You can copy from here when filling out the rest of the page.
PUBLIC NOTICE DATE: July 6, 2012EXPIRATION DATE: August 6, 2012REFERENCE NUMBER:
PUBLIC NOTICE DATE: July 6, 2012
EXPIRATION DATE: August 6, 2012
REFERENCE NUMBER: POA-2012-440
WATERWAY: Tongass Narrows
Interested parties are hereby notified that a Department of the Army permit application has been received for work in waters of the United States as described below and shown on the project drawings that are available online at our website http://www.poa.usace.army.mil/reg/PNNew.htm.
Comments on the described work, with the reference number, should reach this office no later than the expiration date of this Public Notice to become part of the record and be considered in the decision. Please contact Ms. Shannon Morgan at (907) 753-5556, toll free from within Alaska at (800) 478-2712, by fax at (907) 753-5567, or by email at Shannon.R.Morgan@usace.army.mil if further
information is desired concerning this notice.
US Army Corps
of Engineers
Alaska District
Regulatory Division (1145)
CEPOA-RD
Post Office Box 6898
JBER, Alaska 99506-0898
Public Notice
of Application
for Permit
PUBLIC NOTICE DATE:
July 6, 2012
EXPIRATION DATE:
August 6, 2012
REFERENCE NUMBER:
POA-2012-440
WATERWAY:
Tongass Narrows
Interested parties are hereby notified that a Department of the Army permit
application has been received for work in waters of the United States as described
below and shown on the project drawings that are available online at our website
http://www.poa.usace.army.mil/reg/PNNew.htm.
Comments on the described work, with the reference number, should reach this office
no later than the expiration date of this Public Notice to become part of the
record and be considered in the decision. Please contact Ms. Shannon Morgan at
(907) 753-5556, toll free from within Alaska at (800) 478-2712, by fax at
(907) 753-5567, or by email at Shannon.R.Morgan@usace.army.mil if further
information is desired concerning this notice.
APPLICANT: The City of Ketchikan, 334 front Street, Ketchikan, AK 99901;
Mr. Carl Amylon, City Manager.
AGENT: PND Engineers, Inc., 9360 Glacier Highway, Suite 100, Juneau, AK 99801;
Mr. Dick Somerville, P.E., Vice President.
LOCATION: The project site is located within Section 23, T. 75 S., R. 90 E.,
Copper River Meridian; USGS Quad Map Ketchikan B-6; Latitude 55.350º N., Longitude
131.683º W.; NOAA Chart 17430, Ketchikan Harbor; Tidelands Addition to U.S. Survey
1229, Plat entitled Bar Harbor and filed with the City Clerk as Document No.
87-280, City of Ketchikan, Alaska. The project site is located between Bar Harbor
North and Bar Harbor South and is accessible via Tongass Avenue in Ketchikan,
Alaska.
PURPOSE: The applicant's stated purpose is to replace an aging facility and
improve accessibility and safety at the City of Ketchikan's Bar Harbor Launch Ramp
facility. The applicant states: "The City of Ketchikan currently operates a single
lane boat launch ramp at Bar Harbor. The facility is inadequate for the volume of
harbor users and congestion is frequent during peak summer months. The existing
retaining wall adjacent to the facility is failing and needs to be replaced.
Upland site lighting is insufficient to provide safe access during hours of
darkness and poor weather."
PROPOSED WORK: Place 3,325 cubic yards of clean fill material (class A shot rock,
grading A base course, and class II and III riprap), as well as ramp planks, in
0.049 acre of waters of the U.S. below the high tide line of Ketchikan Harbor,
replace the aging single lane Bar Harbor Boat Launch Ramp facility with a modern
two lane facility to meet the needs of the community. Construction would include
the dismantling of the northern portion of the retaining wall and resetting the
existing MSE blocks to reestablish the structure. The existing MSE block retaining
wall would be reset with geogrid reinforcement (filter cloth) and the access
stairway would be replaced. All work would be performed in accordance with the
enclosed plan (sheets 1-12), sheets 1-7 undated, and sheets 8-12 dated April 2012.
ADDITIONAL INFORMATION:
Statehood.
The existing ramp facility has been in-place since
APPLICANT PROPOSED MITIGATION: The applicant proposes the following mitigation
measures to avoid, minimize, and compensate for impacts to waters of the United
States from activities involving discharges of dredged or fill material.
a. Avoidance: The applicant states: "This project utilizes pile supported
and floating structures to the maximum extent possible. Inherently, impacts to the
waters of the U.S. would occur by rehabilitating the existing facility and
retaining wall."
b. Minimization: The applicant states: "The design has been optimized to
minimize any impacts beyond what is required to facilitate the Bar Harbor Launch
Ramp Rehabilitation. Measures to avoid impact to jurisdictional wetlands and
waters of the U.S. include the following actions:
Utilizing existing project footprint. The fill footprint has been minimized
to the greatest extent practicable, while still meeting the purpose of the
project. The launch ramp utilizes the existing footprint for the launch ramp
facility thereby minimizing impacts.
Avoid dredging activities. The project would avoid dredging by utilizing the
exiting ramp location placing the facility within the existing Bar Harbor
Basin. The will be no need to dredge the sea floor.
Avoid migration barriers to salmonids. At no time would the construction
activities result in a migration barrier to salmonids.
Avoid introduction of contaminated material during construction. Contaminantfree embankment and surface materials would be used during all aspects of
construction.
Preparation of Fill Site. The City of Ketchikan would utilize clean shot
rock materials for placement of fill materials so that entry of fine sediment
and other suspendible material into Tongass Narrows is kept to the minimum
practicable.
Avoid potential water quality impacts to Tongass Narrows by controlling
surface water run-off. Surface water runoff would be directed away from
Tongass Narrows through a storm drain system and oil/water separator system
prior to discharge.
Avoid impacts from potential spills during construction. To prevent spills
or leakage of hazardous material during construction, standard BMP spillprevention measures would be implemented during construction.
Avoid impacts to marine mammals. A marine mammal monitor would be assigned
to the project during pile driving operations. Driving piles can generate
-2-
underwater sound pressure waves that have the potential to disrupt migration
and harass or injure marine mammals. The following measures would be taken:
o An observer would begin to observe 15 minutes prior to pile driving and
throughout the duration of each pile driving event.
o If marine mammals are observed within a 200-meter (656-foot) radius of
the pile being driven, driving would cease until the animal is clear of
the zone.
o If the marine mammal is observed during pile driving and appears to be
disturbed by the noise/activity, pile driving would be discontinued and
not resumed until the marine mammal is no longer observed.
o Methods would be confirmed through consultation with NOAA.
Impacts to wetlands and other waters of the U.S. and other resources that
depend on other wildlife that depend on aquatic ecosystems have been avoided to the
greatest extent practicable. However, due to fill placement, there would be
unavoidable impacts. The following measures would be implemented to minimize
unavoidable impacts associated with the proposed project:
Minimization of potential impacts to salmonids and EFH species during
critical life stage. Timing windows would be incorporated during
construction activities for all in-water work to minimize potential adverse
effects to salmon during critical life stages. In-water work would be timed
to avoid those times when juvenile salmon are out-migrating if stipulated in
the permit special conditions. Once construction has ceased, the proposed
project is not expected to measurably impact EFH-listed fish populations at
the Bar Harbor Boat Launch facility site.
Minimization of impacts to estuarine intertidal/subtidal habitat. The
spatial configuration of the intertidal fill was adjusted to minimize the
amount of fill that would be placed in estuarine intertidal and subtidal
habitats by primarily utilizing the footprint of the existing ramp.
Minimization of potential turbidity impacts during construction. Potential
impacts to Tongass Narrows during construction, such as increased turbidity,
would be temporary in nature and minimized through implementation of
construction and BMPs. For example, if stipulated, floating silt curtains may
be used around fill areas during construction to minimize potential turbidity
impacts.
Minimization of noise impacts from pile driving. The City of Ketchikan would
encourage the use of vibratory pile driving equipment as the primary
installation method for the project.
o Impact hammers shall only be allowed for piles that encounter soils too
dense to penetrate with the vibratory equipment.
o The specifications shall require the use of light duty cushion blocks.
Use of a pile cushion between the impact hammer and the piling will
help to attenuate sound.
o The impact hammer energy will be limited to approximately 20,000 footpounds (ft-lbs) to minimize driving energy.
o Timing for the installation of all piles shall consider sensitive fish
habitat periods for juvenile salmon.
o Small diameter piles will be used, when possible, to minimize potential
harm to fish.
o Driving will occur at low tide when practicable in an effort to
minimize potential impacts to fish.
Minimization of impacts to bald eagles and migratory birds. The proposed
project is not expected to have impacts on bald eagles or migratory birds in
the project area; however, the following measures will be taken to minimize
-3-
Potential impacts.
o If active bird nests, eggs, or nestlings are observed during
construction, USFWS agency personnel will be contacted for guidance.
o If a bald eagles nest is located in the vicinity of the project area
during construction, agencies will be contacted and a bald eagle permit
will be obtained, if needed, in accordance with 50 CFR Part 22.
Minimization of impacts from invasive species. Revegetation and planting
activities are not anticipated for this work. Should it be necessary, the
prevention and establishment of invasive plants during planting and
revegetation activities will be accomplished by following the Cooperative
Extension Service's "DON'T plant in Alaska" list."
c. Compensatory Mitigation: The applicant states: "The City of Ketchikan
took advantage of extreme low tides during the week of April 1, 2012 to pull
debris, including grocery carts, bicycles and other items from Thomas Basin and Bar
Harbor. This clean up, coupled with the introduction of a new storm drain and
treatment system will aid in promoting a healthy harbor. Existing creosote timber
piles will be replaced with galvanized steel piles. Please see attached photos
from the clean-up effort and accompanying Ketchikan Daily News article [sheets 47].
The City of Ketchikan believes that the impacts resulting from rehabilitating
the existing boat launch ramp facility and removing dismantling and resetting the
existing MSE block retaining wall with be minor. No further mitigation measures
will be taken."
WATER QUALITY CERTIFICATION: A permit for the described work will not be issued
until a certification or waiver of certification, as required under Section 401 of
the Clean Water Act (Public Law 95-217), has been received from the Alaska
Department of Environmental Conservation.
CULTURAL RESOURCES: The latest published version of the Alaska Heritage Resources
Survey (AHRS) has been consulted for the presence or absence of historic
properties, including those listed in or eligible for inclusion in the National
Register of Historic Places. There are no listed or eligible properties in the
vicinity of the worksite. Consultation of the AHRS constitutes the extent of
cultural resource investigations by the District Commander at this time, and he is
otherwise unaware of the presence of such resources. This application is being
coordinated with the State Historic Preservation Office (SHPO). Any comments SHPO
may have concerning presently unknown archeological or historic data that may be
lost or destroyed by work under the requested permit will be considered in our
final assessment of the described work.
ENDANGERED SPECIES: No threatened or endangered species are known to use the
project area. We have determined the described activity would have no effect on
any listed or proposed threatened or endangered species, and would have no effect
on any designated or proposed critical habitat, under the Endangered Species Act of
1973 (87 Stat. 844). Therefore, no consultation with the U.S. Fish and Wildlife
Service or the National Marine Fisheries Service is required. However, any
comments they may have concerning endangered or threatened wildlife or plants or
their critical habitat will be considered in our final assessment of the described
work.
ESSENTIAL FISH HABITAT:
The Magnuson-Stevens Fishery Conservation and Management
-4-
Act, as amended by the Sustainable Fisheries Act of 1996, requires all Federal
agencies to consult with the NMFS on all actions, or proposed actions, permitted,
funded, or undertaken by the agency, that may adversely affect Essential Fish
Habitat (EFH).
The project area is within the known range of the Chinook (Oncorhynchus
tshawytscha), Coho (Oncorhynchus kitsutch), Sockeye (Oncorhynchus nerka) Pink
(Oncorhynchus gorbuscha), and Chum (Oncorhynchus keta) Salmon.
We have determined the described activity would not adversely affect EFH in the
project area.
TRIBAL CONSULTATION: The Alaska District fully supports tribal self-governance and
government-to-government relations between Federally recognized Tribes and the
Federal government. Tribes with protected rights or resources that could be
significantly affected by a proposed Federal action (e.g., a permit decision) have
the right to consult with the Alaska District on a government-to-government basis.
Views of each Tribe regarding protected rights and resources will be accorded due
consideration in this process. This Public Notice serves as notification to the
Tribes within the area potentially affected by the proposed work and invites their
participation in the Federal decision-making process regarding the protected Tribal
right or resource. Consultation may be initiated by the affected Tribe upon
written request to the District Commander during the public comment period.
PUBLIC HEARING: Any person may request, in writing, within the comment period
specified in this notice, that a public hearing be held to consider this
application. Requests for public hearings shall state, with particularity, reasons
for holding a public hearing.
EVALUATION: The decision whether to issue a permit will be based on an evaluation
of the probable impacts, including cumulative impacts of the proposed activity and
its intended use on the public interest. Evaluation of the probable impacts, which
the proposed activity may have on the public interest, requires a careful weighing
of all the factors that become relevant in each particular case. The benefits,
which reasonably may be expected to accrue from the proposal, must be balanced
against its reasonably foreseeable detriments. The outcome of the general
balancing process would determine whether to authorize a proposal, and if so, the
conditions under which it will be allowed to occur. The decision should reflect
the national concern for both protection and utilization of important resources.
All factors, which may be relevant to the proposal, must be considered including
the cumulative effects thereof. Among those are conservation, economics,
aesthetics, general environmental concerns, wetlands, cultural values, fish and
wildlife values, flood hazards, floodplain values, land use, navigation, shore
erosion and accretion, recreation, water supply and conservation, water quality,
energy needs, safety, food and fiber production, mineral needs, considerations of
property ownership, and, in general, the needs and welfare of the people. For
activities involving 404 discharges, a permit will be denied if the discharge that
would be authorized by such permit would not comply with the Environmental
Protection Agency's 404(b)(l) guidelines. Subject to the preceding sentence and
any other applicable guidelines or criteria (see Sections 320.2 and 320.3), a
permit will be granted unless the District Commander determines that it would be
contrary to the public interest.
The Corps of Engineers is soliciting comments from the public; Federal, State, and
local agencies and officials; Indian Tribes; and other interested parties in order
-5-
to consider and evaluate the impacts of this proposed activity. Any comments
received will be considered by the Corps of Engineers to determine whether to
issue, modify, condition or deny a permit for this proposal. To make this
decision, comments are used to assess impacts on endangered species, historic
properties, water quality, general environmental effects, and the other public
interest factors listed above. Comments are used in the preparation of an
Environmental Assessment and/or an Environmental Impact Statement pursuant to the
National Environmental Policy Act. Comments are also used to determine the need
for a public hearing and to determine the overall public interest of the proposed
activity.
AUTHORITY:
This permit will be issued or denied under the following authorities:
(X) Perform work in or affecting navigable waters of the United States
Section 10 Rivers and Harbors Act 1899 (33 U.S.C. 403).
(X) Discharge dredged or fill material into waters of the United States
Section 404 Clean Water Act (33 U.S.C. 1344). Therefore, our public interest
review will consider the guidelines set forth under Section 404(b) of the Clean
Water Act (40 CFR 230).
Notice of Application for State Water Quality Certification is enclosed with this
Public Notice and Project drawings are available online at our website
http://www.poa.usace.army.mil/reg/PNNew.htm.
District Commander
U.S. Army, Corps of Engineers
Enclosures
-6-
SEAN PARNELL, GOVERNOR
STATE OF ALASKA
DEPT. OF ENVIRONMENTAL CONSERVATION
DIVISION OF WATER
401 Certification Program
Non-Point Source Water Pollution Control Program
ANCHORAGE
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
WQM/401 CERTIFICATION
555 CORDOVA STREET
ANCHORAGE, ALASKA 99501-2617
PHONE: (907) 269-7564/FAX: (907) 334-2415
NOTICE OF APPLICATION
FOR
STATE WATER QUALITY CERTIFICATION
Any applicant for a federal license or permit to conduct an activity that might
result in a discharge into navigable waters, in accordance with Section 401 of the
Clean Water Act of 1977 (PL95-217), also must apply for and obtain certification
from the Alaska Department of Environmental Conservation that the discharge will
comply with the Clean Water Act, the Alaska Water Quality Standards, and other
applicable State laws. By agreement between the U.S. Army Corps of Engineers and
the Department of Environmental Conservation, application for a Department of the
Army permit to discharge dredged or fill material into navigable waters under
Section 404 of the Clean Water Act also may serve as application for State Water
Quality Certification.
Notice is hereby given that the application for a Department of the Army Permit
described in the Corps of Engineers' Public Notice No. POA-2012-440, Tongass
Narrows, serves as application for State Water Quality Certification from the
Department of Environmental Conservation.
After reviewing the application, the Department may certify there is reasonable
assurance the activity, and any discharge that might result, will comply with the
Clean Water Act, the Alaska Water Quality Standards, and other applicable State
laws. The Department also may deny or waive certification.
Any person desiring to comment on the project, with respect to Water Quality
Certification, may submit written comments to the address above by the expiration
date of the Corps of Engineer's Public Notice.
EXISTING SITE PHOTOS
Figure 1- Existing Boat Launch Ramp, looking towards harbor from abutment
Figure 2 - Existing Single Lane Facility;
POA-2012-440
City of Ketchikan
Sheet 1 of 12
Figure 3 - MSE Retaining Wall, 'Kids Don't Float' Kiosk and Connex on left
Figure 4- Site overview
POA-2012-440
City of Ketchikan
Sheet 2 of 12
Figure 5 - Failing Retaining Wall and Concrete Abutment
Figure 6 - Existing failing retaining wall and staircase
POA-2012-440
City of Ketchikan
Sheet 3 of 12
CLEAN UP PHOTOS
POA-2012-440
City of Ketchikan
Sheet 4 of 12
POA-2012-440
City of Ketchikan
Sheet 5 of 12
POA-2012-440
City of Ketchikan
Sheet 6 of 12
POA-2012-440
City of Ketchikan
Sheet 7 of 12
POA-2012-440
Sheet 8 of 12
POA-2012-440
Sheet 9 of 12
POA-2012-440
Sheet 10 of 12
POA-2012-440
Sheet 11 of 12
POA-2012-440
Sheet 12 of 12