The applicant proposes to permanently discharge approximately 2

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The applicant proposes to permanently discharge approximately 2,292-cubic-yards of fill material.

Public Notice Project Plans Alternative Analysis Mitigation Plan

The applicant proposes to permanently discharge approximately 2,292-cubic-yards of fill material into approximately 1.46-acres of aquatic resources, including approximately 0.083-acre of palustrine emergent wetlands (PEM), 0.28-acre of palustrine scrub shrub wetlands (PSS), 0.34-acre of palustrine forested wetlands (PFO), 299-linear-feet (0.05-acre) of ephemeral streams, 334-linear-feet (0.04-acre) of intermittent streams, and 75-linear-feet (<0.01-acre) of perennial streams, throughout 9 independent single, and complete crossings associated with the widening of approximately 4.5-miles of State Highway (SH) 105. Such activities include widening the project corridor to a four-lane facility with two 12-foot-wide travel lanes in each direction, a 16-foot-wide continuous two-way turn lane, a 6-foot-wide sidewalk along the north and south sides of SH 105, and a 15-foot outside shared use lane with bicycle accommodations provided along the north and south sides of SH 105. Temporary impacts would occur to approximately 125-linear-feet of streams (<0.03-acre) associated with existing bridge column removal.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas