PUBLIC NOTICE DATE: June 26, 2012EXPIRATION DATE: July 10, 2012REFERENCE NUMBER:
PUBLIC NOTICE DATE: June 26, 2012
EXPIRATION DATE: July 10, 2012
REFERENCE NUMBER: POA-2012-470
WATERWAY: Tolovana River
Interested parties are hereby notified that a Department of the Army permit application has been received for work in waters of the United States as described below and shown on the enclosed project drawings.
Comments on the described work, with the reference number, should reach this office no later than the expiration date of this Public Notice to become part of the record and be considered in the decision. Please contact Ellen Lyons at (907) 474-2166 or by email at Ellen.H.Lyons@usace.army.mil if further
information is desired concerning this notice.
US Army Corps
of Engineers
Alaska District
Public Notice
of Application
for Permit
Regulatory Division (1145)
CEPOA-RD
2175 University Avenue, Suite 201E
Fairbanks, Alaska 99709-4927
PUBLIC NOTICE DATE: June 26, 2012
EXPIRATION DATE: July 10, 2012
REFERENCE NUMBER:
WATERWAY:
POA-2012-470
Tolovana River
Interested parties are hereby notified that a Department of the Army permit
application has been received for work in waters of the United States as
described below and shown on the enclosed project drawings.
Comments on the described work, with the reference number, should reach this
office no later than the expiration date of this Public Notice to become part
of the record and be considered in the decision. Please contact Ellen Lyons
at (907) 474-2166 or by email at Ellen.H.Lyons@usace.army.mil if further
information is desired concerning this notice.
Alaska Department of Transportation and Public Facilities
APPLICANT:
(ADOT), Northern Region Maintenance and Operations (M&O)
AGENT:
Katrina LeMieux, M&O Environmental Analyst, 451-2243
LOCATION: The project site is located within Section 31, T. 8 N., R. 5 W.,
and Section 6, T. 7 N., R. 5 W., Fairbanks Meridian; USGS Quad Map Livengood
B-4; Latitude 65.468342º N., Longitude 148.654133º W.;, near Livengood,
Alaska.
PURPOSE: The applicant's stated purpose is to improve the conditions at the
Livengood Airport so that Medevac services and larger aircraft can utilize
the airport. This would provide for the safety of the community.
PROPOSED WORK: The applicant proposed to discharge 9030 cubic yard of gravel
into 4.99 acres of wetlands to widen and lengthen the existing runway. All
work would be performed in accordance with the enclosed plan, (Figures 1-4),
dated May 23, 2012.
1
ADDITIONAL INFORMATION: The existing runway in Livengood is approximately
2,554' in length.
Of this, only 1,340' has been actively maintained. M&O
is proposing to improve the runway to current standards by re-establishing
the existing runway length of 2,554' to a useable condition and to extend it
to the south by an additional 926'. The final total runway will be 3,000',
with a surface width of 60', including 240' safety areas at either end. Work
necessary to improve the original 2,554' will involve increasing the width
beyond the existing toe of slope by approximately 30' on each side. The
areas highlighted in blue on the attached plan, Figure 2, indicate the
locations of the permanent wetlands impacts. A 20' temporary work area
beyond the proposed toe will be used to move equipment when constructing the
new embankments. The runway extension will be built to match the profile of
the existing runway and this will require a new footprint. Approximately ½ of
this footprint is located in wetlands. Material for this project will be
brought in via side dump trucks from an existing material site located at MP
73 of the Elliott Highway, M.S. 680-105-2. The material will be dumped on
the proposed expansion area, placed and compacted. There will not be any new
ground disturbances via excavation operations at the airport or the material
site.
APPLICANT PROPOSED MITIGATION: The applicant proposes the following
mitigation measures to avoid, minimize, and compensate for impacts to waters
of the United States from activities involving discharges of dredged or fill
material.
a. Avoidance: "The project is utilizing an existing material site and
operating within the previously disturbed area to avoid additional impacts."
b. Minimization: "The runway expansion is limited to the necessary
safety standard requirements in order to minimize any additional impacts."
c. Compensatory Mitigation: "The 4.99 acres of permanent impacts will
be compensated via an in-lieu fee payment to the Conservation Fund."
WATER QUALITY CERTIFICATION: A permit for the described work will not be
issued until a certification or waiver of certification, as required under
Section 401 of the Clean Water Act (Public Law 95-217), has been received
from the Alaska Department of Environmental Conservation.
CULTURAL RESOURCES:
The latest published version of the Alaska Heritage
Resources Survey (AHRS) has been consulted for the presence or absence of
historic properties, including those listed in or eligible for inclusion in
the National Register of Historic Places. There are no listed or eligible
properties in the vicinity of the worksite. Consultation of the AHRS
constitutes the extent of cultural resource investigations by the District
Commander at this time, and he is otherwise unaware of the presence of such
resources. This application is being coordinated with the State Historic
Preservation Office (SHPO). The ADOT has initiated consultation with the
SHPO. In a letter dated June 15, 2012, the SHPO required additional survey
information from ADOT. Any comments SHPO may have concerning presently
unknown archeological or historic data that may be lost or destroyed by work
under the requested permit will be considered in our final assessment of the
described work.
ENDANGERED SPECIES:
project area.
No threatened or endangered species are known to use the
2
We have determined the described activity would have no effect on any listed
or proposed threatened or endangered species, and would have no effect on any
designated or proposed critical habitat, under the Endangered Species Act of
1973 (87 Stat. 844). Therefore, no consultation with the U.S. Fish and
Wildlife Service or the National Marine Fisheries Service is required.
However, any comments they may have concerning endangered or threatened
wildlife or plants or their critical habitat will be considered in our final
assessment of the described work.
ESSENTIAL FISH HABITAT: The Magnuson-Stevens Fishery Conservation and
Management Act, as amended by the Sustainable Fisheries Act of 1996, requires
all Federal agencies to consult with the NMFS on all actions, or proposed
actions, permitted, funded, or undertaken by the agency, that may adversely
affect Essential Fish Habitat (EFH).
No EFH species are known to use the project area. We have determined the
described activity would not adversely affect EFH, since there is no EFH in
the project area.
TRIBAL CONSULTATION: The Alaska District fully supports tribal selfgovernance and government-to-government relations between Federally
recognized Tribes and the Federal government. Tribes with protected rights
or resources that could be significantly affected by a proposed Federal
action (e.g., a permit decision) have the right to consult with the Alaska
District on a government-to-government basis. Views of each Tribe regarding
protected rights and resources will be accorded due consideration in this
process. This Public Notice serves as notification to the Tribes within the
area potentially affected by the proposed work and invites their
participation in the Federal decision-making process regarding the protected
Tribal right or resource. Consultation may be initiated by the affected
Tribe upon written request to the District Commander during the public
comment period.
PUBLIC HEARING: Any person may request, in writing, within the comment
period specified in this notice, that a public hearing be held to consider
this application. Requests for public hearings shall state, with
particularity, reasons for holding a public hearing.
EVALUATION: The decision whether to issue a permit will be based on an
evaluation of the probable impacts, including cumulative impacts of the
proposed activity and its intended use on the public interest. Evaluation of
the probable impacts, which the proposed activity may have on the public
interest, requires a careful weighing of all the factors that become relevant
in each particular case. The benefits, which reasonably may be expected to
accrue from the proposal, must be balanced against its reasonably foreseeable
detriments. The outcome of the general balancing process would determine
whether to authorize a proposal, and if so, the conditions under which it
will be allowed to occur. The decision should reflect the national concern
for both protection and utilization of important resources. All factors,
which may be relevant to the proposal, must be considered including the
cumulative effects thereof. Among those are conservation, economics,
aesthetics, general environmental concerns, wetlands, cultural values, fish
and wildlife values, flood hazards, floodplain values, land use, navigation,
shore erosion and accretion, recreation, water supply and conservation, water
quality, energy needs, safety, food and fiber production, mineral needs,
considerations of property ownership, and, in general, the needs and welfare
3
of the people. For activities involving 404 discharges, a permit will be
denied if the discharge that would be authorized by such permit would not
comply with the Environmental Protection Agency's 404(b)(l) guidelines.
Subject to the preceding sentence and any other applicable guidelines or
criteria (see Sections 320.2 and 320.3), a permit will be granted unless the
District Commander determines that it would be contrary to the public
interest.
The Corps of Engineers is soliciting comments from the public; Federal,
State, and local agencies and officials; Indian Tribes; and other interested
parties in order to consider and evaluate the impacts of this proposed
activity. Any comments received will be considered by the Corps of Engineers
to determine whether to issue, modify, condition or deny a permit for this
proposal. To make this decision, comments are used to assess impacts on
endangered species, historic properties, water quality, general environmental
effects, and the other public interest factors listed above. Comments are
used in the preparation of an Environmental Assessment and/or an
Environmental Impact Statement pursuant to the National Environmental Policy
Act. Comments are also used to determine the need for a public hearing and
to determine the overall public interest of the proposed activity.
AUTHORITY:
authority:
This permit will be issued or denied under the following
(X) Discharge dredged or fill material into waters of the United States
Section 404 Clean Water Act (33 U.S.C. 1344). Therefore, our public interest
review will consider the guidelines set forth under Section 404(b) of the
Clean Water Act (40 CFR 230).
Project drawings and a Notice of Application for State Water Quality
Certification are enclosed with this Public Notice.
District Commander
U.S. Army, Corps of Engineers
Enclosures
4
SEAN PARNELL, GOVERNOR
STATE OF ALASKA
DEPT. OF ENVIRONMENTAL CONSERVATION
DIVISION OF WATER
401 Certification Program
Non-Point Source Water Pollution Control Program
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
WQM/401 CERTIFICATION
410 WILLOUGHBY AVENUE
JUNEAU, ALASKA 99801-1795
PHONE: (907) 465-5321/FAX: (907) 465-5274
NOTICE OF APPLICATION
FOR
STATE WATER QUALITY CERTIFICATION
Any applicant for a federal license or permit to conduct an activity that
might result in a discharge into navigable waters, in accordance with Section
401 of the Clean Water Act of 1977 (PL95-217), also must apply for and obtain
certification from the Alaska Department of Environmental Conservation that
the discharge will comply with the Clean Water Act, the Alaska Water Quality
Standards, and other applicable State laws. By agreement between the U.S.
Army Corps of Engineers and the Department of Environmental Conservation,
application for a Department of the Army permit to discharge dredged or fill
material into navigable waters under Section 404 of the Clean Water Act also
may serve as application for State Water Quality Certification.
Notice is hereby given that the application for a Department of the Army
Permit described in the Corps of Engineers' Public Notice No. POA-2012-470,
Tolovana River, serves as application for State Water Quality Certification
from the Department of Environmental Conservation.
After reviewing the application, the Department may certify there is
reasonable assurance the activity, and any discharge that might result, will
comply with the Clean Water Act, the Alaska Water Quality Standards, and
other applicable State laws. The Department also may deny or waive
certification.
Any person desiring to comment on the project, with respect to Water Quality
Certification, may submit written comments to the address above by the
expiration date of the Corps of Engineer's Public Notice.