The applicant proposes to permanently discharge fill.

Public Notice Project Plans Alternatives Analysis

The applicant proposes to permanently discharge fill into 6.81 acres of palustrine forested (PFO) wetlands and 9.19 acre of palustrine emergent (PEM) wetlands, permanently convert 1.93 acres of PFO wetlands to PEM or palustrine scrub shrub (PSS) wetlands, and temporarily discharge fill into 3.94 acres of PEM wetlands to construct new 138 kV and 345 kV substations. Construction of the substations will also include attendant infrastructure consisting of two stormwater detention ponds and outfalls, and high voltage transmission interconnect lines supported by bi-level concrete poles, double circuit steel poles, and lattice towers. The bi-level concrete poles, double circuit steel poles, and lattice towers will have bases constructed of poured concrete, and these discharge impacts have been incorporated into the totals above.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas