SUMMARY: The following application has been submitted for a Department of the Army Permit under the provisions of Section 404 of the Clean Water Act. A copy of the application including all supplemental materials (alternative analysis, compensatory mitigation plan, etc.) is available for review in the Huntington District Office. The proposed discharge is in conjunction with the expansion of an existing refuse impoundment at the applicant's Jake Gore Refuse Facility (S-5057-88, IBR No. 14), which is currently being reviewed by the West Virginia Department of Environmental Protection (WVDEP) pursuant to the Surface Mining Control and Reclamation Act of 1977 (SMCRA).
PUBLIC NOTICE: The purpose ofthis public notice is to inform you of a proposal for work in which you might be interested. It is also to solicit your comments and information to better enable us to make a reasonable decision on factors affecting the public interest. We hope you will participate in this process.
REGULATORY PROGRAM: Since its early history, the United States Army Corps ofEngineers (Corps) has played an important role in the development ofthe nation's water resources. Originally, this involved construction of harbor fortifications and coastal defenses. Later duties included the improvement of waterways to provide avenues of commerce. An important part of our mission today is the protection of the nation's waterways through the administration of the Corps' Regulatory Program.
SECTION 10: The Corps is directed by Congress under Section 10 ofthe Rivers and Harbors Act of 1899 (33 USC 403) to regulate all work or structures in or affecting the course, condition or capacity of navigable waters of the United States (U.S.). The intent ofthis law is to protect the navigable capacity of waters important to interstate commerce.
SECTION 404: The Corps is directed by Congress under Section 404 ofthe Clean Water Act (33 USC 1344) to regulate the discharge of dredged and fill material into all waters of the U.S., including wetlands. The intent of the law is to protect the nation's waters from the indiscriminate discharge of material capable of causing pollution and to restore and maintain their chemical, physical and biological integrity.
TO WHOM IT MAY CONCERN: The following application has been submitted for a Department ofthe Army Permit under the provisions of Section 404 of the Clean Water Act. A copy of the application including all supplemental materials (alternative analysis, compensatory mitigation plan, etc.) is available for review in the Huntington District Office. The proposed discharge is in conjunction with the expansion of an existing refuse impoundment at the applicant's Jake Gore Refuse Facility (S-5057-88, IBR No. 14), which is currently being reviewed by the West Virginia Department ofEnvironmental Protection (WVDEP) pursuant to the Surface Mining Control and Reclamation Act of 1977 (SMCRA)~
APPLICANT: Independence Coal Company 782 Robinson Creek Road Madison, WV 25130
LOCATION: The proposed project is located approximately 1.25 miles northeast of Quinland, in Boone County, West Virginia. The project can be found near latitude 38°01 '56" and longitude 81 °45'29". The proposed project would be constructed in unnamed tributaries of Robinson Creek. Robinson Creek is an indirect tributary to the Little Coal River, a traditional navigable water. See project Location Map in Exhibit 1 and the Stream Delineation Map in Exhibit 2.
DESCRIPTION OF THE PROPOSED WORK: The applicant is requesting authorization to discharge fill material into two (2) jurisdictional waters of the U.S. in conjunction with the downstream expansion of an existing refuse impoundment. The proposed impacts are associated with the proposed 101.16 acre expansion of an existing 519.40 acre refuse impoundment at the lake Gore Refuse Facility. The applicant's proposal would consist ofthe permanent filling of jurisdictional waters of the U.S. Proposed stream impacts are described in detail below. See the Stream Delineation Map in Exhibit 2 and the Plan View Map in Exhibit 3.
Impacted Stream(s)
Permanent Impacts (ft)
Intermittent
Ephemeral
Channel A
1,125
0
Channel A2
0
843
Total
1,968
Proposed Impoundment Expansion: The applicant proposes to construct a permanent refuse impoundment expansion within Channel A and Channel A2, both unnamed tributaries of Robinson Creek, to extend the operational life ofthe existing lake Gore Refuse Facility. The proposed expansion would provide four (4) additional years of coarse coal refuse disposal and eleven (11) years of fines disposal. The proposed activity would result in 1,968 ft ofpermanent impacts, as a result ofthe discharge of fill material, to intermittent and ephemeral streams and would result in
291.06 cubic yards (CY) offill material placed into waters ofthe U.S. below the ordinary high water mark.
ALTERNATIVE ANALYSIS: The applicant's stated basic project purpose is for the downstream expansion of an existing coal refuse impoundment providing for an additional four (4) years of coarse coal refuse disposal and an additional eleven (11) years of fines disposal at the lake Gore Refuse Facility. This project is not water dependent; therefore, the applicant is required to show that no other less damaging practicable alternatives, which do not require the placement of fill material into waters of the U.S., are available. No permit will be issued unless the alternatives analysis clearly demonstrates that practicable upland alternatives are not available to achieve the overall project purpose.
The applicant evaluated eleven (11) different watersheds through an alternative watershed analysis in order to determine the least environmentally damaging location for the disposal ofboth coarse and fine coal refuse which is sourced from the existing coal preparation plant (S-5057-88). The alternative watershed analysis indicated that watershed No. 11 (site of the existing 519.40 acre coal refuse embankment and fine coal refuse impoundment) was the most suitable location for the disposal of the coal refuse. The applicant determined all the other alternative watersheds would require construction of a new impounding embankment and impoundment. Further, the applicant indicated these watersheds lack the proper infrastructure to transport materials on-site.
The applicant also evaluated the practicability of upland disposal ofthe coarse and fine coal refuse as an alternative. Due to the relatively steep terrain and floodplain areas, the applicant determined that even if several of the alternative watersheds were utilized, a sufficient amount of upland area would not be available to store the anticipated volume of refuse.
The applicant's alternatives analysis is currently under review, and is available for public review in the Huntington District's Regulatory office, by appointment.
AVOIDANCE AND MINIMIZATION: The applicant indicated the proposed project cannot be located in an area that will avoid all impacts to jurisdictional waters. The applicant's alternative watershed analysis identified the expansion of the existing impoundment as the least environmentally damaging practicable alternative. Proposed impacts to waters of the U.S. associated with this project would result in the permanent filling of 1,968 linear feet of stream channel. Of this total, 1,125 linear feet of stream channel was determined to exhibit intermittent flow, and 843 linear feet was determined to exhibit ephemeral flow via an Approved Jurisdictional Determination completed by this office, dated December 22, 2011. The 1,125 If ofintermittent stream channel delineated and identified as Channel A within the Area of Interest (see Exhibit 2) is a component of an active wastewater treatment system required by an NPDES permit (WV0096199) and is currently exempt from regulation under Section 404 of the Clean Water Act. Channel A was identified to describe the respective reach that would be subject to regulation under Section 404 of the CWA upon removal and reclamation of the wastewater treatment system components and/or if any portion ofthe respective reach no longer functions as a component of an active wastewater treatment system. The applicant also indicated the discharge offill material in this location would minimize impacts to the overall watershed.
COMPENSATORY MITIGATION PLAN (CMP): The applicant has submitted a CMP to compensate for unavoidable impacts to waters of the U.S. after avoidance and minimization of impacts were considered. The applicant proposed the following CMP components:
1. The applicant proposes the re-establishment of 2,91 0 linear feet of stream in the Jacks Branch watershed by removing existing valley fills. Approximately 98,000 cubic yards of material would be removed from the three mitigation reaches (see Exhibit 4) located in two unnamed tributaries of Jacks Branch. This material would be utilized in reclaiming open highwalls adjacent to the site. The material would be excavated and hauled to the adjacent highwalls and placed "on bench" and seeded and planted in accordance with the reforestation plan associated with the Article No.3 Permit (S-5057-88).
Once all the material is removed, the stream channels will be graded to the dimensions, patterns, and profiles described in the CMP. Step pools would be placed every 30-50 feet and would be constructed from rock which would be sourced from the fill material removed. After the structures are put in place, erosion protection measures would be implemented in order to maintain channel stability.
The applicant prepared the CMP using current functional assessment data and used.the West Virginia Stream and Wetland Valuation Metric (SWVM) to assess and correlate the baseline conditions of the proposed impact areas with the proposed compensatory mitigation. Physical, chemical and biological parameters were considered by the applicant to demonstrate the CMP mitigates for impacts to waters of the U.S. As part of our evaluation, the Corps will review the applicant's SWVM sheets for accuracy. See the Mitigation Location Map in Exhibit 4.
The proposed CMP is open to comment and is subject to change based on comments received. After review of all the submitted information the Corps will make a determination of appropriate mitigation, in the event a decision is made to issue a permit.
WATER QUALITY CERTIFICATION: An individual Section 401 Water Quality Certification (WQC) is required for this activity. It is the applicant's responsibility to obtain certification from the WVDEP.
HISTORIC AND CULTURAL RESOURCES: The National Register of Historic Places has been consulted and it has been determined that there are no properties currently listed on the Register that are in the area affected by the proposed project. This public notice serves as a request to the West Virginia Division of Cultural Resources for any additional information they may have as to the presence and/or absence of historic resources listed on or eligible for inclusion in the National Register of Historic Places as required under Section 106 ofthe National Historic Preservation Act of 1966 (as amended). Comments concerning archeological sensitivity of a project area should be based upon collected data.
ENDANGERED/THREATENED SPECIES REVIEW: One federally listed endangered species, the Indiana bat (Myotis sodalis) may occur within the project area. The applicant retained the services ofLogan County Mine Services to complete a winter habitat and portal assessment and a summer habitat and mist net survey to determine presence or probable absence ofthe bat species within the proposed proj ect area. The winter habitat and portal assessment revealed no open portals within the proposed project area. A mist net survey was conducted during June of2010. No Indiana bats were captured during the survey. The validity of the survey results expires June 27, 2015.
Based on this information, the Corps has determined that the project, as proposed, is not likely to adversely affect the Indiana bat or its designated critical habitat. This public notice serves as a request to the USFWS and WVDEP for any additional information they may have on whether any listed or proposed to be listed endangered or threatened species may be present in the proposed project area as required under the ESA Species Act of 1972 (as amended).
PUBLIC INTEREST REVIEW AND CUMULATIVE EFFECTS: This application will be reviewed in accordance with 33 CFR 320-332, the Regulatory Program ofthe Corps, and other pertinent laws, regulations, and executive orders. Our evaluation will also follow guidelines published by the U.S. Environmental Protection Agency pursuant to Section 404(b)(1) ofthe Clean Water Act. The decision whether to issue a permit will be based on an evaluation of the probable impacts including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits that reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments. All factors that may be relevant to the proposal will be considered including the cumulative effects thereof; ofthose are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership and, in general, the needs and welfare of the people.
The project lies within the Lower Pond Fork-Little Coal River (050500090404) 12-digit hydrologic unit code watersheds. The Corps is assessing the potential cumulative effects that the proposed stream impacts may have on public interest factors when considered with other activities in that watershed. The assessment includes use of the Corps analytic tool, Cumulative Effects Analysis Prototype/or LRD Regulatory Districts. The tool uses available State and Federal data for each 12 digit hydrologic unit code watershed to analyze past and present activities that may currently be affecting streams.
SOLICITATION OF COMMENTS: The Corps is soliciting comments from the public; Federal, state, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Interested parties are invited to state any objections they mayhave to the proposed work. For accuracy and completeness of the administrative record, all data in support of or in opposition to the proposed work should be submitted in writing setting forth sufficient detail to furnish a clear understanding of the reasons for support or opposition. Any person who has an interest that may be adversely affected by the issuance of a permit may request a public hearing. The request must be submitted in writing to the District Engineer on or before the expiration date of this notice and must clearly set forth the interest which may be adversely affected and the manner in which the interest may be adversely affected by the activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. Written statements on these factors received in this office on or before the expiration date of this public notice will become a part of the record and will be considered in the final determination. A permit will be granted unless its issuance is found to be contrary to the public interest.
CLOSE OF COMMENT PERIOD: All comments pertaining to this public notice must reach this office on or before the close of the comment period listed on page one ofthis public notice. Ifno comments are received by that date, it will be considered that there are no objections. Comments and requests for additional information should be submitted to:
U. S. Army Corps of Engineers
ATTN: CELRH-RD-E Public Notice No. LRH-2000-532-LCR
502 Eighth Street
Huntington, West Virginia 25701-2070
Please note that names and addresses ofthose who submit comments in response to this public notice become part of our administrative record, and, as such, are available to the public under provisions of the Freedom of Information Act. Thank you for your interest in our nation's water resources. If you have any questions concerning this public notice, please call Mr. Cory Wilson of the Energy Resource Branch at (304) 399-5610.