You can copy from here when filling out the rest of the page.
HENDERSON LAKE DRAWDOWN IN ST. MARTIN PARISH
NAME OF APPLICANT: ST. MARTIN GOVERNMENT, c/o Louisiana Department of Natural Resources, Atchafalaya Basin Program, Attn: Mr. Don Haydel, P. O. Box 44487, Baton Rouge, Louisiana 70804.
LOCATION OF WORK: At 30.25164 N, -91.72463 W, on Henderson Lake, within the Atchafalaya Basin Floodway, east of Henderson, Louisiana, in St. Martin Parish, as shown on the attached drawings. The proposed project is in Hydrologic Unit Code 08080101 – Atchafalaya Basin Watershed.
CHARACTER OF WORK: Draw down surface water elevations within Henderson Lake. Water level reductions are to be accomplished through operating the lake’s water control structure. The operational plan is designed for a gradual lowering of lake levels by 2 to 4 inches per day until reaching the target elevation of a minimum +6’/maximum +7’. The proposed drawdown would be for three (3) months each year between approximately August 1 through October 31 to facilitate an effective noxious aquatic weed treatment program. A reduction in vegetation coverage is critical to improving habitat for various fish and wildlife communities, as well as providing navigation for recreational and commercial interest. Sufficient draft for safe marine vessel travel within the lake’s established channels should be maintained throughout the drawdown period. The proposed drawdown would occur on an annual basis from 2014 through 2019.
DEPARTMENT OF THE ARMY
NEW ORLEANS DISTRICT, CORPS OF ENGINEERS
P. O. BOX 60267
NEW ORLEANS, LOUISIANA 70160-0267
April 7, 2014
REPLY TO
ATTENTION OF:
Operations Division
Western Evaluation Section
Project Manager
James W. Little, Jr.
(225) 342-3099 / fax: (225) 342-9439
james.little@usace.army.mil
Permit Application Number:
MVN-2006-02221-WII
PUBLIC NOTICE
Interested parties are hereby notified that a permit application has been received
by the New Orleans District of the U.S. Army Corps of Engineers pursuant to: [ X ]
Section 10 of the Rivers and Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC
403); and/or [ ] Section 404 of the Clean Water Act (86 Stat. 816; 33 USC 1344).
HENDERSON LAKE DRAWDOWN IN ST. MARTIN PARISH
NAME OF APPLICANT: ST. MARTIN GOVERNMENT, c/o Louisiana Department of
Natural Resources, Atchafalaya Basin Program, Attn: Mr. Don Haydel, P. O. Box
44487, Baton Rouge, Louisiana 70804.
LOCATION OF WORK: At 30.25164 N, -91.72463 W, on Henderson Lake, within the
Atchafalaya Basin Floodway, east of Henderson, Louisiana, in St. Martin Parish, as
shown on the attached drawings. The proposed project is in Hydrologic Unit Code
08080101 Atchafalaya Basin Watershed.
CHARACTER OF WORK: Draw down surface water elevations within Henderson
Lake. Water level reductions are to be accomplished through operating the lake's
water control structure. The operational plan is designed for a gradual lowering of lake
levels by 2 to 4 inches per day until reaching the target elevation of a minimum
+6'/maximum +7'. The proposed drawdown would be for three (3) months each year
between approximately August 1 through October 31 to facilitate an effective noxious
aquatic weed treatment program. A reduction in vegetation coverage is critical to
improving habitat for various fish and wildlife communities, as well as providing
navigation for recreational and commercial interest. Sufficient draft for safe marine
vessel travel within the lake's established channels should be maintained throughout
the drawdown period. The proposed drawdown would occur on an annual basis from
2014 through 2019.
The comment period for the Department of the Army Permit will close 20 days
from the date of this joint public notice. Written comments, including suggestions for
modifications or objections to the proposed work, stating reasons thereof, are being
solicited from anyone having interest in this permit and must be submitted so as to be
received before or by the last day of the comment period. Letters concerning the Corps
of Engineers permit application must reference the applicant's name and the Permit
Application Number, and be forwarded to the Corps of Engineers at the address above,
ATTENTION: REGULATORY BRANCH. Individuals or parties may request an
extension of time in which to comment on the proposed work by writing, faxing, or emailing the Corps of Engineers Project Manager listed above. Any request must be
specific and substantively supportive of the requested extension, and received by this
office prior to the end of the initial comment period. The Section Chief will review the
request and the requestor will be promptly notified of the decision to grant or deny the
request. If granted, the time extension will be continuous to the initial comment period
and, inclusive of the initial comment period, will not exceed a total of 30 calendar days.
Corps of Engineers Permit Criteria
The decision whether to issue a permit will be based on an evaluation of the
probable impacts, including cumulative impacts of the proposed activity on the public
interest. That decision will reflect the national concern for both protection and utilization
of important resources. The benefit which reasonably may be expected to accrue from
the proposal must be balanced against its reasonably foreseeable detriments. All
factors which may be relevant to the proposal will be considered including the
cumulative effects thereof; among those are conservation, economics, aesthetics,
general environmental concerns, wetlands, historic properties, fish and wildlife values,
flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion,
recreation, water supply and conservation, water quality, energy needs, safety, food
and fiber production, mineral needs, considerations of property ownership and, in
general, the needs and welfare of the people.
The U.S. Army Corps of Engineers is soliciting comments from the public,
federal, state, and local agencies and officials, Indian Tribes, and other interested
parties in order to consider and evaluate the impacts of this proposed activity. Any
comments received will be considered by the U.S. Army Corps of Engineers to
determine whether to make, modify, condition, or deny a permit for this proposal. To
make this decision, comments are used to assess impacts on endangered species,
historic properties, water quality, general environmental effects, and other public
interest factors listed above. Comments are used in the preparation of an
Environmental Assessment and/or an Environmental Impact Statement pursuant to the
National Environmental Policy Act. Comments are also used to determine the need for
a public hearing and to determine the overall public interest of the proposed activity.
The New Orleans District is unaware of properties listed on the National Register
of Historic Places near the proposed work. The possibility exists that the proposed
work may damage or destroy presently unknown archeological, scientific, pre-historical,
historical sites, or data. Issuance of this public notice solicits input from the State
Archeologist and State Historic Preservation Officer regarding potential impacts to
cultural resources.
Our initial finding is that the proposed work would neither affect any species
listed as endangered by the U.S. Departments of Interior or Commerce, nor affect any
habitat designated as critical to the survival and recovery of any endangered species.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements
of the Magnuson-Stevens Fishery Conservation and Management Act. The applicant's
proposal may result in the destruction or alteration of N/A acres of EFH utilized by
various life stages of red drum and penaeid shrimp. Our initial determination is that the
proposed action would not have a substantial adverse impact on EFH or federally
managed fisheries in the Gulf of Mexico. Our final determination relative to project
impacts and the need for mitigation measures is subject to review by and coordination
with the National Marine Fisheries Service.
If the proposed work involves deposits of dredged or fill material into navigable
waters, the evaluation of the probable impacts will include the application of guidelines
established by the Administrator of the Environmental Protection Agency. Also, a
certification that the proposed activity will not violate applicable water quality standards
will be required from the Department of Environmental Quality, before a permit is
issued.
Any person may request, in writing, within the comment period specified in this
notice, that a public hearing be held to consider this application. Requests for public
hearings shall state, with particularity, the reasons for holding a public hearing.
You are requested to communicate the information contained in this notice to
any other parties whom you deem likely to have interest in the matter.
Darrell S. Barbara
Chief, Western Evaluation Section
Regulatory Branch
Enclosure