Home

Nashville District

Run scraper

Beginning on September 12 – 14

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

Beginning on September 12 – 14, 2022 the Cumberland River will be closed to all navigation traffic.

Beginning on September 12 – 14, 2022 the Cumberland River willcloseto all navigation traffic. American Barge company will placethe channel span truss of the new US HWY 60 (Smithland) bridge. This work will begin on September 12, 2022 at 05:30 amthrough September 14, 2022 at10pm. The contractor’s equipment will be moored on site within the navigation channel during this time frame.

POC: Scott Swamback 914-497-8831

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas