BULKHEAD, FILL AND MOORING PILES IN ST MARTIN PARISH
NAME OF APPLICANT: Jason Bailey, 510 Third Street, Morgan City, LA 70380.
LOCATION OF WORK: (29.81126 N, -91.09852) on Four Mile Bayou, St. Martin Parish, Louisiana. Project is located in the Atchafalaya River Basin, HUC 08080101
CHARACTER OF WORK Construct a 150-linear feet bulkhead and associated fill, and place 14 mooring piles, all to extend from the bankline of 35-feet channelward for the purpose of mooring houseboats. Approximately 0.02 acres of waterbottoms will be impacted as a result of project implementation. A permit was previously issued for structures at this location under the Programmatic General Permit (PGP). This project is to authorize the addition of mooring piles, which now exceed the guidelines of the PGP.
JOINT PUBLIC NOTICE
March 31, 2014
United States Army
Corps of Engineers
New Orleans District
Regulatory Branch
Post Office Box 60267
New Orleans, La. 70160-0267
State of Louisiana
Department of Environmental Quality
Office of Environmental Services
Post Office Box 4313
Baton Rouge, LA 70821-4313
(504) 862-1954 FAX (504) 862-2574
Project Manager
Mike H. Herrmann
Permit Application Number
MVN 2013-00104-WLL
(225) 219-3225 Fax (225) 325-8250
Project Manager
Elizabeth Johnson
WQC Application Number
WQC 140327-01
Interested parties are hereby notified that a permit application has been received by
the New Orleans District of the U.S. Army Corps of Engineers pursuant to: [X] Section 10
of the Rivers and Harbors Act of March 3, 1899 (30 Stat. 1151; 33 USC 403); and/or [X]
Section 404 of the Clean Water Act (86 Stat. 816; 33 USC 1344).
Application has also been made to the Louisiana Department of Environmental
Quality for a Water Quality Certification (WQC) in accordance with statutory authority
contained in LRS 30:2074 A(3) and provisions of Section 401 of the Clean Water Act.
BULKHEAD, FILL AND MOORING PILES IN ST MARTIN PARISH
NAME OF APPLICANT: Jason Bailey, 510 Third Street, Morgan City, LA 70380.
LOCATION OF WORK: (29.81126 N, -91.09852) on Four Mile Bayou, St. Martin Parish,
Louisiana. Project is located in the Atchafalaya River Basin, HUC 08080101
CHARACTER OF WORK Construct a 150-linear feet bulkhead and associated fill, and place
14 mooring piles, all to extend from the bankline of 35-feet channelward for the purpose of
mooring houseboats. Approximately 0.02 acres of waterbottoms will be impacted as a result of
project implementation. A permit was previously issued for structures at this location under the
Programmatic General Permit (PGP). This project is to authorize the addition of mooring piles,
which now exceed the guidelines of the PGP.
To compensate for unavoidable project related impacts to wetlands, the applicant has
proposed to utilize "in kind" mitigation credits from one of the approved mitigation bank sponsors
located in the primary and secondary service areas of the project watersheds.
The comment period for the Department of the Army Permit and the Louisiana Department
1
of Environmental Quality WQC will close 20 days from the date of this joint public notice. Written
comments, including suggestions for modifications or objections to the proposed work, stating
reasons thereof, are being solicited from anyone having interest in this permit and/or this WQC
request and must be mailed so as to be received before or by the last day of the comment period.
Letters concerning the Corps of Engineers permit application must reference the applicant's name
and the Permit Application Number, and be mailed to the Corps of Engineers at the address above,
ATTENTION: REGULATORY BRANCH. Individuals or parties may request an extension of time in
which to comment on the proposed work by writing to the project manager or clicking on the project
manager's name on the public notice grid on the web page. Any request must be specific and
substantively supportive of the requested extension, and received by this office prior to the end of
the initial comment period. The Section Chief will review the request and the requestor will be
promptly notified of the decision to grant or deny the request. If granted, the time extension will be
continuous to the initial comment period and, inclusive of the initial comment period, will not exceed
a total of 30 calendar days. Letters concerning the Water Quality Certification must reference the
applicant's name and the WQC Application number and be mailed to the Louisiana Department of
Environmental Quality at the address above.
The application for this proposed project is on file with the Louisiana Department of
Environmental Quality and may be examined during weekdays between 8:00 a.m. and 4:30
p.m. Copies may be obtained upon payment of costs of reproduction.
Corps of Engineers Permit Criteria
The decision whether to issue a permit will be based on an evaluation of the
probable impacts, including cumulative impacts of the proposed activity on the public
interest. That decision will reflect the national concern for both protection and utilization of
important resources. The benefit which reasonably may be expected to accrue from the
proposal must be balanced against its reasonably foreseeable detriments. All factors
which may be relevant to the proposal will be considered including the cumulative effects
thereof; among those are conservation, economics, aesthetics, general environmental
concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain
values, land use, navigation, shoreline erosion and accretion, recreation, water supply and
conservation, water quality, energy needs, safety, food and fiber production, mineral
needs, considerations of property ownership and, in general, the needs and welfare of the
people.
The U.S. Army Corps of Engineers is soliciting comments from the public, federal,
state, and local agencies and officials, Indian Tribes, and other interested parties in order
to consider and evaluate the impacts of this proposed activity. Any comments received will
be considered by the U.S. Army Corps of Engineers to determine whether to make, modify,
condition, or deny a permit for this proposal. To make this decision, comments are used to
assess impacts on endangered species, historic properties, water quality, general
environmental effects, and other public interest factors listed above. Comments are used
in the preparation of an Environmental Assessment and/or an Environmental Impact
Statement pursuant to the National Environmental Policy Act. Comments are also used to
determine the need for a public hearing and to determine the overall public interest of the
proposed activity.
No properties listed on the National Register of Historic Places are near the
proposed work. The possibility exists that the proposed work may damage or destroy
presently unknown archeological, scientific, prehistorical, historical sites, or data. Copies of
this notice are being sent to the State Archeologist and the State Historic Preservation
2
Officer.
Our initial finding is that the proposed work would neither affect any species listed as
endangered by the U.S. Departments of Interior or Commerce, nor affect any habitat
designated as critical to the survival and recovery of any endangered species.
This notice initiates the Essential Fish Habitat (EFH) consultation requirements of the
Magnuson-Stevens Fishery Conservation and Management Act. The applicant's proposal
would result in the destruction or alteration of 0.02 acre(s) of EFH utilized by various life
stages of red drum and penaeid shrimp. Our initial determination is that the proposed
action would not have a substantial adverse impact on EFH or federally managed fisheries
in the Gulf of Mexico. Our final determination relative to project impacts and the need for
mitigation measures is subject to review by and coordination with the National Marine
Fisheries Service.
If the proposed work involves deposits of dredged or fill material into navigable
waters, the evaluation of the probable impacts will include the application of guidelines
established by the Administrator of the Environmental Protection Agency. Also, a
certification that the proposed activity will not violate applicable water quality standards will
be required from the Department of Environmental Quality before a permit is issued.
Any person may request, in writing, within the comment period specified in this
notice, that a public hearing be held to consider this application. Requests for public
hearings shall state, with particularity, the reasons for holding a public hearing.
You are requested to communicate the information contained in this notice to any
other parties whom you deem likely to have interest in the matter.
The applicant has certified that the proposed activity described in the application
complies with and will be conducted in a manner that is consistent with the Louisiana
Coastal Resources Program. The Department of the Army permit will not be issued unless
the applicant received approval or a waiver of the Coastal Use Permit by the Department of
Natural Resources.
Darrell S. Barbara
Chief, Western Evaluation Section
Enclosures:
3