The applicant is requesting authorization to discharge fill material into waters ofthe United States (U.S.) to facilitate the removal of bituminous coal at the McDonald Fork Surface Mine.

PUBLIC NOTICE: The purpose of this public notice is to inform you of a proposal for work in which you might be interested. It is also to solicit your comments and information to better enable us to make a reasonable decision on factors affecting the public interest. We hope you will participate in this process. TO WHOM IT MAY CONCERN: The following application has been submitted for a Department of the Army Permit under the provisions of Section 404 of the Clean Water Act (CWA). This notice serves as the Corps' request to the West Virginia Department of Environmental Protection (WVDEP) to act on the Section 401 water quality certification for the following application: APPLICANT: National Resources Inc. 100 Cranberry Drive Beckley, WV 25801 LOCATION: The proposed project is located near Guyan, Wyoming County, West Virginia. The project can be found at latitude 37°39'55" and longitude 81°42'54" on the Oceana, Mallory, Baileysville, and Gilbert USGS Quadrangle maps. A portion of the proposed project would be constructed in two ephemeral tributaries of McDonald Run, which flow into Big Cub Creek, a tributary of the Guyandotte River, a Section 10 navigable water. The project location map is attached to this public notice. DESCRIPTION OF THE PROPOSED WORK: The applicant is requesting authorization to discharge fill material into waters ofthe United States (U.S.) to facilitate the removal of bituminous coal at the McDonald Fork Surface Mine. The proposal would include the discharge of fill material into two ephemeral tributaries of McDonald Fork in conjunction with mine-through activities at the site. The applicant has applied to the West Virginia Department of Environmental Protection (WVDEP) for the required Surface Mining Control and Reclamation Act (SMCRA) permit (S-4001- 10). The work requiring authorization from this office is limited to the discharge of dredged and/or fill material below the ordinary high water elevation of jurisdictional waters of the U.S. Representatives from the Corps conducted a field review in August 2010 to determine the extent of waters of the U.S. at the site. It was determined that approximately 1,090 feet of ephemeral stream channel was located within the delineation boundary. A total of I ,090 feet (0.06 acre) of ephemeral stream channel would be excavated by mine-though activities in conjunction with the removal of approximately 19.4 million tons of coal from eleven coal seams at the 763.8 acre site. No valley fills are proposed at the site. In order to avoid the discharge of fill material into waters of the U.S., the applicant proposes to place excess overburden onto authorized valley fills at two adjacent sites (WVDEP SMCRA permits S-4020-96 and S-4021- 96) and this placement of fill material would not be within waters of the U.S. and therefore would not require authorization under Section 404 of the CWA. To further avoid the discharge of fill material into waters of the U.S., there are no newly proposed sediment impoundment structures at the site. The use of existing, upland impoundment structures would assist in the reduction of temporary and secondary impacts to waters of the U.S. The project life is expected to be approximately 14 years. The applicant provided information concerning the approximate length of stream channel proposed to be impacted by the discharge of fill material (cubic yards) into waters of the U.S. (See Table 1). A copy of the Section 404 permit application, including all supplemental materials (Environmental Information Document, alternative analysis, compensatory mitigation plan, etc.), is available for review in the Huntington District Office by appointment. ALTERNATIVE ANALYSIS: The applicant's stated basic project purpose is coal removal. Coal removal is not a water dependent activity, therefore; the applicant is required to show that other less environmentally damaging practicable alternatives, which do not require the placement of fill material into waters of the U.S., are not available that would achieve the overall project purpose. The Corps cannot issue a permit unless the alternatives analysis clearly demonstrates that there are no practicable upland alternatives available to achieve the overall project purpose. The applicant evaluated five mining method alternatives for this project: single seam contour with highwall mining, single seam contour mining, combination area mining with multi-seam contour and highwall mountaintop mining, and underground mining. The applicant also evaluated three alternatives for placement of the overburden material: on-site disposal, off-site disposal -permitted, and off-site non-permitted areas. After a review of each alternative, the applicant indicated that the combination of area mining with multi-seam contour and highwall mining with off-site overburden storage at two previously authorized surface mine sites (S-4020-96 and S-4021-96) would best meet the project's stated purpose and need. Therefore, the applicant stated the preferred alternative as proposed by this application is the least environmentally damaging practicable alternative. The applicant's alternatives analysis is currently being evaluated and is available in the Corps Huntington District office for public review. AVOIDANCE AND MINIMIZATION: The applicant indicated the proposed project cannot be located in an area(s) that would avoid all discharges of fill material into waters ofthe U.S. However, the applicant has designed the mine plan to limit the discharges of fill material into two ephemeral stream channels totaling 1,090 feet. The applicant stated the mine plan was designed to avoid and/or minimize the discharge of fill material into waters of the U.S, to the extent practicable, while still meeting the stated project purpose. The preferred alternative would not require permanent construction of a valley fill or sediment pond in waters of the U.S. (see project description above). After mining and reclamation, the stream channels would be re-established at their approximate original location and the site would be returned to a post-mining land use of forestland. COMPENSATORY MITIGATION PLAN (CMP): The applicant has submitted a CMP that details measures which would provide compensation for unavoidable discharges of fill material into waters of the U.S. The compensation would consist of the re-establishment of 1,097 feet of two ephemeral stream channels on-site; 576 feet of Drainage A and 521 feet of Drainage B. There established stream channels, which would be constructed at their approximate original locations, would flow into an existing impoundment within McDonald Fork, which is located downstream of the proposed mine site where Drainage A (unnamed tributary of McDonald Fork) flows into Drainage B (main stem of McDonald Fork). The goal of the mitigation plan is to approximate the natural channels, which are designated as Rosgen Aa+ channels, in profile, pattern, cross-section, and step-pool sequences to the maximum extent practicable. The re-established channels would maintain their pre-impact gradient (23% and 26% respectively) as the nature of the mining activities would not alter the existing gradient. The channels would be constructed to mimic, to the maximum extent practicable, their existing Rosgen Aa+ designation. Drainage A would be re-established with bottom width of five feet and top ofbank width of 12 feet. The side slopes would be 2:1. Drainage B would be re-established with a bottom width of six feet and tip of bank width of 12 feet. The streambeds would be established using cobble, small stones, and other native substrate. In-stream structures including j-hooks, cross-vanes, boulder clusters, and root wads would be installed in the stream bed and/or streambanks to reduce shear stress along the banks and increase water flow within the middle of the channel. The structures would also provide habitat for aquatic species. A l 00 foot riparian buffer, 50 feet from the top of each re-established stream bank, would be established using native shrub and tree species. The applicant prepared the CMP using current functional assessment data and used the West Virginia Stream and Wetland Valuation Metric (SWVM) to assess and correlate the baseline conditions ofthe proposed areas impacted by the discharge of fill material into waters ofthe U.S. with the proposed compensatory mitigation. Physical, chemical and biological parameters were considered by the applicant to demonstrate the CMP mitigates for the discharge of fill material into waters of the U.S. As part of our evaluation, the Corps will review the applicant's SWVM sheets for accuracy. The applicant's CMP is currently under review and is available for public review. The proposed CMP is open to comment and is subject to change based on comments received. Upon completion of the Corps evaluation of the submitted information, it would be determined if the mitigation is appropriate to off-set the loss of waters ofthe U.S. WATER QUALITY CERTIFICATION: An individual Section 401 Water Quality Certification (WQC) is required for this project. The applicant's WQC is currently pending (WV1024078) with the WVDEP. HISTORIC AND CULTURAL RESOURCES: This project must be reviewed to determine any potential effects to properties that may be eligible for or listed in the National Register of Historic Places (NRHP), in accordance with Section 106 of the National Historic Preservation Act. The application package included letters dated June 9, 2010 and March 16, 2011 from the West Virginia Division of Culture and History (WVDCH). The June 9, 2010 letter stated no archaeological resources that are listed or eligible for listing in the NRHP will be impacted by this project and no further consultation regarding archaeological resources was necessary for the proposed project site; however, they did request photographs of any buildings or structures which may be located within the line of sight of the proposed project. The applicant provided the requested information to WVDCH on February 18, 2011. On March 16, 2011 WVDCH requested that the applicant obtain an architectural historian to complete the Section 106 coordination. As ofthe date of this public notice, that coordination has not been completed. Section 1 06 coordination must be completed prior to the issuance of any permit for this proposal. ENDANGERED/THREATENED SPECIES REVIEW: This public notice will serve as coordination with the U.S. Fish and Wildlife Service (USFWS) concerning threatened or endangered species, pursuant to Section 7 of the Endangered Species Act of 1972 (as amended). This project was reviewed by the WVDEP pursuant to the 1996 Biological Opinion and Conference Report between the U.S. Office of Surface Mining and the USFWS. By letter dated September 19, 2011, the WVDEP concluded the project is not expected to impact federally-listed threatened and endangered species, and therefore the proposed project is not likely to adversely affect federallylisted species. The Corps agrees with WVDEP's determination and concludes that Section 7 requirements have been met. PUBLIC INTEREST REVIEW AND CUMULATIVE EFFECTS: This application will be reviewed in accordance with 33 CFR 320-332, the Regulatory Program of the Corps, and other pertinent laws, regulations, and executive orders. Our evaluation will also follow guidelines published by the U.S. Environmental Protection Agency pursuant to Section 404(b)(l) of the Clean Water Act. The decision whether to issue a permit will be based on an evaluation of the probable impacts including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits that reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments. All factors that may be relevant to the proposal will be considered including the cumulative effects thereof; of those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership and, in general, the needs and welfare of the people. The project lies within the Big Cub Creek (050701010503) 12-digit hydrologic unit code watershed. The Corps is assessing the potential cumulative effects that the proposed stream impacts from the discharge of fill ma1lerial into waters ofthe U.S. may have on public interest factors when considered with other activities in that watershed. The assessment includes use of the Corps analytic tool, Cumulative Effects Analysis Prototype for LRD Regulatory Districts. The tool uses available State and Federal data for each 12-digit hydrologic unit code watershed to analyze past and present activities that may currently be affecting streams. SOLICITATION OF COMMENTS: The Corps is soliciting comments from the public; Federal, state, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Interested parties are invited to state any objections they may have to the proposed work. For accuracy and completeness of the administrative record, all data in support of or in opposition to the proposed work should be submitted in writing setting forth sufficient detail to furnish a clear understanding of the reasons for support or opposition. Any person who has an interest that may be adversely affected by the issuance of a permit may request a public hearing. The request must be submitted in writing to the District Engineer on or before the expiration date ofthis notice and must clearly set forth the interest which may be adversely affected and the manner in which the interest may be adversely affected by the activity. Any comments received will be considered by the Corps to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. Written statements on these factors received in this office on or before the expiration date of this public notice will become a part ofthe record and will be considered in the final determination. A permit will be granted unless its issuance is found to be contrary to the public interest. CLOSE OF COMMENT PERIOD: All comments pertaining to this public notice must reach this office on or before the close ofthe comment period listed at the beginning of this public notice. If no comments are received by that date, it will be considered that there are no objections. Comments and requests for additional information should be submitted to: U.S. Army Corps of Engineers ATTN: CELRH-RD-E Public Notice: LRH-20101-531-GUY 502 Eighth Street Huntington, West Virginia 25701-2070 Please note that names and addresses of those who submit comments in response to this public notice become part of our administrative record, and, as such, are available to the public under provisions of the Freedom oflnformation Act. Thank you for your interest in our nation's water resources. If you have any questions concerning this public notice, please call Kimberly Courts-Brown of the Energy Resource Branch at (304) 399-6906.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas