Home

New Orleans District

Run scraper

PROPOSED 4.5” OIL PIPELINE INSTALLATION

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

PROPOSED 4.5” OIL PIPELINE INSTALLATION, GULF OF MEXICO OCS, EWING BANK BLOCK 305 – WEST DELTA BLOCK 138, TRAVERSING A SAFETY FAIRWAY AT GRAND ISLE BLOCKS 80 & 81

NAME OF APPLICANT: TALOS ENERGY OFFSHORE, LLC, 333 Clay Street, Suite 3300, Houston, Texas 77002

LOCATION OF WORK: Gulf of Mexico, Outer Continental Shelf, from Ewing Bank Block 305 to West Delta Block 138, located approximately 34 nautical miles south of Port Fourchon, Louisiana, (POB = 28.665763, -89.969450, POE = 28.687408, -89.777706), off the coast of Lafourche Parish, Louisiana, as shown on the enclosed drawings.

CHARACTER OF WORK: The applicant has requested Department of the Army authorization to install and maintain approximately 64,717 feet of 4.5” oil pipeline, to transport oil originating at Ewing Bank Block 305, Platform A and terminating at a Subsea Tie-In Point, West Delta Block 138. The proposed pipeline will traverse a safety fairway through the offshore block of Grand Isle Blocks 80 and 81. The pipeline will transport oil approximately 12.26 miles where the pipeline will tie into Crescent GIGS, LLC’s, 8-inch diameter oil pipeline via a 4-inch subsea tie-in assembly. The entire subsea connection assembly will be buried a minimum of 3-feet and covered with sandbags. Talos will hydrostatically test the entire assemble to 1800 psi for a minimum of 8 hours. No special aquatic sites will be affected by this project and no mitigation is anticipated.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas