PROPOSED WELL PAD REMOVAL, RELOCATION OF PROPOSED LEACHING PLANT AND AN ADDITIONAL ACCESS ROAD TO DRILL AND OPERATE NEW BRINE FACILITIES AT THE GRAND BAYOU SALT DOME FACILITY IN ASSUMPTION PARISH
PROPOSED WELL PAD REMOVAL, RELOCATION OF PROPOSED LEACHING PLANT AND AN ADDITIONAL ACCESS ROAD TO DRILL AND OPERATE NEW BRINE FACILITIES AT THE GRAND BAYOU SALT DOME FACILITY IN ASSUMPTION PARISH
NAME OF APPLICANT: EnLink Processing Services, LLC, c/o GEOSYNTECConsultants, Attn: Mr. Spencer Varnado, 5420 Corporate Blvd., Suite 202, Baton Rouge,Louisiana 70808.
LOCATION OF WORK: In Assumption Parish, North 30.015097, West -91.136514,approximately 0.1 mile south of the intersection of Louisiana Highway 69 & 70, near GrandBayou, Louisiana, in hydrologic unit (HUC 08090302, West Central Louisiana Coastal), asshown on the attached drawings.
CHARACTER OF WORK: The applicant has requested a Department of the Armyauthorization to conduct modifications on a previously authorized brine facility. Themodifications will entail the removal of Well #4 from the project, relocation of the proposedleaching plant, add a new permanent access road to connect to Louisiana Highway 70,add a new saltwater disposal well (SWD), and construct an approximately 0.25-milepipeline to connect to the SWD well. The work will also include the deposition ofapproximately 41,000 cubic yards of sand material and approximately 8,220 cubic yards ofcrushed stone.
A preliminary analysis of these proposed modifications will result in a decrease inpermanent impacts from the previously authorized 6.18 acres to a new permanent impactof approximately 5.76 acres.
MITIGATION: The applicant states that the proposed project has been designed to avoidand minimize direct and secondary adverse impacts to the maximum extent practicable.Any further reduction in the project footprint would limit usage of the property and,therefore function deeming the project impracticable. The permit modification has reducedthe onsite permanent impacts by 0.42 of an acre, from what was originally mitigated for,therefore, no additional mitigation will be required for the proposed work.