CLEAR, GRADE, EXCAVATE, AND DEPOSIT FILL TO CONSTRUCT A REGIONAL DISTRIBTUION FACILITY AND ASSOCIATED FEATURES IN SAINT TAMMANY PARISH

NAME OF APPLICANT: Crosby Development Company, LLC, c/o J.V. Burkes & Associates, Inc., 1805 Shortcut Highway, Slidell, Louisiana 70458.

LOCATION OF WORK: Project site consist of two parcels, an approximate 111.5 acre parcel north of I-12 and a 44.4 acre parcel located south of I-12, Near Covington, Louisiana, in Saint Tammany Parish, as shown on the attached drawings.

Hydrologic Unit Code: 08090201: Liberty Bayou – Tchefuncte River Latitude: 30.399228 Longitude: -90.010603

CHARACTER OF WORK: Clear, grade, excavate, and fill to construct a regional distribution facility and associated features. The project would include parking areas, loadings zones, access roads, associated utilities, and drainage infrastructure. The project as proposed would directly impact approximately 89.2 acres of jurisdictional wetlands and an additional 35.2 acres of jurisdictional wetlands are to be converted to a wetland buffer and detention area. The applicant has proposed to compensate for any unavoidable impacts to jurisdictional wetlands by utilizing a Corps approved mitigation bank within the watershed.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas