You can copy from here when filling out the rest of the page.
RAIL STORAGE YARD EXPANSION IN CALCASIEU PARISH
Name of applicant: Union Pacific Railway Corporation, c/o CH2M Hill, Attn: Blake Amos, 2112 Eleventh Avenue South, Suite 320, Birmingham, Alabama 35205
Location of work: 30.23828oN, 93.30865oW, in Westlake, Louisiana, in CALCASIEU Parish, as shown on the enclosed drawings.
Character of work: Place approximately 7,685 cubic yards of earthen material, 13,846 cubic yards of subballast, 22,315 cubic yards of ballast, and 12 cubic yards of rip-rap, all to facilitate construction of a rail storage yard expansion. Approximately 10.75 acres of unavoidable wetland impacts will be compensated for through the purchase of credits from an approved mitigation bank in the same hydrologic basin (HUC 08080206).
JOINT PUBLIC NOTICE
March 24, 2014
United States Army
Corps of Engineers
New Orleans District
Regulatory Branch
Post Office Box 60267
New Orleans, LA 70160-0267
State of Louisiana
Department of Environmental Quality
Office of Environmental Services
Post Office Box 4313
Baton Rouge, LA 70821-4313
(504) 862-1879
Project Manager
Ms. Angelle Greer
Permit Application Number
MVN-2014-00147-WMM
(225) 219-3225
Project Manager
Elizabeth Johnson
WQC Application Number
WQC 140321-01
Interested parties are hereby notified that a permit application has been received by the New Orleans District of the
U.S. Army Corps of Engineers pursuant to: [ ] Section 10 of the Rivers and Harbors Act of March 3, 1899 (30 Stat. 1151;
33 USC 403); and/or [X] Section 404 of the Clean Water Act (86 Stat. 816; 33 USC 1344).
Application has also been made to the Louisiana Department of Environmental Quality for a Water Quality
Certification (WQC) in accordance with statutory authority contained in LRS 30:2074 A(3) and provisions of Section 401
of the Clean Water Act."
RAIL STORAGE YARD EXPANSION IN CALCASIEU PARISH
Name of applicant: Union Pacific Railway Corporation, c/o CH2M Hill, Attn: Blake Amos, 2112 Eleventh Avenue
South, Suite 320, Birmingham, Alabama 35205
Location of work: 30.23828oN, 93.30865oW, in Westlake, Louisiana, in CALCASIEU Parish, as shown on the
enclosed drawings.
Character of work: Place approximately 7,685 cubic yards of earthen material, 13,846 cubic yards of subballast,
22,315 cubic yards of ballast, and 12 cubic yards of rip-rap, all to facilitate construction of a rail storage yard expansion.
Approximately 10.75 acres of unavoidable wetland impacts will be compensated for through the purchase of credits from
an approved mitigation bank in the same hydrologic basin (HUC 08080206).
The comment period for the Department of the Army Permit and the Louisiana Department of Environmental Quality
WQC will close 20 days from the date of this joint public notice. Written comments, including suggestions for
modifications or objections to the proposed work, stating reasons thereof, are being solicited from anyone having interest in
this permit and/or this WQC request and must be mailed so as to be received before or by the last day of the comment
period. Letters concerning the Corps of Engineers permit application must reference the applicant's name and the Permit
Application Number, and be mailed to the Corps of Engineers at the address above, ATTENTION: REGULATORY
BRANCH. Individuals or parties may request an extension of time in which to comment on the proposed work by
writing to the project manager or clicking on the project manager's name on the public notice grid on the web page.
Any request must be specific and substantively supportive of the requested extension and received by this office
prior to the end of the initial comment period. The Section Chief will review the request and the requestor will be
promptly notified of the decision to grant or deny the request. If granted, the time extension will be continuous to
the initial comment period and, inclusive of the initial comment period, will not exceed a total of 30 calendar days.
Letters concerning the Water Quality Certification must reference the applicant's name and the WQC Application number
and be mailed to the Louisiana Department of Environmental Quality at the address above.
The application for this proposed project is on file with the Louisiana Department of Environmental Quality and may
be examined weekdays between 8:00 a.m. and 4:30 p.m. Copies may be obtained upon payment of costs of reproduction.
Corps of Engineers Permit Criteria
The decision whether to issue a permit will be based on an evaluation of the probable impacts, including cumulative
impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection
and utilization of important resources. The benefit which reasonably may be expected to accrue from the proposal must be
balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be
considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general
environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use,
navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety,
food and fiber production, mineral needs, considerations of property ownership and, in general, the needs and welfare of the
people.
The U.S. Army Corps of Engineers is soliciting comments from the public, Federal, state, and local agencies and
officials, Indian Tribes, and other interested parties in order to consider and evaluate the impacts of this proposed activity.
Any comments received will be considered by the U.S. Army Corps of Engineers to determine whether to make, modify,
condition, or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered
species, historic properties, water quality, general environmental effects, and other public interest factors listed above.
Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement
pursuant to the National Environmental Policy Act. Comments are also
used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.
No properties listed on the National Register of Historic Places are near the proposed work. The possibility exists
that the proposed work may damage or destroy presently unknown archeological, scientific, prehistorical, historical sites, or
data. Copies of this notice are being sent to the State Archeologist and the State Historic Preservation Officer.
Our initial finding is that the proposed work would neither affect any species listed as endangered by the U.S.
Departments of Interior or Commerce, nor affect any habitat designated as critical to the survival and recovery of any
endangered species.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the Magnuson-Stevens Fishery
Conservation and Management Act. The applicant's proposal would result in the destruction or alteration of 0.0 acre(s) of
EFH utilized by various life stages of red drum and penaeid shrimp. Our initial determination is that the proposed action
would not have a substantial adverse impact on EFH or federally managed fisheries in the Gulf of Mexico. Our final
determination relative to project impacts and the need for mitigation measures is subject to review by and coordination with
the National Marine Fisheries Service.
If the proposed work involves deposits of dredged or fill material into navigable waters, the evaluation of the probable
impacts will include the application of guidelines established by the Administrator of the Environmental Protection
Agency. Also, a certification that the proposed activity will not violate applicable water quality standards will be required
from the Department of Environmental Quality, Office of Environmental Services before a permit is issued.
Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held
to consider this application. Requests for public hearings shall state, with particularity, the reasons for holding a public
hearing.
You are requested to communicate the information contained in this notice to any other parties whom you deem likely
to have interest in the matter.
Darrell S. Barbara
Chief, Western Evaluation Section
Enclosures
POB
Latitude: 30°14'17.804" N
Longitude: 93°18'31.128" W
Path: R:\GIS\HOU\UPRR\Lockmoor\MapFiles\Permit\Lockmoor_Vicinity_Map.mxd - 2/11/2014 @ 9:37:47 AM
POE
Latitude: 30°14'17.391" N
Longitude: 93°16'59.729" W
Copyright:© 2013 National Geographic Society, i-cubed
February 11, 2014
Rail Centerline
Arkansas
Major Highway
Mississippi
Interstate
Project Boundary
0
¯
Texas
Louisiana
10,000
Feet
1 in = 10,000 ft
Vicinity Map
UPRR Lockmoor Yard Expansion,
Lafayette Subdivision MP 224.35 to MP 222.98
Figure 1
Sheet 1 of 13
POE
Latitude: 30°14'17.391" N
Longitude: 93°16'59.729" W
Path: R:\GIS\HOU\UPRR\Lockmoor\MapFiles\Permit\Lockmoor_Existing_Conditions.mxd - 2/11/2014 @ 10:09:06 AM
POB
Latitude: 30°14'17.804" N
Longitude: 93°18'31.128" W
February 11, 2014
Rail Centerline
Road Centerline
?
Surface Water and Flow Direction
Project Boundary
0
¯
Feet
1 in = 3,000 ft
Existing Conditions
UPRR Lockmoor Yard Expansion,
Lafayette Subdivision MP 224.35 to MP 222.98
3,000
© OpenStreetMap (and)
contributors, CC-BY-SA
Figure 1
Sheet 2 of 13
S007
Permanent Impact: 0.03 ac
Temporary Impact: 0.006 ac
(187 cy) To be filled by
proposed track and access
road construction
Calcasieu
Parish
W16
Permanent Impact: 0.05 ac
Temporary Impact: 0.004 ac
(322 cy) To be filled by
proposed track, access road,
and culvert construction
W15
Permanent Impact: 0.68 ac
Temporary Impact: 0.03 ac
(3,911 cy) To be filled by
proposed track, access road,
and culvert construction
W17
Permanent Impact: 0.70 ac
Temporary Impact: 0.04 ac
(4,073 cy) To be filled by
proposed track and access
road construction
Pond 1
Permanent Impact: 0.30 ac
Temporary Impact: 0.001 ac
(1,653 cy) To be filled by
proposed track and access
road construction
???????? ???????? ?????
?
?
?
?
?
?
?
???????? ????????
???????? ???????? ???????? ???
????? ????
Prater Road
Proposed Culvert
(See Sheet 12)
?
?????? ?
?
?
?
?
?
?
?
?
?
POB
Latitude: 30°14'17.804" N
Longitude: 93°18'31.128" W
Wetland/WOUS Fill Substrates and Quantities
Substrate
5626
1,416
Ba l l a s t Fi l l
17946
2,316
Ri p Ra p Fi l l
Total:
10876
0
34,448
Napoleon St.
WOUS Fill Quantity (CY)
Ea rthen Fi l l
Subba l l a s t Fi l l
R:\GIS\HOU\UPRR\Lockmoor\MapFiles\Permit\Lockmoor_Permit_DataDriven.mxd - 2/11/2014 @ 10:16:03 AM
Wetland Fill Quantity (CY)
90
¥
12
5,470
Wetland/WOUS
Permanent Impact Acreage Temporary Impact Acreage
Pa l us tri ne Needl e-Lea ved Deci duous Fores ted (PFO2)
4.86
0.18
Pers i s tent Pa l us tri ne Emergent (PEM1)
0.23
0.06
Pa l us tri ne Broa d-Lea ved Deci duous Fores ted (PFO1)
0.14
Pa l us tri ne Broa d-Lea ved Deci duous Shrub-Scrub (PSS1) 0.71
Dra i na ge Di tch/Ephemera l Strea m
0.67
Total:
6.91
Ma nma de Pond
Grading Limits
Existing Bridge
Road Centerline
Existing Culvert
Existing Access Road
Proposed Track
Proposed Culvert
????
0.30
Existing Right of Way
Existing Track
Proposed Surface Flow
Road Improvement
W14
Permanent Impact: 0.90 ac
Temporary Impact: 0.03 ac
(5,174 cy) To be filled by
proposed track and access
road construction
W18
Temporary Impact: 0.02 ac
(87 cy) To be filled by
culvert construction
1,726
Permanent and Temporary Wetland/WOUS Impacts
S005
Permanent Impact: 0.47 ac
Temporary Impact: 0.001 ac.
(2,598 cy) To be filled by
proposed track and access
road construction
0.02
0.11
W19
Temporary Impact: 0.01 ac
(50 cy) To be filled by
culvert construction
0.03
0.001
0.40
February 11, 2014
Signal Case
Potential Jurisdictional Waters of the U.S.
Potential Jurisdictional Wetlands
Pond
Permanent Workspace
Temporary Workspace
0
¯
Feet
1 in = 200 ft
Plan View
UPRR Lockmoor Yard Expansion,
Lafayette Subdivision MP 224.35 to MP 222.98
3
200
4
5
6
7
8
© OpenStreetMap (and)
contributors, CC-BY-SA
Figure 1
Sheet 3 of 13
9
Calcasieu
Parish
W11
Permanent Impact: 1.54 ac
Temporary Impact: 0.03 ac
(8,496 cy) To be filled by
proposed track and access
road construction
W14
Permanent Impact: 0.90 ac
Temporary Impact: 0.03 ac
(5,174 cy) To be filled by
proposed track and access
road construction
0.68 ac
.03 ac
d by
ess road,
tion
W12
Permanent Impact: 0.64 ac
Temporary Impact: 0.01 ac
(3,531 cy) To be filled by
proposed track and access
road construction
W13
Permanent Impact: 0.25 ac
Temporary Impact: 0.01 ac
(1,447 cy) To be filled by
proposed track and access
road construction
act: 0.30 ac
ct: 0.001 ac
filled by
and access
n
???????? ???????? ???????? ???????? ???????? ?
??????? ???????? ???????? ???????? ???????? ???????
? ???????? ??????
S005
Permanent Impact: 0.47 ac
Temporary Impact: 0.001 ac
(2,598 cy) To be filled by
proposed track and access
road construction
c
c
s
Wetland/WOUS Fill Substrates and Quantities
Substrate
5626
1,416
Ba l l a s t Fi l l
17946
2,316
Ri p Ra p Fi l l
Total:
10876
0
34,448
1,726
12
5,470
Permanent and Temporary Wetland/WOUS Impacts
Wetland/WOUS
Permanent Impact Acreage Temporary Impact Acreage
Pa l us tri ne Needl e-Lea ved Deci duous Fores ted (PFO2)
4.86
0.18
Pers i s tent Pa l us tri ne Emergent (PEM1)
0.23
0.06
Pa l us tri ne Broa d-Lea ved Deci duous Fores ted (PFO1)
0.14
Pa l us tri ne Broa d-Lea ved Deci duous Shrub-Scrub (PSS1) 0.71
Dra i na ge Di tch/Ephemera l Strea m
0.67
Total:
6.91
Ma nma de Pond
Grading Limits
Existing Bridge
Road Centerline
Existing Culvert
Existing Access Road
Proposed Track
Proposed Culvert
????
0.30
Existing Right of Way
Existing Track
Proposed Surface Flow
Road Improvement
90
¥
WOUS Fill Quantity (CY)
Ea rthen Fi l l
Subba l l a s t Fi l l
R:\GIS\HOU\UPRR\Lockmoor\MapFiles\Permit\Lockmoor_Permit_DataDriven.mxd - 2/11/2014 @ 10:16:05 AM
Wetland Fill Quantity (CY)
Napoleon St.
0.02
0.11
0.03
0.001
0.40
February 11, 2014
Signal Case
Potential Jurisdictional Waters of the U.S.
Potential Jurisdictional Wetlands
Pond
Permanent Workspace
Temporary Workspace
0
¯
Feet
1 in = 200 ft
Plan View
UPRR Lockmoor Yard Expansion,
Lafayette Subdivision MP 224.35 to MP 222.98
3
200
4
5
6
7
8
© OpenStreetMap (and)
contributors, CC-BY-SA
Figure 1
Sheet 4 of 13
9
Calcasieu
Parish
W11
Permanent Impact: 1.54 ac
Temporary Impact: 0.03 ac
(8,496 cy) To be filled by
proposed track and access
road construction
W10
Permanent Impact: 0.06 ac
Temporary Impact: 0.01 ac
(341 cy) To be filled by
proposed track and access
road construction
W20
Permanent Impact: 0.04 ac
(221 cy) To be filled by
proposed track and access
road construction
???????? ???????? ???????? ???????? ???????? ?????
??? ???????? ?????
??? ?
????
???
????
???
? ?
??
???
??
??
??
???
? ?
??
??
??
S005
Permanent Impact: 0.47 ac
Temporary Impact: 0.001 ac
(2,598 cy) To be filled by
proposed track and access
road construction
.47 ac
.001 ac
d by
access
Wetland/WOUS Fill Substrates and Quantities
Substrate
WOUS Fill Quantity (CY)
5626
1,416
Ba l l a s t Fi l l
17946
2,316
Ri p Ra p Fi l l
Total:
10876
0
34,448
Napoleon St.
90
¥
Ea rthen Fi l l
Subba l l a s t Fi l l
R:\GIS\HOU\UPRR\Lockmoor\MapFiles\Permit\Lockmoor_Permit_DataDriven.mxd - 2/11/2014 @ 10:16:08 AM
Wetland Fill Quantity (CY)
1,726
12
5,470
Permanent and Temporary Wetland/WOUS Impacts
Wetland/WOUS
Permanent Impact Acreage Temporary Impact Acreage
Pa l us tri ne Needl e-Lea ved Deci duous Fores ted (PFO2)
4.86
0.18
Pers i s tent Pa l us tri ne Emergent (PEM1)
0.23
0.06
Pa l us tri ne Broa d-Lea ved Deci duous Fores ted (PFO1)
0.14
Pa l us tri ne Broa d-Lea ved Deci duous Shrub-Scrub (PSS1) 0.71
Dra i na ge Di tch/Ephemera l Strea m
0.67
Total:
6.91
Ma nma de Pond
Grading Limits
Existing Bridge
Road Centerline
Existing Culvert
Existing Access Road
Proposed Track
Proposed Culvert
????
0.30
Existing Right of Way
Existing Track
Proposed Surface Flow
Road Improvement
S006
Permanent Impact: 0.02 ac
Temporary Impact: 0.001 ac
(92 cy) To be filled by
proposed track and access
road construction
0.02
0.11
0.03
0.001
0.40
February 11, 2014
Signal Case
Potential Jurisdictional Waters of the U.S.
Potential Jurisdictional Wetlands
Pond
Permanent Workspace
Temporary Workspace
0
¯
Feet
1 in = 200 ft
Plan View
UPRR Lockmoor Yard Expansion,
Lafayette Subdivision MP 224.35 to MP 222.98
3
200
4
5
6
7
8
© OpenStreetMap (and)
contributors, CC-BY-SA
Figure 1
Sheet 5 of 13
9
Calcasieu
Parish
W9
Permanent Impact: 0.05 ac
Temporary Impact: 0.01 ac
(323 cy) To be filled by
proposed track and access
road construction
W6
Temporary Impact: 0.0002 ac
(1 cy) To be filled by slope
embankment construction
W8
Permanent Impact: 0.01 ac
Temporary Impact: 0.01 ac
(110 cy) To be filled by
proposed track and access
road construction
W7
No Impacts
???
??
???
???
??
??
? ?
??????? ????????
???????? ???????? ??????
?
S005
Permanent Impact: 0.47 ac
Temporary Impact: 0.001 ac
(2,598 cy) To be filled by
proposed track and access
road construction
t: 0.02 ac
t: 0.001 ac
d by
nd access
Napoleon St.
Wetland/WOUS Fill Substrates and Quantities
Substrate
WOUS Fill Quantity (CY)
Ea rthen Fi l l
5626
1,416
Ba l l a s t Fi l l
17946
2,316
Subba l l a s t Fi l l
R:\GIS\HOU\UPRR\Lockmoor\MapFiles\Permit\Lockmoor_Permit_DataDriven.mxd - 2/11/2014 @ 10:16:10 AM
Wetland Fill Quantity (CY)
Ri p Ra p Fi l l
Total:
10876
0
34,448
1,726
12
5,470
Permanent and Temporary Wetland/WOUS Impacts
Wetland/WOUS
Permanent Impact Acreage Temporary Impact Acreage
Pa l us tri ne Needl e-Lea ved Deci duous Fores ted (PFO2)
4.86
0.18
Pers i s tent Pa l us tri ne Emergent (PEM1)
0.23
0.06
Pa l us tri ne Broa d-Lea ved Deci duous Fores ted (PFO1)
0.14
Pa l us tri ne Broa d-Lea ved Deci duous Shrub-Scrub (PSS1) 0.71
Dra i na ge Di tch/Ephemera l Strea m
0.67
Total:
6.91
Ma nma de Pond
Grading Limits
Existing Bridge
Road Centerline
Existing Culvert
Existing Access Road
Proposed Track
Proposed Culvert
????
0.30
Existing Right of Way
Existing Track
Proposed Surface Flow
Road Improvement
90
¥
0.02
0.11
0.03
0.001
0.40
February 11, 2014
Signal Case
Potential Jurisdictional Waters of the U.S.
Potential Jurisdictional Wetlands
Pond
Permanent Workspace
Temporary Workspace
0
¯
Feet
1 in = 200 ft
Plan View
UPRR Lockmoor Yard Expansion,
Lafayette Subdivision MP 224.35 to MP 222.98
3
200
4
5
6
7
8
© OpenStreetMap (and)
contributors, CC-BY-SA
Figure 1
Sheet 6 of 13
9
Calcasieu
Parish
W6
Temporary Impact: 0.0002 ac
(1 cy) To be filled by slope
embankment construction
S003
Permanent Impact: 0.01 ac
Temporary Impact: 0.004 ac
(63 cy) To be filled by
access road construction
S004
No Impacts
W5
Permanent Impact: 0.10 ac
Temporary Impact: 0.04 ac
(746 cy) To be filled by
proposed track and access
road construction
Trousdale Road
S005
Permanent Impact: 0.47 ac
Temporary Impact: 0.001 ac
(2,598 cy) To be filled by
proposed track and access
road construction
Napoleon St.
Wetland/WOUS Fill Substrates and Quantities
Substrate
5626
1,416
Ba l l a s t Fi l l
17946
2,316
Ri p Ra p Fi l l
Total:
10876
0
34,448
1,726
12
5,470
Permanent and Temporary Wetland/WOUS Impacts
Wetland/WOUS
Permanent Impact Acreage Temporary Impact Acreage
Pa l us tri ne Needl e-Lea ved Deci duous Fores ted (PFO2)
4.86
0.18
Pers i s tent Pa l us tri ne Emergent (PEM1)
0.23
0.06
Pa l us tri ne Broa d-Lea ved Deci duous Fores ted (PFO1)
0.14
Pa l us tri ne Broa d-Lea ved Deci duous Shrub-Scrub (PSS1) 0.71
Dra i na ge Di tch/Ephemera l Strea m
0.67
Total:
6.91
Ma nma de Pond
Grading Limits
Existing Bridge
Road Centerline
Existing Culvert
Existing Access Road
Proposed Track
Proposed Culvert
????
0.30
Existing Right of Way
Existing Track
Proposed Surface Flow
Road Improvement
90
¥
WOUS Fill Quantity (CY)
Ea rthen Fi l l
Subba l l a s t Fi l l
R:\GIS\HOU\UPRR\Lockmoor\MapFiles\Permit\Lockmoor_Permit_DataDriven.mxd - 2/11/2014 @ 10:16:13 AM
Wetland Fill Quantity (CY)
S002
Permanent Impact: 0.14 ac
Temporary Impact: 0.02 ac
(877 cy) To be filled by
proposed track and access
road construction
0.02
0.11
0.03
0.001
0.40
February 11, 2014
Signal Case
Potential Jurisdictional Waters of the U.S.
Potential Jurisdictional Wetlands
Pond
Permanent Workspace
Temporary Workspace
0
¯
Feet
1 in = 200 ft
Plan View
UPRR Lockmoor Yard Expansion,
Lafayette Subdivision MP 224.35 to MP 222.98
3
200
4
5
6
7
8
© OpenStreetMap (and)
contributors, CC-BY-SA
Figure 1
Sheet 7 of 13
9
Calcasieu
Parish
W2
Permanent Impact: 0.14 ac
Temporary Impact: 0.02 ac
(900 cy) To be filled by
proposed track and access
road construction
W4
Permanent Impact: 0.01 ac
Temporary Impact: 0.02 ac
(139 cy) To be filled by
access road construction
Proposed Culvert
(See Sheet 12)
S002
Permanent Impact: 0.14 ac
Temporary Impact: 0.02 ac
(877 cy) To be filled by
proposed track and access
road construction
Trousdale Road
Trousdale
???????? ???????? ???????? ???????? ????????
???????? ???????? ???????? ????????
W3
Permanent Impact: 0.61 ac
Temporary Impact: 0.05 ac
(3,606 cy) To be filled by
proposed track and access
road construction
Wetland/WOUS Fill Substrates and Quantities
Substrate
5626
1,416
Ba l l a s t Fi l l
17946
2,316
Ri p Ra p Fi l l
Total:
10876
0
34,448
1,726
12
5,470
Permanent and Temporary Wetland/WOUS Impacts
Wetland/WOUS
Permanent Impact Acreage Temporary Impact Acreage
Pa l us tri ne Needl e-Lea ved Deci duous Fores ted (PFO2)
4.86
0.18
Pers i s tent Pa l us tri ne Emergent (PEM1)
0.23
0.06
Pa l us tri ne Broa d-Lea ved Deci duous Fores ted (PFO1)
0.14
Pa l us tri ne Broa d-Lea ved Deci duous Shrub-Scrub (PSS1) 0.71
Dra i na ge Di tch/Ephemera l Strea m
0.67
Total:
6.91
Ma nma de Pond
Grading Limits
Existing Bridge
Road Centerline
Existing Culvert
Existing Access Road
Proposed Track
Proposed Culvert
????
0.30
Existing Right of Way
Existing Track
Proposed Surface Flow
Road Improvement
90
¥
WOUS Fill Quantity (CY)
Ea rthen Fi l l
Subba l l a s t Fi l l
R:\GIS\HOU\UPRR\Lockmoor\MapFiles\Permit\Lockmoor_Permit_DataDriven.mxd - 2/11/2014 @ 10:16:15 AM
Wetland Fill Quantity (CY)
Napoleon St.
0.02
0.11
0.03
0.001
0.40
February 11, 2014
Signal Case
Potential Jurisdictional Waters of the U.S.
Potential Jurisdictional Wetlands
Pond
Permanent Workspace
Temporary Workspace
0
¯
Feet
1 in = 200 ft
Plan View
UPRR Lockmoor Yard Expansion,
Lafayette Subdivision MP 224.35 to MP 222.98
3
200
4
5
6
7
8
© OpenStreetMap (and)
contributors, CC-BY-SA
Figure 1
Sheet 8 of 13
9
Calcasieu
Parish
W2
Permanent Impact: 0.14 ac
Temporary Impact: 0.02 ac
(900 cy) To be filled by
proposed track and access
road construction
S003
Permanent Impact: 0.01 ac
Temporary Impact: 0.004 ac
(63 cy) To be filled by
access road construction
S001
No Impacts
Trousdale Road
???????? ????????
?
?
POE
Latitude: 30°14'17.391" N
Longitude: 93°16'59.729" W
?
W1
Permanent Impact: 0.17 ac
Temporary Impact: 0.03 ac
(1,108 cy) To be filled by
proposed track and access
road construction
Wetland/WOUS Fill Substrates and Quantities
Substrate
5626
1,416
Ba l l a s t Fi l l
17946
2,316
Ri p Ra p Fi l l
Total:
10876
0
34,448
1,726
12
5,470
Permanent and Temporary Wetland/WOUS Impacts
Wetland/WOUS
4.86
0.18
Pers i s tent Pa l us tri ne Emergent (PEM1)
0.23
0.06
Pa l us tri ne Broa d-Lea ved Deci duous Fores ted (PFO1)
0.14
Pa l us tri ne Broa d-Lea ved Deci duous Shrub-Scrub (PSS1) 0.71
Dra i na ge Di tch/Ephemera l Strea m
0.67
Total:
6.91
Grading Limits
Existing Bridge
Road Centerline
Existing Culvert
Existing Access Road
Proposed Track
Proposed Culvert
????
0.30
Existing Right of Way
Existing Track
Proposed Surface Flow
Road Improvement
10
¥
Permanent Impact Acreage Temporary Impact Acreage
Pa l us tri ne Needl e-Lea ved Deci duous Fores ted (PFO2)
Ma nma de Pond
90
¥
WOUS Fill Quantity (CY)
Ea rthen Fi l l
Subba l l a s t Fi l l
R:\GIS\HOU\UPRR\Lockmoor\MapFiles\Permit\Lockmoor_Permit_DataDriven.mxd - 2/11/2014 @ 10:15:40 AM
Wetland Fill Quantity (CY)
Napoleon St.
10
¥
0.02
0.11
0.03
0.001
0.40
February 11, 2014
Signal Case
Potential Jurisdictional Waters of the U.S.
Potential Jurisdictional Wetlands
Pond
Permanent Workspace
Temporary Workspace
0
¯
Feet
1 in = 200 ft
Plan View
UPRR Lockmoor Yard Expansion,
Lafayette Subdivision MP 224.35 to MP 222.98
3
200
4
5
6
7
8
© OpenStreetMap (and)
contributors, CC-BY-SA
Figure 1
Sheet 9 of 13
9
Proposed Tracks
Existing Ground
Proposed Embankment
Proposed Swale
Existing Track Centerline
Wetland
TYPICAL EMBANKMENT SECTION - SWALE REQUIRED
Proposed Embankment
Existing Ground
Wetland
Existing Track Centerline
TYPICAL EMBANKMENT SECTION - SWALE NOT REQUIRED
POST-CONSTRUCTION DRAINAGE FLOW CASES.
1. EXISTING SHEETFLOW AWAY FROM TRACKS WITH NO EXISTING SWALE:
PROPOSED EMBANKMENT PROVIDES SHEET FLOW AWAY FROM TRACKS
MATCHING EXISTING DRAINAGE CONDITION. NO SWALE REQUIRED PER
HYDROLOGY AND HYDRAULICS ANALYSIS.
2. PROPOSED GRADING IMPACTING EXISTING SWALE
PROPOSED EMBANKMENT LOCATED WITHIN LIMITS OF
EXISTING SWALE REQUIRES PROPOSED SWALE TO BE
RELOCATED ALONG THE OUTSIDE OF PROPOSED
EMBANKMENT SLOPE. PROPOSED SWALE SIZED
ACCORDING TO CALCULATIONS PER HYDROLOGY AND
HYDRAULICS ANALYSIS.
ES121313053030SAC
FEBRUARY 11, 2014
UPRR LOCKMOOR YARD EXPANSION PROJECT
TYPICAL CROSS SECTION
THROUGH WETLANDS
SHEET 10 of 13
TYPICAL SECTION FOR ACCESS ROAD
TYPICAL SECTION FOR STORAGE TRACKS
UPRR LOCKMOOR YARD EXPANSION PROJECT
FEBRUARY 11, 2014
ES121313053030SAC
TYPICAL TRACK CROSS SECTION
SHEET 11 of 13
Existing Ground
TYPICAL SECTION FOR STORAGE TRACK
UPRR LOCKMOOR YARD EXPANSION PROJECT
FEBRUARY 11, 2014
ES121313053030SAC
TYPICAL TRACK CROSS SECTION
SHEET 12 of 13
EXISTING GROUND LINE
6" ROAD BASE MATERIAL
PROPOSED 24"x50' CMP CULVERT
DRIVEWAY CULVERT SECTION
Proposed 72"x170' CMP Culvert
Existing Ground
Proposed 72"x90' SSP Culvert
Centerline Proposed Track
Proposed Future Tracks
Class 2 RipRap at Outlet
Existing Track Centerline
CULVERT 224.26 SECTION
UPRR LOCKMOOR YARD EXPANSION PROJECT
FEBRUARY 11, 2014
ES121313053030SAC
CULVERT CROSS SECTION
SHEET 13 of 13