AFTER-THE-FACT LANDFILL EXPANSION IN ST. CHARLES PARISH.
NAME OF APPLICANT: KV Enterprises, LLC, c/o Professional Engineering & Environmental Consultants, Inc., Attention: Mo Saleh, 1065 Muller Parkway, Suite B, Westwego, Louisiana 70094.
LOCATION OF WORK: Located at 5900 LA Highway 3127, in Killona, Louisiana, in St. Charles Parish, as shown on the attached drawings.
POB: Latitude: 30.00584 Longitude: -90.51464
Hydrologic Unit Codes: 08090301, East Central Louisiana Coastal
The work described below was partially completed prior to obtaining a Department of the Army permit and was in violation of Section 301 of the Clean Water Act. All legal issues concerning the unauthorized work have since been deferred.
CHARACTER OF WORK: Clear, grade, excavate and fill for the expansion of the existing Killona landfill; to include the installation of two (2) culverts. The project as proposed would directly impact approximately 32.9 acres of jurisdictional wetlands; of which approximately 8.31 acres had been cleared prior. The applicant proposed to contract with an approved mitigation bank to offset the adverse impact to jurisdictional wetlands.
The applicant may be required to restore the site fully or partially to pre-project conditions if issuance of a permit is determined to be contrary to the public interest.