Home

New Orleans District

Run scraper

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

MILL CREEK MITIGATION BANK IN EAST FELICIANA PARISH

NAME OF APPLICANT: Dennis Aucoin, c/o: Trinity Mitigation Services, LLC, 215 West Beach Parkway, Mandeville, Louisiana 70448.

LOCATION OF WORK: Located in East Feliciana Parish, along the Comite River, approximately 5 miles south-southwest of Clinton, Louisiana, (Latitude: 30.79519, Longitude: -91.03181), as shown within the enclosed drawings. (Hydrologic Unit Code 08070202, Amite River Watershed)

CHARACTER OF WORK: Within the proposed 928.2-acre wetland mitigation bank, approximately 623.3 acres of bottomland hardwood forest would be reestablished, rehabilitated, enhanced, and preserved. The site is currently comprised of planted pines, agricultural pastures, scrub/shrub habitat, and existing bottomland hardwood forest. The proposed restoration activities include removal of a beaver dam, harvesting of pine species (with stumps left intact), and restoration of vegetative through the planting of native hardwood seedlings.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas