Home

New York District

Run scraper

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The Port Authority of New York and New Jersey has requested Department of the Army authorization to perform regulated construction work in waters of the United States to facilitate the installation of new fairlead structures at the Bayonne Dry Dock.

The Port Authority of New York and New Jerseyhas requested Department of the Army authorization to perform regulated construction work in waters of the United States to facilitate the installation of new fairlead structures at the Bayonne Dry Dock.

APPLICANT: Port Authority of New York and New Jersey 4 World Trade Center 150 Greenwich Street, 20th Floor New York, New York 10007

ACTIVITY: Installation of new fairlead structures

WATERWAY: Upper Bay, a tributary of New York Harbor

LOCATION: Bayonne Dry Dock, City of Bayonne, Hudson County, New Jersey

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas