PUBLIC NOTICE DATE: July 27, 2012EXPIRATION DATE: August 27, 2012REFERENCE NUMBER:

PUBLIC NOTICE DATE: July 27, 2012

EXPIRATION DATE: August 27, 2012

REFERENCE NUMBER: POA-2001-1082-M1

WATERWAY: Beaufort Sea

The public in hereby notified that a Department of the Army (DA) permit application has been received for proposed work in waters and navigable waters of the United States (U.S.), including surface waters, wetlands, and ocean waters, as described below and shown on the enclosed project figures. This is the second public notice issued for the Point Thomson Project to solicit public comment. The first coincided with publication for the Draft Environmental Impact Statement (EIS) on November 18, 2011. This public notice is issued concurrently with publication of the Final EIS. Included herein are the applicant’s changes to the proposed project figures previously published with the first public notice. The changes include revisions and clarifications represented in the set of 82 Figures for this Public Notice are available online at http://www.poa.usace.army.mil/reg/PNNew.htm. Some figures have been modified and others added. Comments on the described work noting U.S. Army Corps of Engineers (USACE) file number POA-2001-1082-M1, Beaufort Sea, must be submitted no later than the expiration date of this Public Notice (August 27, 2012) to become part of the administrative record and be considered in our permit decision. Please submit comments to the USACE Project Manager listed immediately below by the communication method of your choice.

USACE PROJECT MANAGER: Please submit comments to by e-mail address at , at the mailing address above, by calling 907-753-2784 (office), 907-350-5097 (cell), toll free in Alaska at 800-478-2712, or by fax at 907-753-5567. Questions and requests for information on this public notice can be sent directly to Mr. Baij at the above e-mail address. Please submit comments to by e-mail address at , at the mailing address above, by calling 907-753-2784 (office), 907-350-5097 (cell), toll free in Alaska at 800-478-2712, or by fax at 907-753-5567. Questions and requests for information on this public notice can be sent directly to Mr. Baij at the above e-mail address.

F

Beaufort Sea

Barrow

Kaktovik Nuiqsut National Petroleum ReserveAlaska

ntr a

TA PS

nce

Arctic National Wildlife Refuge

Ne w

p or

DUCK ISLAND UNIT

an ce

! !

! !

!

! !

!

oE Jag 3-

it lim

r ive

r

C

Simpson Cove

ru kR Ka tak tu

sh i lik Ka dle ro

Ka R vik

1 - NORTH SLOPE ALASKA VICINITY MAP

r ive

1002 AREA

APPLICANT:

EXXON MOBIL CORPORATION & PTE PIPELINE LLC.

PROJECT:

POINT THOMSON PROJECT

LOCATION:

NORTH SLOPE BOROUGH, ALASKA

REFERENCE:

POA-2001-1082-M1

WATERBODY:

BEAUFORT SEA

DATE:

MARCH 2012

Proposed Gathering Lines !

!

Proposed Export Pipeline Proposed Point Thomson Facilities and Roads Existing Roads Existing Pipelines Existing Facilities Oil and Gas Units

0

5

10 Miles

15

iver

ARCTIC NATIONAL WILDLIFE REFUGE

WILDERNESS AREA

!

Kaktovik

R ilak Okp

gR nin n a

Ri v er

Camden Bay

le mi

ive

Sta ine s

Riv er

Canning River Recreational Rafting Take-Out Area

%

! !

ive r

! !

iov ik R

ntr a

Sac hs En tr Ma ry

!

! !

! !

BADAMI UNIT

Sh av

Brownlow Point

Lion Bay

Hulahula Riv er

nce ntr a eE eng Ch all

! !

Ri ve r

! !

an i rk tok

% ! !

Sa ga v

! !

!

PRUDHOE BAY UNIT

Bullen Point

!

Mikkelsen Bay

POINT THOMSON UNIT

%

Foggy Island Bay

Deadhorse

nce

LIBERTY UNIT

Prudhoe Bay

!

da Can a USA

Beaufort Sea

tE

Deadhorse

8

F

10

11

12

7

8

9

15

14

13

18

17

16

20

21

22

23

24

19

20

29

28

27

26

25

30

29

BULLEN POINT RADAR SITE 33

10N 20E 9N 20E

34

35

36

31

8

9

Mikkelsen Bay

6

BADAMI

17

16

20

21

29

32

3

2

1

10

11

12

BADAMI UNIT

4

15

14

13

18

17

16

15

14

21

22

23

24

19

20

21

22

23

28

27

26

25

30

29

28

27

Beaufort Sea

Point Gordon

Bullen Point 32

33

34

5

4

8

9

25 Point Sweeney 36

35

34

36

31

32

33

3

2

1

6

5

4

7

10

11

12

7

8

9

10

11

12

EAST MIKKELSEN BAY STATE #1

EXPORT PIPELINE

2 3 PAD JUNCTION WEST

1

POINT THOMSON UNIT

17

16

15

14

13

18

17

16

15

14

13

22

23

24

19

20

21

22

23

24

19

20

21

22

23

24

28

27

26

25

30

29

28

27

26

25

30

29

28

27

26

25

33

34

35

36

31

32

33

34

35

36

31

4

3

2

1

Proposed Export Pipeline

7

2

14

13

Miles

9

8

10

11

12

6

7

5

8

17

APPLICANT:

EXXON MOBIL CORPORATION & PTE PIPELINE LLC. 1 2 6 POINT THOMSON PROJECT

LOCATION:

NORTH SLOPE BOROUGH, ALASKA

4 3 PROJECT:

10 9REFERENCE:

WATERBODY:

4 18

2 - TOWNSHIP, RANGE, AND 35SECTION 36 33 34 32 MAP 1

9N 22E 9N 23E

PIPELINE CROSSING PADS

9N 20E 9N 21E

18

0 15

WEST PAD

24

13

Existing Gravel12 11

10

POINT THOMSON UNIT #4

26 Point Hopson

Duchess Island 13

35

Proposed Gathering Lines !

12

11

10

14

2 6 5 Roads Proposed Point 1Thomson Facilities and

!

9

8

7

15

9N 20E 8N 20E

!

Challenge Island

BADAMI AUXILIARY PAD

5

3

12

11

Alaska Island 16

32

10

9N 21E 9N 22E

17

9

16

15

14

13

18

17

DATE: 16

15

12 11 POA-2001-1082-M1

5

4

7

8

9

18

17

16

BEAUFORT SEA MARCH 2012 14

13

23

24

28

27

26

Point Hopson

25

19

20

EXPORT PIPELINE & 29 30 WEST GATHERING LINE

Point Sweeney

34

10N 22E 9N 22E

4

3

35

WEST PAD JUNCTION

2

EXPORT PIPELINE

9

36

11

15

21

22

1

12

33

23

24

5

6

4

26

8

35

9

10

2

17

18

24

19

27

26

11

25

30

15

21

29

Proposed Export Pipeline

33

34

35

36

Proposed Point Thomson Facilities and Roads Existing Gravel 0

2

1

1 Miles

2

6

5

9N 22E 9N 23E

!

16

19

20

21

30

29

28

31

32

33

22

28

4

32

23

27

33

2

EAST PAD

7

8

9

18

17

16

20

21

26

STAINES RIVER STATE #1

24

34

1

25

35 LOCATION:36

6

19

3 - TOWNSHIP, RANGE, AND SECTION MAP 2

REFERENCE:

3

4

5

6

WATER ACCESS PAD

PROJECT:

31

10N 24E 9N 24E

EAST GATHERING LINE

13

14

Proposed Gathering Lines !

Lion Bay

12

APPLICANT:

!

17

ALASKA STATE C-1 PAD

16

20

36

1

GRAVEL MINE

WEST STAINES STATE #2

28

25

CENTRAL PAD

3

GRAVEL STOCKPILE

7

13

23

18

Flaxman Island

AIRSTRIP

14

22

13

Mary Sachs Island

34

WEST STAINES STATE 18-09-23-180

21

14

Beaufort Sea

27

EAST PAD JUNCTION

32

31

POINT THOMSON UNIT 16

15

28

POINT THOMSON UNIT #1

POINT THOMSON UNIT #2

10

16

Point Thomson

WEST PAD

33

North Star Island

10N 23E 10N 24E

22

17

WATERBODY:

DATE: 5

29

30

28

EXXON MOBIL CORPORATION & PTE PIPELINE LLC.

POINT THOMSON PROJECT

NORTH SLOPE BOROUGH, 31 32 ALASKA

9N 23E 9N 24E

21

18

an ce

13

Sac hs En tr

14

Ma ry

15

10N 22E 10N 23E

F

16

33

POA-2001-1082-M1 BEAUFORT SEA

4 2012 MARCH

3

2

1

sE

n tr

an

ce

F Ma

ry

Sa

ch

Mary Sachs Island

Flaxman Island

WEST PAD

Lion Bay WEST GATHERING LINE

EXPORT PIPELINE & WEST GATHERING LINE

CENTRAL PAD

!

!

!

! !

! !

!

!

! !

!

!

!

! !

! ! ! ! ! !

!

!

! !

! !

! !

! !

!

! ! !

! !

! ! !

! ! ! !

! ! !

! ! !

!

!

! !

! !

!

! ! ! !

! !

! !

! !

!

!

!

!

! !

EXPORT PIPELINE

CENTRAL PAD ROAD

EAST GATHERING LINE

WEST PAD ROAD

GRAVEL STOCKPILE

GRAVEL MINE

EAST PAD

ALASKA STATE C-1 PAD

AIRSTRIP

EAST PAD ROAD

WATER ACCESS PAD AIRSTRIP ROAD

4 - IPS FACILITY LAYOUT POINT THOMSON UNIT Proposed Gathering Lines ! !

!

Proposed Export Pipeline

Proposed Point Thomson Facilities and Roads 0

1 Miles

2

APPLICANT:

EXXON MOBIL CORPORATION & PTE PIPELINE LLC.

PROJECT:

POINT THOMSON PROJECT

LOCATION:

NORTH SLOPE BOROUGH, ALASKA

REFERENCE:

POA-2001-1082-M1

WATERBODY:

BEAUFORT SEA

DATE:

MARCH 2012

! !

!

!

! !

!

!

! !

F AK ISL

CHAL ISL

an

ce

"

"

sE

n tr

AK FL

G

"

ry

Sa

RED DOG 1

ch

PTU-15

"

AK C1

G

WSTN 1

"

G

"

NSTNS IRD Lion Bay

PTU-16

CENTRAL PAD

"

"

!

" EAST PAD STNS 1

G

"

WSTN 2

"

ine S ta

G

"

sR

SOUR 2

er Riv

i ve

G

r

"

ing

G

SOUR 3

nn

POINT THOMSON UNIT

"

"

Ca

EMIK

G

PTU 2

"

PTU 3

G

PTU 1

"

G

"

AK G2

AK A1

!

WEST PAD

G

G

"

"

G

PTU 4

"

AK D1

Ma

"

G

Ch

all

en

ge

En

tr a

nc

e

Beaufort Sea

5 - THOMSON SAND RESERVOIR

! " G

"

Generalized Outline of Thomson Sand Hydrocarbon Accumulation

APPLICANT:

2009-2010 Drilling Program Well Bottom Hole Location

PROJECT:

POINT THOMSON PROJECT

Proposed Pad Locations

LOCATION:

NORTH SLOPE BOROUGH, ALASKA

REFERENCE:

POA-2001-1082-M1

WATERBODY:

BEAUFORT SEA

DATE:

MARCH 2012

Existing Exploration Well Bottom Hole Location Existing Exploration Well Surface Location

0

2 Miles

4

EXXON MOBIL CORPORATION & PTE PIPELINE LLC.

CENTRAL PAD/ACCESS ROAD

EXISTING GRAVEL FACILITIES

AIRSTRIP & HELIPAD/ACCESS ROAD EAST PAD/ACCESS ROAD

NAVAID PAD/ACCESS ROAD WEST PAD/ACCESS ROAD

OFF PAD QUANTITIES ALASKA STATE C-1 PAD/ACCESS ROAD

BOAT LAUNCH RAMP (ON SHORE PORTION)4

DREDGE MATERIAL OFFSHORE SECTION 10 QUANTITIES6 WATER SOURCE PAD/ACCESS ROAD

GRAVEL MINE/ACCESS ROADS BADAMI PADS

6 - PROJECT QUANTITIES APPLICANT:

EXXON MOBIL CORPORATION & PTE PIPELINE LLC.

PROJECT:

POINT THOMSON PROJECT

LOCATION:

NORTH SLOPE BOROUGH, ALASKA

REFERENCE:

POA-2001-1082-M1

WATERBODY:

BEAUFORT SEA

DATE:

MARCH 2012

MOORING DOLPHINS

8

17 - ACS LAYDOWN AREA 18 - VAC TRUCK 19 - COLD STORAGE 20 - WAREHOUSE 21 - ACS & MAINTENANCE 22 - BOAT STORAGE 23 - WASTE 24 - WATER & SEWAGE 25 - CAMP PARKING 26 - INCINERATOR 27 - STANDBY GENERATORS 28 - CAMP COMMON AREA 29 - LIVING QUARTERS 30 - CONSTRUCTION EQUIPMENT 31 - MATERIAL 32 - FUEL

F

8

TEMPORARY RAMP SUPPORT

SERVICE PIER

8

B

390 '

8 8

2

6

5

4

3

PAD TOE 7

13 12

11

A

14

'

9

0 162

8 10 ! !

! !

!

!

!

!

700 '

11

8

A

15

20

!

16

! !

1825 '

Lion Bay

SEALIFT BULKHEAD

EXISTING PTU-3 PAD

1

FLARE STACK

PAD DIMENSIONS ARE APPROXIMATE ACTUAL LAYOUT PENDING FINAL DESIGN

925 '

8

1 - DISPOSAL WELL 2 - DRILLING UTILITIES 3 - GRIND & INJECT 4 - CUTTINGS STORAGE 5 - DRY BULK STORAGE 6 - TANK TRAILERS 7 - CAMP 8 - INJECTION COMPRESSORS 9 - UTILITY MODULE 10 - SEPARATION/DEHYDRATION 11 - POWER GENERATORS 12 - DRILLING FLUID TANKS 13 - PIPE MATERIAL 14 - DIESEL 15 - DIESEL/METHANOL 16 - SUPER SUCKERS

PAD SHOULDER

17

! ! !

18

! ! ! ! !

20

!

19

8

! ! ! ! ! ! ! ! ! ! ! !

31

25

24

23

!

!

!

!

!

! ! !

! !

! !

!

26

!

7

!

32

22

21

30

31

26

!

25

!

23

27

28

29

8

!

! !

! !

!

900

!

8

! !

! !

8

!

% !

!

Proposed Point Thomson Facilities and Roads

Feet

Drilling

Living Facilities 8

Barge Offloading Operations

Processing Unit

APPLICANT:

Proposed Export Pipeline

500

B

7 - CENTRAL PAD FOOTPRINT

EAST GATHERING LINE

Existing Gravel

0

Zone Key

WASTEWATER EFFLUENT LINE

Proposed Gathering Lines !

560 '

'

8

!

To Airstrip, Gravel Mine

CENTRAL PAD ROAD

BOAT LAUNCH

8

EXPORT PIPELINE & EAST AND WEST GATHERING LINES

1,000

EXXON MOBIL CORPORATION & PTE PIPELINE LLC.

PROJECT:

POINT THOMSON PROJECT

LOCATION:

NORTH SLOPE BOROUGH, ALASKA

REFERENCE:

POA-2001-1082-M1

WATERBODY:

BEAUFORT SEA

DATE:

MARCH 2012

CENTRAL PAD

KEY MAP

SECTION A-A

SECTION B-B

8 - CENTRAL PAD SECTIONS APPLICANT:

EXXON MOBIL CORPORATION & PTE PIPELINE LLC.

PROJECT:

POINT THOMSON PROJECT

LOCATION:

NORTH SLOPE BOROUGH, ALASKA

REFERENCE:

POA-2001-1082-M1

WATERBODY:

BEAUFORT SEA

DATE:

MARCH 2012

F

MOORING DOLPHINS TEMPORARY RAMP SUPPORT

SERVICE PIER

Lion Bay

SEALIFT BULKHEAD

EXISTING PTU-3 PAD

SLOPE PROTECTION

! !

! !

!

!

! ! ! ! ! ! ! ! ! ! ! ! !

BOAT LAUNCH

! ! ! ! ! !

EXPORT PIPELINE & EAST AND WEST GATHERING LINES

! ! ! ! ! ! ! !

!

!

!

!

! ! !

! !

! !

! !

! !

! !

! !

! !

! !

! !

! !

! !

To Airstrip, Gravel Mine

CENTRAL PAD ROAD PAD DIMENSIONS ARE APPROXIMATE ACTUAL LAYOUT PENDING FINAL DESIGN

WASTEWATER EFFLUENT LINE

%

9 - CENTRAL PAD SLOPE PROTECTION PLAN

EAST GATHERING LINE Proposed Slope Protection

APPLICANT:

Proposed Gathering Lines !

!

!

Proposed Export Pipeline Existing Gravel

Proposed Point Thomson Facilities and Roads 0

500

Feet

1,000

EXXON MOBIL CORPORATION & PTE PIPELINE LLC.

PROJECT:

POINT THOMSON PROJECT

LOCATION:

NORTH SLOPE BOROUGH, ALASKA

REFERENCE:

POA-2001-1082-M1

WATERBODY:

BEAUFORT SEA

DATE:

MARCH 2012

GRAVEL BAG ARMOR SECTION

10 - TYPICAL PAD SLOPE PROTECTION SECTION APPLICANT:

EXXON MOBIL CORPORATION & PTE PIPELINE LLC.

PROJECT:

POINT THOMSON PROJECT

LOCATION:

NORTH SLOPE BOROUGH, ALASKA

REFERENCE:

POA-2001-1082-M1

WATERBODY:

BEAUFORT SEA

DATE:

MARCH 2012

-8

F

120 ' -6

MOORING DOLPHIN 4

815 '

-7

160 ' 1

-4

MOORING DOLPHIN 1 TEMPORARY RAMP SUPPORT SEALIFT BULKHEAD

125 '

0

250 '

300 '

-2 % -1

%

%

%

%

-3

%

32

%

PIER

%

-4SERVICE

-5

5

5

4

PAD SHOULDER 2

3

3

2

%

PAD TOE

-7

MOORING DOLPHIN 2 %

%

MOORING DOLPHIN 8 6

330 '

-5

400 '

-6

MOORING DOLPHIN 5

SHORE LIN E

% -6

DREDGING AND SCREEDING AREA

MOORING DOLPHIN 7

MOORING DOLPHIN 3

%

-7

MOORING DOLPHIN 6

400 '

-7

%

SCREEDING AREA

Lion Bay

%

DIMENSIONS ARE APPROXIMATE ACTUAL LAYOUT PENDING FINAL DESIGN

CENTRAL PAD

ELEVATIONS ARE IN FEET AND BASED ON MLLW

11 - BARGE OFFLOADING STRUCTURES PLAN APPLICANT:

0

200

Feet

400

EXXON MOBIL CORPORATION & PTE PIPELINE LLC.

PROJECT:

POINT THOMSON PROJECT

LOCATION:

NORTH SLOPE BOROUGH, ALASKA

REFERENCE:

POA-2001-1082-M1

WATERBODY:

BEAUFORT SEA

DATE:

MARCH 2012

SEALIFT BULKHEAD SECTION SEALIFT BULKHEAD SECTION

SERVICE PIER SECTION 12 - BARGE OFFLOADING STRUCTURES SECTIONS APPLICANT:

EXXON MOBIL CORPORATION & PTE PIPELINE LLC.

PROJECT:

POINT THOMSON PROJECT

LOCATION:

NORTH SLOPE BOROUGH, ALASKA

REFERENCE:

POA-2001-1082-M1

WATERBODY:

BEAUFORT SEA

DATE:

JULY 2012

PLAN

MOORING DOLPHIN FRONT ELEVATION

MOORING DOLPHIN SIDE ELEVATION 13 - MOORING DOLPHIN PLAN & ELEVATION APPLICANT:

EXXON MOBIL CORPORATION & PTE PIPELINE LLC.

PROJECT:

POINT THOMSON PROJECT

LOCATION:

NORTH SLOPE BOROUGH, ALASKA

REFERENCE:

POA-2001-1082-M1

WATERBODY:

BEAUFORT SEA

DATE:

MARCH 2012

F

Proposed Onshore Dredge Material Placement Proposed Central Pad

10 00 '

Lion Bay

A A

DREDGING AND/OR SCREEDING AREA

0

500

1,000

1,500

Feet

14 - DREDGE MATERIAL ONSHORE PLACEMENT APPLICANT:

EXXON MOBIL CORPORATION & PTE PIPELINE LLC.

PROJECT:

POINT THOMSON PROJECT

LOCATION:

NORTH SLOPE BOROUGH, ALASKA

WATERBODY:

BEAUFORT SEA

DATE:

JULY 2012

Central Pad REFERENCE: Road POA-2001-1082-M1

2,000

BOAT LAUNCH

N

KEY MAP

15 - BOAT LAUNCH PLAN APPLICANT:

EXXON MOBIL CORPORATION & PTE PIPELINE LLC.

PROJECT:

POINT THOMSON PROJECT

LOCATION:

NORTH SLOPE BOROUGH, ALASKA

REFERENCE:

POA-2001-1082-M1

WATERBODY:

BEAUFORT SEA

DATE:

MARCH 2012

RAMP ELEVATION

RAMP SECTION A-A 16 - BOAT LAUNCH SECTIONS APPLICANT:

EXXON MOBIL CORPORATION & PTE PIPELINE LLC.

PROJECT:

POINT THOMSON PROJECT

LOCATION:

NORTH SLOPE BOROUGH, ALASKA

REFERENCE:

POA-2001-1082-M1

WATERBODY:

BEAUFORT SEA

DATE:

MARCH 2012

Lion Bay

F

PAD DIMENSIONS ARE APPROXIMATE ACTUAL LAYOUT PENDING FINAL DESIGN 1240 '

8

8 8

EXISTING NORTH STAINES RIVER STATE NO.1 PAD

1

3

A

4

5 PAD ELEV. +12'

PAD ELEV. +17'

9

8

B

RAMP

6

8

2

10

11

12

A

13

7

670 '

8

15 890 '

8

1050 '

14

PAD SHOULDER

16

PAD TOE

17 18 20

19

8

8

EAST PAD ROAD

11 - CASING STORAGE 12 - DRILLING STORAGE 13 - CUTTINGS STORAGE 14 - VAC TRUCK 15 - SUPER SUCKERS 16 - PIPE SHED 17 - METHANOL INJECTION 18 - LOCAL E/I ROOM 19 - ACS STORAGE 20 - PIG LAUNCHER

APPLICANT:

Proposed Gathering Lines

Proposed Point Thomson Facilities and Roads 250

Feet

To Airstrip, Mine, Central Pad

8Gravel

17 - EAST PAD FOOTPRINT

Existing Gravel

0

440 '

%

1 - CAMP 2 - OFFICES 3 - CAMP PARKING 4 - TANK TRAILERS 5 - DRY BULK STORAGE 6 - DRILLING WAREHOUSE 7 - SHOP RIG 8 - BULK TANK FARM 9 - RESERVE FUEL 10 - DRILLPIPE STORAGE

B 8

EAST GATHERING LINE

500

EXXON MOBIL CORPORATION & PTE PIPELINE LLC.

PROJECT:

POINT THOMSON PROJECT

LOCATION:

NORTH SLOPE BOROUGH, ALASKA

REFERENCE:

POA-2001-1082-M1

WATERBODY:

BEAUFORT SEA

DATE:

MARCH 2012

EAST PAD

KEY MAP

SECTION A-A

SECTION B-B

18 - EAST PAD SECTIONS APPLICANT:

EXXON MOBIL CORPORATION & PTE PIPELINE LLC.

PROJECT:

POINT THOMSON PROJECT

LOCATION:

NORTH SLOPE BOROUGH, ALASKA

REFERENCE:

POA-2001-1082-M1

WATERBODY:

BEAUFORT SEA

DATE:

MARCH 2012

460 '

8

8

A

8

F

Beaufort Sea

10 14

PAD SHOULDER

16

1670 '

PAD TOE

B

17 18

B

19 11 12

7 8

5

4

2

9

3

6

1

13 15

8

WEST GATHERING LINE 1 - CAMP PARKING 2 - CAMP 3 - VAC TRUCK 4 - SUPER SUCKERS 5 - BULK TANK FARM 6 - RIG SHOP 7 - CUTTINGS STORAGE 8 - TANK TRAILERS 9 - RESERVE FUEL 10 - DRILLPIPE STORAGE

11 - DRY BULK STORAGE 12 - DRILLING STORAGE 13 - DRILLING WAREHOUSE 14 - CASINGS STORAGE 15 - ACS STORAGE 16 - DIVERTER/CAPTURE 17 - MODULE 202 18 - MODULE 201 19 - MODULE 203

Proposed Gathering Lines

Proposed Point Thomson Facilities and Roads 0

250

Feet

500

A WEST PAD ROAD PAD DIMENSIONS ARE APPROXIMATE ACTUAL LAYOUT PENDING FINAL DESIGN

19 - WEST PAD FOOTPRINT APPLICANT:

EXXON MOBIL CORPORATION & PTE PIPELINE LLC.

PROJECT:

POINT THOMSON PROJECT

LOCATION:

NORTH SLOPE BOROUGH, ALASKA

REFERENCE:

POA-2001-1082-M1

WATERBODY:

BEAUFORT SEA

DATE:

MARCH 2012

WEST PAD

KEY MAP

SECTION A-A

SECTION B-B

20 - WEST PAD SECTIONS APPLICANT:

EXXON MOBIL CORPORATION & PTE PIPELINE LLC.

PROJECT:

POINT THOMSON PROJECT

LOCATION:

NORTH SLOPE BOROUGH, ALASKA

REFERENCE:

POA-2001-1082-M1

WATERBODY:

BEAUFORT SEA

DATE:

MARCH 2012

F

GRAVEL MINE GRAVEL STOCKPILE

HELICOPTER PARKING AREA

8

705 '

245 ' 8

270 ' 8

8

8

8

8

8

8

210 '8 365 ' 8

340 ' 8260 ' 8

8

345 ' 8

8

430 '

370 ' 8

8

HELICOPTER TAXIWAY

8

MAIN TAXIWAY

200 8'

8

NAVAID

8

340 ' 8

180 '

8

NAVAID

8

200 8'

APRON

8

NAVAID

AIRSTRIP ACCESS ROAD

8

NAVAID 675 '

8

8

8

APPROACH LIGHTING PILES (TYP). POWER CABLE CONDUIT ON SLEEPERS

5645 '

8

WATER ACCESS PAD

21 - AIRSTRIP FOOTPRINT APPLICANT:

Proposed Powerline

Proposed Point Thomson Facilities and Roads 0

1,000 Feet

2,000

NOTE: ORGANIC MATERIAL IS PLACED ON ALL SIDES OF THE AIRSTRIP FOR SLOPE PROTECTION. ORGANIC MATERIAL AND JUTE MAT IS PLACED ALONG THE SOUTHERN SLOPE OF THE AIRSTRIP.

EXXON MOBIL CORPORATION & PTE PIPELINE LLC.

PROJECT:

POINT THOMSON PROJECT

LOCATION:

NORTH SLOPE BOROUGH, ALASKA

REFERENCE:

POA-2001-1082-M1

WATERBODY:

BEAUFORT SEA

DATE:

MARCH 2012

AIRSTRIP

TYPICAL TAXIWAY SECTION

KEY MAP

TYPICAL RUNWAY SECTION

TYPICAL APRON SECTION

RUNWAY PROFILE

APRON AND TAXIWAY PROFILE

TYPICAL SLOPE PROTECTION SECTION

22 - AIRSTRIP SECTIONS APPLICANT:

EXXON MOBIL CORPORATION & PTE PIPELINE LLC.

PROJECT:

POINT THOMSON PROJECT

LOCATION:

NORTH SLOPE BOROUGH, ALASKA

REFERENCE:

POA-2001-1082-M1

WATERBODY:

BEAUFORT SEA

DATE:

MARCH 2012

HELICOPTER PARKING AREA

KEY MAP

TYPICAL HELICOPTER TAXIWAY

HELICOPTER APRON TRANSVERSE SECTION

HELICOPTER APRON LONGITUDINAL SECTION 23 - AIRSTRIP AUXILIARY FEATURE SECTIONS APPLICANT:

EXXON MOBIL CORPORATION & PTE PIPELINE LLC.

PROJECT:

POINT THOMSON PROJECT

LOCATION:

NORTH SLOPE BOROUGH, ALASKA

REFERENCE:

POA-2001-1082-M1

WATERBODY:

BEAUFORT SEA

DATE:

MARCH 2012

NAVAID POWER DISTRIBUTION CONDUIT ON SLEEPER SECTION

TYPICAL NAVAID APPROACH LIGHT ON PILE 20 TOTAL 24 - AIRSTRIP LIGHTING SYSTEM SECTIONS APPLICANT:

EXXON MOBIL CORPORATION & PTE PIPELINE LLC.

PROJECT:

POINT THOMSON PROJECT

LOCATION:

NORTH SLOPE BOROUGH, ALASKA

REFERENCE:

POA-2001-1082-M1

WATERBODY:

BEAUFORT SEA

DATE:

MARCH 2012

F 8

A

8 8

410 '

550 '

PAD TOE PAD SHOULDER

B

B

8

ROAD SHOULDER

EXISTING GRAVEL ALASKA STATE C-1 (NO NEW FILL BEYOND EXISTING PAD FOOTPRINT)

ALASKA STATE C-1 PAD

ALASKA STATE C-1 PAD ACCESS ROAD

ROAD TOE

A

To East Pad

To Airstrip, Gravel Mine, Central Pad

END CENTRAL PAD ROAD BEGIN EAST PAD ROAD

%

STREAM CROSSING 24A

PAD DIMENSIONS ARE APPROXIMATE ACTUAL LAYOUT PENDING FINAL DESIGN Stream Crossing Culvert Cross Drainage Culvert Existing Gravel

Proposed Point Thomson Facilities and Roads 0

200

Feet

400

25 - ALASKA STATE C-1 PAD FOOTPRINT APPLICANT:

EXXON MOBIL CORPORATION & PTE PIPELINE LLC.

PROJECT:

POINT THOMSON PROJECT

LOCATION:

NORTH SLOPE BOROUGH, ALASKA

REFERENCE:

POA-2001-1082-M1

WATERBODY:

BEAUFORT SEA

DATE:

MARCH 2012

%

ALASKA STATE C1 PAD

KEY MAP

SECTION A-A - ALASKA STATE C-1 PAD LONGITUDINAL SECTION

SECTION B-B - ALASKA STATE C-1 PAD TRANSVERSE SECTION

26 - ALASKA STATE C-1 PAD SECTIONS APPLICANT:

EXXON MOBIL CORPORATION & PTE PIPELINE LLC.

PROJECT:

POINT THOMSON PROJECT

LOCATION:

NORTH SLOPE BOROUGH, ALASKA

REFERENCE:

POA-2001-1082-M1

WATERBODY:

BEAUFORT SEA

DATE:

MARCH 2012

F

%

To Airstrip, Gravel Mine, Central Pad

CENTRAL PAD ROAD

To East Pad

WATER ACCESS PAD

WATER ACCESS PAD ACCESS ROAD

8

B

A A 170 '

PAD TOE PAD SHOULDER

8

ALASKA STATE C-1 PIT

B 8

24'

WATER INTAKE PUMPS

20'

' 16

12'

4'

Proposed Electrical Trenching

Proposed Point Thomson Facilities and Roads

Feet

APPLICANT:

0'

Cross Drainage Culvert

100

27 - WATER ACCESS PAD FOOTPRINT

8'

PAD DIMENSIONS ARE APPROXIMATE ACTUAL LAYOUT PENDING FINAL DESIGN

0

8

180 '

200

-4'

EXXON MOBIL CORPORATION & PTE PIPELINE LLC.

PROJECT:

POINT THOMSON PROJECT

LOCATION:

NORTH SLOPE BOROUGH, ALASKA

REFERENCE:

POA-2001-1082-M1

WATERBODY:

BEAUFORT SEA

DATE:

MARCH 2012

%

WATER ACCESS PAD

KEY MAP

WATER ACCESS PAD TRANSVERSE SECTION A-A

WATER ACCESS PAD LONGITUDINAL SECTION B-B

28 - WATER ACCESS PAD SECTIONS APPLICANT:

EXXON MOBIL CORPORATION & PTE PIPELINE LLC.

PROJECT:

POINT THOMSON PROJECT

LOCATION:

NORTH SLOPE BOROUGH, ALASKA

REFERENCE:

POA-2001-1082-M1

WATERBODY:

BEAUFORT SEA

DATE:

MARCH 2012

F

Mikkelsen Bay

EXISTING BADAMI PAD

BADAMI AUXILIARY PAD EXISTING BADAMI PIPELINE

B

A

EXISTING SNOW FENCE

!

!

!

!

!

A

!

!

!

B

!

!

!

!

!

!

!

!

! !

! !

!

!

!

!

!

!

! !

! !

!

!

! !

! !

EXISTING ROAD TO AIRSTRIP

!

!

! !

! !

A !

!

! !

! !

!

!

! !

! !

!

!

! !

! !

!

!

! !

! !

! !

!

!

! !

! !

!

!

! !

! !

!

!

! !

! !

!

!

! !

! !

!

!

! !

!

! !

!

!

!

A

! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

EXPORT PIPELINE

!

!

!

!

PIPELINE CROSSING PAD

29 - BADAMI PADS FOOTPRINT APPLICANT:

!

!

!

Proposed Point Thomson Export Pipeline

Proposed Point Thomson Roads and Facilities Existing Roads and Facilities 0

250

Feet

500

EXXON MOBIL CORPORATION & PTE PIPELINE LLC.

PROJECT:

POINT THOMSON PROJECT

LOCATION:

NORTH SLOPE BOROUGH, ALASKA

REFERENCE:

POA-2001-1082-M1

WATERBODY:

BEAUFORT SEA

DATE:

MARCH 2012

PROPOSED BADAMI AUXILIARY PAD TRANSVERSE SECTION

PROPOSED BADAMI AUXILIARY PAD LONGITUDINAL SECTION

PROPOSED BADAMI PIPELINE CROSSING PAD TYP TRANSVERSE SECTION

30 - BADAMI PADS SECTIONS

PROPOSED PIPELINE CROSSING PAD TYPICAL LONGITUDINAL SECTION

APPLICANT:

EXXON MOBIL CORPORATION & PTE PIPELINE LLC.

PROJECT:

POINT THOMSON PROJECT

LOCATION:

NORTH SLOPE BOROUGH, ALASKA

REFERENCE:

POA-2001-1082-M1

WATERBODY:

BEAUFORT SEA

DATE:

MARCH 2012

F Beaufort Sea

BULLEN POINT

Mikkelsen Bay

BADAMI PAD

BADAMI AUXILIARY PAD

DOCK

!

!

PIPELINE CROSSING PAD

! ! !

!

! ! !

!

! !

!

! !

!

! ! ! !

!

!

! ! ! !

! !

!

! !

! !

! !

! !

! !

!

! !

!

!

!

!

!

!

! !

! !

!

!

!

!

! !

!

!

!

! !

! !

!

!

! !

!

!

! !

! !

! ! !

! !

! !

! ! ! !

!

!

!

!

!

!

! ! ! !

!

!

! ! ! !

!

!

!

! ! ! !

Proposed Point Thomson Roads and Facilities Existing Roads and Facilities 0

1

2

Miles

ce

31 - PIPELINE OVERVIEW SHEET 1 OF 4

ry S

Ch

a ch

all e

sE

ng

eE

ntr an

n tr an

ce

Beaufort Sea

APPLICANT:

Ma

Mikkelsen Bay

! !

!

! !

! !

!

! !

! !

! !

!

!

! !

!!

! !

!! ! !

! !

! !

! !

! !

! !

!

!

Lion Bay

!

iv e r

!!

! !

!!

! !

!! ! !

sR

!!

SHEET 2 OF 4

SHEET 3 OF 4

Sta in e

!

! !

SHEET 1 OF 4

SHEET 4 OF 4

EXXON MOBIL CORPORATION & PTE PIPELINE LLC.

PROJECT:

POINT THOMSON PROJECT

LOCATION:

NORTH SLOPE BOROUGH, ALASKA

REFERENCE:

POA-2001-1082-M1

WATERBODY:

BEAUFORT SEA

DATE:

JULY 2012

!

!

!

!

Proposed Point Thomson Gathering Lines

!

!

!

Proposed Point Thomson Export Pipeline

!

!

! !

!

EXPORT PIPELINE

BADAMI MINE SITE

!

!

! !

EXISTING BADAMI PIPELINE

!

BADAMI AIRSTRIP

!

E MIKKELSEN BAY STATE #1

!

F Beaufort Sea

BULLEN POINT STAGING PAD

! !

! ! !! ! ! ! ! ! ! ! ! ! ! ! !

!

! !

! !

! !

! ! !

! ! !

!

! ! ! !

! ! ! ! ! ! !

! !

!

! !

! !

!

!

! !

!

! !

! !

!

!

!

! !

!

! ! ! ! !

! ! ! !

! ! !

! ! ! ! ! !

! ! ! ! !

! !

! ! ! ! !

! ! !

!

!

! ! ! ! ! ! !

! ! ! ! !

!

! ! ! !

! !

! !

! !

!

!

!

Proposed Point Thomson Export Pipeline

!

Proposed Point Thomson Gathering Lines

Proposed Point Thomson Roads and Facilities Existing Roads and Facilities 0

1

2

Miles

ntr an

ce

sE

n tr an

a ch

eE

ry S

ng

!

!

! !

! !

! !

!

! !

!!

! !

!! ! !

! !

! !

! !

! !

! !

Lion Bay

!

!

APPLICANT:

Ma

all e Ch

! !

! !

!

! !

Mikkelsen Bay

32 - PIPELINE OVERVIEW SHEET 2 OF 4

ce

Beaufort Sea

!

!

! !

iv e r

!!

! !

!!

! !

!! ! !

Sta in e

sR

!!

SHEET 1 OF 4

SHEET 2 OF 4

SHEET 3 OF 4

SHEET 4 OF 4

EXXON MOBIL CORPORATION & PTE PIPELINE LLC.

PROJECT:

POINT THOMSON PROJECT

LOCATION:

NORTH SLOPE BOROUGH, ALASKA

REFERENCE:

POA-2001-1082-M1

WATERBODY:

BEAUFORT SEA

DATE:

JULY 2012

! !

!

!

EXPORT PIPELINE

!

POINT THOMSON UNIT #4

BULLEN POINT AIRSTRIP

!

F

Ma ry

Sac h

sE

ntr

anc

e

Beaufort Sea

POINT THOMSON UNIT #1 EXPORT PIPELINE & WEST GATHERING LINE

CENTRAL PAD

!

!

!

!

!

! !

! !

!

!

!

! ! !

! !

! !

!

!

!

!

! !

! !

!

!

!

! !

!

!

! !

! !

!

!

! !

!

! !

!

!

! !

!

! !

!

! !

! !

! !

!

! !

!

WEST GATHERING LINE

!

WEST PAD

!

!

! !

!

! !

! !

! ! ! !

!

! ! !

!

!

!

!

! !

! !

!

!

! ! ! ! ! !

! !

!

WEST PAD ROAD

! !

! !

EAST GATHERING LINE GRAVEL MINE GRAVEL STOCKPILE

WEST STAINES STATE 18-09-23 AIRSTRIP WATER ACCESS PAD

! !

Proposed Point Thomson Export Pipeline

! !

Proposed Point Thomson Gathering Lines

Proposed Point Thomson Roads and Facilities Existing Roads and Facilities 1

WEST STAINES STATE #2

2

Miles

33 - PIPELINE OVERVIEW SHEET 3 OF 4

ry S

Ch

a ch

all e

sE

ng

eE

ntr an

n tr an

ce

Beaufort Sea

ce

0

APPLICANT:

Ma

Mikkelsen Bay !

! !

! !

!

! !

! !

! !

!

!

! !

! !

!!

! !

!! ! !

! !

! !

! !

! !

Lion Bay

!

!

! !

!

!

! !

iv e r

! !

!!

! ! !!

!! ! ! !!

Sta in e

sR

! ! !

POINT THOMSON UNIT #2

! !

!

!

EXPORT PIPELINE

SHEET 1 OF 4

SHEET 2 OF 4

SHEET 3 OF 4

SHEET 4 OF 4

EXXON MOBIL CORPORATION & PTE PIPELINE LLC.

PROJECT:

POINT THOMSON PROJECT

LOCATION:

NORTH SLOPE BOROUGH, ALASKA

REFERENCE:

POA-2001-1082-M1

WATERBODY:

BEAUFORT SEA

DATE:

JULY 2012

!

F

Mary Sachs Island

Beaufort Sea ALASKA STATE A-1

Flaxman Island

ALASKA STATE G2

Lion Bay

EAST GATHERING LINE

EAST PAD

STAINES RIVER STATE #1

EAST PAD ROAD

! !

Proposed Point Thomson Export Pipeline

! !

Proposed Point Thomson Gathering Lines

Proposed Point Thomson Roads and Facilities Existing Roads and Facilities 1

2

Miles

34 - PIPELINE OVERVIEW SHEET 4 OF 4

ry S

Ch

a ch

all e

sE

ng

eE

ntr an

n tr an

ce

Beaufort Sea

ce

0

APPLICANT:

Ma

Mikkelsen Bay

! !

!

! !

! !

!

! !

! !

! !

!

!

! !

!!

! !

!! ! !

! !

! !

! !

! !

! !

!

!

Lion Bay

!

!

! !

iv e r

!!

! !

!!

! !

!! ! !

Sta in e

sR

!!

SHEET 1 OF 4

SHEET 2 OF 4

SHEET 3 OF 4

SHEET 4 OF 4

EXXON MOBIL CORPORATION & PTE PIPELINE LLC.

PROJECT:

POINT THOMSON PROJECT

LOCATION:

NORTH SLOPE BOROUGH, ALASKA

REFERENCE:

POA-2001-1082-M1

WATERBODY:

BEAUFORT SEA

DATE:

JULY 2012

!

WEST GATHERING LINE

EAST GATHERING LINE

KEY MAP

WEST GATHERING LINE

EAST GATHERING LINE 35 - PIPELINE SECTIONS GATHERING LINES APPLICANT:

EXXON MOBIL CORPORATION & PTE PIPELINE LLC.

PROJECT:

POINT THOMSON PROJECT

LOCATION:

NORTH SLOPE BOROUGH, ALASKA

REFERENCE:

POA-2001-1082-M1

WATERBODY:

BEAUFORT SEA

DATE:

MARCH 2012

GATHERING LINES & EXPORT PIPELINE

KEY MAP

GATHERING LINES & EXPORT PIPELINE - CENTRAL PAD TO EAST PAD JUNCTION ON SINGLE VSM 36 - PIPELINE SECTIONS GATHERING LINES & EXPORT PIPELINE (SINGLE VSM) APPLICANT:

EXXON MOBIL CORPORATION & PTE PIPELINE LLC.

PROJECT:

POINT THOMSON PROJECT

LOCATION:

NORTH SLOPE BOROUGH, ALASKA

REFERENCE:

POA-2001-1082-M1

WATERBODY:

BEAUFORT SEA

DATE:

MARCH 2012

GATHERING LINES & EXPORT PIPELINE

KEY MAP

GATHERING LINES & EXPORT PIPELINE - CENTRAL PAD TO EAST PAD JUNCTION ON DUAL VSM 37 - PIPELINE SECTIONS GATHERING LINES & EXPORT PIPELINE (DUAL VSM) APPLICANT:

EXXON MOBIL CORPORATION & PTE PIPELINE LLC.

PROJECT:

POINT THOMSON PROJECT

LOCATION:

NORTH SLOPE BOROUGH, ALASKA

REFERENCE:

POA-2001-1082-M1

WATERBODY:

BEAUFORT SEA

DATE:

MARCH 2012

WEST GATHERING LINE & EXPORT PIPELINE

KEY MAP

WEST GATHERING LINE AND EXPORT PIPELINE EAST PAD JUNCTION TO WEST PAD JUNCTION ON DUAL VSM

WEST GATHERING LINE AND EXPORT PIPELINE EAST PAD JUNCTION TO WEST PAD JUNCTION ON SINGLE VSM 38 - PIPELINE SECTIONS WEST GATHERING LINE AND EXPORT PIPELINE APPLICANT:

EXXON MOBIL CORPORATION & PTE PIPELINE LLC.

PROJECT:

POINT THOMSON PROJECT

LOCATION:

NORTH SLOPE BOROUGH, ALASKA

REFERENCE:

POA-2001-1082-M1

WATERBODY:

BEAUFORT SEA

DATE:

MARCH 2012

TO BADAMI

EXPORT PIPELINE

KEY MAP

EXPORT PIPELINE WEST PAD JUNCTION TO BADAMI

39 - PIPELINE SECTIONS EXPORT PIPELINE APPLICANT:

EXXON MOBIL CORPORATION & PTE PIPELINE LLC.

PROJECT:

POINT THOMSON PROJECT

LOCATION:

NORTH SLOPE BOROUGH, ALASKA

REFERENCE:

POA-2001-1082-M1

WATERBODY:

BEAUFORT SEA

DATE:

MARCH 2012

PLAN

PROFILE

SECTION 40 - TYPICAL PIPELINE ROAD CROSSING CENTRAL PAD ACCESS ROAD APPLICANT:

EXXON MOBIL CORPORATION & PTE PIPELINE LLC.

PROJECT:

POINT THOMSON PROJECT

LOCATION:

NORTH SLOPE BOROUGH, ALASKA

REFERENCE:

POA-2001-1082-M1

WATERBODY:

BEAUFORT SEA

DATE:

MARCH 2012

PLAN

PROFILE

SECTION 41 - TYPICAL PIPELINE ROAD CROSSING WEST PAD ACCESS ROAD APPLICANT:

EXXON MOBIL CORPORATION & PTE PIPELINE LLC.

PROJECT:

POINT THOMSON PROJECT

LOCATION:

NORTH SLOPE BOROUGH, ALASKA

REFERENCE:

POA-2001-1082-M1

WATERBODY:

BEAUFORT SEA

DATE:

MARCH 2012

US Army Corps of Engineers Alaska District

ANCHORAGE Regulatory Division (1145) CEPOA-RD Post Office Box 6898 JBER, Alaska 99506-0898

Public Notice of Application for Permit PUBLIC NOTICE DATE:

July 27, 2012

EXPIRATION DATE:

August 27, 2012

REFERENCE NUMBER:

POA-2001-1082-M1

WATERWAY:

Beaufort Sea

The public in hereby notified that a Department of the Army (DA) permit application has been received for proposed work in waters and navigable waters of the United States (U.S.), including surface waters, wetlands, and ocean waters, as described below and shown on the enclosed project figures. This is the second public notice issued for the Point Thomson Project to solicit public comment. The first coincided with publication for the Draft Environmental Impact Statement (EIS) on November 18, 2011. This public notice is issued concurrently with publication of the Final EIS. Included herein are the applicant's changes to the proposed project figures previously published with the first public notice. The changes include revisions and clarifications represented in the set of 82 Figures for this Public Notice are available online at http://www.poa.usace.army.mil/reg/PNNew.htm. Some figures have been modified and others added. Comments on the described work noting U.S. Army Corps of Engineers (USACE) file number POA-2001-1082-M1, Beaufort Sea, must be submitted no later than the expiration date of this Public Notice (August 27, 2012) to become part of the administrative record and be considered in our permit decision. Please submit comments to the USACE Project Manager listed immediately below by the communication method of your choice. USACE PROJECT MANAGER: Please submit comments to Harry A. Baij Jr. by e-mail address at harry.a.baij@usace.army.mil, at the mailing address above, by calling 907-753-2784 (office), 907-350-5097 (cell), toll free in Alaska at 800-478-2712, or by fax at 907-753-5567. Questions and requests for information on this public notice can be sent directly to Mr. Baij at the above e-mail address. APPLICANT:

Exxon Mobil Corporation and PTE Pipeline LLC.

APPLICANT'S AGENT: Mr. Lee Bruce, Senior Project Manager, Point Thomson Project, ExxonMobil Development Company (EMDC), a wholly-owned subsidiary of ExxonMobil Pipeline Company; 3301 C Street, Suite 400, Anchorage, AK 99503; telephone 832-868-2270. LOCATION: Alaska's Beaufort Sea coastline, North Slope Borough, approximately 60 miles east of Prudhoe Bay and 60 miles west of Kaktovik, Alaska. The proposed development would extend over approximately 30 miles, generally near the Beaufort Sea. The locations of the major components of the proposed project are listed below:

1. The proposed Central Pad would be located at approximate Latitude 70.1713º N., Longitude 146.2568º W. in Sec. 34, T. 10 N., R. 23 E. and Sec. 03, T. 09 N., R. 23 E., Umiat Meridian. 2. The proposed East Pad would be located at approximate Latitude 70.1467º N., Longitude 146.1084º W., in Sec. 8, T. 09 N., R. 24 E., Umiat Meridian. 3. The proposed West Pad would be located at approximate Latitude 70.1806º N., Longitude 146.4394º W., in Sec. 36, T. 10 N., R. 22 E., Umiat Meridian. 4. The proposed airstrip would be located at approximate Latitude 70.1369º N., Longitude 146.2849º W., in Sections 15, and 16, T. 9 N., R. 23 E., Umiat Meridian. 5. The proposed mine site would be located at approximate Latitude 70.1465º N., Longitude 146.2528º W., in Sections 10, 11, T. 9 N., R. 23 E., Umiat Meridian. 6. The proposed support pad (existing Alaska State C-1 pad) would be located at approximate Latitude 70.1369º N., Longitude 146.2441º W., in Sections 14, T. 9 N., R. 23 E., Umiat Meridian. 7. The proposed in-field gravel roads would connect all the above proposed Central, East, and West Pads; the airstrip; and the gravel mine in a relative inland routing. 8. The proposed in-field or gathering pipelines would extend from the proposed East and West Pads to the proposed Central Pad in a relatively straight routing, that is, not closely aligned with the in-field roads. 9. A proposed export pipeline would extend west approximately 22 miles from the proposed Central Pad to connect with an existing common carrier pipeline to the Trans Alaska Pipeline System. Beginning at the proposed Central Pad, approximate Latitude 70.1712º N., Longitude 146.2641º W., in Umiat Meridian and ending at the existing British Petroleum Badami Facility, approximate Latitude 70.1502º N., Longitude 147.1027º W., Umiat Meridian. Vicinity and smaller scale maps are also available online at http://www.poa.usace.army.mil/reg/PNNew.htm. FIGURES: The original figure set included with our November 18, 2011, Public Notice was submitted with the applicant's October 2011, DA permit application. This original figure set has been fully replaced with figures re-submitted and re-dated by the applicant. The figures now include dates of March 2012, and July 2012. Figures are provided for gravel fill roads, gravel pads, an airstrip, a mine site, elevated pipelines, processing facilities, and supporting infrastructure. Some locations and relevant design features of the proposed facilities presented in the original October 2011, DA permit application have been revised by the applicant. A total of 82 figures are included in the revised figure set attachment available online at http://www.poa.usace.army.mil/reg/PNNew.htm and fully replace the original figure set dated November 2011. The figures which have been added include: Figure: 70 Wastewater Water Effluent Section Additional figure Figure: 71 Water Access Pad Intake Section Additional figure

-2-

Figure: Figure: Figure: Figure: Figure: Figure: Figure: Figure: Figure: Figure: Figure:

72 73 74 75 76 77 78 79 80 81 82

Typical Stream Crossing Culvert Section Additional figure Typical Stream Crossing Culvert for Fish Passage Section Powerline Bridge Crossing Section Navaid Pad Section (Sheet 1 of 4) Navaid Pad Section (Sheet 2 of 4) Navaid Pad Section (Sheet 3 of 4) Navaid Pad Section (Sheet 4 of 4) Sealift Bulkhead Dredging and Screeding Details Service Pier Dredging and Screeding Details Sealift Bulkhead and Service Pier Elevation Typical Electrical Trenching and Road Section

APPLICANT'S PURPOSE: Initiate commercial hydrocarbon production (natural gas condensate) and delineate and evaluate hydrocarbon resources in the Point Thomson area. PROPOSED WORK: The total gravel and dredged material fill discharged into waters and wetlands would be approximately 3,300,500 cubic yards on 267.5 acres. Fill would include gravel for drilling/production pads; connecting roads; an airstrip; a gravel mine; vertical support members (VSM's) for in-field pipelines and an export pipeline; a barge docking facility; emergency boat ramp; and service pier. Fill material would come from the new mine site. Navigational dredging and screeding (leveling of the marine sediments) in near-shore ocean waters is proposed in the barge docking area offshore of the Sealift Bulkhead and Service Pier. Dredged material would be discharged on a beach disposal area. The two major components would include production/processing facilities and an export pipeline. Gravel would be placed for: three drill sites at or near the seacoast where a minimum of 5 development wells would be drilled; approximately 10 miles of infield gathering pipelines; approximately 12 miles of infield gravel roads; a 5,600 foot long airstrip; a 49.6 acre gravel mine; a 12.9 acre gravel stockpile; processing facilities; and support infrastructure. Two wells were recently drilled in the winter of 2009-2010 at the previously authorized Central Pad fill area. The use of Long Reach Directional Drilling (LRDD) allows development of the primarily offshore Thomson Sand Reservoir from three onshore pads located on or near the seacoast. The proposed Central Pad would fill a total of 56 acres and include 13.2 acres of existing fill previously placed for the Point Thomson Unit No. 3 project. The expanded Central Pad would accommodate additional drilling, processing facilities, and support infrastructure (e.g. camps, utilities, warehouses, storage, and waste management facilities). At the proposed Central Pad, processing facilities will separate hydrocarbon liquids from the natural gas, re-inject the residual gas, and stabilize the liquid hydrocarbons for transport in the Point Thomson Export Pipeline. The proposed East and West Pads would be located to access the eastern and western extents of the Thomson Sand Reservoir. The East Pad would include a new 11-acre pad on near seacoast at 17+ feet elevation, mean lower low water datum (MLLW), connected to an existing ConocoPhillips Alaska Inc. 4.6 acre North Staines River No. 1 exploration pad. This coastal pad would be utilized for temporarily staging equipment and camps during well drilling. The West Pad (approximately 19 acres) would be a new tundra wetland pad to support drilling and production. It would be located 4 miles west of the proposed Central Pad at 20+ feet MLLW elevation.

-3-

Gathering pipelines would be elevated a minimum of 7 feet above the wetland tundra surface on VSMs to transport hydrocarbons produced from the proposed East and West Pads to the Central Processing Facility at the proposed Central Pad. The silver color metal surfaces of the pipeline would be acid washed to reduce sunlight reflectivity. Details on other proposed production infrastructure include: A 5,600-foot gravel airstrip for all-season transportation capable of accommodating cargo aircraft; An onshore bulkhead and 4 offshore mooring dolphins to accommodate transferring pre-fabricated modules for the proposed Central Pad processing facility from large sealift barges; A service pier and 4 other offshore mooring dolphins for transferring materials and equipment from coastal re-supply barges;

A small boat launch to support access by emergency response vessels;

A 12-mile infield gravel road network for transport of personnel, equipment (including drilling rigs), materials, and supplies in support of drilling, operations, and emergency responses; A 49.6 acre gravel mine with a 12.9 acre permanent stockpile site and an access road; and A Class I injection well for disposal of produced water, domestic wastewater and other authorized waste streams. Construction activities are proposed to commence in the winter of 2012/13 and be completed by the winter of 2015/2016. Civil construction, including gravel placement and gravel mining, would be mainly conducted during the winters of 2012/13 and 2013/14. Production infrastructure construction would commence in early 2013 and be completed in winter 2015/2016. A flotilla of sealift barges would deliver large processing facility modules in the summer of 2015. Drilling operations are planned to commence in early 2015 and be completed in early 2017. Facility module installation, commissioning, and start-up are planned in 2015 to early 2016 followed by production and construction demobilization in 2016. The export pipeline would be a common carrier pipeline and therefore subject to additional regulation (Federal Energy Regulatory Commission) separate from the infield gathering pipelines. The 22-mile long, 12-inch nominal diameter export pipeline would receive processed liquid hydrocarbons from the Central Processing Facility to a connection with the British Petroleum's Badami Facility, Sales Oil Pipeline. The export pipeline would also be elevated a minimum of 7 feet above the wetland tundra surface on VSMs and sheet metal covering surfaces would be acid washed to reduce the reflectivity. Other export pipeline facilities would include a small auxiliary pad at Badami for a leak detection and metering skid and a small pipeline crossing pad to allow ice road crossings. The export pipeline construction would be conducted from ice roads over two winter seasons in 2012/13 and 2013/14. ADDITIONAL INFORMATION: Additional information is available from the Point Thomson Project website established by the USACE for this proposal at www.pointthomsonprojecteis.com, or by contacting the USACE Project Manager above.

-4-

The Final EIS has been distributed and published concurrent with this Public Notice. Comments on the FEIS are not being solicited. The applicant's October 2011, DA permit application, file number POA-2001-1082-M1, Beaufort Sea, and USACE's November 18, 2012, public notice is included with the publication of the Final EIS in Appendix A. Please note the changes to the figures are not included in the Final EIS, only are attached to this public notice. In addition, the applicant has provided the USACE with extensive supporting documentation to supplement its permit application. This documentation includes detailed project descriptions and addendums, an Environmental Report, State of Alaska and North Slope Borough lease and right-of-way applications and stipulations for land use and operations, an Environmental Mitigation Report, and an Oil Spill Preparedness Report. Copies of these documents are available upon request. The applicant has also submitted technical information, responses to requests for information, and held informational workshops including a Hydrology Workshop and a Gravel Mining and Rehabilitation Plan Workshop. APPLICANT PROPOSED MITIGATION: The applicant has proposed mitigation measures to avoid and minimize impacts to waters of the U.S. from activities involving the discharge of dredged or fill material as provided in the Point Thomson Environmental Mitigation Report. The avoidance, minimization, and compensatory mitigation measures are outlined below. a. Avoidance: Avoid the construction and use of substantial offshore development structures and facilities in the Beaufort Sea by locating the 3 proposed Central, East, and West drill site pads on the coast and using LRDD to access the predominantly offshore reservoir. Strategic location of these 3 proposed drill sites is intended to avoid the need to construct additional drilling gravel pads in wetlands/waters and still accommodate future full-field development of the reservoir(s). b. Minimization: Project design, supported by wetlands, hydrology, and other environmental studies, focused on minimizing environmental impacts. This includes minimizing the total area of wetlands/waters fill and construction in navigable waters. Examples include: 1. Executing remote project development without proposed permanent gravel road construction from the Prudhoe Bay area by reliance on seasonal ice roads, a gravel airstrip, and barging with minimal offloading facilities. 2. Using three existing gravel pads at the proposed Central and East Pads and an existing fill pad at the Alaska State C-1 Pad thus minimizing the need for new tundra wetland fill footprint by more than 20 acres. 3. Minimizing gravel pad size through optimization of facility and equipment layout. 4. Designing and locating gravel pads, roads, bridges, and culverts to maintain natural drainage patterns and stream flows. 5. Routing the in-field gravel roads to minimize overall length and fill footprint in consideration of hydrologic impacts and wetlands values. 6. Limiting permanent structures in marine waters to vertical piles for the service pier, mooring dolphins, and sealift barge ramp. c. Compensatory Mitigation: The applicant proposes payment of an in-lieu fee to The Conservation Fund (TCF). TCF is the only in-lieu fee sponsor

-5-

currently authorized by the USACE to provide compensatory mitigation for impacts to navigable waters and waters of the U.S. on Alaska's North Slope. The applicant proposes to would work with TCF and the USACE to develop an appropriate Mitigation Plan to satisfy compensatory mitigation requirements. This would include exploring opportunities which may be available on the North Slope for purchasing lands containing aquatic resources for preservation. WATER QUALITY CERTIFICATION: A permit for the described work will not be issued until a certification or waiver of certification, as required under Section 401 of the Clean Water Act (Public Law 95-217), has been received from the Alaska Department of Environmental Conservation. CULTURAL RESOURCES: Section 106 of the National Historic Preservation Act (NHPA) and its implementing regulations (36 CFR 800) require Federal agencies to consider the effects of their undertakings on cultural resources that are eligible for the National Register of Historic Places. Consultation with the Alaska State Historic Preservation Officer (SHPO), North Slope area Federally recognized Tribes, and other consulting parties is being performed to avoid, minimize, and/or mitigate impacts to eligible cultural resources throughout the NHPA Section 106 process. Issuance of a Federal permit qualifies as an "undertaking" under Section 106; therefore, the impacts of the proposal on historical, cultural, and archaeological resources have been addressed in the Final EIS and will be considered in the USACE permit decision to issue or deny a permit for the applicant's proposal. The USACE, as Lead Federal Agency for the Point Thomson Project EIS, previously initiated consultation with the SHPO. The applicant has prepared and submitted a Cultural Resource Management Plan (CRMP), including a data gap analysis and fieldwork, to identify cultural resources within the project area. The CRMP was reviewed by North Slope Borough (NSB), Inupiat History, Language, and Culture (IHLC) Division and the Alaska Department of Natural Resources, Office of History and Archaeology (OHA) during its preparation. There are potentially eligible properties in the general project area and a determination of effect will be made in consultation with the SHPO. Review of the applicant's CRMP and review of the Alaska Heritage Resources Survey (AHRS) constitutes the extent of cultural resource investigations by the USACE at this time. Any comments the SHPO or other consulting parties may have concerning presently unknown archeological or historic data that may be lost or destroyed by work under the requested permit will be considered in our final assessment of the proposed work. A Programmatic Agreement (PA) is being developed to address to potential effects to cultural resources within the proposed project area. The PA will be distributed to parties identified in the PA for review and comment prior to making a final determination on the applicant's DA permit application. The PA will define the process the applicant will follow should cultural resources be inadvertently discovered during construction. If a permit is issued, the PA would be attached to the DA permit as an enforceable special condition. ENDANGERED SPECIES: The proposed project area is within the known range of the Spectacled eider (Somateria fischeri) and Polar bear (Ursus maritimus) and is within designated Polar bear Critical Habitat Area. The proposed project area is also within the historic range of Steller's eider (Polystic stelleri). All three species are listed as threatened under the Endangered Species Act (ESA) of 1973. One other species that may occur near the Project, the Yellow-billed Loon (Gavia adamsii), is a candidate for listing under the ESA. These species are listed by the U.S. Fish and Wildlife Service.

-6-

The proposed project area is also within the range of mysticetus), Ringed seal (Phoca hispida), and Bearded Bowhead whales are listed as endangered, while Ringed proposed for listing by the National Marine Fisheries threatened under the ESA.

the Bowhead whale (Balaena seal (Erignathus barbatus). and Bearded seals have been Service (NMFS) as

Biological Assessments (BAs) were forwarded to the USFWS and NMFS by the USACE for ESA Section 7 consultation procedures in January 2012. These BAs provide data on the distribution, abundance, and habitat use of the listed and candidate species, describe the effects of the project, and proposed mitigation to minimize impacts on those species. The BA provided to the USFWS determined the proposal was "not likely to adversely affect" the Polar bear, Spectacled eider, and the Yellow-billed loon. The determination for the Steller's eider was "not likely to affect". The BA also determined the activity "may affect, but is not likely to cause destruction or adverse modification" of designated Polar bear critical habitat. The BA provided to the NMFS determined the proposal is "not likely to adversely affect" the Bowhead whale, Ringed seal, and Bearded seal. ESSENTIAL FISH HABITAT: The Magnuson-Stevens Fishery Conservation and Management Act, as amended by the Sustainable Fisheries Act of 1996, requires all Federal agencies to consult with the NMFS on all actions, or proposed actions, permitted, funded, or undertaken by the agency, that may adversely affect Essential Fish Habitat (EFH). An EFH Assessment was prepared and forwarded to the NMFS for consultation in January 2012. The NMFS concurred with the USACE determination of "may affect" but did not require Conservation Recommendations for additional mitigative measures other than those identified in the EFH Assessment. TRIBAL CONSULTATION: The Alaska District fully supports tribal self-governance and government-to-government relations between Federally recognized Tribes and the Federal government. Tribes with protected rights or resources that could be significantly affected by the proposed Federal action (permit decision) have the right to consult with the Alaska District on a government-to-government basis. Views of each Tribe regarding protected rights and resources will be accorded due consideration in this process. This public notice serves as notification to the Tribes within the area potentially affected by the proposed work and invites their participation in the Federal decision-making process regarding the protected Tribal right or resource. PUBLIC HEARING: Any person may request, in writing, within the comment period specified in this public notice, that a public hearing be held to consider this application. Requests for public hearings shall state, with particularity, reasons for holding a public hearing. The USACE held public meetings between December 5th and December 16th, 2011, to receive comments on the Point Thomson Project Draft EIS in Barrow, Nuiqsut, Kaktovik, Fairbanks, and Anchorage. EVALUATION: The decision whether to issue a permit will be based on an evaluation of the probable impacts, including cumulative impacts, of the proposed activity and its intended use on the public interest. Evaluation of the probable impacts, which the proposed activity may have on the public interest, requires a careful weighing of all the factors that become relevant in each particular case. The benefits, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. The outcome of the

-7-

general balancing process would determine whether to authorize a proposal, and if so, the conditions under which it will be allowed to occur. The decision should reflect the national concern for both protection and utilization of important resources. All factors, which may be relevant to the proposal, must be considered including the cumulative effects thereof. Among those are conservation, economics, aesthetics, general environmental concerns, wetlands, cultural values, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shore erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership, and, in general, the needs and welfare of the people. For activities involving Clean Water Act Section 404 discharges (dredged and fill materials), a permit will be denied if the discharge that would be authorized by such permit would not comply with the Clean Water Act Section 404(b)(l) Guidelines. Subject to the preceding sentence and any other applicable guidelines or criteria (see USACE regulations at 33 CFR Parts 320.2 and 320.3), a permit will be granted unless the District Commander determines that it would be contrary to the public interest. The USACE is soliciting comments from the public; Federal, State, and local agencies and officials; Alaska Native Tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the USACE to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental affects, and other public interest factors listed above. Comments were used in the preparation of the EIS for the proposal pursuant to the National Environmental Policy Act. Comments will also be used to assist in a determination the overall public interest of the proposed activity. The USACE determined in late 2009 that the applicant's proposal may result in significant impacts to the quality of the human environment and required an EIS be prepared. A Notice of Intent to Prepare an EIS was published in the Federal Register on December 4, 2009. The Draft EIS was issued for public comment on November 18, 2011. The Final EIS includes responses to substantive comments received on the Draft EIS. AUTHORITY:

This permit will be issued or denied under the following authority:

(X) Perform work in or affecting navigable waters of the United States ­ Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403). (X) Discharge dredged or fill material into waters of the United States ­ Section 404 Clean Water Act (33 U.S.C. 1344). Therefore, our public interest review will consider the guidelines set forth under Section 404 (b) of the Clean Water Act (40 CFR 230) and Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403). Project Figures, 82 total, and a Notice of Application for State Water Quality Certification for this Public Notice are available online at http://www.poa.usace.army.mil/reg/PNNew.htm.

District Commander U.S. Army, Corps of Engineers

-8-

SEAN PARNELL, GOVERNOR

STATE OF ALASKA DEPT. OF ENVIRONMENTAL CONSERVATION DIVISION OF WATER 401 Certification Program Non-Point Source Water Pollution Control Program ANCHORAGE DEPARTMENT OF ENVIRONMENTAL CONSERVATION WQM/401 CERTIFICATION 555 CORDOVA STREET ANCHORAGE, ALASKA 99501-2617 PHONE: (907) 269-7564/FAX: (907) 334-2415

NOTICE OF APPLICATION FOR STATE WATER QUALITY CERTIFICATION

Any applicant for a Federal license or permit to conduct an activity that might result in a discharge of dredged and/or fill material into navigable waters and waters of the U.S., in accordance with Section 401 of the Clean Water Act of 1977 (PL95-217), also must apply for and obtain certification from the State Water Quality Agency. Therefore, the Alaska Department of Environmental Conservation (ADEC) must ensure the discharge will comply with the Clean Water Act, the Alaska Water Quality Standards, and other applicable State laws. By agreement between the U.S. Army Corps of Engineers (USACE) and the ADEC, application for a Department of the Army (DA) permit to discharge dredged and/or fill material into navigable waters and waters of the U.S. under Section 404 of the Clean Water Act also may serve as application for State Water Quality Certification. Notice is hereby given that the application for a DA permit described in the USACE's public notice for the Point Thomson Project, file number POA-2001-1082Ml, Beaufort Sea, serves as application for State Water Quality Certification from the ADEC. After reviewing the application, the ADEC may certify there is reasonable assurance the activity, and any discharge that might result, will comply with the Clean Water Act, the Alaska Water Quality Standards, and other applicable State laws. The ADEC may deny or waive certification. Any person interested in providing comment on the project, with respect to ADEC's Water Quality Certification, can submit written comments to their address above by the expiration date printed on page 1 of the USACE public notice.

PLAN

PROFILE

SECTION 42 - TYPICAL PIPELINE ROAD CROSSING BADAMI MINE SITE ACCESS ROAD APPLICANT:

EXXON MOBIL CORPORATION & PTE PIPELINE LLC.

PROJECT:

POINT THOMSON PROJECT

LOCATION:

NORTH SLOPE BOROUGH, ALASKA

REFERENCE:

POA-2001-1082-M1

WATERBODY:

BEAUFORT SEA

DATE:

MARCH 2012

F

Beaufort Sea

WEST PAD

STREAM 18A WEST GATHERING LINE EXPORT PIPELINE & WEST GATHERING LINE EXPORT PIPELINE TO BADAMI

! ! ! ! ! ! ! !

!

!

!

! !

!

!

! !

!

!

! !

! !

!

!

! !

! !

!

!

! !

! !

!

!

!

!

!

! !

! !

! !

! !

! !

!

!

! !

!

!

!

! !

!

! !

! !

! !

!

!

! !

! !

! !

!

! !

! !

! ! !

!

! !

!

! !

! !

! !

! !

! !

! !

! !

! ! !

Stream Crossing Culvert (Not to Scale) Cross Drainage Culvert (Not to Scale) Proposed Gathering Lines ! !

! !

Proposed Export Pipeline

Proposed Point Thomson Facilities and Roads 0

1,500 Feet

3,000

43 - GRAVEL ROAD AND DRAINAGE STRUCTURES SHEET 1 OF 6

SHEET 3 OF 6

Lion Bay

SHEET 1 OF 6

SHEET 2 OF 6

SHEET 4 OF 6

SHEET 5 OF 6

SHEET 6 OF 6

APPLICANT:

EXXON MOBIL CORPORATION & PTE PIPELINE LLC.

PROJECT:

POINT THOMSON PROJECT

LOCATION:

NORTH SLOPE BOROUGH, ALASKA

REFERENCE:

POA-2001-1082-M1

WATERBODY:

BEAUFORT SEA

DATE:

MARCH 2012

! !

! !

CROSSING 18A CULVERTS

! !

! !

!

! !

! !

!

! !

! !

!

!

! ! ! !

WEST PAD ROAD

F CREEK

!

F

Beaufort Sea

EXPORT PIPELINE & WEST GATHERING LINE

!

!

!

!

! !

! !

!

!

! !

! !

!

!

! !

! !

!

!

! !

! ! ! !

! !

! !

! !

! !

!

! !

! ! !

! ! !

! !

! !

!

!

!

!

! !

!

! !

!

! !

!

!

! ! ! !

! !

!

!

!

! !

E CREEK

!

!

! ! ! ! ! ! ! !

!

!

! ! ! !

! !

! ! ! ! ! ! ! ! ! ! ! ! !

!

! ! !

! !

!

! !

! ! ! ! ! !

! ! ! !

! ! !

CROSSING 18B 40' BRIDGE

D CREEK

WEST PAD ROAD

CROSSING 22B 65' BRIDGE

Stream Crossing Culvert (Not to Scale) Cross Drainage Culvert (Not to Scale) Proposed Gathering Lines ! !

! !

Proposed Export Pipeline

Feet

3,000

ntr

1,500

Ma ry Sac hs E

0

anc e

Proposed Point Thomson Facilities and Roads

SHEET 3 OF 6 Lion Bay

SHEET 1 OF 6

SHEET 2 OF 6

SHEET 4 OF 6

SHEET 5 OF 6

SHEET 6 OF 6

44 - GRAVEL ROAD AND DRAINAGE STRUCTURES SHEET 2 OF 6 APPLICANT:

EXXON MOBIL CORPORATION & PTE PIPELINE LLC.

PROJECT:

POINT THOMSON PROJECT

LOCATION:

NORTH SLOPE BOROUGH, ALASKA

REFERENCE:

POA-2001-1082-M1

WATERBODY:

BEAUFORT SEA

DATE:

MARCH 2012

!

!

F

Lion Bay

CENTRAL PAD

EXPORT PIPELINE & WEST & EAST GATHERING LINES

! !

! ! ! ! ! ! ! !

EXPORT PIPELINE & WEST GATHERING LINE

! !

! !

!

!

!

!

!

!

! ! !

!

! !

!

! !

! !

!

! !

! !

! !

! !

!

!

! !

! !

!

!

! !

! !

!

!

! ! ! !

! !

! !

!

!

! !

! !

!

!

!

! !

!

C CREEK

ELECTRICAL TRENCHING

CROSSING 22A 65' BRIDGE EAST GATHERING LINE

WEST PAD ROAD

ELECTRICAL TRENCHING CENTRAL PAD ROAD

Stream Crossing Culvert (Not to Scale) Cross Drainage Culvert (Not to Scale) Proposed Gathering Lines ! !

Proposed Export Pipeline

!

Proposed Point Thomson Facilities and Roads 0

1,500

3,000

Feet

45 - GRAVEL ROAD AND DRAINAGE STRUCTURES SHEET 3 OF 6

SHEET 3 OF 6

!!

!

! !

!

!!

! !

!!

!!

! !

!!

! !

!!

!!

! !

!!

!!

! !

!!

! !

!!

! ! !!

!!

! !

! !

! !

!

! !! !!

!!

!

!

Lion Bay

SHEET 1 OF 6

SHEET 2 OF 6

SHEET 4 OF 6

SHEET 5 OF 6

SHEET 6 OF 6

APPLICANT:

EXXON MOBIL CORPORATION & PTE PIPELINE LLC.

PROJECT:

POINT THOMSON PROJECT

LOCATION:

NORTH SLOPE BOROUGH, ALASKA

REFERENCE:

POA-2001-1082-M1

WATERBODY:

BEAUFORT SEA

DATE:

MARCH 2012

ELECTRICAL TRENCHING

F

B CREEK GRAVEL STOCKPILE GRAVEL MINE

CROSSING 23 CULVERTS

NAVAID LIGHTS CROSSING 24B 65' BRIDGE ALASKA STATE C-1 PAD

36 INCH CULVERTS CROSSING 24A CULVERTS

AIRSTRIP

NAVAID LIGHTS

Stream Crossing Culvert (Not to Scale) Cross Drainage Culvert (Not to Scale) Proposed Gathering Lines ! !

! !

Proposed Export Pipeline

Proposed Point Thomson Facilities and Roads 0

1,500

3,000

Feet

46 - GRAVEL ROAD AND DRAINAGE STRUCTURES SHEET 4 OF 6

SHEET 3 OF 6

!!

!

! !

!

!!

! !

!!

!!

! !

!!

! !

!!

!!

! !

!!

!!

! !

!!

! !

!!

! ! !!

!!

! !

! !

! !

!

! !! !!

Lion Bay

!!

!

!

SHEET 1 OF 6

SHEET 2 OF 6

SHEET 4 OF 6

SHEET 5 OF 6

SHEET 6 OF 6

APPLICANT:

EXXON MOBIL CORPORATION & PTE PIPELINE LLC.

PROJECT:

POINT THOMSON PROJECT

LOCATION:

NORTH SLOPE BOROUGH, ALASKA

REFERENCE:

POA-2001-1082-M1

WATERBODY:

BEAUFORT SEA

DATE:

MARCH 2012

F

S CREEK

EAST GATHERING LINE R CREEK

B CREEK

ALASKA STATE C-1 PAD

CROSSING 26 CULVERTS

CROSSING 24A CULVERTS

EAST PAD ROAD

Stream Crossing Culvert (Not to Scale) Cross Drainage Culvert (Not to Scale) Proposed Gathering Lines ! !

Proposed Export Pipeline

!

Proposed Point Thomson Facilities and Roads 0

1,500

3,000

Feet

47 - GRAVEL ROAD AND DRAINAGE STRUCTURES SHEET 5 OF 6

SHEET 3 OF 6

!

!

! !

!

! !

!!

!!

! !

!!

!

!!

! !

!!

!!

! !

! !

!!

!!

!!

!!

!!

!! !!

! !

! !

! !

!!

!

! !!

! !

!! !

!

Lion Bay

SHEET 1 OF 6

SHEET 2 OF 6

SHEET 4 OF 6

SHEET 5 OF 6

SHEET 6 OF 6

APPLICANT:

EXXON MOBIL CORPORATION & PTE PIPELINE LLC.

PROJECT:

POINT THOMSON PROJECT

LOCATION:

NORTH SLOPE BOROUGH, ALASKA

REFERENCE:

POA-2001-1082-M1

WATERBODY:

BEAUFORT SEA

DATE:

MARCH 2012

R CREEK

Lion Bay EAST GATHERING LINE

F

EAST PAD

EAST PAD ROAD

A CREEK

CROSSING 27 CULVERT

Stream Crossing Culvert (Not to Scale) Cross Drainage Culvert (Not to Scale) Proposed Gathering Lines ! !

Proposed Export Pipeline

!

3,000

ntr

1,500

Ma ry Sac hs E

0

anc e

Proposed Point Thomson Facilities and Roads

Feet

48 - GRAVEL ROAD AND DRAINAGE STRUCTURES SHEET 6 OF 6

SHEET 3 OF 6

!

!

! !

!

! !

!!

!!

! !

!!

!

!!

! !

!!

!!

! !

! !

!!

!!

!!

!!

!!

!! !!

! !

! !

! !

!!

!

! !!

! !

!! !

!

Lion Bay

SHEET 1 OF 6

SHEET 2 OF 6

SHEET 4 OF 6

SHEET 5 OF 6

SHEET 6 OF 6

APPLICANT:

EXXON MOBIL CORPORATION & PTE PIPELINE LLC.

PROJECT:

POINT THOMSON PROJECT

LOCATION:

NORTH SLOPE BOROUGH, ALASKA

REFERENCE:

POA-2001-1082-M1

WATERBODY:

BEAUFORT SEA

DATE:

MARCH 2012

PRIMARY ACCESS ROAD TYPICAL SECTION

SECONDARY ACCESS / MAINTENANCE ROAD TYPICAL SECTION

NAVAID ACCESS ROAD TYPICAL SECTION 49 - TYPICAL ACCESS ROAD SECTIONS APPLICANT:

EXXON MOBIL CORPORATION & PTE PIPELINE LLC.

PROJECT:

POINT THOMSON PROJECT

LOCATION:

NORTH SLOPE BOROUGH, ALASKA

REFERENCE:

POA-2001-1082-M1

WATERBODY:

BEAUFORT SEA

DATE:

MARCH 2012

BRIDGE PLAN

BRIDGE ELEVATION

50 - STREAM 18B BRIDGE PLAN AND ELEVATION

TYPICAL EROSION PROTECTION SECTION

APPLICANT:

EXXON MOBIL CORPORATION & PTE PIPELINE LLC.

PROJECT:

POINT THOMSON PROJECT

LOCATION:

NORTH SLOPE BOROUGH, ALASKA

REFERENCE:

POA-2001-1082-M1

WATERBODY:

BEAUFORT SEA

DATE:

MARCH 2012

BRIDGE PLAN

BRIDGE ELEVATION 51 - STREAM 22B BRIDGE PLAN AND ELEVATION

TYPICAL EROSION PROTECTION SECTION

APPLICANT:

EXXON MOBIL CORPORATION & PTE PIPELINE LLC.

PROJECT:

POINT THOMSON PROJECT

LOCATION:

NORTH SLOPE BOROUGH, ALASKA

REFERENCE:

POA-2001-1082-M1

WATERBODY:

BEAUFORT SEA

DATE:

MARCH 2012

BRIDGE PLAN

BRIDGE ELEVATION 52 - STREAM 22A BRIDGE PLAN AND ELEVATION APPLICANT:

EXXON MOBIL CORPORATION & PTE PIPELINE LLC.

PROJECT:

POINT THOMSON PROJECT

LOCATION:

NORTH SLOPE BOROUGH, ALASKA

REFERENCE:

POA-2001-1082-M1

WATERBODY:

BEAUFORT SEA

DATE:

MARCH 2012

BRIDGE PLAN

BRIDGE ELEVATION

53 - STREAM 24B BRIDGE PLAN AND ELEVATION APPLICANT:

EXXON MOBIL CORPORATION & PTE PIPELINE LLC.

PROJECT:

POINT THOMSON PROJECT

LOCATION:

NORTH SLOPE BOROUGH, ALASKA

REFERENCE:

POA-2001-1082-M1

TYPICAL EROSION PROTECTION SECTIONWATERBODY: DATE:

BEAUFORT SEA MARCH 2012

TYPICAL SECTION AT ABUTMENT

54 - TYPICAL BRIDGE PIER ELEVATION APPLICANT:

EXXON MOBIL CORPORATION & PTE PIPELINE LLC.

PROJECT:

POINT THOMSON PROJECT

LOCATION:

NORTH SLOPE BOROUGH, ALASKA

REFERENCE:

POA-2001-1082-M1

WATERBODY:

BEAUFORT SEA

DATE:

MARCH 2012

18A CULVERT CROSSING PLAN

18A CULVERT CROSSING PROFILE 55 - STREAM 18A CULVERT PLAN & PROFILE

EMBEDDED MULTI-PLATE CULVERT DETAIL

APPLICANT:

EXXON MOBIL CORPORATION & PTE PIPELINE LLC.

PROJECT:

POINT THOMSON PROJECT

LOCATION:

NORTH SLOPE BOROUGH, ALASKA

REFERENCE:

POA-2001-1082-M1

WATERBODY:

BEAUFORT SEA

DATE:

MARCH 2012

23 CULVERT CROSSING PLAN

56 - STREAM 23 CULVERT PLAN & PROFILE

23 CULVERT CROSSING PROFILE

APPLICANT:

EXXON MOBIL CORPORATION & PTE PIPELINE LLC.

PROJECT:

POINT THOMSON PROJECT

LOCATION:

NORTH SLOPE BOROUGH, ALASKA

REFERENCE:

POA-2001-1082-M1

WATERBODY:

BEAUFORT SEA

DATE:

MARCH 2012

N

24A CULVERT CROSSING PLAN

24A CULVERT CROSSING PROFILE 57 - STREAM 24A CULVERT PLAN & PROFILE

EMBEDDED MULTI-PLATE CULVERT BATTERY DETAIL

APPLICANT:

EXXON MOBIL CORPORATION & PTE PIPELINE LLC.

PROJECT:

POINT THOMSON PROJECT

LOCATION:

NORTH SLOPE BOROUGH, ALASKA

REFERENCE:

POA-2001-1082-M1

WATERBODY:

BEAUFORT SEA

DATE:

MARCH 2012

26 CULVERT CROSSING PLAN

58 - STREAM 26 CULVERT PLAN & PROFILE

26 CULVERT CROSSING PROFILE

APPLICANT:

EXXON MOBIL CORPORATION & PTE PIPELINE LLC.

PROJECT:

POINT THOMSON PROJECT

LOCATION:

NORTH SLOPE BOROUGH, ALASKA

REFERENCE:

POA-2001-1082-M1

WATERBODY:

BEAUFORT SEA

DATE:

MARCH 2012

N

27 CULVERT CROSSING PLAN

59 - STREAM 27 CULVERT PLAN & PROFILE

27 CULVERT CROSSING PROFILE

APPLICANT:

EXXON MOBIL CORPORATION & PTE PIPELINE LLC.

PROJECT:

POINT THOMSON PROJECT

LOCATION:

NORTH SLOPE BOROUGH, ALASKA

REFERENCE:

POA-2001-1082-M1

WATERBODY:

BEAUFORT SEA

DATE:

MARCH 2012

CROSS DRAINAGE CULVERT ELEVATION

CROSS DRAINAGE CULVERT SECTION

60 - TYPICAL CROSS DRAINAGE CULVERT SECTIONS APPLICANT:

EXXON MOBIL CORPORATION & PTE PIPELINE LLC.

PROJECT:

POINT THOMSON PROJECT

LOCATION:

NORTH SLOPE BOROUGH, ALASKA

REFERENCE:

POA-2001-1082-M1

WATERBODY:

BEAUFORT SEA

DATE:

MARCH 2012

F

PROPOSED EXCAVATION LIMITS 400 '

1200 '

8

8

8

8

8

8

8

8

500 '

8

400 ' 8

B CREEK

GRAVEL STOCKPILE

1320 '

1050 '

GRAVEL MINE

8

A

1200 '

8 1100 '

8

TEMPORARY INORGANIC OVERBURDEN STORAGE ON SEASONAL ICE PAD

8

8

8

52 5

'

8

450 '

8

670 '

CENTRAL PAD ROAD TEMPORARY ORGANIC OVERBURDEN STORAGE ON SEASONAL ICE PAD

8

8

8

8

A

500 '

32' WIDE GRAVEL ACCESS ROAD TO GRAVEL STOCKPILE

8

8

900 '

8

AIRSTRIP ACCESS ROAD

61 - GRAVEL MINE FOOTPRINT

PAD DIMENSIONS ARE APPROXIMATE ACTUAL LAYOUT PENDING FINAL DESIGN Proposed Electrical Trenching

Proposed Point Thomson Facilities and Roads Proposed Point Thomson Temporary Ice Pads 0

500

Feet

8

1,000

APPLICANT:

EXXON MOBIL CORPORATION & PTE PIPELINE LLC.

PROJECT:

POINT THOMSON PROJECT

LOCATION:

NORTH SLOPE BOROUGH, ALASKA

REFERENCE:

POA-2001-1082-M1

WATERBODY:

BEAUFORT SEA

DATE:

MARCH 2012

GRAVEL STOCKPILE TYPICAL SECTION

EXCAVATION SECTION A-A

62 - GRAVEL MINE SECTIONS APPLICANT:

EXXON MOBIL CORPORATION & PTE PIPELINE LLC.

PROJECT:

POINT THOMSON PROJECT

LOCATION:

NORTH SLOPE BOROUGH, ALASKA

REFERENCE:

POA-2001-1082-M1

WATERBODY:

BEAUFORT SEA

DATE:

MARCH 2012

Prudhoe Bay

63 - PROPOSED GRAVEL MINE YEAR 1 PLAN APPLICANT:

EXXONMOBIL DEVELOPMENT COMPANY

PROJECT:

POINT THOMSON PROJECT

LOCATION:

NORTH SLOPE BOROUGH, ALASKA

REFERENCE: POA-2001-1082-M1 WATERBODY: BEAUFORT SEA DATE:

MARCH 2012

Deadhorse

64 - PROPOSED GRAVEL MINE YEAR 1 ELEVATIONS APPLICANT:

EXXONMOBIL DEVELOPMENT COMPANY

PROJECT:

POINT THOMSON PROJECT

LOCATION:

NORTH SLOPE BOROUGH, ALASKA

REFERENCE: POA-2001-1082-M1 WATERBODY: BEAUFORT SEA DATE:

MARCH 2012

Deadhorse

65 - PROPOSED GRAVEL MINE YEAR 2 PLAN APPLICANT:

EXXONMOBIL DEVELOPMENT COMPANY

PROJECT:

POINT THOMSON PROJECT

LOCATION:

NORTH SLOPE BOROUGH, ALASKA

REFERENCE: POA-2001-1082-M1 WATERBODY: BEAUFORT SEA DATE:

MARCH 2012

Deadhorse

66 - PROPOSED GRAVEL MINE YEAR 2 ELEVATIONS APPLICANT:

EXXONMOBIL DEVELOPMENT COMPANY

PROJECT:

POINT THOMSON PROJECT

LOCATION:

NORTH SLOPE BOROUGH, ALASKA

REFERENCE: POA-2001-1082-M1 WATERBODY: BEAUFORT SEA DATE:

MARCH 2012

!

!

! ! ! ! ! ! ! !

! !

!

Lion Bay

!

!

CENTRAL PAD

!

!

!

! !

!

!

! !

! !

!

!

! !

! ! !

!

! !

! !

!

!

WEST PAD ROAD

EAST GATHERING LINE

CENTRAL PAD ROAD

GRAVEL STOCKPILE

GRAVEL MINE

ELECTRICAL TO AIRSTRIP ALASKA STATE C-1 PAD

67 - ELECTRICAL POWER PLAN APPLICANT:

Proposed Splice Box Placement Proposed Electrical Trenching

Proposed Point Thomson Facilities and Roads 0

1,500 Feet

3,000

WATER ACCESS PAD

EXXON MOBIL CORPORATION & PTE PIPELINE LLC.

PROJECT:

POINT THOMSON PROJECT

LOCATION:

NORTH SLOPE BOROUGH, ALASKA

REFERENCE:

POA-2001-1082-M1

WATERBODY:

BEAUFORT SEA

DATE:

MARCH 2012

F

! !

! !

!

!

! !

TYPICAL TRENCH SECTION

TYPICAL SPLICE BOX SECTION

68 - TYPICAL ELECTRICAL POWER SECTIONS APPLICANT:

EXXON MOBIL CORPORATION & PTE PIPELINE LLC.

PROJECT:

POINT THOMSON PROJECT

LOCATION:

NORTH SLOPE BOROUGH, ALASKA

REFERENCE:

POA-2001-1082-M1

WATERBODY:

BEAUFORT SEA

DATE:

MARCH 2012

69 - COMPARISON OF FUEL USE FOR IN-FIELD ICE ROADS VS. GRAVEL ROADS

*May 5, 2011 Workshop Presentation (Updated May 13, 2011; also updated August 15, 2011 to clarify applicabilty of the color bars to each alternative)

APPLICANT:

EXXONMOBIL DEVELOPMENT COMPANY

PROJECT:

POINT THOMSON PROJECT

LOCATION:

NORTH SLOPE BOROUGH, ALASKA

REFERENCE: POA-2001-1082-M1 WATERBODY: BEAUFORT SEA DATE:

MARCH 2012

CROSS SECTION OF WASTEWATER EFFLUENT LINE

LONGITUDINAL SECTION OF WASTEWATER EFFLUENT LINE

70 - WASTEWATER EFFLUENT SECTIONS APPLICANT:

EXXON MOBIL CORPORATION & PTE PIPELINE LLC.

PROJECT:

POINT THOMSON PROJECT

LOCATION:

NORTH SLOPE BOROUGH, ALASKA

REFERENCE:

POA-2001-1082-M1

WATERBODY:

BEAUFORT SEA

DATE:

JULY 2012

71 - WATER ACCESS PAD INTAKE SECTION APPLICANT:

EXXON MOBIL CORPORATION & PTE PIPELINE LLC.

PROJECT:

POINT THOMSON PROJECT

LOCATION:

NORTH SLOPE BOROUGH, ALASKA

REFERENCE:

POA-2001-1082-M1

WATERBODY:

BEAUFORT SEA

DATE:

MARCH 2012

CULVERT TABLE

TYPICAL SINGLE CULVERT ELEVATION

TYPICAL MULTIPLE CULVERTS ELEVATION

TYPICAL SINGLE/MULTIPLE CULVERT SECTION

72 - TYPICAL STREAM CROSSING CULVERT SECTION APPLICANT:

EXXON MOBIL CORPORATION & PTE PIPELINE LLC.

PROJECT:

POINT THOMSON PROJECT

LOCATION:

NORTH SLOPE BOROUGH, ALASKA

REFERENCE:

POA-2001-1082-M1

WATERBODY:

BEAUFORT SEA

DATE:

MARCH 2012

TYPICAL EMBEDDED CULVERT DETAIL

TYPICAL FISH PASSAGE CULVERT BATTERY ELEVATION

73 - TYPICAL STREAM CROSSING CULVERT FOR FISH PASSAGE SECTION

TYPICAL EMBEDDED CULVERT SECTION

APPLICANT:

EXXON MOBIL CORPORATION & PTE PIPELINE LLC.

PROJECT:

POINT THOMSON PROJECT

LOCATION:

NORTH SLOPE BOROUGH, ALASKA

REFERENCE:

POA-2001-1082-M1

WATERBODY:

BEAUFORT SEA

DATE:

MARCH 2012

BRIDGE PLAN

SECTION A-A

74 - POWERLINE BRIDGE CROSSING SECTION APPLICANT:

EXXON MOBIL CORPORATION & PTE PIPELINE LLC.

PROJECT:

POINT THOMSON PROJECT

LOCATION:

NORTH SLOPE BOROUGH, ALASKA

REFERENCE:

POA-2001-1082-M1

WATERBODY:

BEAUFORT SEA

DATE:

MARCH 2012

RUNWAY 5 APPROACH LIGHTING SHELTER ACCESS PAD

KEY MAP

RUNWAY 5 APPROACH LIGHTING SHELTER ACCESS PAD LONGITUDINAL SECTION

RUNWAY 5 APPROACH LIGHTING SHELTER ACCESS PAD TRANSVERSE SECTION

75 - NAVAID PAD SECTION (SHEET 1 OF 4) APPLICANT:

EXXON MOBIL CORPORATION & PTE PIPELINE LLC.

PROJECT:

POINT THOMSON PROJECT

LOCATION:

NORTH SLOPE BOROUGH, ALASKA

REFERENCE:

POA-2001-1082-M1

WATERBODY:

BEAUFORT SEA

DATE:

JULY 2012

TOUCHDOWN RUNWAY VISUAL RANGE ACCESS PAD

KEY MAP

TOUCHDOWN RUNWAY VISUAL RANGE ACCESS PAD LONGITUDINAL SECTION

TOUCHDOWN RUNWAY VISUAL RANGE ACCESS PAD TRANSVERSE SECTION

76 - NAVAID PAD SECTION (SHEET 2 OF 4) APPLICANT:

EXXON MOBIL CORPORATION & PTE PIPELINE LLC.

PROJECT:

POINT THOMSON PROJECT

LOCATION:

NORTH SLOPE BOROUGH, ALASKA

REFERENCE:

POA-2001-1082-M1

WATERBODY:

BEAUFORT SEA

DATE:

JULY 2012

MIDFIELD RUNWAY VISUAL RANGE ACCESS PAD

KEY MAP

MIDFIELD RUNWAY VISUAL RANGE ACCESS PAD LONGITUDINAL SECTION

MIDFIELD RUNWAY VISUAL RANGE ACCESS PAD TRANSVERSE SECTION

77 - NAVAID PAD SECTION (SHEET 3 OF 4) APPLICANT:

EXXON MOBIL CORPORATION & PTE PIPELINE LLC.

PROJECT:

POINT THOMSON PROJECT

LOCATION:

NORTH SLOPE BOROUGH, ALASKA

REFERENCE:

POA-2001-1082-M1

WATERBODY:

BEAUFORT SEA

DATE:

JULY 2012

RUNWAY 23 APPROACH LIGHT BUILDING PAD

KEY MAP

RUNWAY 23 APPROACH LIGHT BUILDING PAD LONGITUDINAL SECTION

RUNWAY 23 APPROACH LIGHT BUILDING PAD TRANSVERSE SECTION

78 - NAVAID PAD SECTION (SHEET 4 OF 4) APPLICANT:

EXXON MOBIL CORPORATION & PTE PIPELINE LLC.

PROJECT:

POINT THOMSON PROJECT

LOCATION:

NORTH SLOPE BOROUGH, ALASKA

REFERENCE:

POA-2001-1082-M1

WATERBODY:

BEAUFORT SEA

DATE:

JULY 2012

DREDGING AND SCREEDING AREA PLAN

DREDGING AND SCREEDING AREA PROFILE

79 - SEALIFT BULKHEAD DREDGING AND SCREEDING DETAILS APPLICANT:

EXXON MOBIL CORPORATION & PTE PIPELINE LLC.

PROJECT:

POINT THOMSON PROJECT

LOCATION:

NORTH SLOPE BOROUGH, ALASKA

REFERENCE:

POA-2001-1082-M1

WATERBODY:

BEAUFORT SEA

DATE:

JULY 2012

DREDGING AND SCREEDING AREA LIMITS

80 - SERVICE PIER DREDGING AND SCREEDING DETAILS

DREDGING AND SCREEDING AREA PROFILE AT PIER CENTERLINE

APPLICANT:

EXXON MOBIL CORPORATION & PTE PIPELINE LLC.

PROJECT:

POINT THOMSON PROJECT

LOCATION:

NORTH SLOPE BOROUGH, ALASKA

REFERENCE:

POA-2001-1082-M1

WATERBODY:

BEAUFORT SEA

DATE:

JULY 2012

SEALIFT BULKHEAD/SERVICE PIER ELEVATION

81 - SEALIFT BULKHEAD AND SERVICE PIER ELEVATION APPLICANT:

EXXON MOBIL CORPORATION & PTE PIPELINE LLC.

PROJECT:

POINT THOMSON PROJECT

LOCATION:

NORTH SLOPE BOROUGH, ALASKA

REFERENCE:

POA-2001-1082-M1

WATERBODY:

BEAUFORT SEA

DATE:

JULY 2012

CENTRAL PAD ROAD AND ELECTRICAL TRENCHING TYPICAL SECTION

82- TYPICAL ELECTRICAL TRENCHING AND ROAD SECTION APPLICANT:

EXXON MOBIL CORPORATION & PTE PIPELINE LLC.

PROJECT:

POINT THOMSON PROJECT

LOCATION:

NORTH SLOPE BOROUGH, ALASKA

REFERENCE:

POA-2001-1082-M1

WATERBODY:

BEAUFORT SEA

DATE:

JULY 2012

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits