In compliance with U.S.C. Title 33, Chapter 9, Subchapter 1, Section 408, the Oklahoma Municipal Power Authority (OMPA) has requested permission from the U.S. Army Corps of Engineers (USACE) for the modification of the Sluice Bulkhead Equalization method on the bulkhead gate at Kaw Lake.

OMPA is proposing to replace a small slide gate on the existing sluice bulkhead gate at Kaw Lake. The 1'x1' slide gate on the upstream side of the bulkhead gate will be replaced with a 6" stainless steel quarter-turn ball valve. The existing slide gate tends to close on its own during operation and must be held open until pressure equalization is reached, the modification will not require to be held in the open position to function properly. This modification will improve the pressure equalization process.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas