This Public Notice is being issued to extend the comment period for a previous Public Notice (NAP-2017-00135-84) in response to a request citing the unprecedented scope of this application. The revised comment period will close 60 days from the date of the original public notice

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

This Public Notice is being issued to extend the comment period for a previous Public Notice (NAP-2017-00135-84) in response to a request citing the unprecedented scope of this application. The revised comment period will close 60 days from the date of the original public notice, terminating on August 16, 2022. The applicant, Ocean Wind LLC, proposes to install and maintain an offshore wind energy facility and the required supporting infrastructure. The project includes up to 98 wind turbine generators (WTGs), up to three offshore alternating current (AC) substations, array cables linking the individual turbines to the offshore substation(s), one substation interconnector cable linking two offshore substations to each other, offshore export cables, an onshore export cable system which includes underground cables, two onshore substations, and connections to the existing electrical grid in New Jersey. Public comments are requested by Aug. 16, 2022.

This Public Notice is being issued to extend the comment period for a previous Public Notice (NAP-2017-00135-84) in response to a request citing the unprecedented scope of this application. The revised comment period will close 60 days from the date of the original public notice, terminating on August 16, 2022. The applicant, Ocean Wind LLC, proposes to install and maintain an offshore wind energy facility and the required supporting infrastructure. The project includes up to 98 wind turbine generators (WTGs), up to three offshore alternating current (AC) substations, array cables linking the individual turbines to the offshore substation(s), one substation interconnector cable linking two offshore substations to each other, offshore export cables, an onshore export cable system which includes underground cables, two onshore substations, and connections to the existing electrical grid in New Jersey. Public comments are requested by Aug. 16, 2022.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice