Home

Tulsa District

Run scraper

In compliance with U.S.C. Title 33

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

In compliance with U.S.C. Title 33, Chapter 9, Subchapter 1, Section 408, Pointe Vista Development, LLC (Requester) has requested permission from the U.S. Army Corps of Engineers (USACE) for the construction of a municipal water intake structure, raw water transmission line, and municipal water treatment plant at Lake Texoma, Oklahoma.

The Pointe Vista Development is planning to construct a surface water treatment plant to provide potable water to the development and potentially to nearby developments. The surface water treatment plant will be comprised of an intake structure located at Lake Texoma, a water treatment plant, and a raw water transmission line to transport the water from the intake structure to the water treatment plant. The system will be located on the west side of Lake Texoma and south of Highway 70. The intake structure, water treatment plant, and raw water transmission line will be sized for an initial capacity of approximately 4.2 million gallons per day (MGD) of potable water and a full build out capacity of approximately 8.4 MGD of potable water. The system components will all be designed and constructed to meet the design requirements of the Oklahoma Department of Environmental Quality (ODEQ) for a potable water system.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas