PUBLIC NOTICE DATE: May 25, 2012 EXPIRATION DATE: June 25, 2012 REFERENCE NUMBER: POA-2003-1422
PUBLIC NOTICE DATE: May 25, 2012
EXPIRATION DATE: June 25, 2012
REFERENCE NUMBER: POA-2003-1422
WATERWAY: Channel B
***PUBLIC NOTICE REVISION***
On May 25, 2012, the Alaska District Corps of Engineers published a Public Notice for Department of the Army (DA) permit number POA-2003-1422 for a DA permit application from Tin Cup, LLC, to discharge fill into Waters of the United States (U.S.), including wetlands, as part of the construction of a gravel pad that would support facilities for pipe manufacturing, coating, and storage. The proposed project would consolidate existing pipe manufacturing facilities currently in five locations for more efficient and economical operations.
The project site is located within Sections 26, 27, 34 and 35, T. 1 S., R. 1 E., Fairbanks Meridian, USGS Quad Maps Fairbanks (D-1) SW and Fairbanks (D-2) SE,; Latitude 64.7958º N., Longitude 147.4966º W.; near North Pole, Alaska. The site is between the Old Richardson Highway and Bradway Road approximately 1.5 miles east of the intersection of Dennis Road and the Old Richardson Highway.
The Public Notice comment period has been extended until June 25, 2012.
All other information contained in the previous notice remains the same. Please bring this announcement to the attention of anyone you know who is or may be interested. Please contact Greg Mazer at (907) 474-2166, by fax at (907) 474-2164, or by email at gregory.j.mazer@usace.army.mil if further information is desired concerning this notice.
District Engineer
U.S. Army, Corps of Engineers
US Army Corps
of Engineers
Alaska District
FAIRBANKS FIELD OFFICE
Regulatory Division (1145)
CEPOA-RD
2175 University Avenue, Suite 201E
Fairbanks, Alaska 99709-4927
Public Notice
of Application
for Permit
PUBLIC NOTICE DATE: May 25, 2012
EXPIRATION DATE:
REFERENCE NUMBER:
WATERWAY:
June 25, 2012
POA-2003-1422
Channel B
***PUBLIC NOTICE REVISION***
On May 25, 2012, the Alaska District Corps of Engineers published a Public
Notice for Department of the Army (DA) permit number POA-2003-1422 for a DA
permit application from Tin Cup, LLC, to discharge fill into Waters of the
United States (U.S.), including wetlands, as part of the construction of a
gravel pad that would support facilities for pipe manufacturing, coating, and
storage. The proposed project would consolidate existing pipe manufacturing
facilities currently in five locations for more efficient and economical
operations.
The project site is located within Sections 26, 27, 34 and 35, T. 1 S., R. 1
E., Fairbanks Meridian, USGS Quad Maps Fairbanks (D-1) SW and Fairbanks (D-2)
SE,; Latitude 64.7958º N., Longitude 147.4966º W.; near North Pole, Alaska.
The site is between the Old Richardson Highway and Bradway Road approximately
1.5 miles east of the intersection of Dennis Road and the Old Richardson
Highway.
The Public Notice comment period has been extended until June 25, 2012.
All other information contained in the previous notice remains the same.
Please bring this announcement to the attention of anyone you know who is or
may be interested. Please contact Greg Mazer at (907) 474-2166, by fax at
(907) 474-2164, or by email at gregory.j.mazer@usace.army.mil if further
information is desired concerning this notice.
District Engineer
U.S. Army, Corps of Engineers
US Army Corps
of Engineers
Alaska District
Public Notice
of Application
for Permit
FAIRBANKS FIELD OFFICE
Regulatory Division (1145)
CEPOA-RD
2175 University Avenue, Suite 201E
Fairbanks, Alaska 99709-4927
PUBLIC NOTICE DATE:
May 25, 2012
EXPIRATION DATE: June 8, 2012
REFERENCE NUMBER: POA-2003-1422
WATERWAY: Channel B
Interested parties are hereby notified that a Department of the Army permit
application has been received for work in waters of the United States as
described below and shown on the enclosed project drawings.
Comments on the described work, with the reference number, should reach this
office no later than the expiration date of this Public Notice to become part
of the record and be considered in the decision. Please contact Greg Mazer
at (907) 474-2166, by fax at (907) 474-2164, or by email at
Gregory.j.mazer@usace.army.mil if further information is desired concerning
this notice.
APPLICANT: Tin Cup, LLC, 1881 Livengood, Fairbanks, Alaska 99701; Mr.
Richard Schok
LOCATION: The project site is located within Sections 26, 27, 34 and 35, T.
1 S., R. 1 E., Fairbanks Meridian, USGS Quad Maps Fairbanks (D-1) SW and
Fairbanks (D-2) SE,; Latitude 64.7958º N., Longitude 147.4966º W.; near North
Pole, Alaska. The site is between the Old Richardson Highway and Bradway
Road approximately 1.5 miles east of the intersection of Dennis Road and the
Old Richardson Highway.
PURPOSE: The applicant's stated purpose is to consolidate existing pipe
manufacturing facilities in five locations for more efficient and economical
operations.
PROPOSED WORK: The applicant would place approximately 1,000,000 cubic yards
of gravel fill into 118 acres of jurisdictional wetlands to create a gravel
pad that would support facilities for pipe manufacturing, coating, and
storage. In addition, 24 acres of jurisdictional wetlands would be
mechanically cleared for gravel extraction and 1 acre would be temporarily
filled for the construction of a 1,500-foot long gravel access road
connecting the gravel source area to the gravel pad. Several buildings and a
1
railroad spur would be constructed upon the proposed gravel pad. All work
would be performed in accordance with the enclosed plan, (Sheets 1-4), dated
May 23, 2012 and May 22, 2008.
ADDITIONAL INFORMATION:
Tin Cup, LLC is a holding company for Flowline Alaska, Inc., which provides
pipe fabrication and storage services to oil and gas companies, the Alaska
Department of Transportation and Public Facilities, and others. Flowline
Alaska, Inc. currently conducts its operations in three separate locations
within Fairbanks. The main production facility and the other facilities are
situated on properties that are no more than 14 acres in size, (combined size
of contiguous area where operations occur). One of the locations is over
0.25 mile away from the main production facility. Materials and personnel
travel on public roads to access the disparate facilities. Flowline Alaska,
Inc. leases all the properties where it conducts operations from the Alaska
Railroad Company.
Permitting history
On April 15, 2004, the Alaska District of the U.S. Army Corps of Engineers
issued a permit to fill 165 acres of wetlands on the property in 2004 with a
construction period for completing the work set at March 31, 2007. Although
Tin Cup, LLC cleared vegetation from approximately 35 acres of wetland at the
site, it did not discharge any fill into jurisdictional wetlands authorized
by the permit.
On May 22, 2008, the Alaska District received an application from Tin Cup,
LLC for essentially the same activity they had proposed to conduct under the
original permit. A public notice was issued for the proposed project on June
2, 2008. In response to concerns raised during the public notice, the
applicant conducted a wetland delineation in 2009, which was approved by the
District in 2010. However, no permit was issued due to an appeal of the
jurisdictional determination, which was not resolved until April 13, 2012
when the District re-issued the positive jurisdictional determination.
Although the project plans remain essentially unchanged from 2008, the
proposed activity would result in the placement of fill into 143 acres of
wetland rather than 165 acres as originally proposed because the total amount
of wetland at the site had been overestimated in 2008. The 2009 wetland
delineation, demonstrated that the extent of wetland within the proposed
project area is 143 acres.
Site description
The site is situated within the alluvial plain stretching between the Tanana
and Chena Rivers. The alluvial plain is a relatively flat area about 23
miles long and 8 miles wide that is bounded by the Tanana River on the south,
Moose Creek Dam on the east and the bases of bedrock hills on the north and
west near the Chena River. As with most of the alluvial plain, the site
slopes gently from east to west at approximately 1 to 6 feet per mile (0.02
to 0.11 percent).
The 2009 wetland delineation demonstrated that most of the Tin Cup site is
wetland, except for the 95.4 acres of upland in the southwestern part of the
site and the 8.6 acres of upland in the eastern part of the site. Although
the delineation excluded the 40 acres in the southeastern part of the site,
the District determined that this area is wetland. Thus, of the 455 acres at
the site, the total amount of wetland is 351 acres. The wetland delineation
report identifies five plant communities within the on-site wetland as
2
follows: Shrub-Scrub, Black Spruce Closed Forest, Alaska Birch/Shrub Birch,
Grasslike and Dwarf Shrub, and Alaska Birch/Calamagrostis. The Grasslike and
Dwarf Shrub community comprises the 27-acre area that was cleared of
vegetation in 2007. These communities support near-surface saturation and/or
very shallow inundation; none support any substantial amount of open water.
The on-site wetland is part of a very large wetland (approximately 2,500
acres within the sub-watershed) that extends mainly east and south of the
site. The wetland is generally unencumbered by roads, houses, or other
structures, but is constrained by the Richardson Highway on the south and
Bradway Road on the north.
The southwestern 95.4 acres of the site was cleared of vegetation and lightly
graded over 20 years ago. As a result, several parallel spoil berms
(`windrows') were created; the berms are about 75 feet wide and elevated
approximately 3 feet above the surrounding ground. This area has been left
fallow, but is mowed regularly to prevent re-growth of shrubs and trees. The
8.6-acre upland in the eastern part of the site also appears to have been
cleared and graded over 20 years ago.
APPLICANT PROPOSED MITIGATION: The applicant proposes the following
mitigation measures to avoid, minimize, and compensate for impacts to waters
of the United States from activities involving discharges of dredged or fill
material.
a. Avoidance: Although much of the project would occur in a
previously cleared upland (95.4 acres), the project is unable to avoid
placing fill in 143 acres of wetland, (118 acres for the gravel pad, 1 acre
for the temporary access road, and 24 acres for the gravel source area), due
to the broad expanse of wetland on site.
b. Minimization: During the processing for the 2004 permit, the
applicant reduced the proposed gravel pad by 80 acres. The area that would
no longer be used for this part of the gravel pad is jurisdictional wetland.
The current proposal retains this reduction in the project design and the
associated reduction in wetland impact. All fill would be placed on
geotextile sheeting or equivalent material to prevent excessive settling and
minimize thaw of the underlying frost. During fill placement, silt fences or
hay bales would be placed at the edges of the buffer zones to prevent
sedimentation in adjacent wetlands. In addition, the applicant proposed
25-foot wide vegetated buffers along the portions of the site where wetland
would be filled; these buffers would be comprised of wetland that would not
be directly disturbed by the proposed activity.
c. Compensatory Mitigation: As mentioned above, the applicant
proposes to establish a pond with emergent wetland fringe after completing
gravel extraction by following the April 29, 2004 Gravel Source Reclamation
Plan that was submitted to the District in 2008. The reclamation area would
be approximately 24 acres and would contain a pond approximately 18 acres in
size. Overburden and topsoil stockpiled during gravel extraction would be
placed in the pond and the adjacent wetland fringe area to be created as part
of the reclamation. The wetland fringe would include the pond shoreline,
which would be graded at a 20 to 1 (horizontal to vertical) slope. As
indicated on Sheet 4 of 4, the reclamation plan includes establishing a
250-foot wide buffer area situated around the west, north, and east sides of
the reclamation area; this buffer area would be comprised of wetland that
3
would not be directly disturbed by the proposed activity. In addition, the
1,500-foot access road would be removed after gravel extraction is complete.
WATER QUALITY CERTIFICATION: A permit for the described work will not be
issued until a certification or waiver of certification, as required under
Section 401 of the Clean Water Act (Public Law 95-217), has been received
from the Alaska Department of Environmental Conservation.
CULTURAL RESOURCES: The latest published version of the Alaska Heritage
Resources Survey (AHRS) has been consulted for the presence or absence of
historic properties, including those listed in or eligible for inclusion in
the National Register of Historic Places. There are no listed or eligible
properties in the vicinity of the worksite. Consultation of the AHRS
constitutes the extent of cultural resource investigations by the District
Commander at this time, and he is otherwise unaware of the presence of such
resources. This application is being coordinated with the State Historic
Preservation Office (SHPO). Any comments SHPO may have concerning presently
unknown archeological or historic data that may be lost or destroyed by work
under the requested permit will be considered in our final assessment of the
described work.
ENDANGERED SPECIES: No threatened or endangered species are known to use the
project area. We have determined the described activity would have no effect
on any listed or proposed threatened or endangered species, and would have no
effect on any designated or proposed critical habitat, under the Endangered
Species Act of 1973 (87 Stat. 844). Therefore, no consultation with the U.S.
Fish and Wildlife Service or the National Marine Fisheries Service is
required. However, any comments they may have concerning endangered or
threatened wildlife or plants or their critical habitat will be considered in
our final assessment of the described work.
ESSENTIAL FISH HABITAT: The Magnuson-Stevens Fishery Conservation and
Management Act, as amended by the Sustainable Fisheries Act of 1996, requires
all Federal agencies to consult with the NMFS on all actions, or proposed
actions, permitted, funded, or undertaken by the agency, that may adversely
affect Essential Fish Habitat (EFH).
No EFH species are known to use the project area. We have determined the
described activity would not adversely affect EFH in the project area.
TRIBAL CONSULTATION: The Alaska District fully supports tribal selfgovernance and government-to-government relations between Federally
recognized Tribes and the Federal government. Tribes with protected rights
or resources that could be significantly affected by a proposed Federal
action (e.g., a permit decision) have the right to consult with the Alaska
District on a government-to-government basis. Views of each Tribe regarding
protected rights and resources will be accorded due consideration in this
process. This Public Notice serves as notification to the Tribes within the
area potentially affected by the proposed work and invites their
participation in the Federal decision-making process regarding the protected
Tribal right or resource. Consultation may be initiated by the affected
Tribe upon written request to the District Commander during the public
comment period.
PUBLIC HEARING: Any person may request, in writing, within the comment
period specified in this notice, that a public hearing be held to consider
4
this application. Requests for public hearings shall state, with
particularity, reasons for holding a public hearing.
EVALUATION: The decision whether to issue a permit will be based on an
evaluation of the probable impacts, including cumulative impacts of the
proposed activity and its intended use on the public interest. Evaluation of
the probable impacts, which the proposed activity may have on the public
interest, requires a careful weighing of all the factors that become relevant
in each particular case. The benefits, which reasonably may be expected to
accrue from the proposal, must be balanced against its reasonably foreseeable
detriments. The outcome of the general balancing process would determine
whether to authorize a proposal, and if so, the conditions under which it
will be allowed to occur. The decision should reflect the national concern
for both protection and utilization of important resources. All factors,
which may be relevant to the proposal, must be considered including the
cumulative effects thereof. Among those are conservation, economics,
aesthetics, general environmental concerns, wetlands, cultural values, fish
and wildlife values, flood hazards, floodplain values, land use, navigation,
shore erosion and accretion, recreation, water supply and conservation, water
quality, energy needs, safety, food and fiber production, mineral needs,
considerations of property ownership, and, in general, the needs and welfare
of the people. For activities involving 404 discharges, a permit will be
denied if the discharge that would be authorized by such permit would not
comply with the Environmental Protection Agency's 404(b)(l) guidelines.
Subject to the preceding sentence and any other applicable guidelines or
criteria (see Sections 320.2 and 320.3), a permit will be granted unless the
District Commander determines that it would be contrary to the public
interest.
The Corps of Engineers is soliciting comments from the public; Federal,
State, and local agencies and officials; Indian Tribes; and other interested
parties in order to consider and evaluate the impacts of this proposed
activity. Any comments received will be considered by the Corps of Engineers
to determine whether to issue, modify, condition or deny a permit for this
proposal. To make this decision, comments are used to assess impacts on
endangered species, historic properties, water quality, general environmental
effects, and the other public interest factors listed above. Comments are
used in the preparation of an Environmental Assessment and/or an
Environmental Impact Statement pursuant to the National Environmental Policy
Act. Comments are also used to determine the need for a public hearing and
to determine the overall public interest of the proposed activity.
AUTHORITY:
authority:
This permit will be issued or denied under the following
(X) Discharge dredged or fill material into waters of the United States
Section 404 Clean Water Act (33 U.S.C. 1344). Therefore, our public interest
review will consider the guidelines set forth under Section 404(b) of the
Clean Water Act (40 CFR 230).
Project drawings and a Notice of Application for State Water Quality
Certification are enclosed with this Public Notice.
District Commander
U.S. Army, Corps of Engineers
Enclosures
5
SEAN PARNELL, GOVERNOR
STATE OF ALASKA
DEPT. OF ENVIRONMENTAL CONSERVATION
DIVISION OF WATER
401 Certification Program
Non-Point Source Water Pollution Control Program
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
WQM/401 CERTIFICATION
555 CORDOVA STREET
ANCHORAGE, ALASKA 99501-2617
PHONE: (907) 269-7564/FAX: (907) 334-2415
NOTICE OF APPLICATION
FOR
STATE WATER QUALITY CERTIFICATION
Any applicant for a federal license or permit to conduct an activity that
might result in a discharge into navigable waters, in accordance with Section
401 of the Clean Water Act of 1977 (PL95-217), also must apply for and obtain
certification from the Alaska Department of Environmental Conservation that
the discharge will comply with the Clean Water Act, the Alaska Water Quality
Standards, and other applicable State laws. By agreement between the U.S.
Army Corps of Engineers and the Department of Environmental Conservation,
application for a Department of the Army permit to discharge dredged or fill
material into navigable waters under Section 404 of the Clean Water Act also
may serve as application for State Water Quality Certification.
Notice is hereby given that the application for a Department of the Army
Permit described in the Corps of Engineers' Public Notice No. POA-2003-1422
Channel B, serves as application for State Water Quality Certification from
the Department of Environmental Conservation.
After reviewing the application, the Department may certify there is
reasonable assurance the activity, and any discharge that might result, will
comply with the Clean Water Act, the Alaska Water Quality Standards, and
other applicable State laws. The Department also may deny or waive
certification.
Any person desiring to comment on the project, with respect to Water Quality
Certification, may submit written comments to the address above by the
expiration date of the Corps of Engineer's Public Notice.
6
G
ID
YR
SK
ES
E
ATH
ST
E
MCG
R
LI
NE
SE
TE
E
OL
DS
Fairbanks
IR
B
BIAS
HI
LL
IEW
TV
SK
Y
GE O R G
H
UN NA
EY
M
O
NT
G
SONJA
O
Clear
Creek
HOLMES
E
FRON T
A
Text
REPP
BEAR
DRUM
PLATO
K
PLAC
North
Pole
HURS T
MI
S
D
OL
NULATO
CONIFER
NELSON
GE
CE
SS
SI
O
LEVEE
AC
FLIGHT
A L EV
EE
EL
IN
E
PERIDOT
.
PI
P
Tin Cup site
WILLEDA
INE T
ANAN
NT
AG
PEEDE
LEE
FARMALL
FR
O
BRADWAY
FREEMAN
JA N E L
B R OC K
R/W L
R
ALDER
BENN
.
Channel B
TE
BA
DA
ITTA
W OL L
M
NEELY OAK
ER
Y
ALDER
RICHAR DSO
N
M ED
PE
RS
I NG
B A D GE R
E
DENN IS
LAKEVIEW
E
D
EASY
A
ER
AT
H MAN ST
SL
N CUS
H MA
CUS ILLAM
G
N
GAFF
GE
SA
A N D R OM E
ILL
N OR D A L E
B OR D A
R
I
SK
VE
RI
E
MINK
Chena River
ON
BEAC
HILL
I
B RCH
JOHANSEN
CINDY
INA
R OA D
D&M
GS
HOT SPRIN
Fort Wainwright
CH
RISSE
N
CHEN A
R OA D
HILL
NINE MILE
AMANITA
AD
T
ET
S
EA
NN
BE
NO
A
RO
ESRO
NN
WINC H ORE
B
M
U
IL
RH
JADE G
VIEW
IA
TR
DO
HUBNERITE
B
AR
N
E
Figure 1 Tin Cup Vicinity Map
RI
AR
DYKE
POA-2003-1422 Channel B
Tin Cup, LLCparcel line
Vicinity Map
Sheet 1 of 4
POA-2003-1422 Channel B
Significant Nexus Finding
DS
Tin Cup site
Fairbanks Field Office
Compiled By: GJM
Date: 2-14-12
BUZBY
ON
CH
Tanana River
LAURANCE
¹
Scale: 1 inch = 2 miles
May 23, 2012
Gravel source area (24 acres,
all in wetland)
Temporary gravel access
road (1,500 feet long; 1 acre,
all in wetland)
Gravel pad (213.4 acres
total; 118 acres in wetland)
POA-2003-1422 Channel B
Tin Cup, LLC
Project Layout
Sheet 2 of 4
May 23, 2012
POA-2003-1422 Channel B
Tin Cup, LLC
Typical Cross Sections of Gravel
Pad and Temporary Gravel
Source Area Access Road
Sheet 3 of 4
POA-2003-1422 Channel B
Tin Cup, LLC
Gravel Source Area Reclamation
Sheet 4 of 4