PUBLIC NOTICE DATE: June 28, 2012EXPIRATION DATE: July 30, 2012REFERENCE NUMBER:
PUBLIC NOTICE DATE: June 28, 2012
EXPIRATION DATE: July 30, 2012
REFERENCE NUMBER: POA-2012-293
WATERWAY: Salmon River
Interested parties are hereby notified that a Department of the Army permit application has been received for work in waters of the United States as described below and shown on the enclosed project drawings.
Comments on the described work, with the reference number, should reach this office no later than the expiration date of this Public Notice to become part of the record and be considered in the decision. Please contact Roberta Budnik at (907) 753-2785, toll free from within Alaska at (800) 478-2712, by fax at (907) 753-5567, or by email at roberta.k.budnik@usace.army.mil if further information is desired concerning this notice.
US Army Corps
of Engineers
Alaska District
Regulatory Division (1145)
CEPOA-RD
Post Office Box 6898
JBER, Alaska 99506-0898
Public Notice
of Application
for Permit
PUBLIC NOTICE DATE:
June 28, 2012
EXPIRATION DATE:
July 30, 2012
REFERENCE NUMBER:
POA-2012-293
WATERWAY:
Salmon River
Interested parties are hereby notified that a Department of the Army permit
application has been received for work in waters of the United States as described
below and shown on the enclosed project drawings.
Comments on the described work, with the reference number, should reach this office
no later than the expiration date of this Public Notice to become part of the
record and be considered in the decision. Please contact Roberta Budnik at
(907) 753-2785, toll free from within Alaska at (800) 478-2712, by fax at
(907) 753-5567, or by email at roberta.k.budnik@usace.army.mil if further
information is desired concerning this notice.
APPLICANT: Northwind Services, LLC, Attn: Mr. Dan Frisella, 1176 Big Creek Road,
Kellogg, Idaho 83837
LOCATION: The project site is located within Sections 2, 11, and 12, T. 69 S., R.
100 E., Copper River Meridian; USGS Quad Map Ketchikan D-1; Latitude 55.9076º N.,
Longitude 130.0295º W.; 0.5-mile southwest of Wharf Road via Mainstreet to Salmon
River floodplain, in Hyder, Alaska.
PURPOSE: The applicant's stated purpose is to extract gravel for the purpose of
reconstructing the Hyder Causeway.
PROPOSED WORK: To remove a total of 24,000 cubic yards of gravels, silts, and
cobbles from below the mean high water of the tidally influences portion of the
Salmon River floodplain, over the period of two years. Material would be extracted
from a 1.4348-acre area of an approximately 11.5-acre state owned material site.
Extracted materials would be used for embankment purposes for the widening and
reconstruction of the Hyder Causeway. All work would be performed in accordance
with the enclosed plan (sheets 1-3), dated April 13, 2012.
APPLICANT PROPOSED MITIGATION: The applicant proposes the following mitigation
measures to avoid, minimize, and compensate for impacts to waters of the United
States from activities involving discharges of dredged or fill material.
a. Avoidance: The applicant plans to avoid as much disturbance from gravel
extraction activities as possible at Salmon River. The project site is located in
a state owned designated material site.
b. Minimization: They plan to use properly sized equipment which would
minimize adverse effects of contributing to the sediment load into the Salmon
River. Typical gravel extraction best management practices would be followed, such
as silt fence installation and usage of straw wattles. The applicant also intends
to maintain a suitable buffer between their proposed excavation activities and the
main channel of the river. Settling ponds would be constructed if they would be
needed to catch any sediment from excavation activities.
c. Compensatory Mitigation:
the applicant.
No compensatory mitigation has been proposed by
CULTURAL RESOURCES: The latest published version of the Alaska Heritage Resources
Survey (AHRS) has been consulted for the presence or absence of historic
properties, including those listed in or eligible for inclusion in the National
Register of Historic Places. There are no listed or eligible properties in the
vicinity of the worksite. Consultation of the AHRS constitutes the extent of
cultural resource investigations by the District Commander at this time, and he is
otherwise unaware of the presence of such resources. This application is being
coordinated with the State Historic Preservation Office (SHPO). Any comments SHPO
may have concerning presently unknown archeological or historic data that may be
lost or destroyed by work under the requested permit will be considered in our
final assessment of the described work.
ENDANGERED SPECIES: No threatened or endangered species are known to use the
project area. We have determined the described activity would have no effect on
any listed or proposed threatened or endangered species, and would have no effect
on any designated or proposed critical habitat, under the Endangered Species Act of
1973 (87 Stat. 844). Therefore, no consultation with the U.S. Fish and Wildlife
Service or the National Marine Fisheries Service is required. However, any
comments they may have concerning endangered or threatened wildlife or plants or
their critical habitat will be considered in our final assessment of the described
work.
ESSENTIAL FISH HABITAT: The Magnuson-Stevens Fishery Conservation and Management
Act, as amended by the Sustainable Fisheries Act of 1996, requires all Federal
agencies to consult with the NMFS on all actions, or proposed actions, permitted,
funded, or undertaken by the agency, that may adversely affect Essential Fish
Habitat (EFH). The project area is within the known range of the Chinook salmon
(Oncorhynchus tshawytscha), Coho salmon (Oncorhynchus kisutch), and pink salmon
(Oncorhynchus gorbuscha). We are currently gathering information regarding these
species and have yet to make a determination of effect. Should we find that the
described activity may affect the species listed above, we will follow the
appropriate course of action under Section 305(b)(2) of the Magnuson-Stevens Act.
Any comments the National Marine Fisheries Service may have concerning essential
fish habitat will be considered in our final assessment of the described work.
-2-
TRIBAL CONSULTATION: The Alaska District fully supports tribal self-governance and
government-to-government relations between Federally recognized Tribes and the
Federal government. Tribes with protected rights or resources that could be
significantly affected by a proposed Federal action (e.g., a permit decision) have
the right to consult with the Alaska District on a government-to-government basis.
Views of each Tribe regarding protected rights and resources will be accorded due
consideration in this process. This Public Notice serves as notification to the
Tribes within the area potentially affected by the proposed work and invites their
participation in the Federal decision-making process regarding the protected Tribal
right or resource. Consultation may be initiated by the affected Tribe upon
written request to the District Commander during the public comment period.
PUBLIC HEARING: Any person may request, in writing, within the comment period
specified in this notice, that a public hearing be held to consider this
application. Requests for public hearings shall state, with particularity, reasons
for holding a public hearing.
EVALUATION: The decision whether to issue a permit will be based on an evaluation
of the probable impacts, including cumulative impacts of the proposed activity and
its intended use on the public interest. Evaluation of the probable impacts, which
the proposed activity may have on the public interest, requires a careful weighing
of all the factors that become relevant in each particular case. The benefits,
which reasonably may be expected to accrue from the proposal, must be balanced
against its reasonably foreseeable detriments. The outcome of the general
balancing process would determine whether to authorize a proposal, and if so, the
conditions under which it will be allowed to occur. The decision should reflect
the national concern for both protection and utilization of important resources.
All factors, which may be relevant to the proposal, must be considered including
the cumulative effects thereof. Among those are conservation, economics,
aesthetics, general environmental concerns, wetlands, cultural values, fish and
wildlife values, flood hazards, floodplain values, land use, navigation, shore
erosion and accretion, recreation, water supply and conservation, water quality,
energy needs, safety, food and fiber production, mineral needs, considerations of
property ownership, and, in general, the needs and welfare of the people. For
activities involving 404 discharges, a permit will be denied if the discharge that
would be authorized by such permit would not comply with the Environmental
Protection Agency's 404(b)(l) guidelines. Subject to the preceding sentence and
any other applicable guidelines or criteria (see Sections 320.2 and 320.3), a
permit will be granted unless the District Commander determines that it would be
contrary to the public interest.
The Corps of Engineers is soliciting comments from the public; Federal, State, and
local agencies and officials; Indian Tribes; and other interested parties in order
to consider and evaluate the impacts of this proposed activity. Any comments
received will be considered by the Corps of Engineers to determine whether to
issue, modify, condition or deny a permit for this proposal. To make this
decision, comments are used to assess impacts on endangered species, historic
properties, water quality, general environmental effects, and the other public
interest factors listed above. Comments are used in the preparation of an
Environmental Assessment and/or an Environmental Impact Statement pursuant to the
National Environmental Policy Act. Comments are also used to determine the need
for a public hearing and to determine the overall public interest of the proposed
activity.
-3-
AUTHORITY: This permit will be issued or denied under the following authority:
(X) Perform work in or affecting navigable waters of the United States
Section 10 Rivers and Harbors Act 1899 (33 U.S.C. 403).
Project drawings are enclosed with this Public Notice.
District Commander
U.S. Army, Corps of Engineers
Enclosures
-4-
~HYder.AK
· -
..
lot·
·
.".. ...
POA- 2012 - 293 , Salmon River , Northwind Services , LLC
Gravel Extraction
Lat . 55 . 9076 N . , Long . 130 . 0295
Sheet 1 of 3
w.
~
I
6'
.
---
MeanHighWater~ 18'
Avg Surface E116'
~ " . 4i&Sf.
-----....
<. ~ ~.4.""'Jitl!. QLq . .... ;:~ bR
-------~
I
salmon
river
50'-100' wide
E
50' buffe r from main Sa lmon River
Typical cro ssection for riverbed gravel removal in the Salm on River Borrow.
NORTH WIND SERVICES, LLC
HYDER CAUSEWAY RECONSTRUCTION
SALMON RIVER BORROW SITE
POA-2012-293 , Salmon River, Northw ind Services , LLC
Gravel Extraction - Typical mining cross section
Lat. 55 . 9 0 76 N., Long . 130 . 0295 W.
Sheet 2 of 3
SALMON RIVER BORROW SOURCE @ HYDER - FOR HYDER CAUSEWAY PROJECT ------NORTHWIND SERVICES, LLC------------------------6/11/12
GJ
t
15'
Contour
Salmon River
J
Nevada St
Extraction
SOD'
sites 250x6'
\
depthx 50'
'-,
Main St
700'
Causeway
1600' ~
Loading Area
!!il'!iiI
---.::
>
Equipment Proposed
330 Cat Track ExcavatorExcavate & Load
POA-2012-293, Salmon River , Northwind t~i
Gravel Extra ction - Typical mining
Lat . 55.9076 N. , Long. 130.0295 w.
Sheet 3 of 3
966 Cat F.E Loader-Load
End Dumps - Haul