You can copy from here when filling out the rest of the page.
POA-2007-510, Cleary and Fairbanks Creek - The applicant’s stated purpose is Hard Rock Exploration
POA-2007-510, Cleary and Fairbanks Creek-The applicant’s stated purpose is Hard Rock Exploration for a five year period (January 1, 2012 – December 31, 2016). Anticipated exploration activities would be diamond core drilling using wheel, track, or skid-mounted drill rigs. Where possible, drilling would be conducted from existing roads and/or drilling pads, or on previously constructed and reclaimed drilling pads or access roads. Where existing infrastructure is not available, Freegold proposes to clear drill pads, (maximum of 50 feet in diameter), from which one or more holes would be drilled. Drill holes would average 500-1500 feet in depth with an average hole depth of approximately 750 feet. New access roads to support drilling would be required in some parts of the exploration area. Access roads would have a 12’ wide footprint. Please contact Debby McAtee by email at Debby.J.McAtee@usace.army.mil, by phone at (907) 474-2166, or by fax at (907) 474-2164, if further information is desired concerning this notice.
US Army Corps
of Engineers
Alaska District
Public Notice
of Application
for Permit
FAIRBANKS FIELD OFFICE
Regulatory Division (1145)
CEPOA-RD
2175 University Avenue, Suite 201E
Fairbanks, Alaska 99709-4927
PUBLIC NOTICE DATE:
October 29, 2012
EXPIRATION DATE: November 27, 2012
REFERENCE NUMBER:
WATERWAY:
POA-2007-510
Cleary and Fairbanks Creeks
Interested parties are hereby notified that a Department of the Army permit
application has been received for work in waters of the United States as
described below and shown on the enclosed project drawings.
Comments on the described work, with the reference number, should reach this
office no later than the expiration date of this Public Notice to become part
of the record and be considered in the decision. Please contact Debby McAtee
by email at Debby.J.McAtee@usace.army.mil, by phone at (907) 907-474-2166, or
by fax at (907) 474-2164, if further information is desired concerning this
notice.
APPLICANT: Freegold Recovery, Inc., Freegold Ventures Limited, 888-700 West
Georgia Street, Vancouver, BC V7Y 1G5
AGENT: Mr. Curtis J. Freeman, President, Avalon Development Corporation,
P.O. Box 80268, Fairbanks, Alaska 99708
LOCATION: The Golden Summit project is located approximately 25 road miles
north of Fairbanks, Alaska via the Steese Highway. The project site, APMA
9726, is located within Sections 24-26 and 35, T. 3 N., R. 1 E., and Sections
14-24 and 28-30, T. 3 N., R. 2 E., Fairbanks Meridian; USGS Quad Map
Livengood A-1; Latitude 65.073º N., Longitude 147.357º W.; near Chatanika,
Alaska.
PURPOSE: The applicant's stated purpose is Hard Rock Exploration for a five
year period (January 1, 2012 December 31, 2016).
1
PROPOSED WORK:
Anticipated exploration activities would be diamond core drilling using
wheel, track, or skid-mounted drill rigs. Where possible, drilling would be
conducted from existing roads and/or drilling pads, or on previously
constructed and reclaimed drilling pads or access roads. Where existing
infrastructure is not available, Freegold proposes to clear drill pads,
(maximum of 50 feet in diameter), from which one or more holes would be
drilled. Drill holes would average 500-1500 feet in depth with an average
hole depth of approximately 750 feet. New access roads to support drilling
would be required in some parts of the exploration area. Access roads would
have a 12' wide footprint.
The applicant requests a five year (5) time extension to extend exploration
activities on the Tolovana-Cleary Hill exploration block on the western half
of their Golden Summit project, (POA-2007-510-4 issued June 7, 2007).
Applicant also proposes to expand exploration on the Christina Hi Yu
exploration block on the eastern half of their Golden Summit project,
(Sheet 1-11).
Wetland impacts on the western half of the project are still covered under
the original permit. Modification of the permit to include the eastern half
would add an additional 15.8 acres of impacts to black spruce wetlands.
Exploration activities include access roads, drill pads and drill holes. All
work would be performed in accordance with the enclosed plan, (sheets 1-11),
dated October 17, 2012.
ADDITIONAL INFORMATION: In previous applications submitted on the Golden
Summit project, the project has been separated into several exploration
prospect areas to facilitate explanation of the proposed activities. These
prospect names have been retained in this new application to maintain clarity
and consistency.
Tolovana-Cleary Hill exploration block western half of the Golden Summit
Project:
This part of the Fairbanks Mining District has seen extensive lode and placer
gold mining since the early 1900's. Exploration within several of the
exploration areas was conducted between 1978-1988 by previous companies.
Disturbances from most of these activities were not reclaimed prior to
Freegold's acquisition of Golden Summit in 1991. Freegold conducted
additional exploration between 1994 and 1998 and completed all reclamation
requirements before January 1, 2000.
In 2007, an Individual Permit was issued to Freegold Recovery, Inc. USA, APMA
9726, to impact 33 acres of wetlands for exploration trenches, bulk sampling,
access roads, and drill pads on the Tolovana-Cleary Hill exploration blocks,
(West Half of Golden Summit Project). To date, 11.9 acres of wetlands have
been impacted under this authorization. The applicant has requested a five
year time extension for this work and an additional 14 acres of new wetland
disturbance, bringing the total wetland impacts to 25.9, still within the
original authorization. The proposed new wetland fills would occur on
typical north-facing black spruce forest. No riparian wetland disturbance is
proposed.
The main streams draining this block include Cleary Creek and its tributaries
Chatham, Bedrock, and Willow Creeks. The western edge of the Tolovana area
is drained by the upper reaches of Little Eldorado Creek.
2
West-Half
Prospect
Cleary Hill All
Tolovana All
Unreclaimed
Acres
Unreclaimed
Wetland
Acres
Proposed
Drill Pad
Acres
Proposed
Access
Road
Acres
Proposed
Wetland
Acres
All
Acres
25.565
6.8
4.0
2.0
5.4
31.6
12.2
17.16
5.1
5.5
4.0
8.6
26.7
13.7
42.725
11.9
9.5
6.0
14.0
58.2
25.9
Totals
All
Wetland
Acres
Christina-Hi Yu exploration block - eastern half of the Golden Summit
Project:
This part of the Fairbanks Mining District has seen extensive lode and placer
gold mining since the early 1900's. Exploration within several of the
exploration areas was conducted between 1978-1988 by previous companies.
Disturbances from most of these activities were reclaimed prior to Freegold's
acquisition of Golden Summit in 1991. Freegold conducted additional
exploration between 1994 and 1998 and completed all reclamation requirements
before January 1, 2000. Three acres of reclamation liabilities currently
exist on the Christina-Hi Yu exploration block.
The applicant has requested a modification to the 2007 permit to include
exploration in the Christina-Hi Yu block. Total disturbance for this block
would be 31.5 acres of which 15.8 acres are in wetlands. Freegold states
that approximately 50% of this drilling would be on previously undisturbed
lands.
The main streams draining this block include Cleary Creek and its tributaries
Wolf and Chatham Creeks; Fairbanks Creek and its tributaries Too Much Gold
and Moose Creeks; and Pilot and Captain Creeks which drain the northern edge
of the claim area. The lower reaches of Captain Creek (outside the project
area) is identified as a Chinook salmon rearing stream on the Alaska
Department of Fish and Game website.
East-Half Prospect
Proposed
Proposed Access Proposed
All
Unreclaimed Unreclaimed Drill Pad
All Wetland
Road
Wetland
Acres
Wetland Acres Acres
Acres
Acres
Acres Acres
Christina - All
3
1.5
3.5
1.5
2.5
8.0
4.0
Circle Trail - All
0
0.0
2.5
1.0
1.8
3.5
1.8
Goose Creek - All
0
0.0
2.5
2.5
2.5
5.0
2.5
Hi Yu - All
0
0.0
2.0
1.5
1.8
3.5
1.8
Saddle - All
0
0.0
3.5
1.5
2.5
5.0
2.5
Too Much Gold - All
0
0.0
4.0
2.5
3.3
6.5
3.3
3
1.5
18.0
10.5
14.3
31.5
15.8
Totals
Reclamation: During initial disturbance, all humic material covering drill
pads and/or access roads would be stockpiled in a separate but adjacent area,
preferably the low-side of the site to allow this berm to act as a natural
silt-fence for run-off from the excavation. All soil overburden would be
stockpiled in a separate but adjacent area. All rock and rubble from bedrock
excavation would be stockpiled in a different area.
3
Following completion of drilling at each drill hole, all drill holes would be
plugged from termination depth to surface using a commercial hole plugging
mixture. All surface casing, if used, would be removed prior to reclamation.
All timber used to stabilize the rig would be removed and re-used. All
refuse, drill supplies, and materials brought to site would be removed prior
to reclamation of the site.
Once planned work at a drill pad and/or access road has been completed, a
back-hoe and/or crawler dozer would be used to backfill the disturbed area in
the reverse order of excavation. Silt fences would be placed as appropriate
to minimize impact to adjacent wetlands and streams. No artificial
re-seeding is planned unless required. Culverts, if installed, would be
removed.
Historic RS2477 roads, Cleary Wagon Road, Bedrock Creek Road, Willow Creek
Road, Chatham Creek Road, and Cleary Creek Road would be used for access but
would not be reclaimed due to their historic nature and heavy use by third
party recreationalists and mining claim owners.
APPLICANT PROPOSED MITIGATION: The applicant proposes the following
mitigation measures to avoid, minimize, and compensate for impacts to waters
of the United States from activities involving discharges of dredged or fill
material.
a. Avoidance: Applicant's mineral exploration efforts are naturally
concentrated in uplands. Wetlands and waters avoidance would include the
following:
1. Occupying diamond core drilling sites in uplands.
2. No work would be planned in stream bottoms or streams.
3. Utilizing lined sumps to recycle drill fluids to prevent
impacting waters of the United States (U.S.).
4. Utilizing existing water ponds for source water therefore
eliminating excavation in wetlands.
5. Placing equipment and fuel supplies within containment systems to
prevent release of petroleum based products into waters of the
U.S.
b. Minimization: Applicant anticipates disturbing hillside wetlands
and plans to minimize impacts by
1. Drilling as many exploration drill holes as possible from
existing, historic roads and trails.
2. Drilling multiple drill holes from a single drill pad and
reducing pad footprint to minimum size for safe operations.
3. Excavating and utilizing pads in wetlands areas during the winter
months.
4. Constructing access roads and drill pads such that sheet and
channel erosion are reduced or eliminated.
5. Reclaiming all disturbed areas to as close to original contours
as possible at the soonest date practicable.
c. Compensatory Mitigation:
fee as compensatory mitigation.
The applicant proposes to pay an in-lieu
WATER QUALITY CERTIFICATION: A permit for the described work will not be
issued until a certification or waiver of certification, as required under
Section 401 of the Clean Water Act (Public Law 95-217), has been received
from the Alaska Department of Environmental Conservation.
4
CULTURAL RESOURCES: The latest published version of the Alaska Heritage
Resources Survey (AHRS) has been consulted for the presence or absence of
historic properties, including those listed in or eligible for inclusion in
the National Register of Historic Places. There are many unevaluated
properties in the vicinity of the worksite. There is one eligible property in
the vicinity of the worksite. It has been designated LIV-404, Hi-Yu Stamp
Mill. Because it has been determined to be within the project area, a
determination of effect will be made in consultation with the State Historic
Preservation Officer (SHPO). Consultation of the AHRS constitutes the extent
of cultural resource investigations by the District Commander at this time.
Any comments SHPO may have concerning presently unknown archeological or
historic data that may be lost or destroyed by work under the requested
permit will be considered in our final assessment of the described work.
SHPO was contacted via email by Debby McAtee, on October 19, 2012 with a list
providing all properties found within the mining claims, the area of
potential effect.
ENDANGERED SPECIES:
NO EFFECT. No threatened or endangered species are known to use the project
area.
Therefore, no consultation with the U.S. Fish and Wildlife Service or the
National Marine Fisheries Service is required. However, any comments they
may have concerning endangered or threatened wildlife or plants or their
critical habitat will be considered in our final assessment of the described
work.
ESSENTIAL FISH HABITAT: The Magnuson-Stevens Fishery Conservation and
Management Act, as amended by the Sustainable Fisheries Act of 1996, requires
all Federal agencies to consult with the NMFS on all actions, or proposed
actions, permitted, funded, or undertaken by the agency, that may adversely
affect Essential Fish Habitat (EFH).
No EFH species are known to use the project area. The Alaska Department of
Fish and Game's Fish Monitor Resource website was checked on October 22,
2012. The lower reaches of Captain Creek is identified as an anadromous
stream for Chinook rearing.
We have determined the described activity would not adversely affect EFH in
the project area.
TRIBAL CONSULTATION: The Alaska District fully supports tribal selfgovernance and government-to-government relations between Federally
recognized Tribes and the Federal government. Tribes with protected rights
or resources that could be significantly affected by a proposed Federal
action (e.g., a permit decision) have the right to consult with the Alaska
District on a government-to-government basis. Views of each Tribe regarding
protected rights and resources will be accorded due consideration in this
process. This Public Notice serves as notification to the Tribes within the
area potentially affected by the proposed work and invites their
participation in the Federal decision-making process regarding the protected
Tribal right or resource. Consultation may be initiated by the affected
Tribe upon written request to the District Commander during the public
comment period.
PUBLIC HEARING: Any person may request, in writing, within the comment
period specified in this notice, that a public hearing be held to consider
5
this application. Requests for public hearings shall state, with
particularity, reasons for holding a public hearing.
EVALUATION: The decision whether to issue a permit will be based on an
evaluation of the probable impacts, including cumulative impacts of the
proposed activity and its intended use on the public interest. Evaluation of
the probable impacts, which the proposed activity may have on the public
interest, requires a careful weighing of all the factors that become relevant
in each particular case. The benefits, which reasonably may be expected to
accrue from the proposal, must be balanced against its reasonably foreseeable
detriments. The outcome of the general balancing process would determine
whether to authorize a proposal, and if so, the conditions under which it
will be allowed to occur. The decision should reflect the national concern
for both protection and utilization of important resources. All factors,
which may be relevant to the proposal, must be considered including the
cumulative effects thereof. Among those are conservation, economics,
aesthetics, general environmental concerns, wetlands, cultural values, fish
and wildlife values, flood hazards, floodplain values, land use, navigation,
shore erosion and accretion, recreation, water supply and conservation, water
quality, energy needs, safety, food and fiber production, mineral needs,
considerations of property ownership, and, in general, the needs and welfare
of the people. For activities involving 404 discharges, a permit will be
denied if the discharge that would be authorized by such permit would not
comply with the Environmental Protection Agency's 404(b)(l) guidelines.
Subject to the preceding sentence and any other applicable guidelines or
criteria (see Sections 320.2 and 320.3), a permit will be granted unless the
District Commander determines that it would be contrary to the public
interest.
The Corps of Engineers is soliciting comments from the public; Federal,
State, and local agencies and officials; Indian Tribes; and other interested
parties in order to consider and evaluate the impacts of this proposed
activity. Any comments received will be considered by the Corps of Engineers
to determine whether to issue, modify, condition or deny a permit for this
proposal. To make this decision, comments are used to assess impacts on
endangered species, historic properties, water quality, general environmental
effects, and the other public interest factors listed above. Comments are
used in the preparation of an Environmental Assessment and/or an
Environmental Impact Statement pursuant to the National Environmental Policy
Act. Comments are also used to determine the need for a public hearing and
to determine the overall public interest of the proposed activity.
AUTHORITY:
authority:
This permit will be issued or denied under the following
(X) Discharge dredged or fill material into waters of the United States
Section 404 Clean Water Act (33 U.S.C. 1344). Therefore, our public interest
review will consider the guidelines set forth under Section 404(b) of the
Clean Water Act (40 CFR 230).
Project drawings and a Notice of Application for State Water Quality
Certification are enclosed with this Public Notice.
District Commander
U.S. Army, Corps of Engineers
Enclosures
6
SEAN PARNELL, GOVERNOR
STATE OF ALASKA
DEPT. OF ENVIRONMENTAL CONSERVATION
DIVISION OF WATER
401 Certification Program
Non-Point Source Water Pollution Control Program
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
WQM/401 CERTIFICATION
555 CORDOVA STREET
ANCHORAGE, ALASKA 99501-2617
PHONE: (907) 269-7564/FAX: (907) 334-2415
NOTICE OF APPLICATION
FOR
STATE WATER QUALITY CERTIFICATION
Any applicant for a federal license or permit to conduct an activity that
might result in a discharge into navigable waters, in accordance with Section
401 of the Clean Water Act of 1977 (PL95-217), also must apply for and obtain
certification from the Alaska Department of Environmental Conservation that
the discharge will comply with the Clean Water Act, the Alaska Water Quality
Standards, and other applicable State laws. By agreement between the U.S.
Army Corps of Engineers and the Department of Environmental Conservation,
application for a Department of the Army permit to discharge dredged or fill
material into navigable waters under Section 404 of the Clean Water Act also
may serve as application for State Water Quality Certification.
Notice is hereby given that the application for a Department of the Army
Permit described in the Corps of Engineers' Public Notice No. POA-2007-510,
Cleary and Fairbanks Creeks, serves as application for State Water Quality
Certification from the Department of Environmental Conservation.
After reviewing the application, the Department may certify there is
reasonable assurance the activity, and any discharge that might result, will
comply with the Clean Water Act, the Alaska Water Quality Standards, and
other applicable State laws. The Department also may deny or waive
certification.
Any person desiring to comment on the project, with respect to Water Quality
Certification, may submit written comments to the address above by the
expiration date of the Corps of Engineer's Public Notice.
7
Western Half
Tolovana-Cleary Hill
Exploration Block
Vicinity Map
POA-2007-510, Fairbanks Creek
APMA 9726, Freegold Recovery Inc.
Golden Summit Project
17 October 2012
Sheet 1 of 11
Eastern Half
Christina-Hi Yu
Exploration Block
Exploration Areas
POA-2007-510, Fairbanks Creek
APMA 9726, Freegold Recovery Inc.
Golden Summit Project
17 October 2012
Sheet 2 of 11
Drill Holes (Existing)
POA-2007-510, Fairbanks Creek
APMA 9726, Freegold Recovery Inc.
Golden Summit Project
17 October 2012
Sheet 3 of 11
Fairbanks Creek Road
Drill Target Areas (Proposed)
POA-2007-510, Fairbanks Creek
APMA 9726, Freegold Recovery Inc.
Golden Summit Project
17 October 2012
Sheet 4 of 11
Drill Target Areas and Wetlands
POA-2007-510, Fairbanks Creek
APMA 9726, Freegold Recovery Inc.
Golden Summit Project
17 October 2012
Sheet 5 of 11
Typical Drill Pad Plans
POA-2007-510, Fairbanks Creek
APMA 9726, Freegold Recovery Inc.
Golden Summit Project
17 October 2012
Sheet 6 of 11
50' MAX CLEARING LIMIT
5 - 10'
10' DIAMETER
ORIGINAL SLOPE
5' +
ORGANIC LAYER
BEDROCK
4' DEPTH
ORGANIC
STOCKPILE
ORGANIC MAT
DRILL RETURN SUMP
(FOR RECYCLE)
CUT/FILL AREA
Plan View
50'
NOTES:
- DRILL PAD VARIES TO MAX OF 50 FEET DIAMETER.
Drill Pad
Footprint
Mud
Sump
- WHERE APPLICABLE, TOPSOIL AND ORGANIC MATERIALS WILL BE STOCKPILED ON DOWNGRADIENT SLOPE TO
MINIMIZE IMPACTS TO ADJACENT WETLANDS.
- DURING RECLAMATION, DRILL PAD WILL BE RECONTOURED AND CAPPED WITH ORGANICS. IF AVAILABLE, CUT TREES
WILL BE SCATTERED OVER THE RECONTOURED TRENCH TO PROMOTE REVEGETATION AND DISCOURAGE ACCESS.
Drill
Hole
- DEPTH OF CUT AND FILL WILL DEPEND ON SIDE SLOPE ASSUME AVERAGE OF 2-FOOT CUT DEPTH ON UPSLOPE SIDE
- AVERAGE PAD SIZE 50' DIAMETER AND COVERING 0.05 ACRES
- DRILL WATER RECYCLE SUMP IS UNLINED AND AVERAGES 10 FEET IN DIAMETER AND 3-4 FEET DEEP, CONTAINING 12
CUBIC YARDS
- DIESEL FUEL FOR DRILL RIG AND SUPPORT EQUIPMENT IS STORED IN EACH UNIT'S ON-BOARD FUEL TANK. THIS FUEL IS
REPLENSIHED FROM 100 GALLON TANKS IN DRILL SUPPORT PICKUP TRUCKS. NO OTHER FUEL STORAGE ON-SITE
Drill Rig
Outline
- RECLAMATION: DRILL PADS AND SUMP WILL BE RECONTOURED WITH BEDROCK AND SOIL USED TO MAKE PAD, THEN
ORGANIC STOCKPILE WOULD BE DISTRIBUTED OVER AREA TO MITIGATE SHEET AND CHANNEL EROSION AND FOSTER
REVEGETATION.
Golden Summit Project: Exploration Drill Pad Typical Section
Drainage
ditch
Typical Access Road Plans
POA-2007-510, Fairbanks Creek
APMA 9726, Freegold Recovery Inc.
Golden Summit Project
17 October 2012
Sheet 7 of 11
20' MAX CLEARING LIMIT
5 - 10'
WORKING SURFACE (10 feet)
ORGANIC
STOCKPILE
5' +
2'
ORGANIC LAYER
BEDROCK
ORGANIC MAT
CUT/FILL AREA (12 feet)
DRAINAGE DITCH
Plan View
20'
NOTES:
- FILL WILL BE EITHER EXCAVATED BEDROCK FROM CUT PORTION OF ROAD OR GRAVEL.
Road
- WHERE APPLICABLE, TOPSOIL AND ORGANIC MATERIALS WILL BE STOCKPILED ON DOWNGRADIENT SLOPE TO MINIMIZE
IMPACTS TO ADJACENT WETLANDS.
- DURING RECLAMATION, ACCESS ROADS WILL BE RECONTOURED AND CAPPED WITH ORGANICS. IF AVAILABLE, CUT TREES
WILL BE SCATTERED OVER THE RECONTOURED TRENCH TO PROMOTE REVEGETATION AND DISCOURAGE ACCESS.
- DEPTH OF CUT AND FILL WILL DEPEND ON SIDE SLOPE ASSUME AVERAGE OF 2-FOOT CUT DEPTH ON UPSLOPE SIDE.
- RECLAMATION: ROADS WILL BE RECONTOURED WITH BEDROCK AND SOIL USED TO MAKE ROAD BED, THEN ORGANIC
STOCKPILE WOULD BE DISTRIBUTED OVER AREA TO MITIGATE SHEET AND CHANNEL EROSION AND FOSTER REVEGETATION.
DRAINAGE DITCHES
Golden Summit Project: Exploration Access Road Typical Section
Organic Stockpile
- ACCESS ROAD OPERATING SURFACE IS 12 FEET IN WIDTH.
Typical Culvert Plans
POA-2007-510, Fairbanks Creek
APMA 9726, Freegold Recovery Inc.
Golden Summit Project
17 October 2012
Sheet 8 of 11
20' MAX CLEARING LIMIT
5 - 10'
WORKING SURFACE (10 feet)
5' +
2'
ORGANIC
STOCKPILE
ORGANIC MAT
ORGANIC LAYER
BEDROCK
ARMOR PLACED
AROUND CULVERT
CULVERT
Plan View
20'
NOTES:
- CULVERT WILL BE SIZED TO FIT THE DRAINAGE, USUALLY 18-24-INCH DIAMETER CMP.
Road
- RECLAIMATION: CULVERTS WILL BE REMOVED, THEN ROAD WILL BE RECONTOURED WITH BEDROCK
AND SOIL USED TO MAKE ROAD BED, THEN ORGANIC STOCKPILE WOULD BE DISTRIBUTED OVER AREA TO
MITIGATE SHEET AND CHANNEL EROSION AND FOSTER REVEGETATION.
CULVERT
- CULVERT WILL BE PLACED IN NATURAL DRAINAGE OR DITCH FLOW LINE. IF APPLICABLE, DOWNSLOPE
ORGANIC STOCKPILE WILL BE NOTCHED TO ALLOW FLOW-THROUGH.
DRAINAGE DITCHES
Golden Summit Project: Culvert Typical Section
Organic Stockpiles
- ACCESS ROAD OPERATING SURFACE IS 12 FEET IN WIDTH.
RIP-RAP
CUT/FILL AREA (12 feet)
Typical Drill Pad Reclamation
POA-2007-510, Fairbanks Creek
APMA 9726, Freegold Recovery Inc.
Golden Summit Project
17 October 2012
Sheet 9 of 11
50' MAX CLEARING LIMIT
ORGANIC
BACKFILL
ORGANIC LAYER
BEDROCK
BEDROCK
ORGANIC MAT
BACKFILL
CUT/FILL AREA
Plan View
DRILL RETURN SUMP
50'
NOTES:
- DRILL PAD VARIES TO MAX OF 50 FEET DIAMETER.
Drill Pad
Footprint
Mud
Sump
- WHERE APPLICABLE, TOPSOIL AND ORGANIC MATERIALS WILL BE STOCKPILED ON DOWNGRADIENT SLOPE TO
MINIMIZE IMPACTS TO ADJACENT WETLANDS.
- DURING RECLAMATION, DRILL PAD WILL BE RECONTOURED AND CAPPED WITH ORGANICS. IF AVAILABLE, CUT TREES
WILL BE SCATTERED OVER THE RECONTOURED TRENCH TO PROMOTE REVEGETATION AND DISCOURAGE ACCESS.
- DEPTH OF CUT AND FILL WILL DEPEND ON SIDE SLOPE ASSUME AVERAGE OF 2-FOOT CUT DEPTH ON UPSLOPE SIDE
- AVERAGE PAD SIZE 50' DIAMETER AND COVERING 0.05 ACRES
- DRILL WATER RECYCLE SUMP IS UNLINED AND AVERAGES 10 FEET IN DIAMETER AND 3-4 FEET DEEP, CONTAINING 12
CUBIC YARDS
- DIESEL FUEL FOR DRILL RIG AND SUPPORT EQUIPMENT IS STORED IN EACH UNIT'S ON-BOARD FUEL TANK. THIS FUEL IS
REPLENSIHED FROM 100 GALLON TANKS IN DRILL SUPPORT PICKUP TRUCKS. NO OTHER FUEL STORAGE ON-SITE
Organic Backfill
- RECLAMATION: DRILL PADS AND SUMP WILL BE RECONTOURED WITH BEDROCK AND SOIL USED TO MAKE PAD, THEN
ORGANIC STOCKPILE WOULD BE DISTRIBUTED OVER AREA TO MITIGATE SHEET AND CHANNEL EROSION AND FOSTER
REVEGETATION.
Golden Summit Project: Reclaimed Exploration Drill Pad Typical Section
Typical Road Reclamation
POA-2007-510, Fairbanks Creek
APMA 9726, Freegold Recovery Inc.
Golden Summit Project
17 October 2012
Sheet 10 of 11
20' MAX CLEARING LIMIT
ORGANIC
BACKFILL
ORGANIC LAYER
BEDROCK
BEDROCK
ORGANIC MAT
BACKFILL
Plan View
20'
NOTES:
- FILL WILL BE EITHER EXCAVATED BEDROCK FROM CUT PORTION OF ROAD OR GRAVEL.
- WHERE APPLICABLE, TOPSOIL AND ORGANIC MATERIALS WILL BE STOCKPILED ON DOWNGRADIENT SLOPE TO MINIMIZE
IMPACTS TO ADJACENT WETLANDS.
- DURING RECLAMATION, ACCESS ROADS WILL BE RECONTOURED AND CAPPED WITH ORGANICS. IF AVAILABLE, CUT TREES
WILL BE SCATTERED OVER THE RECONTOURED TRENCH TO PROMOTE REVEGETATION AND DISCOURAGE ACCESS.
Organic Backfill
- ACCESS ROAD OPERATING SURFACE IS 12 FEET IN WIDTH.
- DEPTH OF CUT AND FILL WILL DEPEND ON SIDE SLOPE ASSUME AVERAGE OF 2-FOOT CUT DEPTH ON UPSLOPE SIDE.
- RECLAMATION: ROADS WILL BE RECONTOURED WITH BEDROCK AND SOIL USED TO MAKE ROAD BED, THEN ORGANIC
STOCKPILE WOULD BE DISTRIBUTED OVER AREA TO MITIGATE SHEET AND CHANNEL EROSION AND FOSTER REVEGETATION.
Golden Summit Project: Reclaimed Exploration Access Road Typical Section
Typical Culvert Reclamation
POA-2007-510, Fairbanks Creek
APMA 9726, Freegold Recovery Inc.
Golden Summit Project
17 October 2012
Sheet 11 of 11
20' MAX CLEARING LIMIT
ORGANIC
BACKFILL
ORGANIC MAT
ORGANIC LAYER
BEDROCK
CULVERT (Removed)
Plan View
20'
NOTES:
- CULVERT WILL BE SIZED TO FIT THE DRAINAGE, USUALLY 18-24-INCH DIAMETER CMP.
- CULVERT WILL BE PLACED IN NATURAL DRAINAGE OR DITCH FLOW LINE. IF APPLICABLE, DOWNSLOPE
ORGANIC STOCKPILE WILL BE NOTCHED TO ALLOW FLOW-THROUGH.
- RECLAIMATION: CULVERTS WILL BE REMOVED, THEN ROAD WILL BE RECONTOURED WITH BEDROCK
AND SOIL USED TO MAKE ROAD BED, THEN ORGANIC STOCKPILE WOULD BE DISTRIBUTED OVER AREA TO
MITIGATE SHEET AND CHANNEL EROSION AND FOSTER REVEGETATION.
Golden Summit Project: Reclaimed Culvert Typical Section
Organic Backfill
- ACCESS ROAD OPERATING SURFACE IS 12 FEET IN WIDTH.
US Army Corps
of Engineers
Alaska District
Public Notice
of Application
for Permit
FAIRBANKS FIELD OFFICE
Regulatory Division (1145)
CEPOA-RD
2175 University Avenue, Suite 201E
Fairbanks, Alaska 99709-4927
PUBLIC NOTICE DATE:
October 29, 2012
EXPIRATION DATE: November 27, 2012
REFERENCE NUMBER:
WATERWAY:
POA-2007-510
Cleary and Fairbanks Creeks
Interested parties are hereby notified that a Department of the Army permit
application has been received for work in waters of the United States as
described below and shown on the enclosed project drawings.
Comments on the described work, with the reference number, should reach this
office no later than the expiration date of this Public Notice to become part
of the record and be considered in the decision. Please contact Debby McAtee
by email at Debby.J.McAtee@usace.army.mil, by phone at (907) 907-474-2166, or
by fax at (907) 474-2164, if further information is desired concerning this
notice.
APPLICANT: Freegold Recovery, Inc., Freegold Ventures Limited, 888-700 West
Georgia Street, Vancouver, BC V7Y 1G5
AGENT: Mr. Curtis J. Freeman, President, Avalon Development Corporation,
P.O. Box 80268, Fairbanks, Alaska 99708
LOCATION: The Golden Summit project is located approximately 25 road miles
north of Fairbanks, Alaska via the Steese Highway. The project site, APMA
9726, is located within Sections 24-26 and 35, T. 3 N., R. 1 E., and Sections
14-24 and 28-30, T. 3 N., R. 2 E., Fairbanks Meridian; USGS Quad Map
Livengood A-1; Latitude 65.073º N., Longitude 147.357º W.; near Chatanika,
Alaska.
PURPOSE: The applicant's stated purpose is Hard Rock Exploration for a five
year period (January 1, 2012 December 31, 2016).
1
PROPOSED WORK:
Anticipated exploration activities would be diamond core drilling using
wheel, track, or skid-mounted drill rigs. Where possible, drilling would be
conducted from existing roads and/or drilling pads, or on previously
constructed and reclaimed drilling pads or access roads. Where existing
infrastructure is not available, Freegold proposes to clear drill pads,
(maximum of 50 feet in diameter), from which one or more holes would be
drilled. Drill holes would average 500-1500 feet in depth with an average
hole depth of approximately 750 feet. New access roads to support drilling
would be required in some parts of the exploration area. Access roads would
have a 12' wide footprint.
The applicant requests a five year (5) time extension to extend exploration
activities on the Tolovana-Cleary Hill exploration block on the western half
of their Golden Summit project, (POA-2007-510-4 issued June 7, 2007).
Applicant also proposes to expand exploration on the Christina Hi Yu
exploration block on the eastern half of their Golden Summit project,
(Sheet 1-11).
Wetland impacts on the western half of the project are still covered under
the original permit. Modification of the permit to include the eastern half
would add an additional 15.8 acres of impacts to black spruce wetlands.
Exploration activities include access roads, drill pads and drill holes. All
work would be performed in accordance with the enclosed plan, (sheets 1-11),
dated October 17, 2012.
ADDITIONAL INFORMATION: In previous applications submitted on the Golden
Summit project, the project has been separated into several exploration
prospect areas to facilitate explanation of the proposed activities. These
prospect names have been retained in this new application to maintain clarity
and consistency.
Tolovana-Cleary Hill exploration block western half of the Golden Summit
Project:
This part of the Fairbanks Mining District has seen extensive lode and placer
gold mining since the early 1900's. Exploration within several of the
exploration areas was conducted between 1978-1988 by previous companies.
Disturbances from most of these activities were not reclaimed prior to
Freegold's acquisition of Golden Summit in 1991. Freegold conducted
additional exploration between 1994 and 1998 and completed all reclamation
requirements before January 1, 2000.
In 2007, an Individual Permit was issued to Freegold Recovery, Inc. USA, APMA
9726, to impact 33 acres of wetlands for exploration trenches, bulk sampling,
access roads, and drill pads on the Tolovana-Cleary Hill exploration blocks,
(West Half of Golden Summit Project). To date, 11.9 acres of wetlands have
been impacted under this authorization. The applicant has requested a five
year time extension for this work and an additional 14 acres of new wetland
disturbance, bringing the total wetland impacts to 25.9, still within the
original authorization. The proposed new wetland fills would occur on
typical north-facing black spruce forest. No riparian wetland disturbance is
proposed.
The main streams draining this block include Cleary Creek and its tributaries
Chatham, Bedrock, and Willow Creeks. The western edge of the Tolovana area
is drained by the upper reaches of Little Eldorado Creek.
2
West-Half
Prospect
Cleary Hill All
Tolovana All
Unreclaimed
Acres
Unreclaimed
Wetland
Acres
Proposed
Drill Pad
Acres
Proposed
Access
Road
Acres
Proposed
Wetland
Acres
All
Acres
25.565
6.8
4.0
2.0
5.4
31.6
12.2
17.16
5.1
5.5
4.0
8.6
26.7
13.7
42.725
11.9
9.5
6.0
14.0
58.2
25.9
Totals
All
Wetland
Acres
Christina-Hi Yu exploration block - eastern half of the Golden Summit
Project:
This part of the Fairbanks Mining District has seen extensive lode and placer
gold mining since the early 1900's. Exploration within several of the
exploration areas was conducted between 1978-1988 by previous companies.
Disturbances from most of these activities were reclaimed prior to Freegold's
acquisition of Golden Summit in 1991. Freegold conducted additional
exploration between 1994 and 1998 and completed all reclamation requirements
before January 1, 2000. Three acres of reclamation liabilities currently
exist on the Christina-Hi Yu exploration block.
The applicant has requested a modification to the 2007 permit to include
exploration in the Christina-Hi Yu block. Total disturbance for this block
would be 31.5 acres of which 15.8 acres are in wetlands. Freegold states
that approximately 50% of this drilling would be on previously undisturbed
lands.
The main streams draining this block include Cleary Creek and its tributaries
Wolf and Chatham Creeks; Fairbanks Creek and its tributaries Too Much Gold
and Moose Creeks; and Pilot and Captain Creeks which drain the northern edge
of the claim area. The lower reaches of Captain Creek (outside the project
area) is identified as a Chinook salmon rearing stream on the Alaska
Department of Fish and Game website.
East-Half Prospect
Proposed
Proposed Access Proposed
All
Unreclaimed Unreclaimed Drill Pad
All Wetland
Road
Wetland
Acres
Wetland Acres Acres
Acres
Acres
Acres Acres
Christina - All
3
1.5
3.5
1.5
2.5
8.0
4.0
Circle Trail - All
0
0.0
2.5
1.0
1.8
3.5
1.8
Goose Creek - All
0
0.0
2.5
2.5
2.5
5.0
2.5
Hi Yu - All
0
0.0
2.0
1.5
1.8
3.5
1.8
Saddle - All
0
0.0
3.5
1.5
2.5
5.0
2.5
Too Much Gold - All
0
0.0
4.0
2.5
3.3
6.5
3.3
3
1.5
18.0
10.5
14.3
31.5
15.8
Totals
Reclamation: During initial disturbance, all humic material covering drill
pads and/or access roads would be stockpiled in a separate but adjacent area,
preferably the low-side of the site to allow this berm to act as a natural
silt-fence for run-off from the excavation. All soil overburden would be
stockpiled in a separate but adjacent area. All rock and rubble from bedrock
excavation would be stockpiled in a different area.
3
Following completion of drilling at each drill hole, all drill holes would be
plugged from termination depth to surface using a commercial hole plugging
mixture. All surface casing, if used, would be removed prior to reclamation.
All timber used to stabilize the rig would be removed and re-used. All
refuse, drill supplies, and materials brought to site would be removed prior
to reclamation of the site.
Once planned work at a drill pad and/or access road has been completed, a
back-hoe and/or crawler dozer would be used to backfill the disturbed area in
the reverse order of excavation. Silt fences would be placed as appropriate
to minimize impact to adjacent wetlands and streams. No artificial
re-seeding is planned unless required. Culverts, if installed, would be
removed.
Historic RS2477 roads, Cleary Wagon Road, Bedrock Creek Road, Willow Creek
Road, Chatham Creek Road, and Cleary Creek Road would be used for access but
would not be reclaimed due to their historic nature and heavy use by third
party recreationalists and mining claim owners.
APPLICANT PROPOSED MITIGATION: The applicant proposes the following
mitigation measures to avoid, minimize, and compensate for impacts to waters
of the United States from activities involving discharges of dredged or fill
material.
a. Avoidance: Applicant's mineral exploration efforts are naturally
concentrated in uplands. Wetlands and waters avoidance would include the
following:
1. Occupying diamond core drilling sites in uplands.
2. No work would be planned in stream bottoms or streams.
3. Utilizing lined sumps to recycle drill fluids to prevent
impacting waters of the United States (U.S.).
4. Utilizing existing water ponds for source water therefore
eliminating excavation in wetlands.
5. Placing equipment and fuel supplies within containment systems to
prevent release of petroleum based products into waters of the
U.S.
b. Minimization: Applicant anticipates disturbing hillside wetlands
and plans to minimize impacts by
1. Drilling as many exploration drill holes as possible from
existing, historic roads and trails.
2. Drilling multiple drill holes from a single drill pad and
reducing pad footprint to minimum size for safe operations.
3. Excavating and utilizing pads in wetlands areas during the winter
months.
4. Constructing access roads and drill pads such that sheet and
channel erosion are reduced or eliminated.
5. Reclaiming all disturbed areas to as close to original contours
as possible at the soonest date practicable.
c. Compensatory Mitigation:
fee as compensatory mitigation.
The applicant proposes to pay an in-lieu
WATER QUALITY CERTIFICATION: A permit for the described work will not be
issued until a certification or waiver of certification, as required under
Section 401 of the Clean Water Act (Public Law 95-217), has been received
from the Alaska Department of Environmental Conservation.
4
CULTURAL RESOURCES: The latest published version of the Alaska Heritage
Resources Survey (AHRS) has been consulted for the presence or absence of
historic properties, including those listed in or eligible for inclusion in
the National Register of Historic Places. There are many unevaluated
properties in the vicinity of the worksite. There is one eligible property in
the vicinity of the worksite. It has been designated LIV-404, Hi-Yu Stamp
Mill. Because it has been determined to be within the project area, a
determination of effect will be made in consultation with the State Historic
Preservation Officer (SHPO). Consultation of the AHRS constitutes the extent
of cultural resource investigations by the District Commander at this time.
Any comments SHPO may have concerning presently unknown archeological or
historic data that may be lost or destroyed by work under the requested
permit will be considered in our final assessment of the described work.
SHPO was contacted via email by Debby McAtee, on October 19, 2012 with a list
providing all properties found within the mining claims, the area of
potential effect.
ENDANGERED SPECIES:
NO EFFECT. No threatened or endangered species are known to use the project
area.
Therefore, no consultation with the U.S. Fish and Wildlife Service or the
National Marine Fisheries Service is required. However, any comments they
may have concerning endangered or threatened wildlife or plants or their
critical habitat will be considered in our final assessment of the described
work.
ESSENTIAL FISH HABITAT: The Magnuson-Stevens Fishery Conservation and
Management Act, as amended by the Sustainable Fisheries Act of 1996, requires
all Federal agencies to consult with the NMFS on all actions, or proposed
actions, permitted, funded, or undertaken by the agency, that may adversely
affect Essential Fish Habitat (EFH).
No EFH species are known to use the project area. The Alaska Department of
Fish and Game's Fish Monitor Resource website was checked on October 22,
2012. The lower reaches of Captain Creek is identified as an anadromous
stream for Chinook rearing.
We have determined the described activity would not adversely affect EFH in
the project area.
TRIBAL CONSULTATION: The Alaska District fully supports tribal selfgovernance and government-to-government relations between Federally
recognized Tribes and the Federal government. Tribes with protected rights
or resources that could be significantly affected by a proposed Federal
action (e.g., a permit decision) have the right to consult with the Alaska
District on a government-to-government basis. Views of each Tribe regarding
protected rights and resources will be accorded due consideration in this
process. This Public Notice serves as notification to the Tribes within the
area potentially affected by the proposed work and invites their
participation in the Federal decision-making process regarding the protected
Tribal right or resource. Consultation may be initiated by the affected
Tribe upon written request to the District Commander during the public
comment period.
PUBLIC HEARING: Any person may request, in writing, within the comment
period specified in this notice, that a public hearing be held to consider
5
this application. Requests for public hearings shall state, with
particularity, reasons for holding a public hearing.
EVALUATION: The decision whether to issue a permit will be based on an
evaluation of the probable impacts, including cumulative impacts of the
proposed activity and its intended use on the public interest. Evaluation of
the probable impacts, which the proposed activity may have on the public
interest, requires a careful weighing of all the factors that become relevant
in each particular case. The benefits, which reasonably may be expected to
accrue from the proposal, must be balanced against its reasonably foreseeable
detriments. The outcome of the general balancing process would determine
whether to authorize a proposal, and if so, the conditions under which it
will be allowed to occur. The decision should reflect the national concern
for both protection and utilization of important resources. All factors,
which may be relevant to the proposal, must be considered including the
cumulative effects thereof. Among those are conservation, economics,
aesthetics, general environmental concerns, wetlands, cultural values, fish
and wildlife values, flood hazards, floodplain values, land use, navigation,
shore erosion and accretion, recreation, water supply and conservation, water
quality, energy needs, safety, food and fiber production, mineral needs,
considerations of property ownership, and, in general, the needs and welfare
of the people. For activities involving 404 discharges, a permit will be
denied if the discharge that would be authorized by such permit would not
comply with the Environmental Protection Agency's 404(b)(l) guidelines.
Subject to the preceding sentence and any other applicable guidelines or
criteria (see Sections 320.2 and 320.3), a permit will be granted unless the
District Commander determines that it would be contrary to the public
interest.
The Corps of Engineers is soliciting comments from the public; Federal,
State, and local agencies and officials; Indian Tribes; and other interested
parties in order to consider and evaluate the impacts of this proposed
activity. Any comments received will be considered by the Corps of Engineers
to determine whether to issue, modify, condition or deny a permit for this
proposal. To make this decision, comments are used to assess impacts on
endangered species, historic properties, water quality, general environmental
effects, and the other public interest factors listed above. Comments are
used in the preparation of an Environmental Assessment and/or an
Environmental Impact Statement pursuant to the National Environmental Policy
Act. Comments are also used to determine the need for a public hearing and
to determine the overall public interest of the proposed activity.
AUTHORITY:
authority:
This permit will be issued or denied under the following
(X) Discharge dredged or fill material into waters of the United States
Section 404 Clean Water Act (33 U.S.C. 1344). Therefore, our public interest
review will consider the guidelines set forth under Section 404(b) of the
Clean Water Act (40 CFR 230).
Project drawings and a Notice of Application for State Water Quality
Certification are enclosed with this Public Notice.
District Commander
U.S. Army, Corps of Engineers
Enclosures
6
SEAN PARNELL, GOVERNOR
STATE OF ALASKA
DEPT. OF ENVIRONMENTAL CONSERVATION
DIVISION OF WATER
401 Certification Program
Non-Point Source Water Pollution Control Program
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
WQM/401 CERTIFICATION
555 CORDOVA STREET
ANCHORAGE, ALASKA 99501-2617
PHONE: (907) 269-7564/FAX: (907) 334-2415
NOTICE OF APPLICATION
FOR
STATE WATER QUALITY CERTIFICATION
Any applicant for a federal license or permit to conduct an activity that
might result in a discharge into navigable waters, in accordance with Section
401 of the Clean Water Act of 1977 (PL95-217), also must apply for and obtain
certification from the Alaska Department of Environmental Conservation that
the discharge will comply with the Clean Water Act, the Alaska Water Quality
Standards, and other applicable State laws. By agreement between the U.S.
Army Corps of Engineers and the Department of Environmental Conservation,
application for a Department of the Army permit to discharge dredged or fill
material into navigable waters under Section 404 of the Clean Water Act also
may serve as application for State Water Quality Certification.
Notice is hereby given that the application for a Department of the Army
Permit described in the Corps of Engineers' Public Notice No. POA-2007-510,
Cleary and Fairbanks Creeks, serves as application for State Water Quality
Certification from the Department of Environmental Conservation.
After reviewing the application, the Department may certify there is
reasonable assurance the activity, and any discharge that might result, will
comply with the Clean Water Act, the Alaska Water Quality Standards, and
other applicable State laws. The Department also may deny or waive
certification.
Any person desiring to comment on the project, with respect to Water Quality
Certification, may submit written comments to the address above by the
expiration date of the Corps of Engineer's Public Notice.
7
Western Half
Tolovana-Cleary Hill
Exploration Block
Vicinity Map
POA-2007-510, Fairbanks Creek
APMA 9726, Freegold Recovery Inc.
Golden Summit Project
17 October 2012
Sheet 1 of 11
Eastern Half
Christina-Hi Yu
Exploration Block
Exploration Areas
POA-2007-510, Fairbanks Creek
APMA 9726, Freegold Recovery Inc.
Golden Summit Project
17 October 2012
Sheet 2 of 11
Drill Holes (Existing)
POA-2007-510, Fairbanks Creek
APMA 9726, Freegold Recovery Inc.
Golden Summit Project
17 October 2012
Sheet 3 of 11
Fairbanks Creek Road
Drill Target Areas (Proposed)
POA-2007-510, Fairbanks Creek
APMA 9726, Freegold Recovery Inc.
Golden Summit Project
17 October 2012
Sheet 4 of 11
Drill Target Areas and Wetlands
POA-2007-510, Fairbanks Creek
APMA 9726, Freegold Recovery Inc.
Golden Summit Project
17 October 2012
Sheet 5 of 11
Typical Drill Pad Plans
POA-2007-510, Fairbanks Creek
APMA 9726, Freegold Recovery Inc.
Golden Summit Project
17 October 2012
Sheet 6 of 11
50' MAX CLEARING LIMIT
5 - 10'
10' DIAMETER
ORIGINAL SLOPE
5' +
ORGANIC LAYER
BEDROCK
4' DEPTH
ORGANIC
STOCKPILE
ORGANIC MAT
DRILL RETURN SUMP
(FOR RECYCLE)
CUT/FILL AREA
Plan View
50'
NOTES:
- DRILL PAD VARIES TO MAX OF 50 FEET DIAMETER.
Drill Pad
Footprint
Mud
Sump
- WHERE APPLICABLE, TOPSOIL AND ORGANIC MATERIALS WILL BE STOCKPILED ON DOWNGRADIENT SLOPE TO
MINIMIZE IMPACTS TO ADJACENT WETLANDS.
- DURING RECLAMATION, DRILL PAD WILL BE RECONTOURED AND CAPPED WITH ORGANICS. IF AVAILABLE, CUT TREES
WILL BE SCATTERED OVER THE RECONTOURED TRENCH TO PROMOTE REVEGETATION AND DISCOURAGE ACCESS.
Drill
Hole
- DEPTH OF CUT AND FILL WILL DEPEND ON SIDE SLOPE ASSUME AVERAGE OF 2-FOOT CUT DEPTH ON UPSLOPE SIDE
- AVERAGE PAD SIZE 50' DIAMETER AND COVERING 0.05 ACRES
- DRILL WATER RECYCLE SUMP IS UNLINED AND AVERAGES 10 FEET IN DIAMETER AND 3-4 FEET DEEP, CONTAINING 12
CUBIC YARDS
- DIESEL FUEL FOR DRILL RIG AND SUPPORT EQUIPMENT IS STORED IN EACH UNIT'S ON-BOARD FUEL TANK. THIS FUEL IS
REPLENSIHED FROM 100 GALLON TANKS IN DRILL SUPPORT PICKUP TRUCKS. NO OTHER FUEL STORAGE ON-SITE
Drill Rig
Outline
- RECLAMATION: DRILL PADS AND SUMP WILL BE RECONTOURED WITH BEDROCK AND SOIL USED TO MAKE PAD, THEN
ORGANIC STOCKPILE WOULD BE DISTRIBUTED OVER AREA TO MITIGATE SHEET AND CHANNEL EROSION AND FOSTER
REVEGETATION.
Golden Summit Project: Exploration Drill Pad Typical Section
Drainage
ditch
Typical Access Road Plans
POA-2007-510, Fairbanks Creek
APMA 9726, Freegold Recovery Inc.
Golden Summit Project
17 October 2012
Sheet 7 of 11
20' MAX CLEARING LIMIT
5 - 10'
WORKING SURFACE (10 feet)
ORGANIC
STOCKPILE
5' +
2'
ORGANIC LAYER
BEDROCK
ORGANIC MAT
CUT/FILL AREA (12 feet)
DRAINAGE DITCH
Plan View
20'
NOTES:
- FILL WILL BE EITHER EXCAVATED BEDROCK FROM CUT PORTION OF ROAD OR GRAVEL.
Road
- WHERE APPLICABLE, TOPSOIL AND ORGANIC MATERIALS WILL BE STOCKPILED ON DOWNGRADIENT SLOPE TO MINIMIZE
IMPACTS TO ADJACENT WETLANDS.
- DURING RECLAMATION, ACCESS ROADS WILL BE RECONTOURED AND CAPPED WITH ORGANICS. IF AVAILABLE, CUT TREES
WILL BE SCATTERED OVER THE RECONTOURED TRENCH TO PROMOTE REVEGETATION AND DISCOURAGE ACCESS.
- DEPTH OF CUT AND FILL WILL DEPEND ON SIDE SLOPE ASSUME AVERAGE OF 2-FOOT CUT DEPTH ON UPSLOPE SIDE.
- RECLAMATION: ROADS WILL BE RECONTOURED WITH BEDROCK AND SOIL USED TO MAKE ROAD BED, THEN ORGANIC
STOCKPILE WOULD BE DISTRIBUTED OVER AREA TO MITIGATE SHEET AND CHANNEL EROSION AND FOSTER REVEGETATION.
DRAINAGE DITCHES
Golden Summit Project: Exploration Access Road Typical Section
Organic Stockpile
- ACCESS ROAD OPERATING SURFACE IS 12 FEET IN WIDTH.
Typical Culvert Plans
POA-2007-510, Fairbanks Creek
APMA 9726, Freegold Recovery Inc.
Golden Summit Project
17 October 2012
Sheet 8 of 11
20' MAX CLEARING LIMIT
5 - 10'
WORKING SURFACE (10 feet)
5' +
2'
ORGANIC
STOCKPILE
ORGANIC MAT
ORGANIC LAYER
BEDROCK
ARMOR PLACED
AROUND CULVERT
CULVERT
Plan View
20'
NOTES:
- CULVERT WILL BE SIZED TO FIT THE DRAINAGE, USUALLY 18-24-INCH DIAMETER CMP.
Road
- RECLAIMATION: CULVERTS WILL BE REMOVED, THEN ROAD WILL BE RECONTOURED WITH BEDROCK
AND SOIL USED TO MAKE ROAD BED, THEN ORGANIC STOCKPILE WOULD BE DISTRIBUTED OVER AREA TO
MITIGATE SHEET AND CHANNEL EROSION AND FOSTER REVEGETATION.
CULVERT
- CULVERT WILL BE PLACED IN NATURAL DRAINAGE OR DITCH FLOW LINE. IF APPLICABLE, DOWNSLOPE
ORGANIC STOCKPILE WILL BE NOTCHED TO ALLOW FLOW-THROUGH.
DRAINAGE DITCHES
Golden Summit Project: Culvert Typical Section
Organic Stockpiles
- ACCESS ROAD OPERATING SURFACE IS 12 FEET IN WIDTH.
RIP-RAP
CUT/FILL AREA (12 feet)
Typical Drill Pad Reclamation
POA-2007-510, Fairbanks Creek
APMA 9726, Freegold Recovery Inc.
Golden Summit Project
17 October 2012
Sheet 9 of 11
50' MAX CLEARING LIMIT
ORGANIC
BACKFILL
ORGANIC LAYER
BEDROCK
BEDROCK
ORGANIC MAT
BACKFILL
CUT/FILL AREA
Plan View
DRILL RETURN SUMP
50'
NOTES:
- DRILL PAD VARIES TO MAX OF 50 FEET DIAMETER.
Drill Pad
Footprint
Mud
Sump
- WHERE APPLICABLE, TOPSOIL AND ORGANIC MATERIALS WILL BE STOCKPILED ON DOWNGRADIENT SLOPE TO
MINIMIZE IMPACTS TO ADJACENT WETLANDS.
- DURING RECLAMATION, DRILL PAD WILL BE RECONTOURED AND CAPPED WITH ORGANICS. IF AVAILABLE, CUT TREES
WILL BE SCATTERED OVER THE RECONTOURED TRENCH TO PROMOTE REVEGETATION AND DISCOURAGE ACCESS.
- DEPTH OF CUT AND FILL WILL DEPEND ON SIDE SLOPE ASSUME AVERAGE OF 2-FOOT CUT DEPTH ON UPSLOPE SIDE
- AVERAGE PAD SIZE 50' DIAMETER AND COVERING 0.05 ACRES
- DRILL WATER RECYCLE SUMP IS UNLINED AND AVERAGES 10 FEET IN DIAMETER AND 3-4 FEET DEEP, CONTAINING 12
CUBIC YARDS
- DIESEL FUEL FOR DRILL RIG AND SUPPORT EQUIPMENT IS STORED IN EACH UNIT'S ON-BOARD FUEL TANK. THIS FUEL IS
REPLENSIHED FROM 100 GALLON TANKS IN DRILL SUPPORT PICKUP TRUCKS. NO OTHER FUEL STORAGE ON-SITE
Organic Backfill
- RECLAMATION: DRILL PADS AND SUMP WILL BE RECONTOURED WITH BEDROCK AND SOIL USED TO MAKE PAD, THEN
ORGANIC STOCKPILE WOULD BE DISTRIBUTED OVER AREA TO MITIGATE SHEET AND CHANNEL EROSION AND FOSTER
REVEGETATION.
Golden Summit Project: Reclaimed Exploration Drill Pad Typical Section
Typical Road Reclamation
POA-2007-510, Fairbanks Creek
APMA 9726, Freegold Recovery Inc.
Golden Summit Project
17 October 2012
Sheet 10 of 11
20' MAX CLEARING LIMIT
ORGANIC
BACKFILL
ORGANIC LAYER
BEDROCK
BEDROCK
ORGANIC MAT
BACKFILL
Plan View
20'
NOTES:
- FILL WILL BE EITHER EXCAVATED BEDROCK FROM CUT PORTION OF ROAD OR GRAVEL.
- WHERE APPLICABLE, TOPSOIL AND ORGANIC MATERIALS WILL BE STOCKPILED ON DOWNGRADIENT SLOPE TO MINIMIZE
IMPACTS TO ADJACENT WETLANDS.
- DURING RECLAMATION, ACCESS ROADS WILL BE RECONTOURED AND CAPPED WITH ORGANICS. IF AVAILABLE, CUT TREES
WILL BE SCATTERED OVER THE RECONTOURED TRENCH TO PROMOTE REVEGETATION AND DISCOURAGE ACCESS.
Organic Backfill
- ACCESS ROAD OPERATING SURFACE IS 12 FEET IN WIDTH.
- DEPTH OF CUT AND FILL WILL DEPEND ON SIDE SLOPE ASSUME AVERAGE OF 2-FOOT CUT DEPTH ON UPSLOPE SIDE.
- RECLAMATION: ROADS WILL BE RECONTOURED WITH BEDROCK AND SOIL USED TO MAKE ROAD BED, THEN ORGANIC
STOCKPILE WOULD BE DISTRIBUTED OVER AREA TO MITIGATE SHEET AND CHANNEL EROSION AND FOSTER REVEGETATION.
Golden Summit Project: Reclaimed Exploration Access Road Typical Section
Typical Culvert Reclamation
POA-2007-510, Fairbanks Creek
APMA 9726, Freegold Recovery Inc.
Golden Summit Project
17 October 2012
Sheet 11 of 11
20' MAX CLEARING LIMIT
ORGANIC
BACKFILL
ORGANIC MAT
ORGANIC LAYER
BEDROCK
CULVERT (Removed)
Plan View
20'
NOTES:
- CULVERT WILL BE SIZED TO FIT THE DRAINAGE, USUALLY 18-24-INCH DIAMETER CMP.
- CULVERT WILL BE PLACED IN NATURAL DRAINAGE OR DITCH FLOW LINE. IF APPLICABLE, DOWNSLOPE
ORGANIC STOCKPILE WILL BE NOTCHED TO ALLOW FLOW-THROUGH.
- RECLAIMATION: CULVERTS WILL BE REMOVED, THEN ROAD WILL BE RECONTOURED WITH BEDROCK
AND SOIL USED TO MAKE ROAD BED, THEN ORGANIC STOCKPILE WOULD BE DISTRIBUTED OVER AREA TO
MITIGATE SHEET AND CHANNEL EROSION AND FOSTER REVEGETATION.
Golden Summit Project: Reclaimed Culvert Typical Section
Organic Backfill
- ACCESS ROAD OPERATING SURFACE IS 12 FEET IN WIDTH.