Navigation Notice LRN 22-17: Kentucky Lock closure for miter and guard wall repair

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

Kentucky Lock will experience a series of intermittent closures from 13 June through 30 June 2022. The closures will occur daily from 0600-1800 hours.

Kentucky Lock will experience a series of intermittent closures from 13 June through 30 June 2022. The closures will occur daily from 0600-1800 hours.

During the closures, crews willpaintthe upstream miter gates from repairsearlier thisyear. Crews will also be making repairs the armor plating on the upstream guard wall. These repairs will require the lock closurefor the duration of time the crews are performing repairs. The lock willreopeneach evening to relieve the lock queue.

POC: Wayne Chapman USACE, Kentucky Lock 270-362-4226

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas