Interested parties are hereby notified that a Department of the Army permit application has been received for work in waters of the United States as described below and shown on the enclosed project drawings.
PUBLIC NOTICE DATE: October 16, 2012
EXPIRATION DATE: November 15, 2012
REFERENCE NUMBER: POA-2012-772
WATERWAY: Tongass Narrows
Interested parties are hereby notified that a Department of the Army permit application has been received for work in waters of the United States as described below and shown on the enclosed project drawings.
Comments on the described work, with the reference number, should reach this office no later than the expiration date of this Public Notice to become part of the record and be considered in the decision. Please contact Heather Boyer at (907) 753-2877, toll free from within Alaska at (800) 478-2712, by fax at (907) 753-5567, or by email at heather.l.boyer@usace.army.mil if further information is desired concerning this notice.
US Army Corps
of Engineers
Alaska District
ANCHORAGE
Regulatory Division (1145)
CEPOA-RD
Post Office Box 6898
JBER, Alaska 99506-0898
Public Notice
of Application
for Permit
PUBLIC NOTICE DATE:
October 16, 2012
EXPIRATION DATE:
November 15, 2012
REFERENCE NUMBER:
POA-2012-772
WATERWAY:
Tongass Narrows
Interested parties are hereby notified that a Department of the Army permit
application has been received for work in waters of the United States as described
below and shown on the enclosed project drawings.
Comments on the described work, with the reference number, should reach this office
no later than the expiration date of this Public Notice to become part of the
record and be considered in the decision. Please contact Heather Boyer at (907)
753-2877, toll free from within Alaska at (800) 478-2712, by fax at (907) 753-5567,
or by email at heather.l.boyer@usace.army.mil if further information is desired
concerning this notice.
APPLICANT:
City of Ketchikan, 334 Front Street, Ketchikan, Alaska 99901, Karl R.
Amylon, City Manager, karla@city.ketchikan.ak.us, 907-225-3111
AGENT:
2093
PND Engineers, Inc., 9360 Glacier Highway, Juneau, Alaska 99901, 907-253-
LOCATION: The project site is located within Section 24, T. 75 S., R. 90 E.,
Copper River Meridian; USGS Quad Map Ketchikan B-6; Latitude 55.3490º N., Longitude
131.6776º W.; in the southeast corner of Bar Harbor in Ketchikan, Alaska.
PURPOSE: The applicant's stated purpose is to service commercial fishing and
provide efficient marine loading operations.
PROPOSED WORK: The proposed Ketchikan Bar Harbor Drive Down Float Facility project
would include the construction of a drive down float, including a 20-foot x 48-foot
approach dock with vehicle transition; a 17-foot x 140-foot transfer bridge, a
48-foot x 120-foot drive down float with bridge support float, including (6) 24-inch
x 0.500-inch thick galvanized steel Float Anchor Piles, (8) 16-inch x 0.500-inch
thick galvanized steel Dock Support Batter Piles, (6) 16-inch x 0.500-inch thick
galvanized steel Vertical Dock Support Piles, and float mooring pile frames as
required. Marine excavation of 5,100 cubic yards with disposal in an approved
uplands site would allow for all-tide access. The project would also refurbish,
relocate and reinstall the existing Net Float, including reinstallation of (6) 16"
x 0.500" thick galvanized steel Float Anchor Piles. A domestic water system,
life ring cabinets and fire extinguishers will be added to improve safety.
All work would be performed in accordance with the enclosed plan (sheets 1-7),
dated September 2012.
APPLICANT PROPOSED MITIGATION: The applicant proposes the following mitigation
measures to avoid, minimize, and compensate for impacts to waters of the United
States from activities involving discharges of dredged or fill material.
a. Avoidance: The facility has been designed to minimize any impacts beyond what
is required to construct the Ketchikan Bar Harbor Drive Down Float.
b. Minimization: The facility has been designed to minimize any impacts beyond
what is required to construct the Ketchikan Bar Harbor Drive Down Float.
Measures to avoid impact to jurisdictional wetlands and waters of the U.S.
include the following actions:
Avoid fill placement. The project was designed to utilize pile supported and
floating structures to the maximum extent possible.
No fill would be used
below the HTL.
Protect eelgrass beds. The project utilizes a small corner of an existing
harbor basin and relocates the existing Net Float to protect eelgrass beds
within the harbor basin.
Minimize dredging activities. The project has been redesigned to minimize
extensive dredging by extending a pile supported approach dock into deeper
water to the drive down float location. Only minor dredging is required at
the face of the proposed loading dock to achieve suitable depth at the berth.
Uplands disposal is proposed for this small volume of dredging.
Avoid migration barriers to salmonids. At no time would the construction
activities result in a migration barrier to salmonids.
Avoid impacts from potential spills during construction. To prevent spills or
leakage of hazardous material during construction, standard spill-prevention
measures
including
on-site
spill
kits
would
be
implemented
during
construction.
Avoid impacts to marine mammals. A marine mammal monitor would be assigned to
the project during pile driving operations. Driving piles can generate
underwater sound pressure waves that have the potential to disrupt migration
and harass or injure marine mammals. The following measures will be taken:
o An observer would begin to observe 15 minutes prior to pile driving and
throughout the duration of each pile driving event.
o If marine mammals are observed within a 200-meter (656-foot) radius of
the pile being driven, driving would cease until the animal is clear of
the zone.
o If the marine mammal is observed during pile driving and appears to be
disturbed by the noise/activity, pile driving would be discontinued and
not resumed until the marine mammal is no longer observed.
o Methods would be confirmed through consultation with NOAA.
o Impacts to wetlands and other waters of the U.S. and other resources
that depend on other wildlife that depend on aquatic ecosystems have
been avoided to the greatest extent practicable.
-2-
Minimization of noise impacts from pile driving. The City of Ketchikan would
specify the use of vibratory pile driving equipment as the primary
installation method for the project.
o Impact hammers and drilled sockets shall only be allowed for piles that
encounter soils too dense to penetrate with the vibratory equipment.
o The specifications shall require the use of cushion blocks for all
impact hammers. Use of a pile cushion between the impact hammer and the
piling will help to attenuate sound.
o The impact hammer energy would be limited to approximately 60,000 footpounds (ft-lbs) to minimize driving energy.
o Timing for the installation of all piles shall consider sensitive fish
habitat periods for juvenile salmon.
o Steel piles, 24-inch in diameter or less would be used, when possible,
to minimize potential harm to fish.
o Driving will occur at lower tidal stages in an effort to minimize
potential impacts to fish.
Minimization of impacts to bald eagles and migratory birds. The Proposed
Action is not expected to have impacts on bald eagles or migratory birds in
the project area; however, the following measures will be taken to minimize
potential impacts.
o If active bird nests, eggs, or nestlings are observed during
construction, USFWS agency personnel would be contacted for guidance.
o If a bald eagles nest is located in the vicinity of the project area
during construction, agencies would be contacted and a bald eagle permit
will be obtained, if needed, in accordance with 50 CFR Part 22.
Minimization of impacts from invasive species. Revegetation and planting
activities are not anticipated for this work.
Should it be necessary, the
prevention and establishment of invasive plants during planting and
revegetation activities would be accomplished by following the Cooperative
Extension Service's "DON'T plant in Alaska" list.
c. Compensatory Mitigation: Because extreme measures have been taken to
avoid and minimize in this project, including the removal of existing
infrastructure and because the project does not propose any fill placement, the
applicant does not propose compensatory mitigation measures for this project.
CULTURAL RESOURCES: The latest published version of the Alaska Heritage Resources
Survey (AHRS) has been consulted for the presence or absence of historic
properties, including those listed in or eligible for inclusion in the National
Register of Historic Places. There are no listed or eligible properties in the
vicinity of the worksite. Consultation of the AHRS constitutes the extent of
cultural resource investigations by the District Commander at this time, and he is
otherwise unaware of the presence of such resources. This application is being
coordinated with the State Historic Preservation Office (SHPO). Any comments SHPO
may have concerning presently unknown archeological or historic data that may be
lost or destroyed by work under the requested permit will be considered in our
final assessment of the described work.
ENDANGERED SPECIES: No threatened or endangered species are known to use the
project area. We have determined the described activity would have no effect on
any listed or proposed threatened or endangered species, and would have no effect
on any designated or proposed critical habitat, under the Endangered Species Act of
1973 (87 Stat. 844). Therefore, no consultation with the U.S. Fish and Wildlife
-3-
Service or the National Marine Fisheries Service is required. However, any
comments they may have concerning endangered or threatened wildlife or plants or
their critical habitat will be considered in our final assessment of the described
work.
ESSENTIAL FISH HABITAT: The Magnuson-Stevens Fishery Conservation and Management
Act, as amended by the Sustainable Fisheries Act of 1996, requires all Federal
agencies to consult with the NMFS on all actions, or proposed actions, permitted,
funded, or undertaken by the agency, that may adversely affect Essential Fish
Habitat (EFH).
The project area is within the known range of the Chinook (Oncorhynchus
tshawytscha), Coho (Oncorhynchus kitsutch), Sockeye (Oncorhynchus nerka), Pink
(Oncorhynchus gorbuscha), and Chum (Oncorhynchus keta) Salmon.
We have determined the described activity would not adversely affect EFH in the
project area.
TRIBAL CONSULTATION: The Alaska District fully supports tribal self-governance and
government-to-government relations between Federally recognized Tribes and the
Federal government. Tribes with protected rights or resources that could be
significantly affected by a proposed Federal action (e.g., a permit decision) have
the right to consult with the Alaska District on a government-to-government basis.
Views of each Tribe regarding protected rights and resources will be accorded due
consideration in this process. This Public Notice serves as notification to the
Tribes within the area potentially affected by the proposed work and invites their
participation in the Federal decision-making process regarding the protected Tribal
right or resource. Consultation may be initiated by the affected Tribe upon
written request to the District Commander during the public comment period.
PUBLIC HEARING: Any person may request, in writing, within the comment period
specified in this notice, that a public hearing be held to consider this
application. Requests for public hearings shall state, with particularity, reasons
for holding a public hearing.
EVALUATION: The decision whether to issue a permit will be based on an evaluation
of the probable impacts, including cumulative impacts of the proposed activity and
its intended use on the public interest. Evaluation of the probable impacts, which
the proposed activity may have on the public interest, requires a careful weighing
of all the factors that become relevant in each particular case. The benefits,
which reasonably may be expected to accrue from the proposal, must be balanced
against its reasonably foreseeable detriments. The outcome of the general
balancing process would determine whether to authorize a proposal, and if so, the
conditions under which it will be allowed to occur. The decision should reflect
the national concern for both protection and utilization of important resources.
All factors, which may be relevant to the proposal, must be considered including
the cumulative effects thereof. Among those are conservation, economics,
aesthetics, general environmental concerns, wetlands, cultural values, fish and
wildlife values, flood hazards, floodplain values, land use, navigation, shore
erosion and accretion, recreation, water supply and conservation, water quality,
energy needs, safety, food and fiber production, mineral needs, considerations of
property ownership, and, in general, the needs and welfare of the people. For
activities involving 404 discharges, a permit will be denied if the discharge that
-4-
would be authorized by such permit would not comply with the Environmental
Protection Agency's 404(b)(l) guidelines. Subject to the preceding sentence and
any other applicable guidelines or criteria (see Sections 320.2 and 320.3), a
permit will be granted unless the District Commander determines that it would be
contrary to the public interest.
The Corps of Engineers is soliciting comments from the public; Federal, State, and
local agencies and officials; Indian Tribes; and other interested parties in order
to consider and evaluate the impacts of this proposed activity. Any comments
received will be considered by the Corps of Engineers to determine whether to
issue, modify, condition or deny a permit for this proposal. To make this
decision, comments are used to assess impacts on endangered species, historic
properties, water quality, general environmental effects, and the other public
interest factors listed above. Comments are used in the preparation of an
Environmental Assessment and/or an Environmental Impact Statement pursuant to the
National Environmental Policy Act. Comments are also used to determine the need
for a public hearing and to determine the overall public interest of the proposed
activity.
AUTHORITY: This permit will be issued or denied under the following authority:
(X) Perform work in or affecting navigable waters of the United States
Section 10 Rivers and Harbors Act 1899 (33 U.S.C. 403).
Project drawings and a Notice of Application for State Water Quality Certification
are enclosed with this Public Notice.
District Commander
U.S. Army, Corps of Engineers
Enclosures
-5-
PROJECT DESCRIPTION
Ketchikan Bar Harbor Drive Down Float
KEY TO SYMBOLS AND ABBREVIATIONS
`
"
@
&
+/
Feet
Inches
at
Diameter
And
Plus or Minus
Waterline
ACP
AK
APPROX.
CRM
CY
E
Et al.
Etc.
FT
HTL
KTC
M.
MHW
MLLW
N
NHN
NO
NOAA
P.O.
QTY
QUAD
R.
REQ'D
S
SEPT
T.
TYP.
U.S.
USGS
W
W/
Asphalt Concrete Pavement
Alaska
Approximate
Copper River Meridian
Cubic Yards
East
Et Alii (Latin indicating "and others")
Et Cetera (Latin meaning "and other things")
Feet
High Tide Line
Ketchikan
Meridian
Mean High Water
Mean Lower Low Water
North
No House Number
Number
National Oceanic and Atmospheric Administration
Post Office
Quantity
Quadrangle
Range
Required
South or Section
September
Township
Typical
United States
United States Geological Survey
West
With
City of Ketchikan
POA-2012-772
Tongass Narrows
September 2012
Sheet 1 of 8
ALASKA
SOUTHEAST
ALASKA
LOCATION
MAP
THIS
PROJECT
VICINITY MAP
FROl.!:
NOAA OiART 17430,
KETCHIKAN HARBOR
SOUTHEAST
ALASKA
PURPOSE:
TO SERVICE: cot.(t.lEROAL FISHING "NO f'RO..,DE
EFFlOENT UARINE LOADING OPERA nONS.
VICINITY MAP
DATUM :
I.IUW ~ 0.0' FT
HTL - 19.4'
MHW ~ 14.4'
MUW .. 0.0'
PHD: 122026.02
KETCHIKAN BAR HARBOR
DRIVE DOWN FLOAT
APPUCANT:
On' OF KETOiIKAN
City of Ketchikan
FILE NO:
POA-2012-772
WA TERWA Y: TONGASS NARROWS
Tongass Narrows
PROPOSED ACTIVITY: DRIVE DOVIN RAMP
September
5:
24 T: 755 R:2012
9CE M: CRM QUAD: KTt 86
Sheet
2 of 8
LAT:
55.349'N
LONG: 131 '-6776"W
DATE:
SfPT 2012
Sl'EET 1 OF 7
,,
', ___ '=j'1=e,';;;
,
-,~: ~:::-~f4",,,,,;"",, "- ,\
'",
'-'
,
,,
,
, ,
I
,'
\ ',- ,~="
,,
I
I
- ,I
,
,,
I
~ '''-,,,,,; '"
,,
I
,
I
\ 1-_"
,".-
BLOCK MSE
RETAIN ING WA.LL. TYP.
,
,
,
(11) 18". STEEL PIPE PILES
w/HDPE SLEEVES TO BE REMOVED
{( REINSTALLED AS REO'O
-- ---
I
I
I
,
,,
,
, '... , C:.:
'--
,
72 '. 92' NET FLOAT'" (6) IS ".
STEEL PIPE PiLES TO BE
_ REfURBISHED AND RELOCATED
\
I ,,
I
I
I
I
I
I
I
I
,,
,,, ,,
,
,
']',
,,
,
,
,,
,
,,
,
}
,,,
I
,, , ,
,,
I
I
---
---:: ..
----- -"
I'
,
PU RPOSE:
TO SER VICE: COI.It.I£RClAL fiSHING AND PRO'YIDf
EfflOEN T t.lARINE LOADING Of' ERAllONS.
DATUM:
HTL · 19. 4'
t.lHW · 14.4'
t.lLLW _ 0.0' FT
NLLW · O.O·
EXISTING CONDITIONS
AND DEMOLITION PLAN
PND
122026.02
KETCHIKAN BAR HARBOR
DRIVE DOWN FLOAT
APPUCANT: aTY r1' KETOiIKAN
City of Ketchikan
FILE NO:
POA-2012-772
WA TER WA Y: TONGASS NARROWS
TongassACTIVITY:
Narrows
PROPOSED
DRIVE DOWN RAMP
September 2012
Sheet 3 of 8
DATE:
SEP T 201 2
SHEn 2 OF 7
SUMMARY OF QUANTITIES
MATERIAL
QTY(CY)
'"
DREDGING
'-
~,\OO
CY
,
i "'."
'-'
,
,,
--,,~-
,,
,, ' '
" "- '=9F=~ ,-, "I
TRANSITION PLAIT
\
"
\
ASSE~8LY
I
I
-'
,
' '
"
,i
I
,,
I
I
I
,,
I
,
,
,
16". STEEL pjPE PILE.
AND REINSTALLED. TYP. {6}.
~
,,
,,
,,
I
EXISTING NET FLOAT REfURBISI1ED
w( OVERALL OIIdENSIONS IoIOOIFl'ED TO
'~,,
~'x92'
,
~: 1V
'
!
.."' \.
·
,\
,
'y
EXISllNC GROUND
IV DREDGE SlOPE
DREOG SLOPE
\'
\ \
I ~
1/'
BASIN
J/.i'"
OQ';,N fLOAT
---
,,
----- -"
--:.-----:--------
,
,
,,.'
:
//
"
.... '
PILE f RAM E. TYP,
.
#
PURPOSE:
TO SER""CE COIoIf.lERCIAL flSHING AND PROVlDf
EFFlOENT IoI ARl NE LOAllING G'ERATIONS.
GENERAL SITE PLAN
SCALE IN FUT
P
HTL _ 19.4'
DATU!.!:
I.IllW = 0.0' FT
t.lHW .. I·.· ·
t.lLlW ., 0.0'
PND f. 122026.02
50
160 FT.
KETCHIKAN BAR HARBOR
DRIVE DOWN FLOAT
APPUCANT: on or KET~IKAN
City of Ketchikan
FILE NO;
POA-2012-772
WATERWAY: TONGASS NARROWS
TongassACTIVITY:
Narrows
PROPOSED
DRIVE DO~ RAMP
September 2012
Sheet 4 of 8
DATE:
SEPT 2012
SHEE T J
or
7
!if
I~%,I
~
z
0
;::
"..w
,.'"
~
~
~~
x"
I;
~~~z
.<§
~ ~:>;
I~~
·
Qe-
~',
/
Q
·,
J~! .
;
i
Q
N
Q
,
Q
N
·,
Q
·,
Q
KETCHIKAN BAR HARBOR
DRIVE DOWN FLOAT
PURPOSE:
TO SERVIa:: COl.lt.lERCIAI. FISHING AND PRO""OE
EFFlOENT I.IARINE LOADING OPERATIONS,
APPUCANT:
SECTIONS
NOT TO SCALE
DATUM:
IoILLW .. 0.0' FT
HlL - 19.4'
MHW ~ 14.4'
MLLW ., 0.0'
PHD. 122026.02
CITY Of KETOiIKAN
City of Ketchikan
FILE NO:
POA-2012-772
WA TERWA Y: TONG,I,SS ~ARROWS
TongassACTIVITY:
Narrows
PROPOSED
DRI~ DOWN
September 2012
Sheet 5 of 8
DATE:
SEPT 2012
RAIIIP
SHEET " Of 7
TYPICAL SPIN
FIN PILE SECTION
STEEL PIPE
PILE, T'fP
III
II I
I
III ~~II L_III
111-=11 1111--'111 -'1
- III --II '
1
111-11
_-IW
DRILLED PILE SOCKET
PURPOSE:
TO SER';lCE CQI,IhlEROAL FISH ING AND PRO';lDE
EffICIENT IoIARjNE LOADING CPERATlON5.
PILE DETAILS
NOT TO SCALE
hlUW .. 0.0' FT
1-
III
BEOROD<
DATUt.4:
MARINE SEDlhlENTS
HTL - 19.4'
IoIHW K 14,4'
hlUW .. 0.0'
PND, : 122026.02
SPIN FIN PILE
KETCHIKAN BAR HARBOR
DRIVE DOWN FLOAT
APPUCANT: OTY r::£ KET()l IK AN
City of Ketchikan
FILE NO:
POA-2012-772
WA TERWA Y: TONGASS N,t.,RROWS
TongassACTI'v1TY:
Narrows
PROPOSED
DRI~ OOWN RAt.lP
September 2012
Sheet 6 of 8
DATE: SEPT 2012
SHEET 5 Of 7
IT
Hi
~:)]O j() 3~]
KETCHIKAN BAR HARBOR
DRIVE DOWN FLOAT
PURPOSE:
TO SER..,CE
COM~ EROAL
FlSHINC AND PROVIDE
EffICIENT MARINE LOADING
~E R,I, 110NS.
TYPICAL flOAT
SECTION
NOT TO SCALE
DATUM:
MLlW - 0.0 ' FT
HTl · 19.4'
MHW · 14.4'
MLLW - 0.0'
APPUCANT:
CITY
~
KETCHIKAN
City of Ketchikan
FILE NO:
POA-2012-772
WA
TERWA Y: TONGASS NARROWS
TongassACTIVITY:
Narrows
PROPOSED
DRIVE OOI'otl RAI.IP
September 2012
Sheet 7 of 8
PND" 122025.02
DATE:
SEPT 201 2
SHEET 6 OF 7
p
UGH
pru
~
ELECTRIC,I,l -..........
CONDUIT
['
P
P
r..,
I
GlJARORAlL.
:ro'-C)"
""
[
STEEL DECK
GRATING
(
···
·
L
····
J
."'" ""
\
···
·
J
~
···
·
L
PlL(CAP
~\
srrn"~J
''''"' ""
~
'o£RTlC,I,l PILE,
""
APPROACH DOCK· TYPICAL SECTION
KETCHIKAN BAR HARBOR
DRIVE DOWN FLOAT
PURPOSE:
TO SERVICE COWNERCI,I,l FlSHING NCJ PRQ~DE
EFFlClEHT WAR!NE LOADING OPERATIONS.
APPROACH DOCK
TYPICAL SECTION
NOT TO SC,l,lE
DATUM:
NLLW · 0.0' F"T
HTl · 19.4'
NHW · 14.4'
NLLW - 0.0'
PHD, 122025.02
APPUCAN T:
CITY
(7!
KETOiIKAN
City of Ketchikan
FILE NO:
POA-2012-772
TONGASS NARROWS
WATERWAY:
TongassACTI
Narrows
PROPOSED
VI TY: DRI\If.: DOVoN R......P
September 2012
Sheet 8 of 8
DATE: SEPT 2012
SHEET 7 Of 7