LAND USE PERMIT DIAGRAI.t (Tioa.ANDS)
GRAPHIC SCALE (FEET)
SEWARD MERIDIAN, T.028S, R.019W
SHEEr30F3
APPUCANT'S tW.IE:
FEDERAL AVIATION ADioiiNISTRATION
US Army Corps
of Engineers
Alaska District
Regulatory Division (1145)
CEPOA-RD
Post Office Box 6898
JBER, Alaska 99506-0898
Public Notice
of Application
for Permit
PUBLIC NOTICE DATE:
November 9, 2012
EXPIRATION DATE:
December 10, 2012
REFERENCE NUMBER:
POA-2011-757
WATERWAY:
Woody Island Channel
Interested parties are hereby notified that a Department of the Army permit
application has been received for work in waters of the United States as described
below and shown on the enclosed project drawings.
Comments on the described work, with the reference number, should reach this office
no later than the expiration date of this Public Notice to become part of the
record and be considered in the decision. Please contact Roberta K. Budnik at
(907) 753-2785, toll free from within Alaska at (800) 478-2712, by fax at
(907) 753-5567, or by email at roberta.k.budnik@usace.army.mil if further
information is desired concerning this notice.
APPLICANT: Federal Aviation Administration, 222 West 7th Avenue, Suite 14,
Anchorage, Alaska 99513.
LOCATION: The project site is located within Section 4, T. 28 S., R. 19 W., Seward
Meridian; USGS Quad Map Kodiak D-2; Latitude 57.7822º N., Longitude 152.3583º W.;
on Woody Island, near Kodiak, Alaska.
SPECIAL AREA DESIGNATION:
National Wildlife Refuge.
The project is located within the Alaska Maritime
PURPOSE: The applicant's stated purpose is to construct a new boat ramp in order
to ensure continuous operations for essential Federal Aviation Administration (FAA)
air navigation systems on Woody Island.
PROPOSED WORK: Excavate 1,180 cubic yards of material from a 243-foot long by 58foot wide area (0.3235-acre) and then discharge a total of 1059.5 cubic yards of
fill materials below High Tide Line (HTL) in order to construct a new 228-foot long
by 28-foot wide (toe-to-toe) boat ramp. Up to 180 feet of the boat ramp's length
would be below HTL; therefore 0.1157-acre of waters of the U.S. would be filled.
All work would be performed in accordance with the enclosed plan (sheets 1-3),
dated February 7, 2011.
ADDITIONAL INFORMATION: The proposed boat ramp would replace an existing wooden
dock, constructed in 1964, that is deteriorating and becoming unsafe to use. The
wooden dock was built shortly after the 1964 Great Alaska earthquake, and is
deteriorating and is becoming unsafe to use. The FAA had an engineering survey of
the dock completed and determined that it would be impractical to repair the dock
due to the deteriorating nature of the wood and concrete.
APPLICANT PROPOSED MITIGATION: The applicant proposes the following mitigation
measures to avoid, minimize, and compensate for impacts to waters of the United
States from activities involving discharges of dredged or fill material.
a. Avoidance: The proposed project purpose is for boat access to the
island, and complete avoidance of waters of the U.S. is therefore not possible.
b. Minimization: The FAA will plan and carry out the proposed project using
best management practices and take the necessary steps to minimize impacts to
aquatic resources to the greatest extent possible. The proposed project site was
selected because of its proximity to the existing dock, and due to the site being
an already somewhat developed area. This minimizes impacts to previously
undisturbed areas, and is also the site at the entrance to the existing roadway
that leads to the FAA facilities. All excavated material would be removed to
upland areas.
c. Compensatory Mitigation:
mitigation.
The FAA has not proposed any compensatory
WATER QUALITY CERTIFICATION: A permit for the described work will not be issued
until a certification or waiver of certification, as required under Section 401 of
the Clean Water Act (Public Law 95-217), has been received from the Alaska
Department of Environmental Conservation.
CULTURAL RESOURCES: The lead
is responsible for compliance
Historic Preservation Act. A
until the Section 106 process
Federal agency, the Federal Aviation Administration,
with the requirements of Section 106 of the National
permit for the described work will not be issued
has been completed.
ENDANGERED SPECIES: The project area is within the known or historic range of the
North American breeding Steller's eider (Polysticta stelleri), and the southwest
distinct population segment of northern sea otter (Enhydra lutris kenyoni). The
proposed project area is also with sea otter critical habitat. The lead Federal
agency, the Federal Aviation Administration, is responsible for compliance with the
requirements of Section 7 of the Endangered Species Act. A permit for the
described work will not be issued until the Section 7 process has been completed.
ESSENTIAL FISH HABITAT: The Magnuson-Stevens Fishery Conservation and Management
Act, as amended by the Sustainable Fisheries Act of 1996, requires all Federal
agencies to consult with the NMFS on all actions, or proposed actions, permitted,
funded, or undertaken by the agency, that may adversely affect Essential Fish
Habitat (EFH). The project area is within the known range of the Chinook salmon
(Oncorhynchus tschawytscha), sockeye salmon (Oncorhynchus nerka), chum salmon
(Oncorhynchus keta), Coho salmon (Oncorhynchus kisutch), and pink salmon
(Oncorhynchus gorbuscha). We are currently gathering information regarding these
species and have yet to make a determination of effect. Should we find that the
-2-
described activity may affect the species listed above, we will follow the
appropriate course of action under Section 305(b)(2) of the Magnuson-Stevens Act.
Any comments the National Marine Fisheries Service may have concerning essential
fish habitat will be considered in our final assessment of the described work.
TRIBAL CONSULTATION: The Alaska District fully supports tribal self-governance and
government-to-government relations between Federally recognized Tribes and the
Federal government. Tribes with protected rights or resources that could be
significantly affected by a proposed Federal action (e.g., a permit decision) have
the right to consult with the Alaska District on a government-to-government basis.
Views of each Tribe regarding protected rights and resources will be accorded due
consideration in this process. This Public Notice serves as notification to the
Tribes within the area potentially affected by the proposed work and invites their
participation in the Federal decision-making process regarding the protected Tribal
right or resource. Consultation may be initiated by the affected Tribe upon
written request to the District Commander during the public comment period.
PUBLIC HEARING: Any person may request, in writing, within the comment period
specified in this notice, that a public hearing be held to consider this
application. Requests for public hearings shall state, with particularity, reasons
for holding a public hearing.
EVALUATION: The decision whether to issue a permit will be based on an evaluation
of the probable impacts, including cumulative impacts of the proposed activity and
its intended use on the public interest. Evaluation of the probable impacts, which
the proposed activity may have on the public interest, requires a careful weighing
of all the factors that become relevant in each particular case. The benefits,
which reasonably may be expected to accrue from the proposal, must be balanced
against its reasonably foreseeable detriments. The outcome of the general
balancing process would determine whether to authorize a proposal, and if so, the
conditions under which it will be allowed to occur. The decision should reflect
the national concern for both protection and utilization of important resources.
All factors, which may be relevant to the proposal, must be considered including
the cumulative effects thereof. Among those are conservation, economics,
aesthetics, general environmental concerns, wetlands, cultural values, fish and
wildlife values, flood hazards, floodplain values, land use, navigation, shore
erosion and accretion, recreation, water supply and conservation, water quality,
energy needs, safety, food and fiber production, mineral needs, considerations of
property ownership, and, in general, the needs and welfare of the people. For
activities involving 404 discharges, a permit will be denied if the discharge that
would be authorized by such permit would not comply with the Environmental
Protection Agency's 404(b)(l) guidelines. Subject to the preceding sentence and
any other applicable guidelines or criteria (see Sections 320.2 and 320.3), a
permit will be granted unless the District Commander determines that it would be
contrary to the public interest.
The Corps of Engineers is soliciting comments from the public; Federal, State, and
local agencies and officials; Indian Tribes; and other interested parties in order
to consider and evaluate the impacts of this proposed activity. Any comments
received will be considered by the Corps of Engineers to determine whether to
issue, modify, condition or deny a permit for this proposal. To make this
decision, comments are used to assess impacts on endangered species, historic
properties, water quality, general environmental effects, and the other public
interest factors listed above. Comments are used in the preparation of an
-3-
Environmental Assessment and/or an Environmental Impact Statement pursuant to the
National Environmental Policy Act. Comments are also used to determine the need
for a public hearing and to determine the overall public interest of the proposed
activity.
AUTHORITY:
This permit will be issued or denied under the following authorities:
(X) Perform work in or affecting navigable waters of the United States
Section 10 Rivers and Harbors Act 1899 (33 U.S.C. 403).
(X) Discharge dredged or fill material into waters of the United States
Section 404 Clean Water Act (33 U.S.C. 1344). Therefore, our public interest
review will consider the guidelines set forth under Section 404(b) of the Clean
Water Act (40 CFR 230).
Project drawings and a Notice of Application for State Water Quality Certification
are enclosed with this Public Notice.
District Commander
U.S. Army, Corps of Engineers
Enclosures
-4-
SEAN PARNELL, GOVERNOR
STATE OF ALASKA
DEPT. OF ENVIRONMENTAL CONSERVATION
DIVISION OF WATER
401 Certification Program
Non-Point Source Water Pollution Control Program
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
WQM/401 CERTIFICATION
555 CORDOVA STREET
ANCHORAGE, ALASKA 99501-2617
PHONE: (907) 269-7564/FAX: (907) 334-2415
NOTICE OF APPLICATION
FOR
STATE WATER QUALITY CERTIFICATION
Any applicant for a federal license or permit to conduct an activity that might
result in a discharge into navigable waters, in accordance with Section 401 of the
Clean Water Act of 1977 (PL95-217), also must apply for and obtain certification
from the Alaska Department of Environmental Conservation that the discharge will
comply with the Clean Water Act, the Alaska Water Quality Standards, and other
applicable State laws. By agreement between the U.S. Army Corps of Engineers and
the Department of Environmental Conservation, application for a Department of the
Army permit to discharge dredged or fill material into navigable waters under
Section 404 of the Clean Water Act also may serve as application for State Water
Quality Certification.
Notice is hereby given that the application for a Department of the Army Permit
described in the Corps of Engineers' Public Notice No. POA-2011-757, Woody Island
Channel, serves as application for State Water Quality Certification from the
Department of Environmental Conservation.
After reviewing the application, the Department may certify there is reasonable
assurance the activity, and any discharge that might result, will comply with the
Clean Water Act, the Alaska Water Quality Standards, and other applicable State
laws. The Department also may deny or waive certification.
Any person desiring to comment on the project, with respect to Water Quality
Certification, may submit written comments to the address above by the expiration
date of the Corps of Engineer's Public Notice.
0
I
50
100
200
I
I
I
300
'
I
GRAPHIC srAI..E (FEEl) ,
PROJECT PLAN '
TOP Of RAMP +15 llllW
15
10
5
0 llllW
-5
-10
-15
0
10
20
30
40
50
60
70
80
90
-20
100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 260
LANDING RAMP PROFILE
WOODY ISLAND ACCESS IMPROVEMENTS
IM1E OF PIIPMA1IDH:
rT1 FEB 2011
0
10
20
60
80
HORIZONTAL SCALE (FEET)
0
3
6
9
12
15
VER11CAI.. SCALE (FEET)
stm20F3
APPROXIMATE
UPPER
BEACH
a.EVATION
1-E-::-------------------
58'-2"
----------------1--~
CONCREIE PlANK
1-E-;---- 15'-1" ---~-~
... ·
...!:· ·'··:
·. ·..
~
.·..
SJEEL Sl.fEPER RAILS
200 lB ARMOR STONE
20 lB ALTER STONE
PIT RUN GRAVEL
EXCAVATION UMR'S
TYPICAL RAMP SECTION
NOlE:
CONCRETE PlANK DIMENSIONS M£. NOI.IINAI.LY 16" x 36" X 192"
WOODY ISlAND ACCESS IMPROVEMENTS
DATE OF PREPARATION:
07 FEB 2011
0
5
6U-lU
10
15
I
I
IUSJLAND USE PERMIT DIAGRAI.t (Tioa.ANDS)
GRAPHIC SCALE (FEET)
SEWARD MERIDIAN, T.028S, R.019W
SHEEr30F3
APPUCANT'S tW.IE:
FEDERAL AVIATION ADioiiNISTRATION