Home

Galveston District

Run scraper

SWG-2020-00266 - Entergy Services LLC

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The applicant proposes to permanently discharge approximately 20,848 cubic yards of dredged or fill material.

Public Notice Project Plans Alternatives Analysis Mitigation Plan

The applicant proposes to permanently discharge approximately 20,848 cubic yards of dredged or fill material into 1.81 acres of wetlands and 0.002 acre of other waters and temporarily discharge dredged or fill material into 0.95 acres of wetlands and 0.002 acre of other waters for the purpose of constructing the Orange County Advanced Power Station. This project includes construction of a power generating facility, administrative building, transmission line, substation and switchyard modifications, re-routing existing transmission line infrastructure, development of a new outfall ditch and outfall structure, constructing/improving new and existing access road(s), and construction of laydown areas. This project intends to utilize an existing boat ramp and barge dock.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas