COMMERICAL DEVELOPMENT EXPANSION AND DETENTION PONDS IN CALCASIEU PARISH

NAME OF APPLICANT: Copart, c/o: D&S Environmental Services, Inc., Post OfficeBox 510, French Settlement, Louisiana 70733LOCATION OF WORK: Located in Calcasieu Parish, located near the intersection of Fabacher Road and Highway 90, in the community of Vinton, Louisiana, (Latitude North: 30.225503°N, Longitude West: -93.504706°W), as shown within the enclosed drawings. (Hydrologic Unit Code 08080206, Calcasieu Basin)CHARACTER OF WORK: Excavation Operations: Work consists of excavating approximately 53,183 cubic yards of earthen fill material to construct a 35-foot wide by 1,683-foot long northwest ditch, a 35-foot wide by 1,778-foot long southwest ditch, a 35-foot wide by 1,635-foot long northeast ditch, a 35-foot wide by 1,624-foot long southeast ditch, a 250-foot wide by 400-foot long northwest detention pond, a 300-foot wide by 400-foot long southwest detention pond, a 225-foot wide by 400-foot long northeast detention pond, and a 150-foot wide by 400-foot long detention pond. Approximately 1.71 acres of jurisdictional wetlands would be permanently impacted via excavation operations.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas