The applicant proposes to construct the PIC-East West Connector by using a combination of existing roadways and roadways on new alignment in northern Pickaway County

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The applicant proposes to construct the PIC-East West Connector by using a combination of existing roadways and roadways on new alignment in northern Pickaway County, Ohio. In total, the proposed PIC-East West Connector would extend SR 762 approximately 3.75 miles and would require the widening of Duvall Road, Ashville Pike, and Bulen-Pierce Road. Existing Duvall Road would end in cul-de-sacs on both sides of the railroad. The project purpose is to improve levels of service and enhance safety on the local and regional transportation network.

PUBLIC NOTICE: The purpose of this public notice is to inform you of a proposal for work in which you might be interested. It is also to solicit your comments and information to better enable us to make a reasonable decision on factors affecting the public interest. We hope you will participate in this process. REGULATORY PROGRAM: Since its early history, the United States Army Corps of Engineers (Corps) has played an important role in the development of the nation’s water resources. Originally, this involved construction of harbor fortifications and coastal defenses. Later duties included the improvement of waterways to provide avenues of commerce. An important part of our mission today is the protection of the nation’s waterways through the administration of the Corps Regulatory Program. SECTION 10: The Corps is directed by Congress under Section 10 of the Rivers and Harbors Act of 1899 (33 USC 403) to regulate all work or structures in or affecting the course, condition or capacity of navigable waters of the United States (U.S.). The intent of this law is to protect the navigable capacity of waters important to interstate commerce. SECTION 404: The Corps is directed by Congress under Section 404 of the Clean Water Act (33 USC 1344) to regulate the discharge of dredged and fill material into all waters of the U.S., including wetlands. The intent of the law is to protect the nation’s waters from the indiscriminate discharge of material capable of causing pollution and to restore and maintain their chemical, physical and biological integrity. TO WHOM IT MAY CONCERN: The following application has been submitted for a Department of the Army Permit under the provisions of Section 404 of the Clean Water Act (CWA). This notice serves as the Corps’ request to the Ohio Environmental Protection Agency (EPA) to act on Section 401 Water Quality Certification for the following application: APPLICANT: Ohio Department of Transportation (ODOT) 1980 West Broad Street Columbus, Ohio 43223 LOCATION: The proposed PIC-East West Connector is located within Bulen Ditch, three unnamed tributaries of Bulen Ditch, and four adjacent wetlands associated with the proposed construction of a new roadway between U.S. Route 23, the Norfolk Southern Intermodal Terminal, and the south side of Rickenbacker International Airport in Harrison Township, Pickaway County, Ohio. A grade-separated interchange is proposed at U.S. 23 and State Route (SR) 762 near the western project terminus. From this point, the 5-lane roadway would extend east along Duvall Road for one mile before turning southeast to cross over the CSX and Norfolk Southern railroad with a new bridge. East of the railroad, the roadway would turn northeast toward a new intersection at Duvall Road and Ashville Pike, and extend north along the west side of Ashville Pike to a new intersection at Ashville Pike and Rickenbacker Parkway. Logical termini are as follows: West terminus: Latitude 39.77386 North and Longitude 82.99555 West North terminus: Latitude 39.79385 North and Longitude 82.94746 West DESCRIPTION OF THE PROPOSED WORK: The applicant proposes to construct the PIC-East West Connector by using a combination of existing roadways and roadways on new alignment in northern Pickaway County, Ohio. In total, the proposed PIC-East West Connector would extend SR 762 approximately 3.75 miles and would require the widening of Duvall Road, Ashville Pike, and Bulen-Pierce Road. Existing Duvall Road would end in cul-de-sacs on both sides of the railroad. The project purpose is to improve levels of service and enhance safety on the local and regional transportation network. ODOT has cited the collective transformation of 1) Rickenbacker International Airport, 2) the Rickenbacker Global Logistic Park, and 3) the Norfolk Southern Intermodal Facility into a multi-modal cargo airport/freight distribution hub and the insufficiency of the rural roads to the south to handle traffic volumes. ODOT maintains the proposed roadway would provide the infrastructure necessary to remove freight trucks from rural roads, improve regional connectivity, enhance roadway and railway safety by the elimination of an at-grade rail crossing at Duvall Road, and conforms to local transportation plans for the area. The proposed work would involve the permanent discharge of approximately 6,430 cubic yards of fill material into 2,163 linear feet (0.59-acre) of streams and 4,001 cubic yards of fill material into 1.24 acres of wetlands. The proposed impacts are necessary to construct and widen roadways, build an interchange at U.S. 23, erect a bridge over the CSX and Norfolk Southern railroad, and provide scour protection for new culverts. No temporary discharges of fill material are associated with this proposal. The proposed impacts to potential waters of the U.S. are detailed on the tables, maps, and plans attached to this Public Notice. ALTERNATIVES ANALYSIS: The project does not require access to or siting within a special aquatic site to fulfill its basic purpose and is considered a non-water dependent activity. The CWA Section 404(b)(1) Guidelines state for non-water dependent activities, practicable alternatives that do not involve special aquatic sites are presumed to be available unless clearly demonstrated otherwise. Therefore, the applicant is required to provide an alternatives analysis which must overcome that presumption prior to receiving authorization for the discharge of fill material in waters of the U.S. No permit will be issued until our review of the alternatives analysis clearly shows upland alternatives are not available to achieve the applicant’s goal. The applicant has submitted an alternatives analysis for review. The alternatives include a Preferred Alternative, a Minimal Degradation Alternative, and a No-Build Alternative. ODOT seeks authorization for the Preferred Alternative, under which 2,163 linear feet of four streams and 1.24 acres of four wetlands would be permanently impacted. The majority of stream impacts would result from the relocation of Bulen Ditch for the widening of Bulen-Pierce Road. Bulen Ditch is maintained by the local community in accordance with Ohio’s Petition Ditch Laws. Approximately one acre of Category 2 forested/non-forested wetland impacts would occur due to the construction of the interchange at U.S. 23. Under the Minimal Degradation Alternative the proposed alignment would follow existing roadways. The relocation of Bulen Ditch would not occur and impacts to an unnamed tributary of Bulen Ditch would be minimized. Wetland impacts under this alternative would be identical to the Preferred Alternative, with the exception of avoidance of 0.26-acre of Category 1 emergent wetland east of the CSX and Norfolk Southern railroad. Under the No-Build Alternative, there would be no impacts to aquatic resources because no road improvements would occur. This alternative would not satisfy the project purpose and need. AVOIDANCE AND MINIMIZATION: ODOT has indicated that practical measures to avoid and minimize impacts to potential waters of the U.S. were implemented during project design. Such measures included reducing the need for grading and decreasing the footprint for the proposed interchange at U.S. 23 and SR 762, in order to minimize impacts to wetlands near the Mackey Ford Wildlife Area managed by the Ohio Department of Natural Resources. Best management practices according to ODOT’s Construction and Material Specifications manual (2010) would be used during construction to minimize sedimentation of aquatic resources. COMPENSATORY MITIGATION PLAN: ODOT has submitted a mitigation plan to compensate for unavoidable impacts to potential waters of the U.S. The proposed stream mitigation plan involves the deduction of 3,245 linear feet of pooled stream credit available through the 1999 Big Darby State Scenic River Headwaters Protection Agreement. The mitigation streams are located in the Upper Scioto River Watershed in Champaign, Union, and Madison Counties. To mitigate for wetland impacts, ODOT proposes to deduct 2.78 acres of wetland mitigation credit from the Little Scioto Wetland Mitigation Bank in Marion County, Ohio. WATER QUALITY CERTIFICATION: A Section 401 Water Quality Certification is required for this project. It is the applicant’s responsibility to obtain the certification from the Ohio EPA. HISTORIC AND CULTURAL RESOURCES: The Federal Highway Administration (FHWA) is the lead Federal agency for this project and is responsible for compliance with the National Environmental Policy Act (NEPA) and Section 106 of the National Historic Preservation Act. In 2011, ODOT completed reports titled Phase I History/Architecture Reconnaissance Survey and Phase I Archaeological Reconnaissance Survey and determined that no known resources are eligible for inclusion on the National Register of Historic Places. Based on these studies, which were coordinated with the Ohio Historic Preservation Office (OHPO), ODOT determined that "no historic properties affected" is the appropriate finding for the proposed project. A copy of this Public Notice will be sent to OHPO for review. Comments concerning archaeological sensitivity of a project area should be based upon collected data. ENDANGERED/THREATENED SPECIES REVIEW: This proposal is within the known or historic range of the following Federally-listed endangered (E) or threatened (T) species: Scioto madtom (Noturus trautmani) (E) Snuffbox mussel (Epioblasma triquetra) (E) Clubshell mussel (Pleurobema clava) (E) Rayed bean mussel (Villosa fabilis) (E) Indiana bat (Myotis sodalis) (E) Northern riffleshell mussel (Epioblasma torulosa rangiana) (E) FHWA is responsible for compliance with the NEPA and Section 7 of the Endangered Species Act (ESA). This Public Notice serves as a request to the U.S. Fish and Wildlife Service for any information they may have on whether any listed or proposed to be listed endangered or threatened species may be present in the area which would be affected by the activity, pursuant to Section 7(c) of the ESA of 1972 (as amended). PUBLIC INTEREST REVIEW AND COMMENT: Any person who has an interest that may be adversely affected by the issuance of a permit may request a public hearing. The request must be submitted in writing to the District Engineer on or before the expiration date of this notice and must clearly set forth the interest which may be adversely affected and the manner in which the interest may be adversely affected by the activity. This application will be reviewed in accordance with 33 CFR 320-332, the Corps Regulatory Program, and other pertinent laws, regulations, and executive orders. Our evaluation will also follow the guidelines published by the U.S. EPA pursuant to Section 404(b) (1) of the CWA. Interested parties are invited to state any objections they may have to the proposed work. The decision whether to issue a permit will be based on an evaluation of the probable impact including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit that reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments. All factors that may be relevant to the proposal will be considered including the cumulative effects thereof; of those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership and, in general, the needs and welfare of the people. Written statements on these factors received in this office on or before the expiration date of this public notice will become a part of the record and will be considered in the final determination. A permit will be granted unless its issuance is found to be contrary to the public interest. SOLICITATION OF COMMENTS: The Corps is soliciting comments from the public; Federal, state, and local agencies and officials; Indian Tribes; and other interested parties in order to consider The Corps is soliciting comments from the public; Federal, state, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. For accuracy and completeness of the administrative record, all data in support of or in opposition to the proposed work should be submitted in writing setting forth sufficient detail to furnish a clear understanding of the reasons for support or opposition. Any comments received will be considered by the Corps to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. CLOSE OF COMMENT PERIOD: All comments pertaining to this Public Notice must reach this office on or before the close of the comment period listed on page one of this Public Notice. If no comments are received by that date, it will be considered that there are no objections. Comments and requests for additional information should be submitted to:

Mr. Brett C. Latta, CPG South/Transportation Branch – Ohio Regulatory Transportation Office U.S. Army Corps of Engineers Huntington District – Public Notice No. 2011-00644-SCR 3990 East Broad Street -Building 10, Section 10 Columbus, Ohio 43218-3990

Please note, the names and addresses of those who submit comments in response to this Public Notice become part of our administrative record and, as such, are available to the public under provisions of the Freedom of Information Act. Thank you for your interest in our nation’s water resources. If you have any questions concerning this Public Notice, please contact Brett C. Latta of the Ohio Regulatory Transportation Office at Brett.C.Latta@usace.army.mil or (614) 692-4654.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas