PUBLIC NOTICE DATE: July 27, 2012EXPIRATION DATE: August 27, 2012REFERENCE NUMBER:
PUBLIC NOTICE DATE: July 27, 2012
EXPIRATION DATE: August 27, 2012
REFERENCE NUMBER: POA-2001-1082-M1
WATERWAY: Beaufort Sea
The public in hereby notified that a Department of the Army (DA) permit application has been received for proposed work in waters and navigable waters of the United States (U.S.), including surface waters, wetlands, and ocean waters, as described below and shown on the enclosed project figures. This is the second public notice issued for the Point Thomson Project to solicit public comment. The first coincided with publication for the Draft Environmental Impact Statement (EIS) on November 18, 2011. This public notice is issued concurrently with publication of the Final EIS. Included herein are the applicant’s changes to the proposed project figures previously published with the first public notice. The changes include revisions and clarifications represented in the set of 82 Figures for this Public Notice are available online at http://www.poa.usace.army.mil/reg/PNNew.htm. Some figures have been modified and others added.
Comments on the described work noting U.S. Army Corps of Engineers (USACE) file number POA-2001-1082-M1, Beaufort Sea, must be submitted no later than the expiration date of this Public Notice (August 27, 2012) to become part of the administrative record and be considered in our permit decision. Please submit comments to the USACE Project Manager listed immediately below by the communication method of your choice.
USACE PROJECT MANAGER: Please submit comments to by e-mail address at , at the mailing address above, by calling 907-753-2784 (office), 907-350-5097 (cell), toll free in Alaska at 800-478-2712, or by fax at 907-753-5567. Questions and requests for information on this public notice can be sent directly to Mr. Baij at the above e-mail address.
Please submit comments to by e-mail address at , at the mailing address above, by calling 907-753-2784 (office), 907-350-5097 (cell), toll free in Alaska at 800-478-2712, or by fax at 907-753-5567. Questions and requests for information on this public notice can be sent directly to Mr. Baij at the above e-mail address.
F
Beaufort Sea
Barrow
Kaktovik
Nuiqsut
National
Petroleum
ReserveAlaska
ntr
a
TA PS
nce
Arctic
National
Wildlife
Refuge
Ne
w
p or
DUCK ISLAND
UNIT
an
ce
! !
! !
!
! !
!
oE
Jag
3-
it
lim
r
ive
r
C
Simpson Cove
ru
kR
Ka
tak
tu
sh i
lik
Ka
dle
ro
Ka
R
vik
1 - NORTH SLOPE ALASKA
VICINITY MAP
r
ive
1002 AREA
APPLICANT:
EXXON MOBIL CORPORATION &
PTE PIPELINE LLC.
PROJECT:
POINT THOMSON PROJECT
LOCATION:
NORTH SLOPE BOROUGH, ALASKA
REFERENCE:
POA-2001-1082-M1
WATERBODY:
BEAUFORT SEA
DATE:
MARCH 2012
Proposed Gathering Lines
!
!
Proposed Export Pipeline
Proposed Point Thomson Facilities and Roads
Existing Roads
Existing Pipelines
Existing Facilities
Oil and Gas Units
0
5
10
Miles
15
iver
ARCTIC NATIONAL WILDLIFE REFUGE
WILDERNESS AREA
!
Kaktovik
R
ilak
Okp
gR
nin
n
a
Ri
v er
Camden Bay
le
mi
ive
Sta
ine
s
Riv
er
Canning River
Recreational Rafting
Take-Out Area
%
! !
ive
r
! !
iov
ik R
ntr
a
Sac
hs
En
tr
Ma
ry
!
! !
! !
BADAMI UNIT
Sh
av
Brownlow Point
Lion Bay
Hulahula Riv
er
nce
ntr
a
eE
eng
Ch
all
! !
Ri
ve
r
! !
an
i rk
tok
%
! !
Sa
ga
v
! !
!
PRUDHOE BAY
UNIT
Bullen Point
!
Mikkelsen Bay
POINT THOMSON UNIT
%
Foggy Island Bay
Deadhorse
nce
LIBERTY
UNIT
Prudhoe
Bay
!
da
Can a
USA
Beaufort Sea
tE
Deadhorse
8
F
10
11
12
7
8
9
15
14
13
18
17
16
20
21
22
23
24
19
20
29
28
27
26
25
30
29
BULLEN POINT
RADAR SITE
33
10N 20E
9N 20E
34
35
36
31
8
9
Mikkelsen Bay
6
BADAMI
17
16
20
21
29
32
3
2
1
10
11
12
BADAMI UNIT
4
15
14
13
18
17
16
15
14
21
22
23
24
19
20
21
22
23
28
27
26
25
30
29
28
27
Beaufort Sea
Point Gordon
Bullen Point
32
33
34
5
4
8
9
25
Point
Sweeney
36
35
34
36
31
32
33
3
2
1
6
5
4
7
10
11
12
7
8
9
10
11
12
EAST MIKKELSEN BAY STATE #1
EXPORT PIPELINE
2
3 PAD JUNCTION
WEST
1
POINT THOMSON UNIT
17
16
15
14
13
18
17
16
15
14
13
22
23
24
19
20
21
22
23
24
19
20
21
22
23
24
28
27
26
25
30
29
28
27
26
25
30
29
28
27
26
25
33
34
35
36
31
32
33
34
35
36
31
4
3
2
1
Proposed Export Pipeline
7
2
14
13
Miles
9
8
10
11
12
6
7
5
8
17
APPLICANT:
EXXON MOBIL CORPORATION &
PTE PIPELINE
LLC.
1
2
6
POINT THOMSON PROJECT
LOCATION:
NORTH SLOPE BOROUGH, ALASKA
4
3
PROJECT:
10
9REFERENCE:
WATERBODY:
4
18
2 - TOWNSHIP,
RANGE,
AND 35SECTION
36
33
34
32
MAP 1
9N 22E
9N 23E
PIPELINE CROSSING PADS
9N 20E
9N 21E
18
0
15
WEST PAD
24
13
Existing
Gravel12
11
10
POINT THOMSON UNIT #4
26
Point Hopson
Duchess
Island
13
35
Proposed Gathering Lines
!
12
11
10
14
2
6
5 Roads
Proposed
Point 1Thomson Facilities
and
!
9
8
7
15
9N 20E
8N 20E
!
Challenge Island
BADAMI AUXILIARY PAD
5
3
12
11
Alaska Island
16
32
10
9N 21E
9N 22E
17
9
16
15
14
13
18
17
DATE:
16
15
12
11
POA-2001-1082-M1
5
4
7
8
9
18
17
16
BEAUFORT SEA
MARCH 2012
14
13
23
24
28
27
26
Point Hopson
25
19
20
EXPORT PIPELINE &
29
30
WEST GATHERING
LINE
Point Sweeney
34
10N 22E
9N 22E
4
3
35
WEST PAD JUNCTION
2
EXPORT PIPELINE
9
36
11
15
21
22
1
12
33
23
24
5
6
4
26
8
35
9
10
2
17
18
24
19
27
26
11
25
30
15
21
29
Proposed Export Pipeline
33
34
35
36
Proposed Point Thomson Facilities and Roads
Existing Gravel
0
2
1
1
Miles
2
6
5
9N 22E
9N 23E
!
16
19
20
21
30
29
28
31
32
33
22
28
4
32
23
27
33
2
EAST PAD
7
8
9
18
17
16
20
21
26
STAINES RIVER STATE #1
24
34
1
25
35 LOCATION:36
6
19
3 - TOWNSHIP, RANGE, AND SECTION
MAP 2
REFERENCE:
3
4
5
6
WATER ACCESS PAD
PROJECT:
31
10N 24E
9N 24E
EAST GATHERING LINE
13
14
Proposed Gathering Lines
!
Lion Bay
12
APPLICANT:
!
17
ALASKA STATE
C-1 PAD
16
20
36
1
GRAVEL MINE
WEST STAINES STATE #2
28
25
CENTRAL PAD
3
GRAVEL STOCKPILE
7
13
23
18
Flaxman Island
AIRSTRIP
14
22
13
Mary Sachs Island
34
WEST STAINES STATE 18-09-23-180
21
14
Beaufort Sea
27
EAST PAD
JUNCTION
32
31
POINT THOMSON UNIT
16
15
28
POINT THOMSON UNIT #1
POINT THOMSON UNIT #2
10
16
Point Thomson
WEST PAD
33
North Star Island
10N 23E
10N 24E
22
17
WATERBODY:
DATE: 5
29
30
28
EXXON MOBIL CORPORATION &
PTE PIPELINE LLC.
POINT THOMSON PROJECT
NORTH SLOPE
BOROUGH,
31
32 ALASKA
9N 23E
9N 24E
21
18
an
ce
13
Sac
hs
En
tr
14
Ma
ry
15
10N 22E
10N 23E
F
16
33
POA-2001-1082-M1
BEAUFORT SEA
4 2012
MARCH
3
2
1
sE
n tr
an
ce
F
Ma
ry
Sa
ch
Mary Sachs Island
Flaxman Island
WEST PAD
Lion Bay
WEST
GATHERING
LINE
EXPORT PIPELINE &
WEST GATHERING LINE
CENTRAL PAD
!
!
!
! !
! !
!
!
! !
!
!
!
! !
! !
! !
! !
!
!
! !
! !
! !
! !
!
! !
!
! !
! !
!
! !
! !
! !
!
! !
!
!
!
!
!
! !
!
! !
! !
!
!
! !
! !
!
!
!
!
! !
EXPORT PIPELINE
CENTRAL PAD ROAD
EAST GATHERING LINE
WEST PAD ROAD
GRAVEL STOCKPILE
GRAVEL MINE
EAST PAD
ALASKA STATE
C-1 PAD
AIRSTRIP
EAST PAD ROAD
WATER ACCESS PAD
AIRSTRIP ROAD
4 - IPS FACILITY LAYOUT
POINT THOMSON UNIT
Proposed Gathering Lines
! !
!
Proposed Export Pipeline
Proposed Point Thomson Facilities and Roads
0
1
Miles
2
APPLICANT:
EXXON MOBIL CORPORATION &
PTE PIPELINE LLC.
PROJECT:
POINT THOMSON PROJECT
LOCATION:
NORTH SLOPE BOROUGH, ALASKA
REFERENCE:
POA-2001-1082-M1
WATERBODY:
BEAUFORT SEA
DATE:
MARCH 2012
! !
!
!
! !
!
!
!
!
F
AK ISL
CHAL ISL
an
ce
"
"
sE
n tr
AK FL
G
"
ry
Sa
RED DOG 1
ch
PTU-15
"
AK C1
G
WSTN 1
"
G
"
NSTNS IRD Lion Bay
PTU-16
CENTRAL PAD
"
"
!
" EAST PAD
STNS 1
G
"
WSTN 2
"
ine
S ta
G
"
sR
SOUR 2
er
Riv
i ve
G
r
"
ing
G
SOUR 3
nn
POINT THOMSON UNIT
"
"
Ca
EMIK
G
PTU 2
"
PTU 3
G
PTU 1
"
G
"
AK G2
AK A1
!
WEST PAD
G
G
"
"
G
PTU 4
"
AK D1
Ma
"
G
Ch
all
en
ge
En
tr a
nc
e
Beaufort Sea
5 - THOMSON SAND RESERVOIR
!
"
G
"
Generalized Outline of Thomson Sand Hydrocarbon Accumulation
APPLICANT:
2009-2010 Drilling Program Well Bottom Hole Location
PROJECT:
POINT THOMSON PROJECT
Proposed Pad Locations
LOCATION:
NORTH SLOPE BOROUGH, ALASKA
REFERENCE:
POA-2001-1082-M1
WATERBODY:
BEAUFORT SEA
DATE:
MARCH 2012
Existing Exploration Well Bottom Hole Location
Existing Exploration Well Surface Location
0
2
Miles
4
EXXON MOBIL CORPORATION &
PTE PIPELINE LLC.
CENTRAL PAD/ACCESS ROAD
EXISTING GRAVEL FACILITIES
AIRSTRIP & HELIPAD/ACCESS ROAD
EAST PAD/ACCESS ROAD
NAVAID PAD/ACCESS ROAD
WEST PAD/ACCESS ROAD
OFF PAD QUANTITIES
ALASKA STATE C-1 PAD/ACCESS ROAD
BOAT LAUNCH RAMP (ON SHORE PORTION)4
DREDGE MATERIAL
OFFSHORE SECTION 10 QUANTITIES6
WATER SOURCE PAD/ACCESS ROAD
GRAVEL MINE/ACCESS ROADS
BADAMI PADS
6 - PROJECT QUANTITIES
APPLICANT:
EXXON MOBIL CORPORATION &
PTE PIPELINE LLC.
PROJECT:
POINT THOMSON PROJECT
LOCATION:
NORTH SLOPE BOROUGH, ALASKA
REFERENCE:
POA-2001-1082-M1
WATERBODY:
BEAUFORT SEA
DATE:
MARCH 2012
MOORING DOLPHINS
8
17 - ACS LAYDOWN AREA
18 - VAC TRUCK
19 - COLD STORAGE
20 - WAREHOUSE
21 - ACS & MAINTENANCE
22 - BOAT STORAGE
23 - WASTE
24 - WATER & SEWAGE
25 - CAMP PARKING
26 - INCINERATOR
27 - STANDBY GENERATORS
28 - CAMP COMMON AREA
29 - LIVING QUARTERS
30 - CONSTRUCTION EQUIPMENT
31 - MATERIAL
32 - FUEL
F
8
TEMPORARY
RAMP SUPPORT
SERVICE
PIER
8
B
390 '
8
8
2
6
5
4
3
PAD TOE
7
13
12
11
A
14
'
9
0
162
8
10
! !
! !
!
!
!
!
700 '
11
8
A
15
20
!
16
!
!
1825 '
Lion Bay
SEALIFT BULKHEAD
EXISTING
PTU-3 PAD
1
FLARE
STACK
PAD DIMENSIONS ARE APPROXIMATE
ACTUAL LAYOUT PENDING FINAL DESIGN
925 '
8
1 - DISPOSAL WELL
2 - DRILLING UTILITIES
3 - GRIND & INJECT
4 - CUTTINGS STORAGE
5 - DRY BULK STORAGE
6 - TANK TRAILERS
7 - CAMP
8 - INJECTION COMPRESSORS
9 - UTILITY MODULE
10 - SEPARATION/DEHYDRATION
11 - POWER GENERATORS
12 - DRILLING FLUID TANKS
13 - PIPE MATERIAL
14 - DIESEL
15 - DIESEL/METHANOL
16 - SUPER SUCKERS
PAD
SHOULDER
17
!
!
!
18
!
!
!
!
!
20
!
19
8
!
!
!
!
!
!
!
!
!
!
!
!
31
25
24
23
!
!
!
!
!
!
!
!
!
!
!
!
!
26
!
7
!
32
22
21
30
31
26
!
25
!
23
27
28
29
8
!
!
!
!
!
!
900
!
8
!
!
!
!
8
!
%
!
!
Proposed Point Thomson Facilities and Roads
Feet
Drilling
Living Facilities
8
Barge Offloading
Operations
Processing Unit
APPLICANT:
Proposed Export Pipeline
500
B
7 - CENTRAL PAD FOOTPRINT
EAST
GATHERING
LINE
Existing Gravel
0
Zone Key
WASTEWATER
EFFLUENT LINE
Proposed Gathering Lines
!
560 '
'
8
!
To Airstrip,
Gravel Mine
CENTRAL
PAD ROAD
BOAT
LAUNCH
8
EXPORT
PIPELINE &
EAST AND WEST
GATHERING
LINES
1,000
EXXON MOBIL CORPORATION &
PTE PIPELINE LLC.
PROJECT:
POINT THOMSON PROJECT
LOCATION:
NORTH SLOPE BOROUGH, ALASKA
REFERENCE:
POA-2001-1082-M1
WATERBODY:
BEAUFORT SEA
DATE:
MARCH 2012
CENTRAL PAD
KEY MAP
SECTION A-A
SECTION B-B
8 - CENTRAL PAD SECTIONS
APPLICANT:
EXXON MOBIL CORPORATION &
PTE PIPELINE LLC.
PROJECT:
POINT THOMSON PROJECT
LOCATION:
NORTH SLOPE BOROUGH, ALASKA
REFERENCE:
POA-2001-1082-M1
WATERBODY:
BEAUFORT SEA
DATE:
MARCH 2012
F
MOORING DOLPHINS
TEMPORARY RAMP
SUPPORT
SERVICE
PIER
Lion Bay
SEALIFT BULKHEAD
EXISTING
PTU-3 PAD
SLOPE PROTECTION
! !
! !
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
BOAT
LAUNCH
!
!
!
!
!
!
EXPORT
PIPELINE &
EAST AND WEST
GATHERING
LINES
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
To Airstrip,
Gravel Mine
CENTRAL
PAD ROAD
PAD DIMENSIONS ARE APPROXIMATE
ACTUAL LAYOUT PENDING FINAL DESIGN
WASTEWATER
EFFLUENT LINE
%
9 - CENTRAL PAD
SLOPE PROTECTION PLAN
EAST GATHERING LINE
Proposed Slope Protection
APPLICANT:
Proposed Gathering Lines
!
!
!
Proposed Export Pipeline
Existing Gravel
Proposed Point Thomson Facilities and Roads
0
500
Feet
1,000
EXXON MOBIL CORPORATION &
PTE PIPELINE LLC.
PROJECT:
POINT THOMSON PROJECT
LOCATION:
NORTH SLOPE BOROUGH, ALASKA
REFERENCE:
POA-2001-1082-M1
WATERBODY:
BEAUFORT SEA
DATE:
MARCH 2012
GRAVEL BAG ARMOR SECTION
10 - TYPICAL PAD SLOPE PROTECTION
SECTION
APPLICANT:
EXXON MOBIL CORPORATION &
PTE PIPELINE LLC.
PROJECT:
POINT THOMSON PROJECT
LOCATION:
NORTH SLOPE BOROUGH, ALASKA
REFERENCE:
POA-2001-1082-M1
WATERBODY:
BEAUFORT SEA
DATE:
MARCH 2012
-8
F
120
'
-6
MOORING DOLPHIN 4
815
'
-7
160
'
1
-4
MOORING DOLPHIN 1
TEMPORARY RAMP SUPPORT
SEALIFT BULKHEAD
125
'
0
250
'
300
'
-2 %
-1
%
%
%
%
-3
%
32
%
PIER
%
-4SERVICE
-5
5
5
4
PAD SHOULDER
2
3
3
2
%
PAD TOE
-7
MOORING DOLPHIN 2
%
%
MOORING DOLPHIN 8
6
330
'
-5
400
'
-6
MOORING DOLPHIN 5
SHORE LIN
E
%
-6
DREDGING AND
SCREEDING AREA
MOORING DOLPHIN 7
MOORING DOLPHIN 3
%
-7
MOORING DOLPHIN 6
400
'
-7
%
SCREEDING AREA
Lion Bay
%
DIMENSIONS ARE APPROXIMATE
ACTUAL LAYOUT PENDING FINAL DESIGN
CENTRAL PAD
ELEVATIONS ARE IN FEET AND BASED ON MLLW
11 - BARGE OFFLOADING
STRUCTURES PLAN
APPLICANT:
0
200
Feet
400
EXXON MOBIL CORPORATION &
PTE PIPELINE LLC.
PROJECT:
POINT THOMSON PROJECT
LOCATION:
NORTH SLOPE BOROUGH, ALASKA
REFERENCE:
POA-2001-1082-M1
WATERBODY:
BEAUFORT SEA
DATE:
MARCH 2012
SEALIFT BULKHEAD SECTION
SEALIFT BULKHEAD SECTION
SERVICE PIER SECTION
12 - BARGE OFFLOADING
STRUCTURES SECTIONS
APPLICANT:
EXXON MOBIL CORPORATION &
PTE PIPELINE LLC.
PROJECT:
POINT THOMSON PROJECT
LOCATION:
NORTH SLOPE BOROUGH, ALASKA
REFERENCE:
POA-2001-1082-M1
WATERBODY:
BEAUFORT SEA
DATE:
JULY 2012
PLAN
MOORING DOLPHIN
FRONT ELEVATION
MOORING DOLPHIN
SIDE ELEVATION
13 - MOORING DOLPHIN
PLAN & ELEVATION
APPLICANT:
EXXON MOBIL CORPORATION &
PTE PIPELINE LLC.
PROJECT:
POINT THOMSON PROJECT
LOCATION:
NORTH SLOPE BOROUGH, ALASKA
REFERENCE:
POA-2001-1082-M1
WATERBODY:
BEAUFORT SEA
DATE:
MARCH 2012
F
Proposed Onshore Dredge Material Placement
Proposed Central Pad
10
00
'
Lion Bay
A
A
DREDGING AND/OR
SCREEDING AREA
0
500
1,000
1,500
Feet
14 - DREDGE MATERIAL
ONSHORE PLACEMENT
APPLICANT:
EXXON MOBIL CORPORATION &
PTE PIPELINE LLC.
PROJECT:
POINT THOMSON PROJECT
LOCATION:
NORTH SLOPE BOROUGH, ALASKA
WATERBODY:
BEAUFORT SEA
DATE:
JULY 2012
Central Pad
REFERENCE:
Road POA-2001-1082-M1
2,000
BOAT LAUNCH
N
KEY MAP
15 - BOAT LAUNCH PLAN
APPLICANT:
EXXON MOBIL CORPORATION &
PTE PIPELINE LLC.
PROJECT:
POINT THOMSON PROJECT
LOCATION:
NORTH SLOPE BOROUGH, ALASKA
REFERENCE:
POA-2001-1082-M1
WATERBODY:
BEAUFORT SEA
DATE:
MARCH 2012
RAMP ELEVATION
RAMP SECTION A-A
16 - BOAT LAUNCH SECTIONS
APPLICANT:
EXXON MOBIL CORPORATION &
PTE PIPELINE LLC.
PROJECT:
POINT THOMSON PROJECT
LOCATION:
NORTH SLOPE BOROUGH, ALASKA
REFERENCE:
POA-2001-1082-M1
WATERBODY:
BEAUFORT SEA
DATE:
MARCH 2012
Lion Bay
F
PAD DIMENSIONS ARE APPROXIMATE
ACTUAL LAYOUT PENDING FINAL DESIGN
1240 '
8
8
8
EXISTING
NORTH STAINES RIVER
STATE NO.1 PAD
1
3
A
4
5
PAD
ELEV.
+12'
PAD
ELEV.
+17'
9
8
B
RAMP
6
8
2
10
11
12
A
13
7
670 '
8
15
890 '
8
1050 '
14
PAD SHOULDER
16
PAD TOE
17
18
20
19
8
8
EAST PAD
ROAD
11 - CASING STORAGE
12 - DRILLING STORAGE
13 - CUTTINGS STORAGE
14 - VAC TRUCK
15 - SUPER SUCKERS
16 - PIPE SHED
17 - METHANOL INJECTION
18 - LOCAL E/I ROOM
19 - ACS STORAGE
20 - PIG LAUNCHER
APPLICANT:
Proposed Gathering Lines
Proposed Point Thomson Facilities and Roads
250
Feet
To Airstrip,
Mine,
Central Pad
8Gravel
17 - EAST PAD FOOTPRINT
Existing Gravel
0
440 '
%
1 - CAMP
2 - OFFICES
3 - CAMP PARKING
4 - TANK TRAILERS
5 - DRY BULK STORAGE
6 - DRILLING WAREHOUSE
7 - SHOP RIG
8 - BULK TANK FARM
9 - RESERVE FUEL
10 - DRILLPIPE STORAGE
B
8
EAST
GATHERING
LINE
500
EXXON MOBIL CORPORATION &
PTE PIPELINE LLC.
PROJECT:
POINT THOMSON PROJECT
LOCATION:
NORTH SLOPE BOROUGH, ALASKA
REFERENCE:
POA-2001-1082-M1
WATERBODY:
BEAUFORT SEA
DATE:
MARCH 2012
EAST PAD
KEY MAP
SECTION A-A
SECTION B-B
18 - EAST PAD SECTIONS
APPLICANT:
EXXON MOBIL CORPORATION &
PTE PIPELINE LLC.
PROJECT:
POINT THOMSON PROJECT
LOCATION:
NORTH SLOPE BOROUGH, ALASKA
REFERENCE:
POA-2001-1082-M1
WATERBODY:
BEAUFORT SEA
DATE:
MARCH 2012
460 '
8
8
A
8
F
Beaufort Sea
10
14
PAD SHOULDER
16
1670 '
PAD TOE
B
17
18
B
19
11
12
7
8
5
4
2
9
3
6
1
13
15
8
WEST
GATHERING
LINE
1 - CAMP PARKING
2 - CAMP
3 - VAC TRUCK
4 - SUPER SUCKERS
5 - BULK TANK FARM
6 - RIG SHOP
7 - CUTTINGS STORAGE
8 - TANK TRAILERS
9 - RESERVE FUEL
10 - DRILLPIPE STORAGE
11 - DRY BULK STORAGE
12 - DRILLING STORAGE
13 - DRILLING WAREHOUSE
14 - CASINGS STORAGE
15 - ACS STORAGE
16 - DIVERTER/CAPTURE
17 - MODULE 202
18 - MODULE 201
19 - MODULE 203
Proposed Gathering Lines
Proposed Point Thomson Facilities and Roads
0
250
Feet
500
A
WEST PAD
ROAD
PAD DIMENSIONS ARE APPROXIMATE
ACTUAL LAYOUT PENDING FINAL DESIGN
19 - WEST PAD FOOTPRINT
APPLICANT:
EXXON MOBIL CORPORATION &
PTE PIPELINE LLC.
PROJECT:
POINT THOMSON PROJECT
LOCATION:
NORTH SLOPE BOROUGH, ALASKA
REFERENCE:
POA-2001-1082-M1
WATERBODY:
BEAUFORT SEA
DATE:
MARCH 2012
WEST PAD
KEY MAP
SECTION A-A
SECTION B-B
20 - WEST PAD SECTIONS
APPLICANT:
EXXON MOBIL CORPORATION &
PTE PIPELINE LLC.
PROJECT:
POINT THOMSON PROJECT
LOCATION:
NORTH SLOPE BOROUGH, ALASKA
REFERENCE:
POA-2001-1082-M1
WATERBODY:
BEAUFORT SEA
DATE:
MARCH 2012
F
GRAVEL
MINE
GRAVEL
STOCKPILE
HELICOPTER
PARKING AREA
8
705 '
245 ' 8
270 ' 8
8
8
8
8
8
8
210 '8 365 ' 8
340 ' 8260 ' 8
8
345 ' 8
8
430 '
370 ' 8
8
HELICOPTER
TAXIWAY
8
MAIN
TAXIWAY
200 8'
8
NAVAID
8
340 ' 8
180 '
8
NAVAID
8
200 8'
APRON
8
NAVAID
AIRSTRIP
ACCESS ROAD
8
NAVAID
675 '
8
8
8
APPROACH
LIGHTING
PILES (TYP).
POWER CABLE
CONDUIT ON
SLEEPERS
5645 '
8
WATER ACCESS PAD
21 - AIRSTRIP FOOTPRINT
APPLICANT:
Proposed Powerline
Proposed Point Thomson Facilities and Roads
0
1,000
Feet
2,000
NOTE: ORGANIC MATERIAL IS PLACED ON ALL SIDES
OF THE AIRSTRIP FOR SLOPE PROTECTION.
ORGANIC MATERIAL AND JUTE MAT IS PLACED ALONG
THE SOUTHERN SLOPE OF THE AIRSTRIP.
EXXON MOBIL CORPORATION &
PTE PIPELINE LLC.
PROJECT:
POINT THOMSON PROJECT
LOCATION:
NORTH SLOPE BOROUGH, ALASKA
REFERENCE:
POA-2001-1082-M1
WATERBODY:
BEAUFORT SEA
DATE:
MARCH 2012
AIRSTRIP
TYPICAL TAXIWAY SECTION
KEY MAP
TYPICAL RUNWAY SECTION
TYPICAL APRON SECTION
RUNWAY PROFILE
APRON AND TAXIWAY PROFILE
TYPICAL SLOPE PROTECTION SECTION
22 - AIRSTRIP SECTIONS
APPLICANT:
EXXON MOBIL CORPORATION &
PTE PIPELINE LLC.
PROJECT:
POINT THOMSON PROJECT
LOCATION:
NORTH SLOPE BOROUGH, ALASKA
REFERENCE:
POA-2001-1082-M1
WATERBODY:
BEAUFORT SEA
DATE:
MARCH 2012
HELICOPTER
PARKING AREA
KEY MAP
TYPICAL HELICOPTER TAXIWAY
HELICOPTER APRON TRANSVERSE SECTION
HELICOPTER APRON LONGITUDINAL SECTION
23 - AIRSTRIP AUXILIARY FEATURE
SECTIONS
APPLICANT:
EXXON MOBIL CORPORATION &
PTE PIPELINE LLC.
PROJECT:
POINT THOMSON PROJECT
LOCATION:
NORTH SLOPE BOROUGH, ALASKA
REFERENCE:
POA-2001-1082-M1
WATERBODY:
BEAUFORT SEA
DATE:
MARCH 2012
NAVAID POWER DISTRIBUTION
CONDUIT ON SLEEPER SECTION
TYPICAL NAVAID APPROACH LIGHT ON PILE
20 TOTAL
24 - AIRSTRIP LIGHTING SYSTEM
SECTIONS
APPLICANT:
EXXON MOBIL CORPORATION &
PTE PIPELINE LLC.
PROJECT:
POINT THOMSON PROJECT
LOCATION:
NORTH SLOPE BOROUGH, ALASKA
REFERENCE:
POA-2001-1082-M1
WATERBODY:
BEAUFORT SEA
DATE:
MARCH 2012
F
8
A
8
8
410 '
550 '
PAD TOE
PAD SHOULDER
B
B
8
ROAD
SHOULDER
EXISTING GRAVEL
ALASKA STATE C-1
(NO NEW FILL
BEYOND EXISTING
PAD FOOTPRINT)
ALASKA
STATE
C-1 PAD
ALASKA STATE C-1 PAD
ACCESS ROAD
ROAD TOE
A
To East Pad
To Airstrip,
Gravel Mine,
Central Pad
END CENTRAL PAD ROAD
BEGIN EAST PAD ROAD
%
STREAM
CROSSING 24A
PAD DIMENSIONS ARE APPROXIMATE
ACTUAL LAYOUT PENDING FINAL DESIGN
Stream Crossing Culvert
Cross Drainage Culvert
Existing Gravel
Proposed Point Thomson Facilities and Roads
0
200
Feet
400
25 - ALASKA STATE C-1 PAD
FOOTPRINT
APPLICANT:
EXXON MOBIL CORPORATION &
PTE PIPELINE LLC.
PROJECT:
POINT THOMSON PROJECT
LOCATION:
NORTH SLOPE BOROUGH, ALASKA
REFERENCE:
POA-2001-1082-M1
WATERBODY:
BEAUFORT SEA
DATE:
MARCH 2012
%
ALASKA STATE
C1 PAD
KEY MAP
SECTION A-A - ALASKA STATE C-1 PAD LONGITUDINAL SECTION
SECTION B-B - ALASKA STATE C-1 PAD TRANSVERSE SECTION
26 - ALASKA STATE C-1 PAD
SECTIONS
APPLICANT:
EXXON MOBIL CORPORATION &
PTE PIPELINE LLC.
PROJECT:
POINT THOMSON PROJECT
LOCATION:
NORTH SLOPE BOROUGH, ALASKA
REFERENCE:
POA-2001-1082-M1
WATERBODY:
BEAUFORT SEA
DATE:
MARCH 2012
F
%
To Airstrip,
Gravel Mine,
Central Pad
CENTRAL PAD ROAD
To East Pad
WATER
ACCESS PAD
WATER ACCESS PAD
ACCESS ROAD
8
B
A
A
170 '
PAD TOE
PAD SHOULDER
8
ALASKA STATE
C-1 PIT
B
8
24'
WATER
INTAKE PUMPS
20'
'
16
12'
4'
Proposed Electrical Trenching
Proposed Point Thomson Facilities and Roads
Feet
APPLICANT:
0'
Cross Drainage Culvert
100
27 - WATER ACCESS PAD
FOOTPRINT
8'
PAD DIMENSIONS ARE APPROXIMATE
ACTUAL LAYOUT PENDING FINAL DESIGN
0
8
180 '
200
-4'
EXXON MOBIL CORPORATION &
PTE PIPELINE LLC.
PROJECT:
POINT THOMSON PROJECT
LOCATION:
NORTH SLOPE BOROUGH, ALASKA
REFERENCE:
POA-2001-1082-M1
WATERBODY:
BEAUFORT SEA
DATE:
MARCH 2012
%
WATER
ACCESS PAD
KEY MAP
WATER ACCESS PAD TRANSVERSE SECTION A-A
WATER ACCESS PAD LONGITUDINAL SECTION B-B
28 - WATER ACCESS PAD SECTIONS
APPLICANT:
EXXON MOBIL CORPORATION &
PTE PIPELINE LLC.
PROJECT:
POINT THOMSON PROJECT
LOCATION:
NORTH SLOPE BOROUGH, ALASKA
REFERENCE:
POA-2001-1082-M1
WATERBODY:
BEAUFORT SEA
DATE:
MARCH 2012
F
Mikkelsen Bay
EXISTING BADAMI PAD
BADAMI AUXILIARY PAD
EXISTING BADAMI PIPELINE
B
A
EXISTING SNOW FENCE
!
!
!
!
!
A
!
!
!
B
!
!
!
!
!
!
!
!
! !
! !
!
!
!
!
!
!
! !
! !
!
!
! !
! !
EXISTING ROAD
TO AIRSTRIP
!
!
! !
! !
A
!
!
! !
! !
!
!
! !
! !
!
!
! !
! !
!
!
! !
! !
! !
!
!
! !
! !
!
!
! !
! !
!
!
! !
! !
!
!
! !
! !
!
!
!
!
!
! !
!
!
!
A
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
EXPORT
PIPELINE
!
!
!
!
PIPELINE
CROSSING PAD
29 - BADAMI PADS FOOTPRINT
APPLICANT:
!
!
!
Proposed Point Thomson Export Pipeline
Proposed Point Thomson Roads and Facilities
Existing Roads and Facilities
0
250
Feet
500
EXXON MOBIL CORPORATION &
PTE PIPELINE LLC.
PROJECT:
POINT THOMSON PROJECT
LOCATION:
NORTH SLOPE BOROUGH, ALASKA
REFERENCE:
POA-2001-1082-M1
WATERBODY:
BEAUFORT SEA
DATE:
MARCH 2012
PROPOSED BADAMI AUXILIARY PAD TRANSVERSE SECTION
PROPOSED BADAMI AUXILIARY PAD LONGITUDINAL SECTION
PROPOSED BADAMI PIPELINE CROSSING PAD TYP TRANSVERSE SECTION
30 - BADAMI PADS SECTIONS
PROPOSED PIPELINE CROSSING PAD
TYPICAL LONGITUDINAL SECTION
APPLICANT:
EXXON MOBIL CORPORATION &
PTE PIPELINE LLC.
PROJECT:
POINT THOMSON PROJECT
LOCATION:
NORTH SLOPE BOROUGH, ALASKA
REFERENCE:
POA-2001-1082-M1
WATERBODY:
BEAUFORT SEA
DATE:
MARCH 2012
F
Beaufort Sea
BULLEN
POINT
Mikkelsen Bay
BADAMI PAD
BADAMI
AUXILIARY PAD
DOCK
!
!
PIPELINE
CROSSING PAD
!
! !
!
!
!
!
!
!
!
!
! !
!
!
!
!
!
!
!
!
!
!
!
! !
!
!
!
!
!
!
!
!
!
! !
!
!
!
!
!
!
!
!
!
!
!
! !
!
!
!
!
!
!
!
!
!
! !
! !
!
!
! !
!
!
! !
! !
! !
!
! !
! !
! !
!
!
!
!
!
!
!
!
!
! !
!
!
!
!
! !
!
!
!
!
! !
! !
Proposed Point Thomson Roads and Facilities
Existing Roads and Facilities
0
1
2
Miles
ce
31 - PIPELINE OVERVIEW
SHEET 1 OF 4
ry
S
Ch
a ch
all
e
sE
ng
eE
ntr
an
n tr
an
ce
Beaufort Sea
APPLICANT:
Ma
Mikkelsen Bay
! !
!
! !
! !
!
! !
! !
! !
!
!
! !
!!
! !
!!
! !
! !
! !
! !
! !
! !
!
!
Lion Bay
!
iv e
r
!!
! !
!!
! !
!!
! !
sR
!!
SHEET 2 OF 4
SHEET 3 OF 4
Sta
in e
!
! !
SHEET 1 OF 4
SHEET 4 OF 4
EXXON MOBIL CORPORATION &
PTE PIPELINE LLC.
PROJECT:
POINT THOMSON PROJECT
LOCATION:
NORTH SLOPE BOROUGH, ALASKA
REFERENCE:
POA-2001-1082-M1
WATERBODY:
BEAUFORT SEA
DATE:
JULY 2012
!
!
!
!
Proposed Point Thomson Gathering Lines
!
!
!
Proposed Point Thomson Export Pipeline
!
!
! !
!
EXPORT PIPELINE
BADAMI
MINE SITE
!
!
!
!
EXISTING
BADAMI
PIPELINE
!
BADAMI AIRSTRIP
!
E MIKKELSEN BAY STATE #1
!
F
Beaufort Sea
BULLEN POINT
STAGING PAD
! !
!
!
!!
! !
! !
! !
! !
! !
! !
!
!
!
!
!
!
!
! !
!
!
! !
!
! !
!
!
!
! !
! !
! !
!
!
!
! !
! !
!
!
! !
!
! !
! !
!
!
!
! !
!
!
! !
! !
! !
! !
! !
!
!
! !
! !
!
!
! !
! !
! !
! !
! !
!
!
! !
!
!
! !
! !
! !
!
!
! !
! !
!
!
!
!
!
!
!
!
!
!
!
!
!
!
Proposed Point Thomson Export Pipeline
!
Proposed Point Thomson Gathering Lines
Proposed Point Thomson Roads and Facilities
Existing Roads and Facilities
0
1
2
Miles
ntr
an
ce
sE
n tr
an
a ch
eE
ry
S
ng
!
!
! !
! !
! !
!
! !
!!
! !
!!
! !
! !
! !
! !
! !
! !
Lion Bay
!
!
APPLICANT:
Ma
all
e
Ch
! !
! !
!
! !
Mikkelsen Bay
32 - PIPELINE OVERVIEW
SHEET 2 OF 4
ce
Beaufort Sea
!
!
! !
iv e
r
!!
! !
!!
! !
!!
! !
Sta
in e
sR
!!
SHEET 1 OF 4
SHEET 2 OF 4
SHEET 3 OF 4
SHEET 4 OF 4
EXXON MOBIL CORPORATION &
PTE PIPELINE LLC.
PROJECT:
POINT THOMSON PROJECT
LOCATION:
NORTH SLOPE BOROUGH, ALASKA
REFERENCE:
POA-2001-1082-M1
WATERBODY:
BEAUFORT SEA
DATE:
JULY 2012
! !
!
!
EXPORT PIPELINE
!
POINT THOMSON UNIT #4
BULLEN
POINT
AIRSTRIP
!
F
Ma
ry
Sac
h
sE
ntr
anc
e
Beaufort Sea
POINT THOMSON UNIT #1
EXPORT PIPELINE &
WEST GATHERING LINE
CENTRAL PAD
!
!
!
!
!
! !
! !
!
!
!
! !
!
!
!
!
!
!
!
!
!
! !
! !
!
!
!
! !
!
!
! !
! !
!
!
! !
!
! !
!
!
! !
!
! !
!
! !
! !
! !
!
! !
!
WEST GATHERING LINE
!
WEST PAD
!
!
! !
!
!
!
!
!
! !
! !
!
!
!
!
!
!
!
!
! !
! !
!
!
! !
! !
! !
! !
!
WEST PAD ROAD
! !
! !
EAST GATHERING LINE
GRAVEL
MINE
GRAVEL STOCKPILE
WEST STAINES STATE 18-09-23
AIRSTRIP
WATER
ACCESS
PAD
! !
Proposed Point Thomson Export Pipeline
! !
Proposed Point Thomson Gathering Lines
Proposed Point Thomson Roads and Facilities
Existing Roads and Facilities
1
WEST STAINES STATE #2
2
Miles
33 - PIPELINE OVERVIEW
SHEET 3 OF 4
ry
S
Ch
a ch
all
e
sE
ng
eE
ntr
an
n tr
an
ce
Beaufort Sea
ce
0
APPLICANT:
Ma
Mikkelsen Bay
!
! !
! !
!
! !
! !
! !
!
!
! !
! !
!!
! !
!!
! !
! !
! !
! !
! !
Lion Bay
!
!
! !
!
!
! !
iv e
r
! !
!!
! !
!!
!!
! !
!!
Sta
in e
sR
! !
!
POINT THOMSON UNIT #2
! !
!
!
EXPORT PIPELINE
SHEET 1 OF 4
SHEET 2 OF 4
SHEET 3 OF 4
SHEET 4 OF 4
EXXON MOBIL CORPORATION &
PTE PIPELINE LLC.
PROJECT:
POINT THOMSON PROJECT
LOCATION:
NORTH SLOPE BOROUGH, ALASKA
REFERENCE:
POA-2001-1082-M1
WATERBODY:
BEAUFORT SEA
DATE:
JULY 2012
!
F
Mary Sachs Island
Beaufort Sea
ALASKA STATE A-1
Flaxman Island
ALASKA STATE G2
Lion Bay
EAST GATHERING LINE
EAST PAD
STAINES RIVER STATE #1
EAST PAD ROAD
! !
Proposed Point Thomson Export Pipeline
! !
Proposed Point Thomson Gathering Lines
Proposed Point Thomson Roads and Facilities
Existing Roads and Facilities
1
2
Miles
34 - PIPELINE OVERVIEW
SHEET 4 OF 4
ry
S
Ch
a ch
all
e
sE
ng
eE
ntr
an
n tr
an
ce
Beaufort Sea
ce
0
APPLICANT:
Ma
Mikkelsen Bay
! !
!
! !
! !
!
! !
! !
! !
!
!
! !
!!
! !
!!
! !
! !
! !
! !
! !
! !
!
!
Lion Bay
!
!
! !
iv e
r
!!
! !
!!
! !
!!
! !
Sta
in e
sR
!!
SHEET 1 OF 4
SHEET 2 OF 4
SHEET 3 OF 4
SHEET 4 OF 4
EXXON MOBIL CORPORATION &
PTE PIPELINE LLC.
PROJECT:
POINT THOMSON PROJECT
LOCATION:
NORTH SLOPE BOROUGH, ALASKA
REFERENCE:
POA-2001-1082-M1
WATERBODY:
BEAUFORT SEA
DATE:
JULY 2012
!
WEST
GATHERING
LINE
EAST
GATHERING
LINE
KEY MAP
WEST GATHERING LINE
EAST GATHERING LINE
35 - PIPELINE SECTIONS
GATHERING LINES
APPLICANT:
EXXON MOBIL CORPORATION &
PTE PIPELINE LLC.
PROJECT:
POINT THOMSON PROJECT
LOCATION:
NORTH SLOPE BOROUGH, ALASKA
REFERENCE:
POA-2001-1082-M1
WATERBODY:
BEAUFORT SEA
DATE:
MARCH 2012
GATHERING LINES &
EXPORT PIPELINE
KEY MAP
GATHERING LINES & EXPORT PIPELINE - CENTRAL
PAD TO EAST PAD JUNCTION ON SINGLE VSM
36 - PIPELINE SECTIONS GATHERING LINES &
EXPORT PIPELINE (SINGLE VSM)
APPLICANT:
EXXON MOBIL CORPORATION &
PTE PIPELINE LLC.
PROJECT:
POINT THOMSON PROJECT
LOCATION:
NORTH SLOPE BOROUGH, ALASKA
REFERENCE:
POA-2001-1082-M1
WATERBODY:
BEAUFORT SEA
DATE:
MARCH 2012
GATHERING LINES &
EXPORT PIPELINE
KEY MAP
GATHERING LINES & EXPORT PIPELINE - CENTRAL
PAD TO EAST PAD JUNCTION ON DUAL VSM
37 - PIPELINE SECTIONS GATHERING LINES &
EXPORT PIPELINE (DUAL VSM)
APPLICANT:
EXXON MOBIL CORPORATION &
PTE PIPELINE LLC.
PROJECT:
POINT THOMSON PROJECT
LOCATION:
NORTH SLOPE BOROUGH, ALASKA
REFERENCE:
POA-2001-1082-M1
WATERBODY:
BEAUFORT SEA
DATE:
MARCH 2012
WEST GATHERING LINE &
EXPORT PIPELINE
KEY MAP
WEST GATHERING LINE AND EXPORT PIPELINE EAST PAD JUNCTION TO WEST PAD JUNCTION
ON DUAL VSM
WEST GATHERING LINE AND EXPORT PIPELINE EAST PAD JUNCTION TO WEST PAD JUNCTION
ON SINGLE VSM
38 - PIPELINE SECTIONS WEST GATHERING
LINE AND EXPORT PIPELINE
APPLICANT:
EXXON MOBIL CORPORATION &
PTE PIPELINE LLC.
PROJECT:
POINT THOMSON PROJECT
LOCATION:
NORTH SLOPE BOROUGH, ALASKA
REFERENCE:
POA-2001-1082-M1
WATERBODY:
BEAUFORT SEA
DATE:
MARCH 2012
TO
BADAMI
EXPORT PIPELINE
KEY MAP
EXPORT PIPELINE WEST PAD JUNCTION TO BADAMI
39 - PIPELINE SECTIONS
EXPORT PIPELINE
APPLICANT:
EXXON MOBIL CORPORATION &
PTE PIPELINE LLC.
PROJECT:
POINT THOMSON PROJECT
LOCATION:
NORTH SLOPE BOROUGH, ALASKA
REFERENCE:
POA-2001-1082-M1
WATERBODY:
BEAUFORT SEA
DATE:
MARCH 2012
PLAN
PROFILE
SECTION
40 - TYPICAL PIPELINE ROAD CROSSING
CENTRAL PAD ACCESS ROAD
APPLICANT:
EXXON MOBIL CORPORATION &
PTE PIPELINE LLC.
PROJECT:
POINT THOMSON PROJECT
LOCATION:
NORTH SLOPE BOROUGH, ALASKA
REFERENCE:
POA-2001-1082-M1
WATERBODY:
BEAUFORT SEA
DATE:
MARCH 2012
PLAN
PROFILE
SECTION
41 - TYPICAL PIPELINE ROAD CROSSING
WEST PAD ACCESS ROAD
APPLICANT:
EXXON MOBIL CORPORATION &
PTE PIPELINE LLC.
PROJECT:
POINT THOMSON PROJECT
LOCATION:
NORTH SLOPE BOROUGH, ALASKA
REFERENCE:
POA-2001-1082-M1
WATERBODY:
BEAUFORT SEA
DATE:
MARCH 2012
US Army Corps
of Engineers
Alaska District
ANCHORAGE
Regulatory Division (1145)
CEPOA-RD
Post Office Box 6898
JBER, Alaska 99506-0898
Public Notice
of Application
for Permit
PUBLIC NOTICE DATE:
July 27, 2012
EXPIRATION DATE:
August 27, 2012
REFERENCE NUMBER:
POA-2001-1082-M1
WATERWAY:
Beaufort Sea
The public in hereby notified that a Department of the Army (DA) permit application
has been received for proposed work in waters and navigable waters of the United
States (U.S.), including surface waters, wetlands, and ocean waters, as described
below and shown on the enclosed project figures. This is the second public notice
issued for the Point Thomson Project to solicit public comment. The first
coincided with publication for the Draft Environmental Impact Statement (EIS) on
November 18, 2011. This public notice is issued concurrently with publication of
the Final EIS. Included herein are the applicant's changes to the proposed project
figures previously published with the first public notice. The changes include
revisions and clarifications represented in the set of 82 Figures for this Public
Notice are available online at http://www.poa.usace.army.mil/reg/PNNew.htm. Some
figures have been modified and others added.
Comments on the described work noting U.S. Army Corps of Engineers (USACE) file
number POA-2001-1082-M1, Beaufort Sea, must be submitted no later than the
expiration date of this Public Notice (August 27, 2012) to become part of the
administrative record and be considered in our permit decision. Please submit
comments to the USACE Project Manager listed immediately below by the communication
method of your choice.
USACE PROJECT MANAGER: Please submit comments to Harry A. Baij Jr. by e-mail
address at harry.a.baij@usace.army.mil, at the mailing address above, by calling
907-753-2784 (office), 907-350-5097 (cell), toll free in Alaska at 800-478-2712,
or by fax at 907-753-5567. Questions and requests for information on this public
notice can be sent directly to Mr. Baij at the above e-mail address.
APPLICANT:
Exxon Mobil Corporation and PTE Pipeline LLC.
APPLICANT'S AGENT: Mr. Lee Bruce, Senior Project Manager, Point Thomson Project,
ExxonMobil Development Company (EMDC), a wholly-owned subsidiary of ExxonMobil
Pipeline Company; 3301 C Street, Suite 400, Anchorage, AK 99503; telephone
832-868-2270.
LOCATION:
Alaska's Beaufort Sea coastline, North Slope Borough, approximately
60 miles east of Prudhoe Bay and 60 miles west of Kaktovik, Alaska. The proposed
development would extend over approximately 30 miles, generally near the Beaufort
Sea.
The locations of the major components of the proposed project are listed
below:
1. The proposed Central Pad would be located at approximate Latitude 70.1713º N.,
Longitude 146.2568º W. in Sec. 34, T. 10 N., R. 23 E. and Sec. 03, T. 09 N.,
R. 23 E., Umiat Meridian.
2. The proposed East Pad would be located at approximate Latitude 70.1467º N.,
Longitude 146.1084º W., in Sec. 8, T. 09 N., R. 24 E., Umiat Meridian.
3. The proposed West Pad would be located at approximate Latitude 70.1806º N.,
Longitude 146.4394º W., in Sec. 36, T. 10 N., R. 22 E., Umiat Meridian.
4. The proposed airstrip would be located at approximate Latitude 70.1369º N.,
Longitude 146.2849º W., in Sections 15, and 16, T. 9 N., R. 23 E., Umiat Meridian.
5. The proposed mine site would be located at approximate Latitude 70.1465º N.,
Longitude 146.2528º W., in Sections 10, 11, T. 9 N., R. 23 E., Umiat Meridian.
6. The proposed support pad (existing Alaska State C-1 pad) would be located at
approximate Latitude 70.1369º N., Longitude 146.2441º W., in Sections 14, T. 9 N.,
R. 23 E., Umiat Meridian.
7. The proposed in-field gravel roads would connect all the above proposed
Central, East, and West Pads; the airstrip; and the gravel mine in a relative
inland routing.
8. The proposed in-field or gathering pipelines would extend from the proposed
East and West Pads to the proposed Central Pad in a relatively straight routing,
that is, not closely aligned with the in-field roads.
9. A proposed export pipeline would extend west approximately 22 miles from the
proposed Central Pad to connect with an existing common carrier pipeline to the
Trans Alaska Pipeline System. Beginning at the proposed Central Pad,
approximate Latitude 70.1712º N., Longitude 146.2641º W., in Umiat Meridian and
ending at the existing British Petroleum Badami Facility, approximate Latitude
70.1502º N., Longitude 147.1027º W., Umiat Meridian.
Vicinity and smaller scale maps are also available online at
http://www.poa.usace.army.mil/reg/PNNew.htm.
FIGURES: The original figure set included with our November 18, 2011, Public
Notice was submitted with the applicant's October 2011, DA permit application.
This original figure set has been fully replaced with figures re-submitted and
re-dated by the applicant. The figures now include dates of March 2012, and
July 2012. Figures are provided for gravel fill roads, gravel pads, an airstrip,
a mine site, elevated pipelines, processing facilities, and supporting
infrastructure. Some locations and relevant design features of the proposed
facilities presented in the original October 2011, DA permit application have
been revised by the applicant.
A total of 82 figures are included in the revised figure set attachment available
online at http://www.poa.usace.army.mil/reg/PNNew.htm and fully replace the
original figure set dated November 2011. The figures which have been added
include:
Figure: 70 Wastewater Water Effluent Section Additional figure
Figure: 71 Water Access Pad Intake Section Additional figure
-2-
Figure:
Figure:
Figure:
Figure:
Figure:
Figure:
Figure:
Figure:
Figure:
Figure:
Figure:
72
73
74
75
76
77
78
79
80
81
82
Typical Stream Crossing Culvert Section Additional figure
Typical Stream Crossing Culvert for Fish Passage Section
Powerline Bridge Crossing Section
Navaid Pad Section (Sheet 1 of 4)
Navaid Pad Section (Sheet 2 of 4)
Navaid Pad Section (Sheet 3 of 4)
Navaid Pad Section (Sheet 4 of 4)
Sealift Bulkhead Dredging and Screeding Details
Service Pier Dredging and Screeding Details
Sealift Bulkhead and Service Pier Elevation
Typical Electrical Trenching and Road Section
APPLICANT'S PURPOSE: Initiate commercial hydrocarbon production (natural gas
condensate) and delineate and evaluate hydrocarbon resources in the Point
Thomson area.
PROPOSED WORK: The total gravel and dredged material fill discharged into waters
and wetlands would be approximately 3,300,500 cubic yards on 267.5 acres. Fill
would include gravel for drilling/production pads; connecting roads; an airstrip;
a gravel mine; vertical support members (VSM's) for in-field pipelines and an
export pipeline; a barge docking facility; emergency boat ramp; and service pier.
Fill material would come from the new mine site. Navigational dredging and
screeding (leveling of the marine sediments) in near-shore ocean waters is
proposed in the barge docking area offshore of the Sealift Bulkhead and Service
Pier. Dredged material would be discharged on a beach disposal area.
The two major components would include production/processing facilities and an
export pipeline. Gravel would be placed for: three drill sites at or near the
seacoast where a minimum of 5 development wells would be drilled; approximately
10 miles of infield gathering pipelines; approximately 12 miles of infield gravel
roads; a 5,600 foot long airstrip; a 49.6 acre gravel mine; a 12.9 acre gravel
stockpile; processing facilities; and support infrastructure. Two wells were
recently drilled in the winter of 2009-2010 at the previously authorized Central
Pad fill area.
The use of Long Reach Directional Drilling (LRDD) allows development of the
primarily offshore Thomson Sand Reservoir from three onshore pads located on or
near the seacoast. The proposed Central Pad would fill a total of 56 acres and
include 13.2 acres of existing fill previously placed for the Point Thomson Unit
No. 3 project. The expanded Central Pad would accommodate additional drilling,
processing facilities, and support infrastructure (e.g. camps, utilities,
warehouses, storage, and waste management facilities). At the proposed Central
Pad, processing facilities will separate hydrocarbon liquids from the natural gas,
re-inject the residual gas, and stabilize the liquid hydrocarbons for transport in
the Point Thomson Export Pipeline.
The proposed East and West Pads would be located to access the eastern and western
extents of the Thomson Sand Reservoir. The East Pad would include a new 11-acre
pad on near seacoast at 17+ feet elevation, mean lower low water datum (MLLW),
connected to an existing ConocoPhillips Alaska Inc. 4.6 acre North Staines River
No. 1 exploration pad. This coastal pad would be utilized for temporarily staging
equipment and camps during well drilling. The West Pad (approximately 19 acres)
would be a new tundra wetland pad to support drilling and production. It would be
located 4 miles west of the proposed Central Pad at 20+ feet MLLW elevation.
-3-
Gathering pipelines would be elevated a minimum of 7 feet above the wetland tundra
surface on VSMs to transport hydrocarbons produced from the proposed East and West
Pads to the Central Processing Facility at the proposed Central Pad. The silver
color metal surfaces of the pipeline would be acid washed to reduce sunlight
reflectivity.
Details on other proposed production infrastructure include:
A 5,600-foot gravel airstrip for all-season transportation capable of
accommodating cargo aircraft;
An onshore bulkhead and 4 offshore mooring dolphins to accommodate
transferring pre-fabricated modules for the proposed Central Pad processing
facility from large sealift barges;
A service pier and 4 other offshore mooring dolphins for transferring
materials and equipment from coastal re-supply barges;
A small boat launch to support access by emergency response vessels;
A 12-mile infield gravel road network for transport of personnel, equipment
(including drilling rigs), materials, and supplies in support of drilling,
operations, and emergency responses;
A 49.6 acre gravel mine with a 12.9 acre permanent stockpile site and an
access road; and
A Class I injection well for disposal of produced water, domestic
wastewater and other authorized waste streams.
Construction activities are proposed to commence in the winter of 2012/13 and
be completed by the winter of 2015/2016. Civil construction, including gravel
placement and gravel mining, would be mainly conducted during the winters of
2012/13 and 2013/14. Production infrastructure construction would commence in
early 2013 and be completed in winter 2015/2016. A flotilla of sealift barges
would deliver large processing facility modules in the summer of 2015. Drilling
operations are planned to commence in early 2015 and be completed in early 2017.
Facility module installation, commissioning, and start-up are planned in 2015 to
early 2016 followed by production and construction demobilization in 2016.
The export pipeline would be a common carrier pipeline and therefore subject to
additional regulation (Federal Energy Regulatory Commission) separate from the infield gathering pipelines. The 22-mile long, 12-inch nominal diameter export
pipeline would receive processed liquid hydrocarbons from the Central Processing
Facility to a connection with the British Petroleum's Badami Facility, Sales Oil
Pipeline. The export pipeline would also be elevated a minimum of 7 feet above
the wetland tundra surface on VSMs and sheet metal covering surfaces would be acid
washed to reduce the reflectivity. Other export pipeline facilities would include
a small auxiliary pad at Badami for a leak detection and metering skid and a small
pipeline crossing pad to allow ice road crossings. The export pipeline
construction would be conducted from ice roads over two winter seasons in 2012/13
and 2013/14.
ADDITIONAL INFORMATION: Additional information is available from the Point Thomson
Project website established by the USACE for this proposal at
www.pointthomsonprojecteis.com, or by contacting the USACE Project Manager above.
-4-
The Final EIS has been distributed and published concurrent with this Public
Notice. Comments on the FEIS are not being solicited. The applicant's
October 2011, DA permit application, file number POA-2001-1082-M1, Beaufort Sea,
and USACE's November 18, 2012, public notice is included with the publication of
the Final EIS in Appendix A. Please note the changes to the figures are not
included in the Final EIS, only are attached to this public notice.
In addition, the applicant has provided the USACE with extensive supporting
documentation to supplement its permit application. This documentation includes
detailed project descriptions and addendums, an Environmental Report, State of
Alaska and North Slope Borough lease and right-of-way applications and
stipulations for land use and operations, an Environmental Mitigation Report, and
an Oil Spill Preparedness Report. Copies of these documents are available upon
request. The applicant has also submitted technical information, responses to
requests for information, and held informational workshops including a Hydrology
Workshop and a Gravel Mining and Rehabilitation Plan Workshop.
APPLICANT PROPOSED MITIGATION: The applicant has proposed mitigation measures to
avoid and minimize impacts to waters of the U.S. from activities involving the
discharge of dredged or fill material as provided in the Point Thomson
Environmental Mitigation Report. The avoidance, minimization, and compensatory
mitigation measures are outlined below.
a.
Avoidance: Avoid the construction and use of substantial offshore
development structures and facilities in the Beaufort Sea by locating the 3
proposed Central, East, and West drill site pads on the coast and using LRDD to
access the predominantly offshore reservoir. Strategic location of these 3
proposed drill sites is intended to avoid the need to construct additional
drilling gravel pads in wetlands/waters and still accommodate future full-field
development of the reservoir(s).
b.
Minimization: Project design, supported by wetlands, hydrology, and
other environmental studies, focused on minimizing environmental impacts. This
includes minimizing the total area of wetlands/waters fill and construction in
navigable waters.
Examples include:
1. Executing remote project development without proposed permanent gravel
road construction from the Prudhoe Bay area by reliance on seasonal ice
roads, a gravel airstrip, and barging with minimal offloading
facilities.
2. Using three existing gravel pads at the proposed Central and East Pads
and an existing fill pad at the Alaska State C-1 Pad thus minimizing
the need for new tundra wetland fill footprint by more than 20 acres.
3. Minimizing gravel pad size through optimization of facility and
equipment layout.
4. Designing and locating gravel pads, roads, bridges, and culverts to
maintain natural drainage patterns and stream flows.
5. Routing the in-field gravel roads to minimize overall length and fill
footprint in consideration of hydrologic impacts and wetlands values.
6. Limiting permanent structures in marine waters to vertical piles for
the service pier, mooring dolphins, and sealift barge ramp.
c.
Compensatory Mitigation: The applicant proposes payment of an in-lieu
fee to The Conservation Fund (TCF). TCF is the only in-lieu fee sponsor
-5-
currently authorized by the USACE to provide compensatory mitigation for impacts
to navigable waters and waters of the U.S. on Alaska's North Slope. The
applicant proposes to would work with TCF and the USACE to develop an
appropriate Mitigation Plan to satisfy compensatory mitigation requirements.
This would include exploring opportunities which may be available on the North
Slope for purchasing lands containing aquatic resources for preservation.
WATER QUALITY CERTIFICATION: A permit for the described work will not be issued
until a certification or waiver of certification, as required under Section 401
of the Clean Water Act (Public Law 95-217), has been received from the Alaska
Department of Environmental Conservation.
CULTURAL RESOURCES: Section 106 of the National Historic Preservation Act (NHPA)
and its implementing regulations (36 CFR 800) require Federal agencies to
consider the effects of their undertakings on cultural resources that are
eligible for the National Register of Historic Places. Consultation with the
Alaska State Historic Preservation Officer (SHPO), North Slope area Federally
recognized Tribes, and other consulting parties is being performed to avoid,
minimize, and/or mitigate impacts to eligible cultural resources throughout the
NHPA Section 106 process. Issuance of a Federal permit qualifies as an
"undertaking" under Section 106; therefore, the impacts of the proposal on
historical, cultural, and archaeological resources have been addressed in the
Final EIS and will be considered in the USACE permit decision to issue or deny a
permit for the applicant's proposal. The USACE, as Lead Federal Agency for the
Point Thomson Project EIS, previously initiated consultation with the SHPO.
The applicant has prepared and submitted a Cultural Resource Management Plan
(CRMP), including a data gap analysis and fieldwork, to identify cultural resources
within the project area. The CRMP was reviewed by North Slope Borough (NSB),
Inupiat History, Language, and Culture (IHLC) Division and the Alaska Department
of Natural Resources, Office of History and Archaeology (OHA) during its
preparation. There are potentially eligible properties in the general project
area and a determination of effect will be made in consultation with the SHPO.
Review of the applicant's CRMP and review of the Alaska Heritage Resources Survey
(AHRS) constitutes the extent of cultural resource investigations by the USACE at
this time. Any comments the SHPO or other consulting parties may have concerning
presently unknown archeological or historic data that may be lost or destroyed by
work under the requested permit will be considered in our final assessment of the
proposed work.
A Programmatic Agreement (PA) is being developed to address to potential effects
to cultural resources within the proposed project area. The PA will be
distributed to parties identified in the PA for review and comment prior to
making a final determination on the applicant's DA permit application. The PA
will define the process the applicant will follow should cultural resources be
inadvertently discovered during construction. If a permit is issued, the PA
would be attached to the DA permit as an enforceable special condition.
ENDANGERED SPECIES: The proposed project area is within the known range of the
Spectacled eider (Somateria fischeri) and Polar bear (Ursus maritimus) and is
within designated Polar bear Critical Habitat Area. The proposed project area is
also within the historic range of Steller's eider (Polystic stelleri). All three
species are listed as threatened under the Endangered Species Act (ESA) of 1973.
One other species that may occur near the Project, the Yellow-billed Loon (Gavia
adamsii), is a candidate for listing under the ESA. These species are listed by
the U.S. Fish and Wildlife Service.
-6-
The proposed project area is also within the range of
mysticetus), Ringed seal (Phoca hispida), and Bearded
Bowhead whales are listed as endangered, while Ringed
proposed for listing by the National Marine Fisheries
threatened under the ESA.
the Bowhead whale (Balaena
seal (Erignathus barbatus).
and Bearded seals have been
Service (NMFS) as
Biological Assessments (BAs) were forwarded to the USFWS and NMFS by the USACE
for ESA Section 7 consultation procedures in January 2012. These BAs provide
data on the distribution, abundance, and habitat use of the listed and candidate
species, describe the effects of the project, and proposed mitigation to minimize
impacts on those species.
The BA provided to the USFWS determined the proposal was "not likely to adversely
affect" the Polar bear, Spectacled eider, and the Yellow-billed loon. The
determination for the Steller's eider was "not likely to affect". The BA also
determined the activity "may affect, but is not likely to cause destruction or
adverse modification" of designated Polar bear critical habitat.
The BA provided to the NMFS determined the proposal is "not likely to adversely
affect" the Bowhead whale, Ringed seal, and Bearded seal.
ESSENTIAL FISH HABITAT: The Magnuson-Stevens Fishery Conservation and
Management Act, as amended by the Sustainable Fisheries Act of 1996, requires
all Federal agencies to consult with the NMFS on all actions, or proposed
actions, permitted, funded, or undertaken by the agency, that may adversely
affect Essential Fish Habitat (EFH). An EFH Assessment was prepared and
forwarded to the NMFS for consultation in January 2012. The NMFS concurred with
the USACE determination of "may affect" but did not require Conservation
Recommendations for additional mitigative measures other than those identified
in the EFH Assessment.
TRIBAL CONSULTATION: The Alaska District fully supports tribal self-governance
and government-to-government relations between Federally recognized Tribes and the
Federal government. Tribes with protected rights or resources that could be
significantly affected by the proposed Federal action (permit decision) have the
right to consult with the Alaska District on a government-to-government basis.
Views of each Tribe regarding protected rights and resources will be accorded due
consideration in this process. This public notice serves as notification to the
Tribes within the area potentially affected by the proposed work and invites their
participation in the Federal decision-making process regarding the protected
Tribal right or resource.
PUBLIC HEARING: Any person may request, in writing, within the comment period
specified in this public notice, that a public hearing be held to consider this
application. Requests for public hearings shall state, with particularity,
reasons for holding a public hearing. The USACE held public meetings between
December 5th and December 16th, 2011, to receive comments on the Point Thomson
Project Draft EIS in Barrow, Nuiqsut, Kaktovik, Fairbanks, and Anchorage.
EVALUATION: The decision whether to issue a permit will be based on an evaluation
of the probable impacts, including cumulative impacts, of the proposed activity
and its intended use on the public interest. Evaluation of the probable impacts,
which the proposed activity may have on the public interest, requires a careful
weighing of all the factors that become relevant in each particular case. The
benefits, which reasonably may be expected to accrue from the proposal, must be
balanced against its reasonably foreseeable detriments. The outcome of the
-7-
general balancing process would determine whether to authorize a proposal, and if
so, the conditions under which it will be allowed to occur. The decision should
reflect the national concern for both protection and utilization of important
resources. All factors, which may be relevant to the proposal, must be considered
including the cumulative effects thereof. Among those are conservation,
economics, aesthetics, general environmental concerns, wetlands, cultural values,
fish and wildlife values, flood hazards, floodplain values, land use, navigation,
shore erosion and accretion, recreation, water supply and conservation, water
quality, energy needs, safety, food and fiber production, mineral needs,
considerations of property ownership, and, in general, the needs and welfare of
the people. For activities involving Clean Water Act Section 404 discharges
(dredged and fill materials), a permit will be denied if the discharge that would
be authorized by such permit would not comply with the Clean Water Act Section
404(b)(l) Guidelines. Subject to the preceding sentence and any other applicable
guidelines or criteria (see USACE regulations at 33 CFR Parts 320.2 and 320.3), a
permit will be granted unless the District Commander determines that it would be
contrary to the public interest.
The USACE is soliciting comments from the public; Federal, State, and local
agencies and officials; Alaska Native Tribes; and other interested parties in
order to consider and evaluate the impacts of this proposed activity. Any
comments received will be considered by the USACE to determine whether to issue,
modify, condition or deny a permit for this proposal. To make this decision,
comments are used to assess impacts on endangered species, historic properties,
water quality, general environmental affects, and other public interest factors
listed above. Comments were used in the preparation of the EIS for the proposal
pursuant to the National Environmental Policy Act. Comments will also be used to
assist in a determination the overall public interest of the proposed activity.
The USACE determined in late 2009 that the applicant's proposal may result in
significant impacts to the quality of the human environment and required an EIS
be prepared. A Notice of Intent to Prepare an EIS was published in the Federal
Register on December 4, 2009. The Draft EIS was issued for public comment on
November 18, 2011. The Final EIS includes responses to substantive comments
received on the Draft EIS.
AUTHORITY:
This permit will be issued or denied under the following authority:
(X) Perform work in or affecting navigable waters of the United States Section
10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403).
(X) Discharge dredged or fill material into waters of the United States Section
404 Clean Water Act (33 U.S.C. 1344). Therefore, our public interest review will
consider the guidelines set forth under Section 404 (b) of the Clean Water Act
(40 CFR 230) and Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C.
403).
Project Figures, 82 total, and a Notice of Application for State Water Quality
Certification for this Public Notice are available online at
http://www.poa.usace.army.mil/reg/PNNew.htm.
District Commander
U.S. Army, Corps of Engineers
-8-
SEAN PARNELL, GOVERNOR
STATE OF ALASKA
DEPT. OF ENVIRONMENTAL CONSERVATION
DIVISION OF WATER
401 Certification Program
Non-Point Source Water Pollution Control Program
ANCHORAGE
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
WQM/401 CERTIFICATION
555 CORDOVA STREET
ANCHORAGE, ALASKA 99501-2617
PHONE: (907) 269-7564/FAX: (907) 334-2415
NOTICE OF APPLICATION
FOR
STATE WATER QUALITY CERTIFICATION
Any applicant for a Federal license or permit to conduct an activity that might
result in a discharge of dredged and/or fill material into navigable waters and
waters of the U.S., in accordance with Section 401 of the Clean Water Act of 1977
(PL95-217), also must apply for and obtain certification from the State Water
Quality Agency.
Therefore, the Alaska Department of Environmental Conservation
(ADEC) must ensure the discharge will comply with the Clean Water Act, the Alaska
Water Quality Standards, and other applicable State laws.
By agreement between
the U.S. Army Corps of Engineers (USACE) and the ADEC, application for a
Department of the Army (DA) permit to discharge dredged and/or fill material into
navigable waters and waters of the U.S. under Section 404 of the Clean Water Act
also may serve as application for State Water Quality Certification.
Notice is hereby given that the application for a DA permit described in the
USACE's public notice for the Point Thomson Project, file number POA-2001-1082Ml, Beaufort Sea, serves as application for State Water Quality Certification
from the ADEC.
After reviewing the application, the ADEC may certify there is reasonable
assurance the activity, and any discharge that might result, will comply with the
Clean Water Act, the Alaska Water Quality Standards, and other applicable State
laws. The ADEC may deny or waive certification.
Any person interested in providing comment on the project, with respect to ADEC's
Water Quality Certification, can submit written comments to their address above
by the expiration date printed on page 1 of the USACE public notice.
PLAN
PROFILE
SECTION
42 - TYPICAL PIPELINE ROAD CROSSING
BADAMI MINE SITE ACCESS ROAD
APPLICANT:
EXXON MOBIL CORPORATION &
PTE PIPELINE LLC.
PROJECT:
POINT THOMSON PROJECT
LOCATION:
NORTH SLOPE BOROUGH, ALASKA
REFERENCE:
POA-2001-1082-M1
WATERBODY:
BEAUFORT SEA
DATE:
MARCH 2012
F
Beaufort Sea
WEST PAD
STREAM 18A
WEST
GATHERING
LINE
EXPORT PIPELINE &
WEST GATHERING LINE
EXPORT PIPELINE
TO BADAMI
! !
!
!
!
!
!
!
!
!
!
! !
!
!
! !
!
!
! !
! !
!
!
! !
! !
!
!
! !
! !
!
!
!
!
!
! !
! !
! !
! !
! !
!
!
! !
!
!
!
! !
!
! !
! !
! !
!
!
! !
! !
! !
!
! !
!
!
! !
!
!
! !
!
! !
! !
! !
! !
! !
! !
! !
! !
!
Stream Crossing Culvert (Not to Scale)
Cross Drainage Culvert (Not to Scale)
Proposed Gathering Lines
! !
! !
Proposed Export Pipeline
Proposed Point Thomson Facilities and Roads
0
1,500
Feet
3,000
43 - GRAVEL ROAD AND
DRAINAGE STRUCTURES SHEET 1 OF 6
SHEET 3 OF 6
Lion Bay
SHEET 1 OF 6
SHEET 2 OF 6
SHEET 4 OF 6
SHEET 5 OF 6
SHEET 6 OF 6
APPLICANT:
EXXON MOBIL CORPORATION &
PTE PIPELINE LLC.
PROJECT:
POINT THOMSON PROJECT
LOCATION:
NORTH SLOPE BOROUGH, ALASKA
REFERENCE:
POA-2001-1082-M1
WATERBODY:
BEAUFORT SEA
DATE:
MARCH 2012
! !
! !
CROSSING 18A
CULVERTS
! !
! !
!
! !
! !
!
! !
! !
!
!
! !
! !
WEST PAD
ROAD
F CREEK
!
F
Beaufort Sea
EXPORT PIPELINE &
WEST GATHERING LINE
!
!
!
!
! !
! !
!
!
! !
! !
!
!
! !
! !
!
!
! !
! !
! !
! !
! !
! !
! !
!
! !
! !
!
!
!
!
! !
!
!
!
!
!
!
! !
!
! !
!
! !
!
!
! !
! !
! !
!
!
!
! !
E CREEK
!
!
! !
! !
! !
!
!
!
!
! !
! !
! !
! !
! !
! !
! !
! !
! !
!
!
! !
!
! !
!
! !
! !
! !
! !
! !
! !
! !
!
CROSSING 18B
40' BRIDGE
D CREEK
WEST PAD
ROAD
CROSSING 22B
65' BRIDGE
Stream Crossing Culvert (Not to Scale)
Cross Drainage Culvert (Not to Scale)
Proposed Gathering Lines
! !
! !
Proposed Export Pipeline
Feet
3,000
ntr
1,500
Ma
ry
Sac
hs
E
0
anc
e
Proposed Point Thomson Facilities and Roads
SHEET 3 OF 6
Lion Bay
SHEET 1 OF 6
SHEET 2 OF 6
SHEET 4 OF 6
SHEET 5 OF 6
SHEET 6 OF 6
44 - GRAVEL ROAD AND
DRAINAGE STRUCTURES SHEET 2 OF 6
APPLICANT:
EXXON MOBIL CORPORATION &
PTE PIPELINE LLC.
PROJECT:
POINT THOMSON PROJECT
LOCATION:
NORTH SLOPE BOROUGH, ALASKA
REFERENCE:
POA-2001-1082-M1
WATERBODY:
BEAUFORT SEA
DATE:
MARCH 2012
!
!
F
Lion Bay
CENTRAL PAD
EXPORT PIPELINE &
WEST & EAST
GATHERING LINES
! !
! !
!
!
!
!
!
!
EXPORT PIPELINE &
WEST GATHERING LINE
!
!
!
!
!
!
!
!
!
!
! !
!
!
! !
!
! !
! !
!
! !
! !
! !
! !
!
!
! !
! !
!
!
! !
! !
!
!
! !
! !
! !
! !
!
!
! !
! !
!
!
!
! !
!
C CREEK
ELECTRICAL TRENCHING
CROSSING 22A
65' BRIDGE
EAST GATHERING LINE
WEST PAD
ROAD
ELECTRICAL TRENCHING
CENTRAL PAD
ROAD
Stream Crossing Culvert (Not to Scale)
Cross Drainage Culvert (Not to Scale)
Proposed Gathering Lines
! !
Proposed Export Pipeline
!
Proposed Point Thomson Facilities and Roads
0
1,500
3,000
Feet
45 - GRAVEL ROAD AND
DRAINAGE STRUCTURES SHEET 3 OF 6
SHEET 3 OF 6
!!
!
!
!
!
!!
! !
!!
!!
!
!
!!
! !
!!
!!
! !
!!
!!
! !
!!
! !
!!
! !
!!
!!
! !
! !
! !
!
!
!!
!!
!!
!
!
Lion Bay
SHEET 1 OF 6
SHEET 2 OF 6
SHEET 4 OF 6
SHEET 5 OF 6
SHEET 6 OF 6
APPLICANT:
EXXON MOBIL CORPORATION &
PTE PIPELINE LLC.
PROJECT:
POINT THOMSON PROJECT
LOCATION:
NORTH SLOPE BOROUGH, ALASKA
REFERENCE:
POA-2001-1082-M1
WATERBODY:
BEAUFORT SEA
DATE:
MARCH 2012
ELECTRICAL TRENCHING
F
B CREEK
GRAVEL
STOCKPILE
GRAVEL
MINE
CROSSING 23
CULVERTS
NAVAID LIGHTS
CROSSING 24B
65' BRIDGE
ALASKA
STATE
C-1 PAD
36 INCH CULVERTS
CROSSING 24A
CULVERTS
AIRSTRIP
NAVAID LIGHTS
Stream Crossing Culvert (Not to Scale)
Cross Drainage Culvert (Not to Scale)
Proposed Gathering Lines
! !
! !
Proposed Export Pipeline
Proposed Point Thomson Facilities and Roads
0
1,500
3,000
Feet
46 - GRAVEL ROAD AND
DRAINAGE STRUCTURES SHEET 4 OF 6
SHEET 3 OF 6
!!
!
!
!
!
!!
! !
!!
!!
!
!
!!
! !
!!
!!
! !
!!
!!
! !
!!
! !
!!
! !
!!
!!
! !
! !
! !
!
!
!!
!!
Lion Bay
!!
!
!
SHEET 1 OF 6
SHEET 2 OF 6
SHEET 4 OF 6
SHEET 5 OF 6
SHEET 6 OF 6
APPLICANT:
EXXON MOBIL CORPORATION &
PTE PIPELINE LLC.
PROJECT:
POINT THOMSON PROJECT
LOCATION:
NORTH SLOPE BOROUGH, ALASKA
REFERENCE:
POA-2001-1082-M1
WATERBODY:
BEAUFORT SEA
DATE:
MARCH 2012
F
S CREEK
EAST GATHERING LINE
R CREEK
B CREEK
ALASKA STATE
C-1 PAD
CROSSING 26
CULVERTS
CROSSING 24A
CULVERTS
EAST PAD ROAD
Stream Crossing Culvert (Not to Scale)
Cross Drainage Culvert (Not to Scale)
Proposed Gathering Lines
! !
Proposed Export Pipeline
!
Proposed Point Thomson Facilities and Roads
0
1,500
3,000
Feet
47 - GRAVEL ROAD AND
DRAINAGE STRUCTURES SHEET 5 OF 6
SHEET 3 OF 6
!
!
!
!
!
! !
!!
!!
! !
!!
!
!!
! !
!!
!!
! !
! !
!!
!!
!!
!!
!!
!!
!!
! !
! !
! !
!!
!
!
!!
! !
!!
!
!
Lion Bay
SHEET 1 OF 6
SHEET 2 OF 6
SHEET 4 OF 6
SHEET 5 OF 6
SHEET 6 OF 6
APPLICANT:
EXXON MOBIL CORPORATION &
PTE PIPELINE LLC.
PROJECT:
POINT THOMSON PROJECT
LOCATION:
NORTH SLOPE BOROUGH, ALASKA
REFERENCE:
POA-2001-1082-M1
WATERBODY:
BEAUFORT SEA
DATE:
MARCH 2012
R CREEK
Lion Bay
EAST GATHERING LINE
F
EAST PAD
EAST PAD ROAD
A CREEK
CROSSING 27
CULVERT
Stream Crossing Culvert (Not to Scale)
Cross Drainage Culvert (Not to Scale)
Proposed Gathering Lines
! !
Proposed Export Pipeline
!
3,000
ntr
1,500
Ma
ry
Sac
hs
E
0
anc
e
Proposed Point Thomson Facilities and Roads
Feet
48 - GRAVEL ROAD AND
DRAINAGE STRUCTURES SHEET 6 OF 6
SHEET 3 OF 6
!
!
!
!
!
! !
!!
!!
! !
!!
!
!!
! !
!!
!!
! !
! !
!!
!!
!!
!!
!!
!!
!!
! !
! !
! !
!!
!
!
!!
! !
!!
!
!
Lion Bay
SHEET 1 OF 6
SHEET 2 OF 6
SHEET 4 OF 6
SHEET 5 OF 6
SHEET 6 OF 6
APPLICANT:
EXXON MOBIL CORPORATION &
PTE PIPELINE LLC.
PROJECT:
POINT THOMSON PROJECT
LOCATION:
NORTH SLOPE BOROUGH, ALASKA
REFERENCE:
POA-2001-1082-M1
WATERBODY:
BEAUFORT SEA
DATE:
MARCH 2012
PRIMARY ACCESS ROAD TYPICAL SECTION
SECONDARY ACCESS / MAINTENANCE ROAD TYPICAL SECTION
NAVAID ACCESS ROAD TYPICAL SECTION
49 - TYPICAL ACCESS ROAD SECTIONS
APPLICANT:
EXXON MOBIL CORPORATION &
PTE PIPELINE LLC.
PROJECT:
POINT THOMSON PROJECT
LOCATION:
NORTH SLOPE BOROUGH, ALASKA
REFERENCE:
POA-2001-1082-M1
WATERBODY:
BEAUFORT SEA
DATE:
MARCH 2012
BRIDGE PLAN
BRIDGE ELEVATION
50 - STREAM 18B BRIDGE
PLAN AND ELEVATION
TYPICAL EROSION PROTECTION SECTION
APPLICANT:
EXXON MOBIL CORPORATION &
PTE PIPELINE LLC.
PROJECT:
POINT THOMSON PROJECT
LOCATION:
NORTH SLOPE BOROUGH, ALASKA
REFERENCE:
POA-2001-1082-M1
WATERBODY:
BEAUFORT SEA
DATE:
MARCH 2012
BRIDGE PLAN
BRIDGE ELEVATION
51 - STREAM 22B BRIDGE
PLAN AND ELEVATION
TYPICAL EROSION PROTECTION SECTION
APPLICANT:
EXXON MOBIL CORPORATION &
PTE PIPELINE LLC.
PROJECT:
POINT THOMSON PROJECT
LOCATION:
NORTH SLOPE BOROUGH, ALASKA
REFERENCE:
POA-2001-1082-M1
WATERBODY:
BEAUFORT SEA
DATE:
MARCH 2012
BRIDGE PLAN
BRIDGE ELEVATION
52 - STREAM 22A BRIDGE
PLAN AND ELEVATION
APPLICANT:
EXXON MOBIL CORPORATION &
PTE PIPELINE LLC.
PROJECT:
POINT THOMSON PROJECT
LOCATION:
NORTH SLOPE BOROUGH, ALASKA
REFERENCE:
POA-2001-1082-M1
WATERBODY:
BEAUFORT SEA
DATE:
MARCH 2012
BRIDGE PLAN
BRIDGE ELEVATION
53 - STREAM 24B BRIDGE
PLAN AND ELEVATION
APPLICANT:
EXXON MOBIL CORPORATION &
PTE PIPELINE LLC.
PROJECT:
POINT THOMSON PROJECT
LOCATION:
NORTH SLOPE BOROUGH, ALASKA
REFERENCE:
POA-2001-1082-M1
TYPICAL EROSION PROTECTION SECTIONWATERBODY:
DATE:
BEAUFORT SEA
MARCH 2012
TYPICAL SECTION AT ABUTMENT
54 - TYPICAL BRIDGE PIER
ELEVATION
APPLICANT:
EXXON MOBIL CORPORATION &
PTE PIPELINE LLC.
PROJECT:
POINT THOMSON PROJECT
LOCATION:
NORTH SLOPE BOROUGH, ALASKA
REFERENCE:
POA-2001-1082-M1
WATERBODY:
BEAUFORT SEA
DATE:
MARCH 2012
18A CULVERT CROSSING PLAN
18A CULVERT CROSSING PROFILE
55 - STREAM 18A CULVERT
PLAN & PROFILE
EMBEDDED MULTI-PLATE CULVERT DETAIL
APPLICANT:
EXXON MOBIL CORPORATION &
PTE PIPELINE LLC.
PROJECT:
POINT THOMSON PROJECT
LOCATION:
NORTH SLOPE BOROUGH, ALASKA
REFERENCE:
POA-2001-1082-M1
WATERBODY:
BEAUFORT SEA
DATE:
MARCH 2012
23 CULVERT CROSSING PLAN
56 - STREAM 23 CULVERT
PLAN & PROFILE
23 CULVERT CROSSING PROFILE
APPLICANT:
EXXON MOBIL CORPORATION &
PTE PIPELINE LLC.
PROJECT:
POINT THOMSON PROJECT
LOCATION:
NORTH SLOPE BOROUGH, ALASKA
REFERENCE:
POA-2001-1082-M1
WATERBODY:
BEAUFORT SEA
DATE:
MARCH 2012
N
24A CULVERT CROSSING PLAN
24A CULVERT CROSSING PROFILE
57 - STREAM 24A CULVERT
PLAN & PROFILE
EMBEDDED MULTI-PLATE CULVERT BATTERY DETAIL
APPLICANT:
EXXON MOBIL CORPORATION &
PTE PIPELINE LLC.
PROJECT:
POINT THOMSON PROJECT
LOCATION:
NORTH SLOPE BOROUGH, ALASKA
REFERENCE:
POA-2001-1082-M1
WATERBODY:
BEAUFORT SEA
DATE:
MARCH 2012
26 CULVERT CROSSING PLAN
58 - STREAM 26 CULVERT
PLAN & PROFILE
26 CULVERT CROSSING PROFILE
APPLICANT:
EXXON MOBIL CORPORATION &
PTE PIPELINE LLC.
PROJECT:
POINT THOMSON PROJECT
LOCATION:
NORTH SLOPE BOROUGH, ALASKA
REFERENCE:
POA-2001-1082-M1
WATERBODY:
BEAUFORT SEA
DATE:
MARCH 2012
N
27 CULVERT CROSSING PLAN
59 - STREAM 27 CULVERT
PLAN & PROFILE
27 CULVERT CROSSING PROFILE
APPLICANT:
EXXON MOBIL CORPORATION &
PTE PIPELINE LLC.
PROJECT:
POINT THOMSON PROJECT
LOCATION:
NORTH SLOPE BOROUGH, ALASKA
REFERENCE:
POA-2001-1082-M1
WATERBODY:
BEAUFORT SEA
DATE:
MARCH 2012
CROSS DRAINAGE CULVERT ELEVATION
CROSS DRAINAGE CULVERT SECTION
60 - TYPICAL CROSS DRAINAGE
CULVERT SECTIONS
APPLICANT:
EXXON MOBIL CORPORATION &
PTE PIPELINE LLC.
PROJECT:
POINT THOMSON PROJECT
LOCATION:
NORTH SLOPE BOROUGH, ALASKA
REFERENCE:
POA-2001-1082-M1
WATERBODY:
BEAUFORT SEA
DATE:
MARCH 2012
F
PROPOSED
EXCAVATION
LIMITS
400 '
1200 '
8
8
8
8
8
8
8
8
500 '
8
400 '
8
B CREEK
GRAVEL
STOCKPILE
1320 '
1050 '
GRAVEL MINE
8
A
1200 '
8
1100 '
8
TEMPORARY INORGANIC
OVERBURDEN
STORAGE ON
SEASONAL ICE PAD
8
8
8
52
5
'
8
450 '
8
670 '
CENTRAL PAD ROAD
TEMPORARY
ORGANIC
OVERBURDEN
STORAGE ON
SEASONAL ICE PAD
8
8
8
8
A
500 '
32' WIDE GRAVEL
ACCESS ROAD TO
GRAVEL STOCKPILE
8
8
900 '
8
AIRSTRIP
ACCESS ROAD
61 - GRAVEL MINE FOOTPRINT
PAD DIMENSIONS ARE APPROXIMATE
ACTUAL LAYOUT PENDING FINAL DESIGN
Proposed Electrical Trenching
Proposed Point Thomson Facilities and Roads
Proposed Point Thomson Temporary Ice Pads
0
500
Feet
8
1,000
APPLICANT:
EXXON MOBIL CORPORATION &
PTE PIPELINE LLC.
PROJECT:
POINT THOMSON PROJECT
LOCATION:
NORTH SLOPE BOROUGH, ALASKA
REFERENCE:
POA-2001-1082-M1
WATERBODY:
BEAUFORT SEA
DATE:
MARCH 2012
GRAVEL STOCKPILE TYPICAL SECTION
EXCAVATION SECTION A-A
62 - GRAVEL MINE SECTIONS
APPLICANT:
EXXON MOBIL CORPORATION &
PTE PIPELINE LLC.
PROJECT:
POINT THOMSON PROJECT
LOCATION:
NORTH SLOPE BOROUGH, ALASKA
REFERENCE:
POA-2001-1082-M1
WATERBODY:
BEAUFORT SEA
DATE:
MARCH 2012
Prudhoe
Bay
63 - PROPOSED GRAVEL MINE
YEAR 1 PLAN
APPLICANT:
EXXONMOBIL DEVELOPMENT COMPANY
PROJECT:
POINT THOMSON PROJECT
LOCATION:
NORTH SLOPE BOROUGH, ALASKA
REFERENCE: POA-2001-1082-M1
WATERBODY: BEAUFORT SEA
DATE:
MARCH 2012
Deadhorse
64 - PROPOSED GRAVEL MINE
YEAR 1 ELEVATIONS
APPLICANT:
EXXONMOBIL DEVELOPMENT COMPANY
PROJECT:
POINT THOMSON PROJECT
LOCATION:
NORTH SLOPE BOROUGH, ALASKA
REFERENCE: POA-2001-1082-M1
WATERBODY: BEAUFORT SEA
DATE:
MARCH 2012
Deadhorse
65 - PROPOSED GRAVEL MINE
YEAR 2 PLAN
APPLICANT:
EXXONMOBIL DEVELOPMENT COMPANY
PROJECT:
POINT THOMSON PROJECT
LOCATION:
NORTH SLOPE BOROUGH, ALASKA
REFERENCE: POA-2001-1082-M1
WATERBODY: BEAUFORT SEA
DATE:
MARCH 2012
Deadhorse
66 - PROPOSED GRAVEL MINE
YEAR 2 ELEVATIONS
APPLICANT:
EXXONMOBIL DEVELOPMENT COMPANY
PROJECT:
POINT THOMSON PROJECT
LOCATION:
NORTH SLOPE BOROUGH, ALASKA
REFERENCE: POA-2001-1082-M1
WATERBODY: BEAUFORT SEA
DATE:
MARCH 2012
!
!
!
!
!
!
! !
!
!
!
!
!
Lion Bay
!
!
CENTRAL PAD
!
!
!
! !
!
!
! !
! !
!
!
! !
! !
!
!
! !
! !
!
!
WEST
PAD
ROAD
EAST GATHERING LINE
CENTRAL
PAD
ROAD
GRAVEL
STOCKPILE
GRAVEL MINE
ELECTRICAL TO AIRSTRIP
ALASKA STATE C-1 PAD
67 - ELECTRICAL POWER PLAN
APPLICANT:
Proposed Splice Box Placement
Proposed Electrical Trenching
Proposed Point Thomson Facilities and Roads
0
1,500
Feet
3,000
WATER
ACCESS
PAD
EXXON MOBIL CORPORATION &
PTE PIPELINE LLC.
PROJECT:
POINT THOMSON PROJECT
LOCATION:
NORTH SLOPE BOROUGH, ALASKA
REFERENCE:
POA-2001-1082-M1
WATERBODY:
BEAUFORT SEA
DATE:
MARCH 2012
F
! !
! !
!
!
! !
TYPICAL TRENCH SECTION
TYPICAL SPLICE BOX SECTION
68 - TYPICAL ELECTRICAL POWER
SECTIONS
APPLICANT:
EXXON MOBIL CORPORATION &
PTE PIPELINE LLC.
PROJECT:
POINT THOMSON PROJECT
LOCATION:
NORTH SLOPE BOROUGH, ALASKA
REFERENCE:
POA-2001-1082-M1
WATERBODY:
BEAUFORT SEA
DATE:
MARCH 2012
69 - COMPARISON OF FUEL USE FOR
IN-FIELD ICE ROADS VS. GRAVEL ROADS
*May 5, 2011 Workshop Presentation
(Updated May 13, 2011; also updated
August 15, 2011 to clarify applicabilty
of the color bars to each alternative)
APPLICANT:
EXXONMOBIL DEVELOPMENT COMPANY
PROJECT:
POINT THOMSON PROJECT
LOCATION:
NORTH SLOPE BOROUGH, ALASKA
REFERENCE: POA-2001-1082-M1
WATERBODY: BEAUFORT SEA
DATE:
MARCH 2012
CROSS SECTION OF WASTEWATER EFFLUENT LINE
LONGITUDINAL SECTION OF WASTEWATER EFFLUENT LINE
70 - WASTEWATER EFFLUENT
SECTIONS
APPLICANT:
EXXON MOBIL CORPORATION &
PTE PIPELINE LLC.
PROJECT:
POINT THOMSON PROJECT
LOCATION:
NORTH SLOPE BOROUGH, ALASKA
REFERENCE:
POA-2001-1082-M1
WATERBODY:
BEAUFORT SEA
DATE:
JULY 2012
71 - WATER ACCESS PAD INTAKE
SECTION
APPLICANT:
EXXON MOBIL CORPORATION &
PTE PIPELINE LLC.
PROJECT:
POINT THOMSON PROJECT
LOCATION:
NORTH SLOPE BOROUGH, ALASKA
REFERENCE:
POA-2001-1082-M1
WATERBODY:
BEAUFORT SEA
DATE:
MARCH 2012
CULVERT TABLE
TYPICAL SINGLE CULVERT ELEVATION
TYPICAL MULTIPLE CULVERTS ELEVATION
TYPICAL SINGLE/MULTIPLE
CULVERT SECTION
72 - TYPICAL STREAM CROSSING
CULVERT SECTION
APPLICANT:
EXXON MOBIL CORPORATION &
PTE PIPELINE LLC.
PROJECT:
POINT THOMSON PROJECT
LOCATION:
NORTH SLOPE BOROUGH, ALASKA
REFERENCE:
POA-2001-1082-M1
WATERBODY:
BEAUFORT SEA
DATE:
MARCH 2012
TYPICAL EMBEDDED CULVERT DETAIL
TYPICAL FISH PASSAGE CULVERT BATTERY ELEVATION
73 - TYPICAL STREAM CROSSING CULVERT
FOR FISH PASSAGE SECTION
TYPICAL EMBEDDED CULVERT
SECTION
APPLICANT:
EXXON MOBIL CORPORATION &
PTE PIPELINE LLC.
PROJECT:
POINT THOMSON PROJECT
LOCATION:
NORTH SLOPE BOROUGH, ALASKA
REFERENCE:
POA-2001-1082-M1
WATERBODY:
BEAUFORT SEA
DATE:
MARCH 2012
BRIDGE PLAN
SECTION A-A
74 - POWERLINE BRIDGE CROSSING
SECTION
APPLICANT:
EXXON MOBIL CORPORATION &
PTE PIPELINE LLC.
PROJECT:
POINT THOMSON PROJECT
LOCATION:
NORTH SLOPE BOROUGH, ALASKA
REFERENCE:
POA-2001-1082-M1
WATERBODY:
BEAUFORT SEA
DATE:
MARCH 2012
RUNWAY 5 APPROACH
LIGHTING SHELTER
ACCESS PAD
KEY MAP
RUNWAY 5 APPROACH LIGHTING SHELTER
ACCESS PAD LONGITUDINAL SECTION
RUNWAY 5 APPROACH LIGHTING SHELTER
ACCESS PAD TRANSVERSE SECTION
75 - NAVAID PAD SECTION
(SHEET 1 OF 4)
APPLICANT:
EXXON MOBIL CORPORATION &
PTE PIPELINE LLC.
PROJECT:
POINT THOMSON PROJECT
LOCATION:
NORTH SLOPE BOROUGH, ALASKA
REFERENCE:
POA-2001-1082-M1
WATERBODY:
BEAUFORT SEA
DATE:
JULY 2012
TOUCHDOWN
RUNWAY VISUAL
RANGE ACCESS PAD
KEY MAP
TOUCHDOWN RUNWAY VISUAL RANGE ACCESS PAD LONGITUDINAL SECTION
TOUCHDOWN RUNWAY VISUAL RANGE ACCESS PAD TRANSVERSE SECTION
76 - NAVAID PAD SECTION
(SHEET 2 OF 4)
APPLICANT:
EXXON MOBIL CORPORATION &
PTE PIPELINE LLC.
PROJECT:
POINT THOMSON PROJECT
LOCATION:
NORTH SLOPE BOROUGH, ALASKA
REFERENCE:
POA-2001-1082-M1
WATERBODY:
BEAUFORT SEA
DATE:
JULY 2012
MIDFIELD RUNWAY
VISUAL RANGE
ACCESS PAD
KEY MAP
MIDFIELD RUNWAY VISUAL RANGE ACCESS PAD LONGITUDINAL SECTION
MIDFIELD RUNWAY VISUAL RANGE ACCESS PAD TRANSVERSE SECTION
77 - NAVAID PAD SECTION
(SHEET 3 OF 4)
APPLICANT:
EXXON MOBIL CORPORATION &
PTE PIPELINE LLC.
PROJECT:
POINT THOMSON PROJECT
LOCATION:
NORTH SLOPE BOROUGH, ALASKA
REFERENCE:
POA-2001-1082-M1
WATERBODY:
BEAUFORT SEA
DATE:
JULY 2012
RUNWAY 23
APPROACH LIGHT
BUILDING PAD
KEY MAP
RUNWAY 23 APPROACH LIGHT BUILDING PAD LONGITUDINAL SECTION
RUNWAY 23 APPROACH LIGHT BUILDING PAD TRANSVERSE SECTION
78 - NAVAID PAD SECTION
(SHEET 4 OF 4)
APPLICANT:
EXXON MOBIL CORPORATION &
PTE PIPELINE LLC.
PROJECT:
POINT THOMSON PROJECT
LOCATION:
NORTH SLOPE BOROUGH, ALASKA
REFERENCE:
POA-2001-1082-M1
WATERBODY:
BEAUFORT SEA
DATE:
JULY 2012
DREDGING AND SCREEDING AREA PLAN
DREDGING AND SCREEDING AREA PROFILE
79 - SEALIFT BULKHEAD DREDGING
AND SCREEDING DETAILS
APPLICANT:
EXXON MOBIL CORPORATION &
PTE PIPELINE LLC.
PROJECT:
POINT THOMSON PROJECT
LOCATION:
NORTH SLOPE BOROUGH, ALASKA
REFERENCE:
POA-2001-1082-M1
WATERBODY:
BEAUFORT SEA
DATE:
JULY 2012
DREDGING AND SCREEDING AREA LIMITS
80 - SERVICE PIER DREDGING AND
SCREEDING DETAILS
DREDGING AND SCREEDING AREA PROFILE AT PIER CENTERLINE
APPLICANT:
EXXON MOBIL CORPORATION &
PTE PIPELINE LLC.
PROJECT:
POINT THOMSON PROJECT
LOCATION:
NORTH SLOPE BOROUGH, ALASKA
REFERENCE:
POA-2001-1082-M1
WATERBODY:
BEAUFORT SEA
DATE:
JULY 2012
SEALIFT BULKHEAD/SERVICE PIER ELEVATION
81 - SEALIFT BULKHEAD AND SERVICE
PIER ELEVATION
APPLICANT:
EXXON MOBIL CORPORATION &
PTE PIPELINE LLC.
PROJECT:
POINT THOMSON PROJECT
LOCATION:
NORTH SLOPE BOROUGH, ALASKA
REFERENCE:
POA-2001-1082-M1
WATERBODY:
BEAUFORT SEA
DATE:
JULY 2012
CENTRAL PAD ROAD AND ELECTRICAL TRENCHING TYPICAL SECTION
82- TYPICAL ELECTRICAL TRENCHING
AND ROAD SECTION
APPLICANT:
EXXON MOBIL CORPORATION &
PTE PIPELINE LLC.
PROJECT:
POINT THOMSON PROJECT
LOCATION:
NORTH SLOPE BOROUGH, ALASKA
REFERENCE:
POA-2001-1082-M1
WATERBODY:
BEAUFORT SEA
DATE:
JULY 2012