were designed to avoid and minimize the discharge of dredged and/or fill material into waters of the U.S. to the maximum extent practicable, while meeting the stated project purpose. The proposal would avoid discharges of dredged and/or fill material into 64,057 linear feet (76%) of streams and 0.58 acre (24%) of wetlands at the site. The applicant indicated the entire proposed project footprint and adjacent areas have been previously affected by pre-law surface mining. The total project site, which is 1,086 acres in size, includes over 394 acres of un-reclaimed pre-law surface mining, which comprises 37% of the project area. In addition, approximately 85,794 linear feet of un-reclaimed pre-law highwall exists at the site and is producing large sediment loads within the receiving streams. The applicant has utilized the U.S. Department of Agriculture (USDA) Universal Soil Loss Equation to estimate the current and post-mining reclaimed sediment yields and has concluded that re-mining and reclaiming the pre-law highwalls and surface area would reduce the annual sediment yield emanating from the site from its current 8,207 tons per year to 5.26 tons per year (after site reclamation and re-vegetation). The applicant has avoided discharges of dredged and/or fill material into undisturbed watersheds at the site and the streams proposed for discharge of fill material have been previously affected by the pre-SMCRA mining activities. The applicant has designed the proposed valley fills to be over-stacked to increase their storage volume without resulting in additional impacts to waters of the U.S. Construction of the valley fills would be sequential and proceed from the toe of the fill up, which minimizes the length of time that overburden materials are exposed to runoff and weathering. A special material handling plan has been developed by the applicant and would assure that all fill material discharged into waters of the U.S. would be managed and monitored pursuant to the required Section 402 National Pollutant Discharge Elimination System permit (issued by the WVDEP) during all phases of the proposal to ensure water quality standards are met. Site reclamation would occur contemporaneously and would be sequenced to reduce total land disturbance. No more than 30% of the permitted acreage or 325 acres, whichever is less, would be disturbed and/or un-reclaimed at anyone (1) time. At all times, best management practices and guidance from the “Technical Handbook of Standards and Specifications for Mining Operations in West Virginia” would be employed during all phases of the proposed mining and reclamation activities. After mining and reclamation, the stream segments associated with the sediment pond would be re-established and the area would be returned to a post-mining land use of forestland.

COMPENSATORY MITIGATION PLAN (CMP): The applicant has submitted a CMP to compensate for the unavoidable discharge of fill material into waters of the U.S. The applicant proposes to establish, re-establish, restore, and preserve approximately 26,633 linear feet of perennial and intermittent stream channels and 4.1 acres of PEM wetlands on and off-site as described below (See attached Sheets 6-15).

To calculate an appropriate amount of mitigation to compensate for the loss of waters of the U.S. associated with the proposed project, the applicant used the Corps’ West Virginia Stream and Wetland Valuation Metric (SWVM, Version 2.1). The SWVM compares baseline data with anticipated or actual post-mitigation data to calculate impact debits and mitigation credits. The impact debits for the proposal, including temporal loss, total 15,148.65 debits. The applicant’s proposed on and off-site stream and wetland mitigation work is predicted to produce 17,576.34 stream mitigation credits and 4.1 wetland mitigation credits. The applicant’s CMP is currently under review and is available for public review. The proposed CMP is open to comment and is subject to change based on comments received. After review of all the submitted information, the Corps will determine the appropriate mitigation in the event a decision is made to issue a permit.

On-Site Stream Re-establishment at Sediment Ponds 1-4 and Temporary Access Roads: Upon completion of the mining, reclamation, and removal of the sediment control structures and culverted road crossings at the site, the applicant proposed to re-establish a total of 4,062 linear feet of nine (9) intermittent stream channels at the location of the four (4) sediment ponds. The applicant would also re-establish total of 499 linear feet of intermittent stream channels and 140 linear feet of perennial stream channels at the locations of the nine (9) access roads. Natural stream design techniques would be used within the re-established stream channels. The hydrology of the re-established stream channels is expected to be the same as the pre-project stream channels and exhibit similar drainage patterns. A minimum 100-foot riparian buffer, 50 feet from the top of each bank, would be established along the stream channels. A total of 4,771 linear feet of intermittent stream channels would be re-established on-site.

Workman Creek (WC-1) On-Site Stream Establishment: Upon completion of mining and reclamation activities at the site, the applicant proposes to establish approximately 2,835 linear feet of perennial stream channel along the eastern perimeter of Valley Fill No. 3. Currently, at the head of Workman Creek, a perennial seep exists within the Eagle A coal bench that was created during pre-SMCRA mining activities. The seep would be avoided during the surface mining activities to ensure continued flow. Below the seep, the ground would be re-graded to allow for the construction of a stream corridor post-mining. Upon completion of mining and reclamation, water from the seep would flow through an established corridor for 1,400 linear feet and would then be diverted to a groin ditch which would for approximately 1,435 linear feet. The channel would be graded to provide the appropriate slope, morphology and area to provide for a 100-foot riparian buffer. The established stream channel would outlet into the re-established section of Workman Creek at the site of Sediment Pond No. 3. The applicant proposes to utilize natural stream design techniques within the established stream channels, which include the creation of step-pools and in-stream habitat structures, the stabilization of the banks, the removal of non-native vegetation, planting native temporary herbaceous vegetation and permanent woody vegetation to establish a 100-foot riparian buffer, 50-feet from the top of each bank, along each established and restored stream channel(s). A total of 2,835 linear feet of perennial stream channel established on-site.

McGraw Fork East Off-Site Stream Establishment, Restoration, and Preservation: Upon initiation of the mining activities at the site, the applicant proposes to establish, restore, and preserve approximately 7,935 linear feet of stream channels at the McGraw East Mitigation Site, which is located northeast of Valley Fill No. 1. This site currently contains a reclaimed refuse fill (McGraws Hollow Refuse Fill O-0125-83). The applicant proposes to establish two (2) intermittent stream channels totaling 2,447 linear feet, restore seven (7) intermittent stream channels totaling 5,158 linear feet, and preserve 330 linear feet of an intermittent stream channel. The stream establishment activities would occur in an area once used to convey water around the refuse fill but is no longer in use. The applicant proposes to use natural stream channel design techniques for the stream establishment and restoration activities, which include the creation of step-pools and in-stream habitat structures, the stabilization of the banks, the removal of non-native vegetation, planting native temporary herbaceous vegetation and permanent woody vegetation to establish a 100-foot riparian buffer, 50-feet from the top of each bank, along each established and restored stream channel(s). A total of 2,447 linear feet of intermittent stream channel would be established, restored, and preserved at the McGraw East Mitigation Area.

McGraw Fork West Off-Site Stream Establishment and Restoration: Upon completion of the mining and reclamation activities at the site, the applicant proposes to establish and restore approximately 3,950 linear feet of stream channel at the McGraw West Mitigation Site, which is located on the western side the McGraws Hollow Refuse Fill and below the toe of Valley Fill No. 1. The applicant proposes to establish two (2) intermittent stream channels totaling 3,009 linear feet and restore 941 linear feet of two (2) intermittent stream channels along the western side of the refuse fill. The applicant proposes to use natural stream channel design techniques for the stream establishment and restoration activities, which include the creation of step-pools and in-stream habitat structures, the stabilization of the banks, the removal of non-native vegetation, planting native temporary herbaceous vegetation and permanent woody vegetation to establish a 100-foot riparian buffer, 50-feet from the top of each bank, along each established and restored stream channel. A total of 3,950 linear feet of intermittent stream channel would be established and restored at the McGraw West Mitigation Area.

Stover Fork Off-Site Stream Establishment and Restoration: Upon initiation of mining activities at site, the applicant proposes to establish and restore approximately 6,742 linear feet of stream channel at the Lower Right Fork Stover Fork Mitigation Site, which is located southeast of Valley Fill No. 1. The stream restoration activities are proposed along 5,834 linear feet of Stover Fork and unnamed tributaries of Stover Fork. The restoration activities would restore 2,925 linear feet of the main channel of Stover Fork and 2,889 linear feet of tributaries to the Stover Fork. The stream restoration activities would include the removal of the washed-out pond areas and in-stream road crossings as well as the creation of new stream dimensions to provide both pool and riffle habitats as well as to provide access to the floodplain, especially in the lower reach of the main stem. The restoration activities would also include the creation of step-pools, the stabilization of the banks, the removal of non-native vegetation, and the planting of native temporary herbaceous vegetation and permanent woody vegetation to establish a 100-foot riparian buffer, 50-feet from the top of each bank, along each restored stream channel. The stream establishment activities are proposed to establish 906 linear feet of four (5) intermittent channels to allow the re-connection of more than 2,100 linear feet of currently disconnected stream channel back to an unnamed tributary of Stover Fork. These small intermittent streams were disconnected by logging roads in the area. The applicant proposes to use natural stream channel design techniques for the stream establishment and restoration activities, which include the creation of step-pools and in-stream habitat structures, the stabilization of the banks, the removal of non-native vegetation, planting native temporary herbaceous vegetation and permanent woody vegetation to establish a 100-foot riparian buffer, 50-feet from the top of each bank, along each established and restored stream channel. A total of 6,742 linear feet of intermittent channel would be established and restored at the Stover Fork Mitigation Area.

Off-Site Wetland Establishment: To offset the loss of 1.79 acres of two (2) PEM wetlands associated with the construction of Sediment Ponds No. 2 and No. 3, the applicant proposes to establish 4.1 acres of PEM wetlands off-site along the bank of the mainstem of Stover Fork. The wetland establishment activities would occur during the construction season following initiation of the proposed discharges of dredged and/or fill material into waters of the U.S. at the site. The wetlands, which would consist of four (4) separate wetland cells, would be constructed within the floodplain of Stover Fork, a perennial stream. The construction of the cells would include grading the area to create slightly depressed areas to contain the wetland cells. Micro-topography would be incorporated into each cell to create areas of differing elevations to allow for both saturated and inundated conditions. Embankments would be constructed along the northern perimeter of the wetland cells and would be one (1) foot high. Six (6) inches of compacted clay soils would line the wetland cells. The inlet/outlet structures would be constructed within the embankment structures at an elevation of six (6) inches below the top of the embankment along the norther perimeter of each of the cells. The most northern wetland cell would connect to Stover Creek along the northern perimeter of the wetland establishment site. The outlets are designed to discharge from wetland to wetland. When Stover Creek is above normal flow levels, it would overflow into the wetland cells. It is anticipated that the wetlands would have a minimum of six (6) inches of inundation up to one (1) foot of inundation during overflow periods. The wetland planting schematic would be separated into deep water areas and shallow areas. The deep-water areas would be planted with plugs or rhizomes at least two (2) of the following species: pickerelweed (Pontederia cordata), arrowhead (Sagittaria latifolia), bulrush (Scripus validus), and burred (Spaganium eurycarpum). The shallow water areas and saturated areas would be planted with one (1) or more of the following Ernst seed mixes: FACW Wetland Meadow Mix, Seasonally Flooded Wildlife Food Mix, Specialized Wetland Mix for Shaded OBL-FACW Areas, and/or Eastern West Virginia FACW Wetland Mix. The wetland hydrology would be driven by a combination of overflow from Stover Fork, Stream SF1LA, and precipitation. The wetland would be classified as PEM.

All of the mitigation stream channels would be constructed utilizing natural stream channel design techniques, substrate restoration, in-stream habitat structures, bank stabilization, and the establishment of a vegetated riparian buffer zone. Long-term site protection would be provided for all of the mitigation stream channels and wetland. The applicant’s compensatory mitigation plan includes a 10-year monitoring and adaptive management plan, including success performance standards, to assess the success of the mitigation sites using geomorphic, biological, and habitat assessment tools.

WATER QUALITY CERTIFICATION: The applicant must obtain a Section 401 Water Quality Certification (WQC) from the WVDEP assuring that applicable laws and regulations pertaining to water quality are not violated. A DA permit, if otherwise warranted, would not be issued for this project until the Section 401 WQC has been issued or waived and the 401(a)(2) process as described in the “Clean Water Act Section 401 Certification Rule” (Rule, 85 Federal Register 42,210 [July 13, 2020]) has been completed. The applicant has indicated they area in the process of submitting the required Section 401 WQC application to the WVDEP.

HISTORIC AND CULTURAL RESOURCES: The National Register of Historic Places (NRHP) has been consulted and it has been determined there are no properties currently listed on the NRHP that would be indirectly or directly affected by the proposed work. In a letter dated April 17, 2015 to the WVDEP regarding this proposal, the West Virginia Division of Culture and History (WVDCH) indicated that 69 architectural structures older than 50 years old have been identified within a one-mile study area. The WVDCH stated that none of the structures were listed or are eligible for the NRHP. The WVDCH further stated they reviewed an abbreviated technical report prepared by Apogee Environmental & Archeological, Inc., (Apogee) and did not identify any archaeological or cultural resources. The WVDCH concluded the no historic or archaeological resources would be affected by the proposed project and no further consultation would be necessary with their office with respect to historic resources. Apogee also provided information regarding cemetery resources within the project area. The report identified six (6) cemeteries in the project area and one (1) cemetery outside of the project area. The WVDCH determined that the six (6) cemeteries in the project area are no listed on or eligible for the NRHP and that the cemetery located outside of the project area is located too far from the proposes surface mine to be adversely impacted directly or indirectly by the proposed mining activities. The WVDCH concluded no further consultation with their office is necessary regarding these resources. The WVDCH stated no further consultation regarding historic or archaeological resources is required for the proposal. This Public Notice serves as coordination with the WVDCH, pursuant to Section 106 of the National Historic Preservation Act of 1966. No DA permit will be issued until all obligations under Section 106 of the National Historic Preservation Act of 1966 have been fulfilled.

ENDANGERED/THREATENED SPECIES: The proposal lies within the range of the endangered gray bat (Myotis gresescens), the endangered Indiana bat (Myotis sodalis), and the threatened northern long-eared bat (Myotis septentrionalis). The site is located within a known hibernaculum buffer of the Indiana bat; therefore, the applicant prepared a Protection and Enhancement Plan (PEP) for the federally listed Indiana bat and threatened northern long eared bat. The applicant followed the “Range-wide Indiana bat Protection and Enhancement Plan Guidelines for Surface Coal Mining Operations” (Guidelines). The applicant submitted the PEP to the WVDEP for their review and comment in March 2020. The WVDEP stated that the PEP includes non-discretionary Reasonable and Prudent Measures to avoid and minimize impacts in the Indiana bat and the northern long-eared bat. The WVDEP stated winter clearing in the SMCRA permit area must only be conducted between November 15 to March 31. Since the applicant has chosen to adhere to the timber clearing restrictions, the WVDEP determined the PEP fulfills all requirements, including the Guidelines and the 4(d) Rule, necessary to protect threatened and endangered species. This Public Notice serves as coordination with the U.S. Fish and Wildlife Service concerning any information they may have on whether any listed or proposed to be listed endangered or threatened species may be present in the area which would be affected by the activity, pursuant to Section 7(c) of the Endangered Species Act of 1972 (as amended). No DA permit will be issued until the Corps has verified that all obligations under Section 7 of the Endangered Species Act have been fulfilled.

PUBLIC INTEREST REVIEW AND CUMULATIVE EFFECTS: This application will be reviewed in accordance with 33 CFR 320‑332, the Regulatory Program of the Corps, and other pertinent laws, regulations, and executive orders. Our evaluation will also follow guidelines published by the U.S. Environmental Protection Agency pursuant to Section 404(b)(1) of the Clean Water Act (40 CFR 230). The decision whether to issue a permit will be based on an evaluation of the probable impacts, including cumulative impacts, of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits that reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments. All factors that may be relevant to the proposal will be considered including the cumulative effects thereof; of those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership and, in general, the needs and welfare of the people.

SOLICITATION OF COMMENTS: The Corps is soliciting comments from the public, federal, state, and local agencies and officials, Indian Tribes, and other interested parties in order to consider and evaluate the impacts of this proposed activity. For accuracy and completeness of the administrative record, all data in support of or in opposition to the proposed work should be submitted in writing setting forth sufficient detail to furnish a clear understanding of the reasons for support or opposition. Any person may request, in writing, within the comment period specified in the notice, that a public hearing be held to consider the application. Requests for public hearings shall state, with particularity, the reasons for holding a public hearing. Any comments received will be considered by the Corps to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. Written statements on these factors received in this office on or before the expiration date of this Public Notice will become a part of the record and will be considered in the final determination. A permit will be granted unless its issuance is found to be contrary to the public interest.

CLOSE OF COMMENT PERIOD: Comments and should be submitted electronically to Kimberly Courts-Brown by email at Kimberly.d.courtsbrown@usace.army.mil. If you do not have internet access, comments may be submitted through the U.S. Postal Service (USPS) to the following address:

U. S. Army Corps of Engineers

ATTN: CELRH-RD-E Public Notice: LRH-2020-631-BCR

502 Eighth Street

Huntington, West Virginia 25701-2070

Copies should only be provided through the USPS when electronic submission is not possible. Precautionary internal mail handling procedures may be instituted to protect our workforce, which may result in longer than normal times to process and receive hard copy submissions. To be considered in our evaluation, comments submitted through the USPS should have a postmark date on, or prior to, the close of the comment period listed on page one (1) of this Public Notice. Please note, the names and addresses of those who submit comments in response to this Public Notice become part of our administrative record and, as such, may be available to the pubic under provisions of the Freedom of Information Act. If you have any questions concerning this Public Notice, please contact Kimberly Courts-Brown of the Energy Resource Branch at (304) 399-6906.

Table 1 – Proposed Discharges of Dredged and/or Fill Material

Turkeyfoot Surface Mine (S-3014-19)

LRH-2020-631-BCR

Mining Activity

Name of Water of U.S.

Flow Regime

Length/Acreage

Volume of Discharge

Duration of Impact

Valley Fill No. 1

UNT McGraws Fork (MC-A)

Intermittent

657 lf

0.09 acre

90.3 cy

Permanent

Valley Fill No.1

UNT McGraws Fork (MC-B)

Intermittent

667 lf

0.09 acre

49.4 cy

Permanent

Valley Fill No. 1

UNT McGraws Fork (MC-C)

Intermittent

467 lf

0.03 acre

21.6 cy

Permanent

Valley Fill No. 1

McGraws Fork

(MC-D)

Intermittent

1,618 lf

0.38 acre

300 cy

Permanent

Valley Fill No. 1

UNT McGraws Fork

(MC-E)

Intermittent

300 lf

0.02 acre

32.1 cy

Permanent

Valley Fill No. 1

UNT McGraws Fork (MC-F)

Intermittent

100 lf

0.005 acre

5.9 cy

Permanent

Sediment Pond No. 1B

UNT Workman Branch (below existing NPDES Outlet 002)

Intermittent

209 lf

0.04 acre

61.3 cy

Temporary

Permanent Impacts

Temporary Impacts

3,809 lf (0.62 acre)

209 lf (0.04)

499 cy

61.3 cy

Valley Fill No. 2

UNT Stover Fork (SFR6L1R1R)

Intermittent

240 lf

0.23 acre

71.1 cy

Permanent

Valley Fill No. 2

UNT Stover Fork

(SF8R6L1R)

Intermittent

1,072 lf

0.11 acre

254 cy

Permanent

Valley Fill No. 2

Stover Fork

(SF8R6L)

Intermittent

328 lf

0.003 acre

164 cy

Permanent

Valley Fill No. 2

Stover Fork

(SR6L1R1L)

Ephemeral

460 lf

0.05 acre

85 cy

Permanent

Sediment Pond No. 2

UNT Stover Fork

(SF8R5L)

Intermittent

103 lf

0.02 acre

8.0 cy

Temporary

Sediment Pond No. 2

Stover Fork

(SF8R6L)

Intermittent

272 lf

0.03 acre

151.1 cy

Temporary

Sediment Pond No. 2

UNT Stover Fork

(SF8R)

Intermittent

470 lf

0.097 acre

297 cy

Temporary

Sediment Pond No. 2

WL-SF3

PEM

0.27 acres

400 cy

Temporary

IUAR #2

UNT Stover Fork

(SF8R3L)

Intermittent

119 lf

0.015 acre

44.4 cy

2-36” culverts

Temporary

Permanent Impacts

Temporary Impacts

2,100 lf (0.39 acre)

964 lf (0.16 acre)

0.27 acre wetland

489 cy

901 cy

Valley Fill No. 3

Right Fork Workman Creek

(WC-1)

Perennial

3,660 lf

0.38 acre

371 cy

Permanent

Valley Fill No. 3

UNT Right Fork Workman Creek

(WC-1.1)

Intermittent

322 lf

0.03 acre

34.2 cy

Permanent

Valley Fill No. 3

UNT Right Fork Workman Creek

(WC-1.5)

Intermittent

423 lf

0.01 acre

0.78 cy

Permanent

Valley Fill No. 3

UNT Right Fork Workman Creek

(WC-1.4)

Intermittent

235 lf

0.01 acre

6.39 cy

Permanent

Valley Fill No. 3

UNT Right Fork Workman Creek

(WC-1.2)

Intermittent

560 lf

0.05 acre

51 cy

Permanent

Valley Fill No. 3

UNT Right Fork Workman Creek

(WC 1.4.1)

Ephemeral

570 lf

0.05 acre

14 cy

Permanent

Valley Fill No. 3

UNT Right Fork Workman Creek

(WC 1.2)

Ephemeral

337 lf

0.018 acre

13 cy

Permanent

Sediment Pond No. 3

Wetland 1

PEM

1.52 acres

Removal by excavation

Permanent

Mine-Through

UNT Right Fork Workman Creek

(WC-30L)

Ephemeral

100 lf

0.004 acre

Permanent

Sediment Pond No. 3

Right Fork Workman Creek

(WC-1)

Perennial

605 lf

0.06 acre

38.6 cy

Temporary

Sediment Pond No. 3

UNT Right Fork Workman Creek

(WC-2)

Intermittent

360 lf

0.03 acre

18.47 cy

Temporary

IUAR #3

UNT Right Fork Workman Creek

(WC-3)

Intermittent

70 lf

0.003 acre

1.79 cy

1-36” CMP

Temporary

IUAR #3

(crossing 2)

UNT Right Fork Workman Creek

(WC-4)

Intermittent

70 lf

0.004 acre

3.11 cy

1-36” CMP

Temporary

Permanent Impacts

Temporary Impacts

6,494 lf (0.82 acre)

1.52 acres wetland

1,105 lf (0.10 acre)

463 cy

44 cy

62 cy

Valley Fill No. 4

Wingrove Branch

(WC-1)

Intermittent

1,680 lf

0.06 acre

29.87 cy

Permanent

Valley Fill No. 4

UNT Wingrove Branch

(W-3.1)

Intermittent

605 lf

0.017 acre

8.4 cy

Permanent

Valley Fill No. 4

UNT Wingrove Branch

(W-4)

Intermittent

887 lf

0.06 acre

13.18 cy

Permanent

Valley Fill No. 4

UNT Wingrove Branch

(W-5)

Intermittent

400 lf

0.037 acre

2.96 cy

Permanent

Valley Fill No.4

UNT Wingrove Branch

(W-5.1)

Intermittent

225 lf

0.013 acre

8.5 cy

Permanent

Valley Fill No. 4

UNT Wingrove Branch

(W-5)

Ephemeral

152 lf

0.003 acre

3.0 cy

Permanent

Valley Fill No. 4

UNT Wingrove Branch

(W-5.1)

Ephemeral

30 lf

0.001 acre

1.0 cy

Permanent

Sediment Pond No. 4

UNT Wingrove Branch

(W-6)

Intermittent

185 lf

0.01 acre

4.79 cy

Temporary

Sediment Pond No. 4

UNT Wingrove Branch

(W-7)

Intermittent

237 lf

0.007 acre

6.58 cy

Temporary

Sediment Pond No. 4

UNT Wingrove Branch

(W-3)

Intermittent

894 lf

0.053 acre

20.4 cy

Temporary

IUAR #4

UNT Wingrove Branch

(W-3)

Intermittent

240 lf

0.039 acre

43.56 cy

9-48” CMP

Temporary

2 Drive-through

Crossings

Wingrove Branch

(WC-1)

Perennial

140 lf

0.03 acre

96.8 cy

Temporary

Permanent Impacts

Temporary Impacts

3,979 lf (0.19 acre)

1,696 lf (0.14 acre)

63 cy

172 cy

Total Permanent Perennial Discharges

Total Permanent Intermittent Discharges

Total Permanent Ephemeral Discharges

Total Permanent Wetland Discharges

3,660 lf

(0.38 acre)

10,786 lf

(1.52 acres)

1,937 lf

(0.14 acre)

1.52 acres wetland

371 cy

1,514 cy

Total Temporary Perennial Discharges

Total Temporary Intermittent Discharges

Total Temporary Wetland Discharges

140 lf

(0.03 acre)

3,834 lf

(0.38 acre)

0.27 acre wetland

367 cy

418 cy

Total Discharges of Dredged and/or Fill Material into Waters of the U.S.

20,356 lf

(2.01 acres)

1.79 acres wetland

2,834.38 cy

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas