Home

St. Paul District

Run scraper

Roseau River Flood Control

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

PUBLIC NOTICE: APPLICATION FOR PERMIT TO permanently discharge fill in 221.55 acres of wetlands and temporarily discharge fill in 114.37 acres of wetlands adjacent to the Roseau River. This project is designed as a flood control project to direct water flow from the Roseau River into the Roseau Lake basin where it will be held and used as a detention site for flood waters and for low flow augmentation during extremely dry years.

PROJECT DESCRIPTION AND PURPOSE:APPLICATION FOR PERMIT TO permanently discharge fill in 221.55 acres of wetlands and temporarily discharge fill in 114.37 acres of wetlands adjacent to the Roseau River. This project is designed as a flood control project to direct water flow from the Roseau River into the Roseau Lake basin where it will be held and used as a detention site for flood waters and for low flow augmentation during extremely dry years.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas