Home

Nashville District

Run scraper

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

Southern Marine Construction Company is installing an outfall line on Tennessee River Mile 94.0 Right Descending Bank

Beginning May 2,2022, Southern Marine Construction Co. will begin installing an outfall line for Hood Container Corporationat Tennessee River Mile 94.0 right descending bank. Maintenance operations will take placeMonday through Friday during daylight hours, with a completion date of Sept. 30, 2022.A195 x 35 ft. crane barge, a 195 x 35 ft. deck barge, and the M/V Low Bid Wonwill be moored onsite during non-working hours. Marine Channel 13 will be monitored throughout the project.

POC:Peter Serodino, Jr. (423)266-1855 Steve Hawthorne (423)802-0597 David Serodino (423)443-8252

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas