Please address all comments to: Nashville District Corps of Engineers Regulatory Division (Attn: Aric Payne) 501 Adesa Parkway, Suite 250 Lenoir City, Tennessee 37771, Telephone (423) 394-5102 aric.j.payne@usace.army.mil

SUBJECT: Proposed Riverton Residential Development, Chattanooga, Hamilton County, Tennessee

TO ALL CONCERNED: The application described below has been submitted for a Department of the Army (DA) Permit pursuant to Section 404 of the Clean Water Act (CWA) (33 U.S.C. § 1344). The proposed project also requires Tennessee Valley Authority (TVA) approval under Section 26a of the Tennessee Valley Authority Act. The Applicant received a Section 401 Water Quality Certification (NRS21.230) from the State of Tennessee, Department of Environment and Conservation (TDEC), Division of Water Resources, dated September 29, 2022, pursuant to 40 CFR Part 121 of the CWA (33 U.S.C. § 1251).

APPLICANT: Dane Bradshaw Riverton Development, LLC P.O. Box 4737 Chattanooga, Tennessee 37405

LEAD FEDERAL AGENCY: The U.S. Army Corps of Engineers (USACE) and TVA have a Memorandum of Understanding that designates TVA as the lead Federal Agency for conducting environmental reviews under the National Environmental Policy Act (NEPA) and other applicable federal laws and regulations (e.g., the National Historic Preservation Act (NHPA) and the Endangered Species Act (ESA)) for proposed work that may occur on property which is under TVA jurisdiction or control.

LOCATION: The proposed project is located within the boundaries of Parcel Number 118K A 046, near 1100 Lupton Drive, and between Tennessee River Miles 468.6 and 469.4, Chattanooga, Hamilton County, Tennessee; HUC 12 060200011202 – Upper Nickajack Lake – Tennessee River; Latitude N. 35.102156°, Longitude W. -85.267979°.

DESCRIPTION OF PROPOSED WORK: The Applicant proposes to construct a planned residential community that would include 236 single-family homesites, 38 townhomes, 30 live/work units, and amenities such as community trails, pool, and a 21,617 square foot commercial space in the Village Center on a 154.96 acre project site. The Village Center would include a fitness center, retail opportunities within the live/work units, designated space for a restaurant, and green space with an open-air pavilion and stage for community gatherings. The proposed project would include permanent impacts to 376 linear feet (0.03 acre) of stream and 0.50 acre of wetlands for grading and construction activities, and 75 linear feet of the Tennessee River for bank stabilization.

Plans and location maps of the proposed project are provided in this notice. If you wish to view additional plans, please contact this office or visit our web site at: http://www.lrn.usace.army.mil/Media/PublicNotices.aspx

PURPOSE AND NEED: The Applicant has stated that the purpose of the proposed project is to construct a master-planned, mixed-use residential community along the Tennessee River, in proximity to downtown Chattanooga. The project is needed to accommodate the continued population growth in Hamilton County. The proposed project would provide 236 single-family homesites, 38 townhomes, 30 live/work units, and amenities such as community trails, pool, and a 21,617 square foot commercial space in the Village Center.

AVOIDANCE AND MINIMIZATION OF IMPACTS TO WATERS OF THE U.S.: Based on information provided in the project application, efforts were made during the planning and design phases of this project to avoid impacts to waters of the U.S. to the extent practicable, and to minimize impacts that were not avoidable. The Applicant has redesigned the project from the original application to avoid impacts to approximately 7,066 linear feet of streams and 0.95 acre of wetlands within the project site, through spanned bridge crossings, and avoidance of jurisdictional features during construction activities.

COMPENSATORY MITIGATION: The proposed project would result in the unavoidable impacts to 376 linear feet of streams and 0.5 acre of wetlands. The Applicant has proposed to mitigate unavoidable impacts to 376 linear feet of streams through the purchase of 150.4 Stream Quantification Tool (SQT) credits (120.3 x 1.25 one HUC away multiplier) from the Smokey Run Mitigation Bank.The Applicant has proposed to mitigate unavoidable impacts to 0.5 acre of wetlands through the purchase of 1 wetland mitigation credit at a 2:1 ratio from the Sequatchie Valley Wetland Mitigation Bank.

PUBLIC INTEREST REVIEW/CUMULATIVE EFFECTS: The decision whether to issue a DA permit will be based on an evaluation of the probable impacts including cumulative impacts of the activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production,mineral needs, considerations of property ownership and, in general, the needs and welfare of the people. In addition, the evaluation of the impact of the activity on the public interest will include application of the guidelines promulgated by the Administrator, Environmental Protection Agency, under authority of Section 404(b)(1) of the CWA (40 CFR Part 230).

SOLICITATION OF COMMENTS: The United States Army Corps of Engineers (USACE) is soliciting comments from the public; federal, state, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the USACE to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historical properties, water quality, and general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment (EA) and/or an Environmental Impact Statement (EIS) pursuant to NEPA. Comments are also used to determine the need for a public hearing and determine the overall public interest of the proposed activity. An EA will be prepared by this office prior to a final decision concerning issuance or denial of the requested DA Permit.

HISTORIC AND CULTURAL RESOURCES: As lead federal agency, TVA will review the proposal for compliance with Section 106 of the NHPA. This Public Notice also serves to initiate public involvement requirements of Section 106 of the National Historic Preservation Act of 1996, as amended. Copies of this notice are being sent to the office of the State Historic Preservation Office (SHPO).

ENDANGERED/THREATENED SPECIES REVIEW: The Endangered Species Act (ESA) requires federal agencies to consult with the U.S. Fish and Wildlife Service (USFWS) pursuant to Section 7 of ESA on all actions that may affect a species listed (or proposed for listing) under the ESA as threatened or endangered or any designated critical habitat. As lead federal agency, TVA will review the proposal for compliance with Section 7 of the ESA. A review of USFWS’s Information for Planning and Conservation (IPaC) website (http://ecos.fws.gov/ipac/) identified the following 13 federally-listed Threatened (T) and/or Endangered (E) species that may occur or could potentially be affected by the activities in this location:

OTHER APPROVALS: In addition to the DA permit, other federal, state, and/or local approvals may be required for the proposed work, including: 1.A Section 401 Water Quality Certification was approved by TDEC on September 29, 2022, pursuant to 40 CFR Part 121 of the CWA (33 U.S.C. § 1251). 2.TVA approval is required under Section 26a of the TVA Act for the proposed work and will be processed separately. 3.Other federal, state, and/or local approvals that may be required for the proposed work.

PUBLIC HEARING REQUESTS: Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider this application. Requests for public hearings shall state, with particularity, the reasons for holding a hearing.

COMMENT PERIOD: Written statements received by February 9, 2023, will become a part of the record and considered in the determination. Any response to this notice should reference the Corps Application No. LRN-2017-01076, and be directed to the Regulatory Division, Attention: Aric Payne, at the above address or at aric.j.payne@usace.army.mil.

/s/ Casey Ehorn Deputy Chief, Regulatory Division Nashville District

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas