Home

Tulsa District

Run scraper

SWT-2021-00201

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The proposed Quail Creek Drainage Improvements Project consists of five components: Quail Creek channel, Kemp Boulevard to Maplewood Avenue culvert, Midwestern Parkway culvert enhancement, North Quail Creek channel, and Gladney channel. A project location map is provided in Figure 1. A plan view and cross section exhibit depicting the proposed improvements is provided in Figure 2. A waterbody impacts map is provided in Figure 3.

The basic purpose of this work is flood reduction. There are no special aquatic sites on the project. A water dependency determination is not necessary since no special aquatic sites are located within the project site.

The overall project purpose is to reduce the flooding of residences, businesses, and public infrastructure by increasing the efficiency of the stormwater conveyance system located between Kemp Boulevard and Midwestern Parkway in Wichita Falls, Texas.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas