You can copy from here when filling out the rest of the page.
MILL CREEK MITIGATION BANK IN EAST FELICIANA PARISH
NAME OF APPLICANT: Dennis Aucoin, c/o: Trinity Mitigation Services, LLC, 215 West Beach Parkway, Mandeville, Louisiana 70448.
LOCATION OF WORK: Located in East Feliciana Parish, along the Comite River, approximately 5 miles south-southwest of Clinton, Louisiana, (Latitude: 30.79519, Longitude: -91.03181), as shown within the enclosed drawings. (Hydrologic Unit Code 08070202, Amite River Watershed)
CHARACTER OF WORK: Within the proposed 928.2-acre wetland mitigation bank, approximately 623.3 acres of bottomland hardwood forest would be reestablished, rehabilitated, enhanced, and preserved. The site is currently comprised of planted pines, agricultural pastures, scrub/shrub habitat, and existing bottomland hardwood forest. The proposed restoration activities include removal of a beaver dam, harvesting of pine species (with stumps left intact), and restoration of vegetative through the planting of native hardwood seedlings.