You can copy from here when filling out the rest of the page.
In compliance with U.S.C. Title 33, Chapter 9, Subchapter 1, Section 408, the Public Service Company of Oklahoma (PSO) (requester) has requested permission from the U.S. Army Corps of Engineers (USACE) to install an overhead fiber optic line crossing the Verdigris River.
PSO is proposing to install an overhead fiber optic line crossing the Verdigris River. The new line will be installed on the existing power poles on both sides of the river and will not require any new land disturbance. PSO will utilize their existing easement for this request and construction will take approximately one day to accomplish.