You can copy from here when filling out the rest of the page.
UNIVERSITY LAKES AQUATIC RESTORATION AND FLOOD RISK REDUCTION PROJECT NEAR BATON ROUGE IN EAST BATON ROUGE PARISH
UNIVERSITY LAKES AQUATIC RESTORATION AND FLOOD RISK REDUCTION PROJECT NEAR BATON ROUGE IN EAST BATON ROUGE PARISH
NAME OF APPLICANT: University Lakes, LLC, c/o: CSRS, LLC., attn.: Ms. Kelly Faerber,8555 United Plaza Blvd., Baton Rouge, Louisiana 70809
LOCATION OF WORK: Located on an approximate 300-acre site, in a six-lake system(University Lakes), located along and northwest of Stanford Avenue, near Baton Rouge, inEast Baton Rouge Louisiana, (lat. 30.4206, long. -91.1678), as shown within the attacheddrawings. (Hydrologic Unit Code 080070202 Pontchartrain Basin).
CHARACTER OFWORK: The applicant has requested Department of the Armyauthorization to dredge and place waterbottoms material as fill to implement the UniversityLakes Aquatic Restoration and Flood Risk Reduction Project. Dredged material is proposedto be utilized beneficially in the creation of shoreline fill, bird sanctuary, or to constructislands. The six-lake system is proposed to be dredged to help improve water quality due toexisting sedimentation, algae blooms, and low dissolved oxygen levels. The project hasbeen designed to detain a 100-year storm event to help provide stormwater retentionimprovements for the area. Approximately 1,045,500 cubic yards of dredged waterbottomsfrom hydraulically dredged from project activity and 26,852 cubic yards of clean hauled in fillmaterial would be placed as fill material in jurisdictional areas. The project would fillapproximately 63.93 acres of jurisdictional Other Waters of the US waterbottoms and createupland habitat located along the shorelines. The project also proposes to createapproximately 32.42 acres of wetland habitat. The project proposes to use approximately14,453 linear feet of geotextile tube to contain approximately 38,319 cubic yards of thedredged material. Temporary bulkheads and laydown areas are also proposed during theconstruction stage of this proposed project and are indicated on the attached proposedproject drawings. Remnant vegetative debris and cypress stumps are also proposed to beremoved as a result of project implementation. The proposed project currently has ajurisdictional wetland determination pending with our Jurisdiction and Enforcement Branch.An addendum Public Notice may be required if the jurisdictional determination determinesthat additional project related impacts to wetlands are present. The project proposes to impact approximately 3.13 acres of potentially jurisdictional wetlands (black willow habitatand fringe herbaceous wetland habitat). Approximately 275 acres of jurisdictional OtherWaters of the US would be directly impacted as a result of project implementation fromhydraulic dredging of waterbottom material. The project proposes to utilize the dredgedmaterial beneficially through creation of wetland and upland habitat adjacent to and within theUniversity Lakes system. The applicant proposes to utilize best management practices forerosion and siltation control during and after the construction phase of the project. Postdredging, the applicant proposes to install boardwalks, retaining walls, pedestrian walkways,and other appurtenances to improve the existing May Street with a proposed bridge toincrease connectivity between City Park Lake and University Lake. If authorized, the projectwill receive approval from all appropriate local drainage authorities. The project is proposedas a beneficial project and no compensatory mitigation has been proposed by the applicantdue to the proposed benefits associated with the project.