Interested parties are hereby notified that a Department of the Army permit application has been received for work in waters of the United States as described below and shown on the enclosed project drawings.

PUBLIC NOTICE DATE: October 10, 2012 EXPIRATION DATE: November 9, 2012 REFERENCE NUMBER: POA-2012-665 WATERWAY: Kanektok River Interested parties are hereby notified that a Department of the Army permit application has been received for work in waters of the United States as described below and shown on the enclosed project drawings. Comments on the described work, with the reference number, should reach this office no later than the expiration date of this Public Notice (PN) to become part of the record and be considered in the decision. Please contact Mary Romero at (907) 753-2773, toll free from within Alaska at (800) 478-2712, by fax at (907) 753-5567, or by email at mary.r.romero@usace.army.milif further information is desired concerning this notice.

US Army Corps of Engineers Alaska District

Regulatory Division (1145) CEPOA-RD Post Office Box 6898 JEER, Alaska 99506-0898

Public Notice of Application for Permit PUBLIC NOTICE DATE:

October 10, 2012

EXPIRATION DATE:

November 9, 2012

REFERENCE NUMBER:

POA-2012-665

WATERWAY:

. Kanektok River

Interested parties are hereby notified that a Department of the Army permit application has been received for ~ork in waters of the United States as described

below and shown on the enclosed project drawings. Comments on the described work, with the reference number, should reach this office no later than the expiration date of this Public Notice (PN) to become part of the record and be considered in the decision. Please contact Mary Romero at (907) 7532773, toll free from within Alaska at (800) 478-2712, by fax at (907) 753-5567, or by email atmary.r.romero@usace.army.milif further information is' desired concerning this notice.

APPLICANT: John Mark, Native Village of Kwinhagak (NVK) , PO Box 149, Quinhagak, Alaska 99655 AGENT:

Brian Davis, CE2 Engineers, PO Box 232946, Anchorage, Alaska

99523

LOCATION: The project site is located within Sections 2, 3, la, & 11/ T. 5 S., R. 74 W., Seward Meridian; USGS Quad Map Goodnews Bay D-8; Latitude 59.7593 0 N., Longitude 161.8633 0 W.; east of Quinhagak, Alaska. SPECIAL AREA DESIGNATION: National wildlife Refuge.

The project is located within the Yukon Kuskokwim

PURPOSE: The applicant's stated purpose is to develop an evacuation route from Quinhagak. PROPOSED WORK: Place 24,900 cubic yards (cy) of fill into 4.8 acres of wetlands for the development of a 3,660' long x 44' wide evacuation route out of Quinhagak and a 1,092' long x 44' wide access road to the gravel source. Culverts would be utilized in drainage areas to maintain natural flow. This work would be phase I of a road that would eventually l,ead to additional gravel sources for fill placement needed for future development of homes and village infrastructure. At this time it is not known when the remainder of the road would be developed. This portion would

allow evacuation away from the coast to high ground in the event of an emergency and provide a measure of safety for residents. The extension of the road would be proposed at a later date as a modification to this project if permitted. All work would be performed in accordance with the enclosed plan (sheets 1-18), dated August 21, 2012. ADDITIONAL INFORMATION: Approximately 4,500 cy would be imported D-l surface course gravels, which are not available in Quinhagak, and 20,400 cy would be pit run gravel from the nearby Pit "A" owned by Calista Corp (the permit for this pit has expired and another PN to expand the pit is being sent out concurrent with this PN). The road would be built on geotextile fabric laid down on top of the existing tundra soil. No excavation would be performed for this -project. Several nonanadromous tundra drainages would be crossed by, the new road and culverts would be incorporated into the road construction. to provide adequate drainage. The road would follow an alignment discussed at a community meeting and approved by tribal, city and ANCSA corporate land owners. It would lie 200 feet south of an existing winter snow machine trail, which itself lies several hundred feet away from the south bank of the Kanektok River, because the trail is a major winter snow machine route utilized for subsistence it is important not to have vehicles use the same area. APPLICANT PROPOSED MITIGATION: The applicant proposes the following mitigation measures to avoid, minimize, and compensate for impacts to waters of the United States from activities involving discharges of dredged or fill material. a. Avoidance: In planning this project, the NVK was mindful of the need to avoid impacting waters of the U.S. including wetlands to the maximum extent practicable. However, two factors made this difficult. The first is that Quinhagak is a community like others in the Yukon-Kuskokwim Delta in that it is low-lying and situated mainly in wetland tundra soil. The other is that the primary function of the proposed road would be as an evacuation route away from low-lying wetlands in the case of a flood or tsunami. For both of these reasons, wetlands would have to be crossed. Alternative locations (route alignments crossing different spans of undeveloped tundra) were considered but all have essentially the same impact. The alignment of the road was the subject of discussion during the Community Development Planning sessions held in Quinhagak. As part of the planning for this project, NVK posted a Notice of Proposed wetlands Development in the Quinhagak post office requesting input. After two weeks, no input was received. b. Minimization: Little could be done to reduce the footprint of the road and the area of impacted wetlands. However, the road was designed with close attention to providing sufficient drainage culverts to facilitate movement of seasonal surface groundwater. The placement and spacing of the road and the culverts are designed to maintain proper drainage. c. Compensatory Mitigation: NVK proposes that no compensation should be required for this project's impact to wetlands. Quinhagak is like other communities in the Yukon-Kuskokwim River delta, an area with a tremendous amount of wetland habitat. The impact of developing a road with a 4.8 acre footprint is relatively minor in the context of the larger aquatic environment, and especially in light of the fact that the purpose of the road is to protect human health and public safety, NVK believes that any requirement for compensatory mitigation would be unjustified. WATER QUALITY CERTIFICATION: A permit for the described work will not be issued until a certification or waiver of certification, as required under Section 401 of -2-

the Clean Water Act (Public Law 95-217), has been received from the Alaska Department of Environmental Conservation. CULTURAL RESOURCES: The latest published version of the Alaska Heritage Resources Survey (AHRS) has been consulted for the presence or absence of historic properties, including those listed in or eligible for inclusion in the National Register of Historic Places. There are no listed or eligible properties in the vicinity of the worksite. Consultation of the AHRS constitutes the extent of cultural resource investigations by the District Commander at this time, and he is otherwise unaware of the presence of such resources. This application is being coordinated with the State Historic preservation Office (SHPO). Any comments SHPO maY'have concerning presently unknown archeological or historic data that may be lost or destroyed by work under the requested permit will be considered in our final assessment of the described work. ENDANGERED SPECIES: No threatened or endangered species are known to use the area. We have determined the described activity would have no effect on any listed or proposed threatened or endangered species, and would have no effect on any designated or proposed critical habitat, under the Endangered Species Act of 1973 (87 Stat. 844). Therefore, no consultation with the U.S. Fish and wildlife Service or the National Marine Fisheries Service is required. However, any comments they·may have concerning endangered or threatened wildlife or plants or their critical habitat will be considered in our final assessment of the described work.

projec~

ESSENTIAL FISH HABITAT: The Magnuson-Stevens Fishery Conservation and Management Act, as amended by the Sustainable Fisheries Act of 1996, requires all Federal agencies to consult with the NMFS on all actions, or proposed actions, permitted, funded, or undertaken by the agency, that may adversely affect Essential Fish Habitat (EFH). No EFH species are known to use the project area. We have determined the described activity would not adversely affect EFH in the project area.

TRIBAL CONSULTATION: The Alaska District fully supports tribal self-governance and government-to-government relations between Federally recognized Tribes and the Federal government. Tribes with protected rights or resources that could be significantly affected by a proposed Federal action (e.g., a permit decision) have the right to consult with the Alaska District on a government-to-government basis. Views of each Tribe regarding protected rights and resources will be accorded due consideration in this process. This Public Notice serves as notification to the Tribes within the area potentially affected by the proposed work and invites their participation in the Federal decision-making process regarding the protected Tribal right or resource. Consultation may be initiated by the affected Tribe upon written request to the District Commander during the public comment period. PUBLIC HEARING: Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider this application. Requests for public hearings shall state, with particularity, reasons for holding a public hearing. EVALUATION: The decision whether to issue a permit will be based on an evaluation of the probable impacts, including cumulative impacts of the proposed activity and its intended use on the public interest. Evaluation of the probable impacts, which the proposed activity may have on the public interest, requires a careful weighing -3-

of all the factors that become relevant in each particular case. The benefits, which reasonably may ~e expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. The outcome of the general balancing process would determine whether to aut·horize a proposal, and if so, the conditions under which it will be allowed to occur. The decision should reflect the national concern for both protection and utilization of important resources. All factors, which may be relevant to the proposal, must be considered including the cumulative effects thereof. Among those are conservation, economics, aesthetics, general environmental concerns, wetlands, cultural values, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shore erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership, and, in general, the needs and welfare of the people. For activities involving 404 discharges, a permit will be denied if the discharge that would be authorized by such permit would not comply with the·Environmental Protection Agency's 404 (b) (1) guidelines. Subject to the preceding sentence and any other applicable guidelines or criteria (see Sections 320.2 and 320.3), a permit will be granted unless the District Commander determines that it would be contrary to the public interest. The Corps of Engineers is soliciting comments from the publici Federal, State, and local agencies and officialsi Indian Tribesi and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any.comments received will be considered by the Corps of Engineers to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. AUTHORITY:

This permit will be issued or denied under the following authority:

(x) Discharge dredged or fill material into waters of the United States Section 404 Clean Water Act (33 U.S.C. 1344). Therefore, our public interest review will consider the guidelines set forth under Section 404(b) of the Clean Water Act (40 CFR 230) .

Project drawings and a Notice of Application for State Water Quality Certification are enclosed with this Public Notice.

District Commander U.S. Army, Corps of Engineers Enclosures

-4-

SEAN PARNELL, GOVERNOR

STATE OF ALASKA DEPT. OF ENVIRONMENTAL CONSERVATION DIVISION OF WATER 401 Certification Program Non-Point Source Water Pollution Control Program DEPARTMENT OF ENVIRONMENTAL CONSERVATION WQM/401 CERTIFICATION 555 CORDOVA STREET ANCHORAGE, ALASKA 99501-2617 PHONE: (907) 269-7564/FAX: (9Q7) 334-2415

NOTICE OF APPLICATION FOR STATE WATER QUALITY CERTIFICATION

Any applicant for a federal license or permit to conduct an activity that might result in a discharge into navigable waters, in accordance with Section 401 of the Clean Water Act of 1977 (PL95-217), also must apply for and obtain certification from the Alaska Department of Environmental Conservation that the discharge will comply with the Clean Water Act, the Alaska Water Quality Standards, and other applicable State laws. By agreement between the U.S. Army Corps of Engineers and the Department of Environmental Conservation, application for a Department of the Army permit to discharge dredged or fill material into navigable waters under Section 404 of the Clean water Act also may serve as application for State Water Quality Certification. Notice is hereby given that the application for a Department of the Army Permit described in the Corps of Engineers' Public Notice No. POA-2012-665, Kanektok River, serves as application for State Water Quality Certification from the Department of Environmental Conservation. After reviewing the application, the Department may certify there is reasonable assurance the activity, and any discharge that might result, will comply with the Clean Water Act, the Alaska Water Quality Standards, and other applicable State laws. The Department also may deny or waive certification. Any person desiring to comment on the project, with respect to Water Quality Certification, may submit written comments to the address above by the expiration date of the Corps of Engineer's Public Notice.

!-¢:-,,,

J.

:'fA.

-.0

I

,

~

3000' ;

I 6000'

I

'--:1,' ~ ...

.'

;.. i/ """

Village of Kwinhagak Route Jr""Alljnrf" dated August 21,2012 Sheet 1 of 18

L OTE

' fi(5if;'POINT OF BEGINNING POE;: POINT OF ENDING

U

I,,

POE (BIA ROUTE 3000)

POE (BIA ROUTE 2700) GRAVel BORROW SITE AND STOCKPILE AREA,

POB (61A ROUTE 3000)

~~ ~H':~~~ ~E~A~IL:'.'._ __~.c::=:::~::~::-~::::=::-::::::==

--·"""'s:~~---:;-IL

__.__.________ ----------,~~--

OF

EXISTING DRAINAGE CHANNEL, INSTALL CMP DRAINAGE CULVERT(S)AS REQUIRED (B LOCATIONS TYP.), SEE SECTION a, SHEET 3 FOR DETAilS

PROPOSED KANEKTOK RIVER ROAD (BIA ROUTE 2700), SEE sECTION A, SHEET 3 FOR DETAILS

'-- "Ropm,,, KANEKTOK RIVER ROAD (SIA ROUTE 2700), SEE SECTION A, SHEET 3 FOR DETAILS

QANIRTUUQ CORPORATION PROpERTY

INatlve Village of Kwinhagak IE\i'aCIJatiiol Route 'ngs dated August 21,2012 2of1B

...

,

, -~,~"'*~~,

I

i

-t

b.

-

r

s

~

Ii

~

~i

iii Iii II

~m

~:: 0'1'

I

1

~

I

f

» d

i I

J

tI

, Kanektok River Native Village of Kwinhagak Evacuation Route

aL----------------------------------~Dffi~n~d~~AU9U~21,2012 Sheet 3 of 18

,

,.

I'

~

'"

/

«

,

J

'.,

II U ilP

.~ -~·d·

<

z

.

<

1

hlh

\ < "~'M,~~<

,

\

\

.<.

<

.

\ \

\

\

\

I· !,

\

I" ! "~ I 0

t

I

I

I ~

ii

~

JJ

·I j

'-----------------------------------1

,

Kanektok River

of Kwinhagak Evacuation Route Drawings dated August 21, 2012 Sheet 4 of 18

Ii

I !

I j

if ~

r.

I

f

J

d

~

j

N

j

I

.~----------------------------~----------~

of Kwinhagak IEV,'lCUi3tior Route Illr::l'Ariinn" dated August 21, 2012 l::-.neel5 of 18

\ \

\ i

1

\

i

\ \

I f

f.

~

j

I i

a ~

;

J

I

I

POA-2012-665, Kanektok River lage of Kwinhagak Evacuation Route Drawings dated August 21, 201; IShppt 6 of 18

I_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _~

~'j,f>,.~M

-.

3it:&mkl tlNV~

~=-~,

~~~lWIiU

4VoWJ~W:Ntm

N .,0 N ~

-

N

'y~~ -;

< f)

:::l

J

OJ

:::l

"0

2co

(1).,"0,,-

-- -- ----

/

i

I \ \ \

!

!

f

!

!

f

I

!

/

I

0

,,

." i

.... ;

I

!

4~

~

!

i

\

I! a

I

i a ~

i

,.

I

:. ~ ,~'oo

S

"i

I f$v,;.,

I

1=k'=!:!C~¥~~

POA-2012-665, Kanektok River Village of Kwinhagak L - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 E v a c u a t i o n Route Drawings dated August 21, 2012 Sheet 8 of 18

I~ .. I I

I

L

%

.;1

!I ,I

j

;'.,'

j I

,· I

I

i

£

~

I

I! " tI ?

J

I

.L-__________________________________________________________________

POA-2012-665, Kanektok River ~vlllageofKwinhagak

Evacuation Route Drawings dated August 21, 2012 ISh",,! 9 of 18

I \

\

I

! I !

.

\ \ ~.-.,

I

I

I i

! I

"

\ ~\ '"

::<:~' ~

.'

~

~ ~

~

~

~

t

~

i

t

i

;

fJ

il

F

j ~

I

I i ti

2-665, Kanektok River lIage of Kwinhagak L - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - j t : : V i 9 C U ; S t l O I Route ngs dated August 21,2012 r,.,rlP!"f 10 of 18

/f

I

" !

\ \

I

1,

,

I

\

J

I' '

I" ~ i

~

i (

t

~

I

i I

il

i ,I

I

i

"'---------------------------------l

lIage of Kwinhagak Route InrOl'IAfiinn dated August 21, 2012 Isn."pr 11 of 18 It:Vi3CU:3t101

l·

I

I

\

I~

hi! liill

8

\ \

~~

f

~1Ii1

I I I /

I

I

I

/ I

iJ £

I I

?E

i

t

i

I

I

lIage of Kwinhagak Route 1I1r:Clwllinr dated August 21,2012 IShF''''! 12 of 18

~------------------------------------------------------------~

I

,,

I I I

~

~

0

If

!

"~ l ~ i

I

is

I

i

· L....-_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _- - \

of Kwinhagak

IEv:3cu;3tiOI Route

dated August 21,2012 of 18

b

,, r

·

I

I I

~

~

It tt

E

1 J I

i

1L-__________________________________________________~------~~II~ag~e~oTIf~Kw~i~nhla~ga~k~~ lL-vClvuation Route ngs dated August 21, 2012 I",nt',,,,r 14 of 18

@1!PICALROADSECTION

, i ~

f

I j

f

j

@~ 1!PICAL CULVERT SECTION

I

;

CULIIERTTA8LE

i

SIGNTA!!LE

_ ._:::::t=_

j

1-

I

J

I

L -________________________________________________________________

~\

of Kwinhagak Evacuation Route Drawings dated August 21,2012 eet 15 of 18

ROAD DIMENSIONS AND MATERIAL QUANTITIES KANEKTOK RIVER ROAD (BIA ROUTE 2700) LENGTH: 3,660 LF

TOP WIDTH; 20 FT MAX. FOOTPRINT: 3.70 AC SURFACE COURSE QUANTITY: 3,450 CY BASE COURSE QUANTITY: 15,700 CY BORROW SITE ROAD (BIA ROUTE 3000) LENGTH: 1,092lF

TOP WIDTH: 20 FT MAX FOOTPRINT: 1.10 AC SURFACE COURSE QUANTITY: 1,050 CY BASE COURSE QUANTITY: 4,700 cY TOTAL LENGTH: 4,752 Lf

TOP WIDTH: 20 FT MAX fOOTPRINT: 4.8 AC SURFACE COURSE QUANTITY: 4,500 CY BASE COURSE QUANTITY: 20,400 CY

'r----'AA"'-----+---------' ·. ~,---------~--------"'·~"--------;_--~,~" 12" SURFACE COURSE

EROSiON CONTROL JUTe MESH & RESEED

":',

@ TYPICAL ROAD SECTION SHT3

tITS

,.

12"MIN OFCOMPACTEO SURFACE E·!)

COURSE, (ADOT E-l), MAINTAIN lEVEL AND FREE OF RUTS.

FlAREO END SECTION lYPICAl BOTH ENDS AS REQUIRED

W

TYPICAL CULVERT SECTION

~'1T5

APPLICANT NAME: VILLAGE OF KWINHAGAK

POA-2012-665, Kanektok River Village of Kwinhagak Evacuation Route Drawings dated August 21,2012 Sheet 16 of 18

L

':'"

'f

: .,-

........ .

PREVIOUSLY USED BORROW.SITE

u -----

PREVIOU~7~E~ .~ 'ORR

r----.--------~ --.----:::----

-~1l

. PREVIOUSLY USED ",', BORROW SITE

. ,"

I I

I /

,

I--~~/

~/'

JULlAWILUAMS'NATiVE ALLOTMENT

-;;/

II

/~

<;/'

"",-

/~/

I

. ///, / "--.. ~

/

RIVER ROAD (BIA ROUTE 2700), see SECTION A, SHEET 3 FOR DETAILS

"",-

/,

I

/

DANIRTUUQ CORPORATION PROPERTY

--,,~

"",-"

.X"~-"""r-------------------i OOINHAG"

'-.,"/

APPLICANT NAME: VILLAGE OF KWINHAGAK

/ '",/', "'-

/' " POA-2012-665, Kanektok River , , " ' - , Village of Kwinhagak / ' Evacuation Route " Drawings dated August 21,2012 ,/ Sheet 17 of 18

""'R~LSOORC'AS"SS"'NTAR"'''

DUANE MILlERASSOCIATES, JUNE 2009

"'",-"

,,/

PROPOSED GRAVEL BORROW SITE DESIGN CRITERIA SURFACE AREA: 60,900 SF (1.4 AC)

TOTAL VOLUME TO BE EXTRACTED: 27,070 CY OVERBURDEN; 4,520 CY NET USABLE VOLUME: 22,550 CY

RECLAMATION PLAN 1.

REMOVE VEGETATION AND ORGANIC OVERBURDEN,

APPROXIMATElY 2 FT, AND DEPOSIT IN ADJACENT BORROW SITES 2.

EXCAVATE AND HAUL FILL MATERIAL, START ON NORTH SIDE AND MOVE SOUTH, EXCAVATE TO 10-12 FTDEPTH

3,

SHAPE FINAL EXCAVATION SIDE WALLS TO 4:1 SLOPE

2' OVERBURDEN, TO BE REMOVED (

f----------W1DTHVARIES

/

I WATER TABLE

fC\ PROPOSED GRAVEL BORROW SITE SECTION

~ SCALE:NTS

IAPPliCANT NAME:

VILLAGE OF KWINHAGAK

POA-2012-665, Kanektok River Village of Kwinhagak Evacuation Route Drawings dated August 21, 2012 Sheet 18 of 18

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas