Interested parties are hereby notified that a Department of the Army permit application has been received for work in waters of the United States as described below and shown on the enclosed project drawings.
PUBLIC NOTICE DATE : September 11, 2012
EXPIRATION DATE : October 11, 2012
REFERENCE NUMBER : POA-2012-556
WATERWAY: Captains Bay
Interested parties are hereby notified that a Department of the Army permit application has been received for work in waters of the United States as described below and shown on the enclosed project drawings.
Comments on the described work, with the refer ence number , should reach this office no later than the expiration date of this Public Notice to become part of the record and be considered in the decision. Please contact Jack Hewitt at (907) 753-2708, toll free from within Alaska at (800) 478-2712 , by fax at (907) 753-5567, orby email at jack.j.hewitt@usace.army.mil if further information is desired concerning this notice.
U S Army Corp s
o f Engineers
Alaska District
Regulatory Division (1145)
CEPOA - RD
Post Office Box 6898
JBER, Alaska 99506-0898
Public Notice
of Application
for Permit
PUBLIC NOTICE DATE :
September 11 , 20 1 2
EXPIRATION DATE :
October 11, 20 1 2
REFERENCE NUMBER:
POA-201 2 -55 6
WAT ERWAY:
Captain s Bay
Interested parties are hereby notified that a Department of the Army permit
application has been received for work in waters of the United States as described
below and shown on the enclosed project drawings.
Comments on the described work, with the refe r ence number , should reach this office
no later than the expiration date of this Public Notice to become part of the
record and be considered in the decision.
Please contact Jack Hewitt at ( 907) 7 53-
2708, toll free from within Alaska at (800) 478-2712 , by fax at (907) 753-5567, or
by email at jack . j.hewitt®Usace . army.mil if further information is desired
concerning this notice.
APPLICANT ,
AGENT:
Bering Shai Marine, LLC., Post Office Box 196, Unalaska, Alaska
PND Engineers , Inc., 1506 West 36 th Ave nue, Anchorage, Alaska
99 6 85.
99501.
LOCATION: The project site is located within Section 21, T . 73 S., R. 118 W.,
Seward Meridian, USGS Quad Map Un alaska C-2, Latitud e 53 . 84 55° N. , Longitude
166.5886° W., in Unalaska, Alaska .
SPECIAL AREA DESIGNATION ,
The project is located within the Aleutian World War II
National Historic Area .
PURPOSE:
The applicant's stated purpose is to provide a secure marine terminal
infrastructure, not currently available on Un alaska Island, for docking of deep
draft vessels and capacity to off l oad large equipmen t and cargo .
PROPOSED WORK, Construct a 380' by 1175 ' solid fill dock by discharging 250,000
cubic yards (CY) of fill material and 2100 CY of rip rap below high tide line
(HTL) . The material would be placed behind a steel, open cell bulkhead, and
encompass a 9 . 2 acre footprint below HTL . A fender system would be mounted on the
sheet pile face.
An unnamed creek woul d be rerouted around the facility through a
500' concrete channel.
The work would b e comp leted in two phases, with an initial
phase consisting of a 300' by 300' solid fill dock , without a sheet pile face, that
includes a mooring dolphin system.
Phase one would requ ire 28,000 CY of fill and
3100 CY of rip rap placed on a 2 . 3 acre footprint below HTL (sheet 3 of 9).
Phase
two would incorporate the work described in phase o ne, and is scheduled to be
completed within five years . All work would be performed in accordance with the
enclosed plan, 9 sheets, dated 8/15/2012.
APPLICANT PROPOSED MITIGATION,
The applicant proposes the following mitigation
measures to avoid, minimize, and compensate for impacts to waters of the United
States from activities involving discharges of dredged or fill material.
a.
Avoidance: The proposed sheet pile bulkhead fill dock design avoids
impacts to the waters of the U.S. to the maximum extent practicable while still
achieving the project purpose. No other design alternatives provided the deep
draft, high load capacity, length of dock face and upland storage area required to
meet the proposed usage requirements of the facility.
b.
Minimization: The proposed sheet pile bulkhead fill dock design limits
the amount of fill material placed in the tidelands to the greatest extent possible
by placing the dock approximately parallel to the existing shoreline.
Dredging,
aside from that required for construction, would be avoided by locating the dock in
a deep water location.
The dock length is the minimum required to accommodate the
proposed usage and intent of the structure as well as provide the necessary upland
storage areas . Materials from the adjacent gravel site would be used for fill
thereby limiting the chances for introduction of contaminated materials.
c . Compensatory Mitigation : Payme nt to an in-lieu fee program is proposed
for compensatory mitigation for the project.
WATER QUALITY CERTIFICATION, A permit for the described work will not be issued
until a certification or waiver of certification, as required under Section 401 of
the Clean Water Act (Public Law 95-217), ha s been received from the Alaska
Department of Environmental Conservation .
CULTURAL RESOURCES, The latest published version of the Alaska Heritage Resources
Survey (AHRS) has been consulted for the presence or absence of historic
properties, including those listed in or eligible for inclusion in the National
Register of Historic Places.
Site UNL-00103 (D-9) is located adjacent to, but
outside of the project impact area, of the proposed project.
The site was a small
seasonal fish camp that was destroyed by military operations during WWII.
BIA
archaeologists resurveyed the area in an attempt to find the site, but only
documented a WWII bunker.
Based upon this information the Corps has determined
there are no historic properties in the permit area.
Consultation of the AHRS
constitutes the extent of cultural resource investigations by the District
Commander at this time, and he is otherwise unaware of the presence of such
resources.
This application is being coordinated with the State Historic
Preservation Office (SHPO), and the National Park Service (NPS). Any comments the
SHPO and/or NPS may have concerning presently unknown archeological or historic
data that may be lost or destroyed by work under the requested permit will be
considered in our final assessment of the des cribed work.
ENDANGERED SPECIES: The described activity is in the historic range of the Steller
sea lion (Eumetopias jubatus), Steller's eider (Polysticta stelleri), short-tailed
albatross (Phoebastria albatrus) and northern sea otter (Enhydra lutris).
We will
initiate the appropriate consultation procedures under section 7 of the Endangered
Species Act with the U . S . Fish and wildlife Service and the National Marine
-2-
Fisheries Service.
Any comments they may have concerning endangered or threatened
wildlife or plants or their critical habitat will be considered in our final
assessment of the described work .
The Corps has determined that the proposed project may adversely affect northern
sea otter designated critical habitat, and will follow the appropriate consultation
procedures under section 7 of the Endangered Species Act of 1973 (87 Stat. 844).
Any comments the USFWS or NMFS may have concerning designated critical habitat will
be considered in our final assessment of the described work.
ESSENTIAL FISH HABITAT : The Magnuson-Stevens Fishery Conservation and Management
Act, as amended by the Sustainable Fisheries Act of 1996, requires all Federal
agencies to consult with the NMFS on all actions, or proposed actions, permitted,
funded, or undertaken by the agency, that may adversely affect Essential Fish
Habitat (EFH).
We have determined the described activity would not adversely
affect EFH in the project area.
TRIBAL CONSULTATION:
The Alaska District fully supports tribal self-governance and
government-to-government relations between Federally recognized Tribes and the
Federal government . Tribes with protected rights or resources that could be
significantly affected by a proposed Federal action (e . g., a permit decision) have
the right to consult with the Alaska District on a government-to-government basis.
views of each Tribe regarding protected rights and resources will be accorded due
consideration in this process.
This Public Notice serves as notification to the
Tribes within the area potentially affected by the proposed work and invites their
participation in the Federal decision-making process regarding the protected Tribal
right or resource.
Consultation may be initiated by the affected Tribe upon
written request to the District Commander during the public comment period.
PUBLIC HEARING: Any person may request, in writing, within the comment period
specified in this notice, that a public hearing be held to consider this
application.
Requests for public hearings shall state, with particularity, reasons
for holding a public hearing.
EVALUATION : The decision whether to issue a permit will be based on an evaluation
of the probable impacts, including cumulative impacts of the proposed activity and
its intended use on the public interest.
Evaluation of the probable impacts, which
the proposed activity may have on the public interest, requires a careful weighing
of all the factors that become relevant in each particular case.
The benefits,
which reasonably may be expected to accrue from the proposal, must be balanced
against its reasonably foreseeable detriments . The outcome of the general
balancing process would determine whether to authorize a proposal, and if so, the
conditions under which it will be allowed to occur.
The decision should reflect
the national concern for both protection and utiliz a tion of important resources.
All factors, which may be relevant to the proposal, must be considered including
the cumulative effects thereof . Among those are conservation, economics,
aesthetics, general environmental concerns, wetlands, cultural values, fish and
wildlife values, flood hazards, floodplain values, land use, navigation, shore
erosion and accretion, recreation, water supply and conservation, water quality,
energy needs, safety, food and fiber production, mineral needs, considerations of
property ownership, and, in general, the needs and welfare of the people.
For
activities involving 404 discharges, a permit will be denied if the discharge that
would be authorized by such permit would not comply with the Environmental
Protection Agency's 404(b) (1) guidelines .
Subject to the preceding sentence and
any other applicable guidelines or criteria (see Sections 320.2 and 320.3), a
-3-
SEAN PARNELL, GOVERNOR
STATE OF ALASKA
DEPT. OF ENVIRONMENTAL CONSERVATION
DIVISION OF WATER
401 Certification Program
Non-Point Source Water Pollution Control Program
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
WQM/401 CERTIFICATION
555 CORDOVA STREET
ANCHORAGE, ALASKA 99501-2617
PHONE: (907) 269 - 7564/FAX: (907) 334-2415
NOTICE OF APPLICATION
FOR
STATE WATER QUALITY CERTIFICATION
Any applicant for a federal license or permit to conduct an activity that might
result in a discharge into navigable waters, in accordance with Section 401 of the
Clean Water Act of 1977 (PL95-217), also must apply for and obtain certification
from the Alaska Department of Environmental Conservation that the discharge will
comply with the Clean Water Act, the Alaska Water Quality Standards, and other
applicable State laws . By agreement between the U . S. Army Corps of Engineers and
the Department of Environmental Conservation, application for a Department of the
Army permit to discharge dredged or fill material into navigable waters under
Section 404 of the Clean Water Act also may serve as application for State Water
Quality Certification .
Notice is hereby given that the application for a Department of the Army Permi t
described in the Corps of Engineers' Public Notice No. POA - 2012 - 556 , Cap tai n s Bay,
serves as application for State Water Quality Certification from the Department of
Environmental Conservation .
After reviewing the application, the Department may certify there is reasonable
assurance the activity, and any discharge that might result, will comply with the
Clean Water Act, the Alaska Water Quality Standards, and other applicable State
laws.
The Department also may deny or waive certification.
Any person desiring to comment on the project, with respect to Water Quality
Certification, may submit written comments to the address above by the expiration
date of the Corps of Engineer's Public Notice .
AMAKNAK
ISLAND
STATE OF ALASKA
NETEEKJN
BAY
UNALASKA
ISLAND
PYRAMID CREEK ROAD
TIDAL DATUM
HIGH TIDE LINE (HTL)
MEAN HIGH WATER (MHW)
MEAN LOWER LOW WATER (MLLW)
,;
t15
o
4.7'
ff\n
3.4'
0,0'
.D o
SCALE IN MILES
f'*--~5
LAT
~APTAlNS -j;L----=5:..:3.~84-5-5-·
·
BAY
CAPTAINS
BAY ROAD
~ ~P~R~O~P;;:O;S~ED~A:::C:;:TI~V:-:T;I:Y-:----r.....::.;~:::::....-------:.....----,----------~
:,~.i
.
;
1.5
2
INS TALLATION OF SHEE T PILE
DOCK FOR DEEP DRAFT VESSELS
VICINITY MAP AND
PROJECT LOCATION
BERING SHAI
MARINE TERMINAL
o
·,
j
~
II
~
POA-2012-556
DA TUM
0.0' MLL W
PROJE CT LOCATION
SEC. 20 & 21. T73S. Rl18W. S.M.
BERING SHAI ROCK & GRAVEL LLC
.
PO BOX 196
UNALASKA. AK 996 85
AT:
CAPTA IN S BAY
DUTCH HARBOR, AK
L -____________________L-____________________JL~
8L
/ 1~5~/~
2~
01~2__~S~H~
E~
ET~~1~o~f~9~
I
ADL 226087
I
I
I
\
\
I
,
\
" ,,
,,
,
r
r
I
I
I
I
/
I
I
I
I
I
/
I
I
I-'
/
I
I
I
/
/
I
/
I
I
/
I
I
I
/
I
/
I
/
I
/
/
I
I
/
////
/
/
I
/
/
I
///
/
/
/
/
/
/
/
/
I
/
/
I
I
/
I
/
I
///""
/
/
/
/
/
/
I
I
I
/
II
/
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
/
I
I
I
/
/
I
I
I
I
I
I
I
I
I
I
I
I
I
/
/
I
I
/
I
/
I
/
/
I
/
/
I
/
/
I
/
/
/
I
/
I
I
/
/
/
I
/"
/
/
I
I
I
I
I
/
/
/
/
/
I
/
I
I
I
/
I
/
/
/
/
/
/
/
/
l
/
/
/
HIGH TIDE LINE (HTL)
MEAN HIGH WATER (MHW)
MEAN LOWER lOW WATER (MLLW)
4.7'
3.4'
0.0'
BERING SHAI
MARINE TERMINAL
EXISTING SITE PLAN
POA-2012-556
DATUM:
0.0' MLLW
AT:
\
ADL 226087
I
I
I
\
\
I
,
I
\
,,
\
\
/
I
I
I
I
I
/
/
-'
/
/
/
/
/
,
,,
,I
,,
/
/
/
/
,
,
,
/
/
,
/
/
,
I
,
,,
,
/
/'
/
//--"
/
/
/
,,
,
, , ,
,, ,
,, ,, ,, ,
, ,,
,
,
,
, ,,,
,
,
/
/
I
/
/
I
/
/
/
I
/
/
/
/
/
/
,
/
,
/
/
I
/
/
/
/
I
/
I
I
I
I
I
I
I
,
,
I
I
I
I
I
I
I
..
i
.!
·
~
,
I
/
,
EXISTING
QUARRY
/
/
~
t
I
I
I
/
l"
t
8"
I
I
I
/
§
I
I
I
/
~
I
I
/
~
I
I
I
I
J
I
I
I
I
I ,
,
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
/
I
I
I
I
/Jo~
I
I
I
/
,
l
/
/
TOTAL FILL..
SURFACE AREA.................................
FILL BELOW MHW ............ .... ..............
SURFACE AREA BELOW MHW . ...... ... ...
FILL BELOW HTL ................................
ASRUMROfARC'ROCARKEAS,Sl'OLOW HTl .............
W HTl. . ............
ARMOR ROCK BELOW MHW . ..............
TOTAL ARMOR ROCK.
.. .....
ARMOR ROCK
48,300 CU VDS
2.9 ACRES
26 ,000 CU YQS
2.1 ACRES
28,000 CU YQS
2.3 ACRES
3,100 CU YOS
2,900 cu YDS
3,400 cu 'i~S
NFS FIlL
TIDAL DATUM
.
~~~~~-:~~::~~~~=-~lr
(
,
PROPOSED ACTIVITY:
INSTALLATION OF SHEE T PILE
DOCK FOR DEEP DRAFT VESSELS
!
.3
~
~
c
~
1 DATUM:
.~
~
,
!
(~~_"'!_~_~_~~~~~;;,~~~~
____ ____ __ __ __
a
~
~IGH
SCALE IN FEET
TIDE LINE (HTL)
MEAN HIGH WATER (MHW)
+4.7
+3.4
~~ ~~ ~~ ~4~O~O____!M~EAN~l~O~W~'R:!lO~W~WA~T~'R~~2-____jo~.o~·
BERING SHAI
INITIAL
MARINE TERMINAL
BARGE BERTH
SITE PLAN
100
200
300
'
POA-2012-556
0.0' MLLW
PROJECT LOCATION
SEC. 20 & 21, T73S, R118W, S.M.
BERI NG SHAI ROCK & GRAVEL LLC
P.O. BOX 1 9 6 '
AT:
CAPT
AINS BAY
DUTCH HARBOR, AK
~__________________-L____________________JL~~~2~__~
SH~E~
E~
T ~3~o~f~9~
UNALASKA, AK 99685
I
ADL 226087
I'
I
I
I
I
I
I
,
I
I
I
\
/
\
I
I
I
I
I
I
/
1
/
1
/
,
/
1-/
I
/
,,
/
/
/'
/
I
I
/
I
/
/---",/
I
I
I
I
I
I
1
I
I
I
I
I
I
I
I
I
/
I
I
I
/
I
I
I
I
I
I
I
1
I
'
/
I
I
I
/
I
I
I
,
/
/
I
I
I
-
/
I
I
1
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
//~qJ
I
I
I
1
1
I
i"
I
I
I
/
I
I
I
I
l
I
i
'"
~
'"
§
~
(!;"
I?
TOTAl FilL.
...............................
SURFACE AREA .................................
FILL BELOW MHW.............................
SURFACE AREA BELOW MHW ...........
FilL BELOW HTL. ................. ·
391,000 CU YDS
11.3 ACRES
236,000 CU vas
8.6 ACRES
......... 250,000 cu YQS
~
SURFACE AREA BELOW HTL............... 9.2 ACRES
ARMOR ROCK BELOW HTL................. 2,100 CU YDS
Q.
ARMOR ROCK BELOW MHW...
~
!
TOTAl ARMOR ROCK ......................... 2,900 CU YDS
CONSTRUCTION OREOGING ......... .......... <5.000 CU YOS'
' As needed for construction of wall.
·
PROPOSED ACTIVITY:
t
..2,000 CU YDS
~ INSTALLATION OF SHEET PILE
ARMOR ROCK
NFS FILL
......-
o
laO
TIDAL DATUM
HIGH TIDE LINE (HTL)
MEAN HIGH WATER (MHW)
i
200
300
400
MEAN LOWER LOW WATER (t.4lLW)
DOCK FOR DEEP DRAFT VESSELS
POA-2012-556
t
DATUM:
~
PROJECT LOCATION:
SEC. 20 & 21, T73S, Rl18W, S.M.
~
!
0.0'
BERING SHAI
MARINE TERMINAL
MARINE TERMINAL PLAN
~
!
"
+4.7
+3.4
0.0' MLLW
BERING SHAI ROCK & GRAVEL, LLC
PO BOX 196
UNALASKA, AK 99685
AT:
CAPTAINS BAY
DUTCH HARBOR, AK
8/15/2012
SHEET
4 01 9
VARIES
- - - --,
I
L ________ ___ ___________ _
I I
I I
I I
I :
. r ANCHOR
I r"
I I
I I
~ NFS _,
PILE
. I
tiLL L--
I I
r -- ---..J~
-- -r- - - - - I
I
i- - --\~EET
\:~~~~f~~~
MUDUNE ~
APPROXIMATE
I
PilE
TAIL WALL
1 - - - - ____1
l.. _
______________
I
I
l
;
TYPICAL MARINE TERMINAL SECTION
~
NTS
~
!
f
~
j
]
~,
j r.:::::~::~--------r--------------------r-------------------J
PROPOSED ACTIVITY
!
I
~
INSTALL ATION OF SHEET PILE
DOCK FOR DEEP DRAFT VESSELS
~
!,DATUM:
TYPICAL MARINE
TERMINAL SECTION
BERING SHAI
MARINE TERMINAL
POA-20 12-556
0.0' MLLW
BERING SHAI ROCK & GRAVEL LLC
PROJECT LOCATION:
PO. BOX 196
AT:
CAPTAINS BAY
SEC. 20 & 21, T73S, R118W, S.M.
UNALASKA, AK 99685
DUTCH HARBOR, AK
! ~
L____________________L~
8/
~12
5L
/2~0~
12~~S~H~
EE~T~5~
Of~9~
~~
r
§
__________________
I
BAY ROAD
24-0 MONOPILE
DOLPHIN
DOLPHIN
- +
'±
FENDER SYSTEt.I
APPROXIt.4A
EXISTING t.4UDLINE
=
TEMPORARY BARGE BERTH INTENDED
FOR USE FOR APPROXIMATELY 1 YEAR
INITIAL BARGE BERTH
NTS
I ~::::~~~::~--------r------------------------'------------------------~
BERIN G SHAI
~
t
I
,
,
~~
,.
PROPOSED ACTIVITY:
INSTALLATION OF SHEET PILE
DOCK FOR DEEP DRAFT VESSELS
INITIAL
BARGE BERTH
SECTION A-A
MARI NE TERMINAL
POA-2012-556
DATUM:
00' MLLW
BERING SHAI ROCK & GRAVEL, LLC
PROJECT LOCATION:
PO. BOX 196
SEC. 20 & 21, T73S , Rl18W, S.M.
UNALASKA, AK 99685
AT
CAPTAINS BAY
DUTCH HARBOR, AK
~ ~__________________L-__________________-L~
8/
~1~
5L
/2~O~
12~~S~H~
EE~T~6~
Of~9~
~
",ij
ARMOR
SLOPE PROTECTION
\~~_~~.J~"S- _
2
1r-::
MUDLINE
~
EL
=
VARIES
~ -~.
SHEET PILE
WALL
TYPICAL ARMOR STONE PROTECTION
NTS
,~
l ~~~--~--------~--------~
BERIN G SHAI
" I PROPOSED ACTIVITY:
1
.~
INSTALLATION OF SHEET PILE
DOCK FOR DEEP DRAFT VESSELS
~
TYPICAL ARMOR
STONE PROTECTION
SECTION B·B
MARINE TERMINAL
POA-2012-556
1,
DATUM:
0.0' MLLW
BERING SHAI ROCK & GRAVEL LLC
PROJECT LOCATION
P.O. BOX 196
'
AT:
CAPTAINS BAY
SEC. 20 & 21 , T73S , Rl18W, S.M.
UNALASKA, AK 99685
DUTCH HARBOR, AK
1 ~
-L____________________JL~8/~1~5L/2~0~12~__~SH~E~E~T~7~o~f~9~
i!
§
__________________
o,
CONCRETE LlNED\
CH ANNEL
N
..
2 ' -O~
J
~
t
~
~
CONCRETE LINED CHANNE L SECTION
§
NTS
.
0;
!i
~
i
j
j
l ~~~--~--~----~--------~
PROPOSED ACTIVITY
BE RING SHAI
~
i
1
~
INSTALLATION OF SHEET PILE
DOCK FOR DEEP DRAFT VESSELS
!, DATUM
CONCRETE
LINED CHANNEL
SECTION C-C
MARIN E TERMINAL
POA-2012-556
0.0' MLLW
BERING SHAI ROCK & GRAVEL LLC
PROJECT LOCATION:
P.O. BOX 196
'
AT:
CAPTAINS BAY
SEC. 20 & 21 , T73S , R118W, S.M.
UNALASKA, AK 99685
DUTCH HARBOR, AK
~ ~__________________-L____________________JL~
8/
~1~
5L
/2~0~12~__~
SH~E~
E~
T ~8~o~f~9~
i!
·§
ROCK
I I
I I
GROUND SLOPE
SLOPE PROTECTION
ROADWAY
~ NF'S "1..
FILL
~ c ," vm
END SECTION
...
-----
CULVERT SECTION
NTS
J
1
t
~
~
§
;;
Ii
f
~ ~~~~~::~---------r----------------------~----------------------~
PROPOSED ACTIVITY:
BERING SHAI
~
1 INSTALLATION
I
!
OF SHEET PILE
DOCK FOR DEEP DRAFT VESSELS
CULVERT SECTION D-D
MARINE TERMINAL
POA-20 12-556
DATUM:
0.0' MLLW
BERING SHAI ROCK & GRAVEL, LLC
PROJECT LOCATION:
PO BOX 196
AT:
CAPTAINS BAY
, SEC. 20 & 21, T73S , Rl18W, S.M.
UNALASKA, AK 99685
DUTCH HARBOR, AK
:~ L -____________________L-____________________JL~
8L
/1~5~/~
20
~1~2__~S!H~E~
ET~~9~o~f~9~
!
!s
§
permit will be granted unless the District Commander determines that it would be
contrary to the public interest .
The Corps of Engineers is soliciting comments from t he public; Federal, State, and
local agencies and officials ; Indian Trib es; and other interested parties in order
to consider and evaluate the impacts of this proposed activity . Any comments
received will be considered by the Corps of Engin eers to determine whether to
issue, modify, condition or deny a permit for this proposal.
To make this
decision, comments are used to assess imp acts on endangered species, historic
properties, water quality, general environmental effects, and the other public
interest factors listed above.
Comments are used in the preparation of an
Environmental Assessment and/or an Environmental Impact Statement pursuant to the
National Environmental Policy Act.
Comme nts are also used to determine the need
for a public hearing and to determine the overall public interest of the proposed
activity.
AUTHORITY:
This permit will be issued or denied under the following authorities:
(X)
Perform work in or affecting nav i gable waters of the United States Section 10 Rivers and Harbors Act 1899 (33 U.S.C . 403) .
(X)
Discharge dredged or fill material into waters of the United States Section 404 Clean Water Act (33 U . S . C . 1344). Therefore, our public interest
review will consider the guidelines set forth under Section 404(b) of the Clean
Water Act (40 CFR 230) .
Project drawings and a Notice of Application for State Water Quality Certification
are enclosed with this Public Notice.
District Commander
U . S. Army, Corps of Engineers
Enclosures
-4-