Home

Nashville District

Run scraper

Beginning Monday

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

Beginning Monday, June 13 through Wednesday June 15, Tennessee River mile 411 will completely shut down during daylight hours only.

TN River is shutdown at river mile 411 while TVA resumes operations on Monday, June 13, 2022 to replace the transmission line after the old one was cut. Beginning Monday, June 13 through Wednesday June 15, the river will completely shut down during daylight hours only. Three boats will occupy the water to warn boaters to keep out; two boats will have will have white/yellow flashing lights, TVA Police will operate the third boat with blue lights.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas