You can copy from here when filling out the rest of the page.
HYDROCHLORIC ACID CHEMICAL TERMINAL IN ASCENSION PARISH
NAME OF APPLICANT: Reagent Chemical and Research, Inc., c/o Conestoga-Rovers & Associates, 5554 Corporate Boulevard, Suite 200, Baton Rouge, Louisiana 70808.
LOCATION OF WORK: Within the Lake Pontchartrain Basin, in the Lake Maurepas hydrologic unit (HUC 08070204), Section 50, Township 9S, Range 2E; on Louisiana Highway 30, approximately 3.1 miles west of its intersection with Interstate 10, near Geismar, Louisiana, in Ascension Parish, as shown on the enclosed drawings.
CHARACTER OF WORK: The applicant has requested authorization to clear, grade, and fill a 35-acre tract to construct an access road, rail yard and appurtenant structures to construct a 4 million-gallon hydrochloric acid chemical terminal. A proposed 6-inch pipeline will be installed to deliver hydrochloric acid to the proposed terminal, where it will be stored in one of the 8 proposed storage sites for loading and blending. The proposed facility will tie into existing rail infrastructure and include 26 railcar loading spots and storage for over 200 rail cars. Truck loading will also be available from 2 truck loading stations with 8 de-pressure stations. Approximately 5,000 cubic yards of native material will be redistributed on-site. An additional 50,500 cubic yards of hauled-in fill material will be deposited on-site. Approximately 6.25 acres of forested wetland will be directly impacted by the proposed activity. As compensation for unavoidable wetland impacts the applicant proposes to purchase wetland credits from a Corps approved mitigation bank located in the watershed.
JOINT PUBLIC NOTICE
March 31, 2014
United States Army
Corps of Engineers
New Orleans District
Regulatory Branch
Post Office Box 60267
New Orleans, Louisiana 70160-0267
State of Louisiana
Department of Environmental Quality
Water Quality Certification Section
Post Office Box 4313
Baton Rouge, Louisiana 70821-4313
(504) 862-2675
Project Manager
Jamie Crowe
Jamie.M.Crowe@usace.army.mil
Permit Application Number
MVN 2013-2774 CO
(225) 219-3225
Project Manager
Elizabeth Johnson
WQC Application Number
WQC 140327-02
Interested parties are hereby notified that a permit application has been received by
the New Orleans District of the U.S. Army Corps of Engineers pursuant to:
[ ] Section 10 of the Rivers and Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC
403); and/or [X] Section 404 of the Clean Water Act (86 Stat. 816; 33 USC 1344).
Application has also been made to the Louisiana Department of Environmental
Quality, Office of Environmental Services, for a Water Quality Certification (WQC) in
accordance with statutory authority contained in LRS30:2047 A(3), and provisions of
Section 401 of the Clean Water Act (P.L.95-17).
HYDROCHLORIC ACID CHEMICAL TERMINAL IN ASCENSION PARISH
NAME OF APPLICANT: Reagent Chemical and Research, Inc., c/o Conestoga-Rovers
& Associates, 5554 Corporate Boulevard, Suite 200, Baton Rouge, Louisiana 70808.
LOCATION OF WORK: Within the Lake Pontchartrain Basin, in the Lake Maurepas
hydrologic unit (HUC 08070204), Section 50, Township 9S, Range 2E; on Louisiana
Highway 30, approximately 3.1 miles west of its intersection with Interstate 10, near
Geismar, Louisiana, in Ascension Parish, as shown on the enclosed drawings.
CHARACTER OF WORK: The applicant has requested authorization to clear, grade,
and fill a 35-acre tract to construct an access road, rail yard and appurtenant structures
to construct a 4 million-gallon hydrochloric acid chemical terminal. A proposed 6-inch
pipeline will be installed to deliver hydrochloric acid to the proposed terminal, where it
will be stored in one of the 8 proposed storage sites for loading and blending. The
proposed facility will tie into existing rail infrastructure and include 26 railcar loading
spots and storage for over 200 rail cars. Truck loading will also be available from 2
truck loading stations with 8 de-pressure stations. Approximately 5,000 cubic yards of
native material will be redistributed on-site. An additional 50,500 cubic yards of hauledin fill material will be deposited on-site. Approximately 6.25 acres of forested wetland
will be directly impacted by the proposed activity. As compensation for unavoidable
wetland impacts the applicant proposes to purchase wetland credits from a Corps
approved mitigation bank located in the watershed.
The comment period for the Department of the Army Permit and the Louisiana
Department of Environmental Quality WQC will close 20 days from the date of this joint
public notice. Written comments, including suggestions for modifications or objections
to the proposed work, stating reasons thereof, are being solicited from anyone having
interest in this permit and/or this WQC request and must be mailed, so as to be
received before or by the last day of the comment period. Letters concerning the Corps
of Engineers permit application must reference the applicant's name and the Permit
Application Number, and be mailed to the Corps of Engineers at the address above,
ATTENTION: REGULATORY BRANCH. The application for this proposed project is on
file with the Louisiana Department of Environmental Quality and may be examined
weekdays between 8:00 a.m. and 4:30 p.m. Copies may be obtained upon payment of
costs of reproduction. Individuals or parties may request an extension of time in which
to comment on the proposed work by writing or e-mailing the Corps of Engineers
Project Manager listed above. Any request must be specific and substantively
supportive of the requested extension, and received by this office prior to the end of the
initial comment period. The Section Chief will review the request and the requestor will
be promptly notified of the decision to grant or deny the request. If granted, the time
extension will be continuous to the initial comment period and, inclusive of the initial
comment period, will not exceed a total of 30 calendar days. Letters concerning the
Water Quality Certification must reference the applicant's name and the WQC
Application number and be mailed to the Louisiana Department of Environmental
Quality at the address above.
Corps of Engineers Permit Criteria
The decision whether to issue a permit will be based on an evaluation of the
probable impacts, including cumulative impacts of the proposed activity on the public
interest. That decision will reflect the national concern for both protection and utilization
of important resources. The benefit which reasonably may be expected to accrue from
the proposal must be balanced against its reasonably foreseeable detriments. All
factors which may be relevant to the proposal will be considered including the
cumulative effects thereof; among those are conservation, economics, aesthetics,
general environmental concerns, wetlands, historic properties, fish and wildlife values,
flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion,
recreation, water supply and conservation, water quality, energy needs, safety, food and
fiber production, mineral needs, considerations of property ownership and, in general,
the needs and welfare of the people.
The U.S. Army Corps of Engineers is soliciting comments from the public, federal,
state, and local agencies and officials, Indian Tribes, and other interested parties in
order to consider and evaluate the impacts of this proposed activity. Any comments
received will be considered by the U.S. Army Corps of Engineers to determine whether
to make, modify, condition, or deny a permit for this proposal. To make this decision,
comments are used to assess impacts on endangered species, historic properties,
water quality, general environmental effects, and other public interest factors listed
above. Comments are used in the preparation of an Environmental Assessment and/or
an Environmental Impact Statement pursuant to the National Environmental Policy Act.
Comments are also used to determine the need for a public hearing and to determine
the overall public interest of the proposed activity.
The New Orleans District is unaware of properties listed on the National Register of
Historic Places near the proposed work. The possibility exists that the proposed work
may damage or destroy presently unknown archeological, scientific, prehistorical,
historical sites, or data. Issuance of this public notice solicits input from the State
Archeologist and State Historic Preservation Officer regarding potential impacts to
cultural resources.
Our initial finding is that the proposed work would neither affect any species listed
as endangered by the U.S. Departments of Interior or Commerce, nor affect any habitat
designated as critical to the survival and recovery of any endangered species.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the
Magnuson-Stevens Fishery Conservation and Management Act. The applicant's
proposal would result in the destruction or alteration of N/A acres of EFH utilized by
various life stages of red drum and penaeid shrimp. Our initial determination is that the
proposed action would not have a substantial adverse impact on EFH or federally
managed fisheries in the Gulf of Mexico. Our final determination relative to project
impacts and the need for mitigation measures is subject to review by and coordination
with the National Marine Fisheries Service.
If the proposed work involves deposits of dredged or fill material into navigable
waters, the evaluation of the probable impacts will include the application of guidelines
established by the Administrator of the Environmental Protection Agency. Also, a
certification that the proposed activity will not violate applicable water quality standards
will be required from the Department of Environmental Quality, Office of Environmental
Services, before a permit is issued.
Any person may request, in writing, within the comment period specified in this
notice, that a public hearing be held to consider this application. Requests for public
hearings shall state, with particularity, the reasons for holding a public hearing. You are
requested to communicate the information contained in this notice to any other parties
whom you deem likely to have interest in the matter.
You are requested to communicate the information contained in this notice to any
other parties whom you deem likely to have interest in the matter.
John M. Herman
Chief, Central Evaluation Section
Regulatory Branch
Enclosure