You can copy from here when filling out the rest of the page.
PROPOSED MIXED-USE DEVELOPMENT IN LIVINGSTON PARISH
NAME OF APPLICANT: Tower Capital c/o Mike Henry of Hydrik, 2323 Highway 190 E, STE 2, Hammond, LA 70401
LOCATION OF WORK: On and south of Buddy Ellis Road, east of Juban Road, in Section 9, Township 7 South, Range 3 East, in Denham Springs, Louisiana, in Livingston Parish, within the Pontchartrain Basin in hydrologic unit (HUC 08070202), as shown on the attached drawings (Latitude 30.456972 N, Longitude -90.907897 W).
CHARACTER OF WORK: The applicant has requested Department of the Army authorization to clear, grade, excavate and deposit fill and/or aggregate material to construct and maintain a mixed-use development (Foxtail Run) to include a commercial business and parking lot, 62 homesites, roads, utilities, and drainage infrastructure. Approximately 45,443 cubic yards of earthen fill material would be excavated for a pond and redistributed to achieve required grade elevation requirements. The proposed project is situated on an approximately 17-acre tract and would impact approximately 4.4 acres of forested wetlands and approx. 0.13 acre of jurisdictional non-wetland waters of the US.
The applicant proposes to minimize secondary impacts to the maximum extent practicable by limiting the construction activity to the designated construction areas onsite, disposing of all removed fill and vegetation not approved as fill material to an off-site, non-jurisdictional location, and utilizing best management practices for erosion and siltation control during and after the construction phase of the project. If authorized, the project will receive approval from all appropriate local drainage authorities and sewerage agencies. As compensation for unavoidable wetland impacts, the applicant proposes to mitigate in-kind wetland credits from a Corps approved mitigation bank located in the watershed.