You can copy from here when filling out the rest of the page.
POA-1991-354-M4, Walker Fork - Ferguson Placer, Inc., stated purpose is to recover economical
POA-1991-354-M4, Walker Fork- Ferguson Placer, Inc., stated purpose is to recover economical alluvial precious metals from the valley floor of Walker Fork. Please contact Leslie W. Tose at (907) 753-5515, toll free from within Alaska at (800) 478-2712, by fax at (907) 753-5567, or by email at leslie.w.tose@usace.army.mil if further information is desired concerning this notice.
US Army Corps
of Engineers
Alaska District
ANCHORAGE
Regulatory Division (1145)
CEPOA-RD
Post Office Box 6898
JBER, Alaska 99506-0898
Public Notice
of Application
for Permit
PUBLIC NOTICE DATE:
November 28, 2012
EXPIRATION DATE:
December 28, 2012
REFERENCE NUMBER:
POA-1991-354-M4
WATERWAY:
Walker Fork
Interested parties are hereby notified that a Department of the Army permit
application has been received for work in waters of the United States as described
below and shown on the enclosed project drawings.
Comments on the described work, with the reference number, should reach this office
no later than the expiration date of this Public Notice to become part of the
record and be considered in the decision. Please contact Leslie W. Tose at (907)
753-5515, toll free from within Alaska at (800) 478-2712, by fax at (907) 753-5567,
or by email at leslie.w.tose@usace.army.mil if further information is desired
concerning this notice.
APPLICANT:
Mr. Kim Ferguson, Ferguson Placer, Inc., P.O. Box 609, Haines, Alaska
99827 Phone: 1-206-792-9776 Email: kkferguson@me.com
LOCATION: The project site is located within Sections 34, 35, and 36, T. 27 N., R.
21 E., and Section 6, T. 26 N., R. 22 E., Copper River Meridian; USGS Quad Map
Eagle A-1; Latitude 64.0775º N., Longitude 141.2752 º W.; near Boundary, Alaska.
PURPOSE: Mr. Kim Ferguson's stated purpose is to recover economical alluvial
precious metals from the valley floor of Walker Fork.
PROPOSED WORK: The applicant proposes to impact approximately 252.15 acres of
waters of the U.S., including wetlands, over a period of five years, in association
with a placer mining operation. Of this area, 166.12 acres would be mined using a
floating wash plant, 64.86 acres would be used for temporary stockpile of
overburden, and 21.18 acres would be used during temporary and/or permanent stream
diversions. The project area would be approximately 16,080 feet long by 700 feet
wide.
Specifics are as follows: In preparation for mining, the applicant proposes to
mechanically clear 957,457 cubic yards (cy) of organic "muck" overburden and
1,898,733 cy gravel overburden from the 166.12 acre mine area. These same
materials would be discharged into 64.86 acres of adjacent wetlands for temporary
stockpile.
1,072,000 cy of exposed pay gravels would then be mined and discharged
back into the mine pit. Following mining, all stockpiled organic and gravel
overburden would be discharged back into the mine pit and re-contoured, for the
purpose of reclamation. During the mining operation, nine temporary and/or
permanent stream diversions totaling 10,251 linear feet (21.18 acres) would be
constructed. All work would be performed in accordance with information available
for viewing in Appendices, A through E, found on our web site at:
http://www.poa.usace.army.mil/Missions/Regulatory/PublicNotices.aspx
Appendix A:
reclamation
Appendix B:
Appendix C:
Appendix D:
Appendix E:
Project Description and photos of mine operation and typical
conducted by Ferguson Placer, Inc., ten pages.
Project Plans, thirteen pages.
Summary and photos of wetland areas, twelve pages.
Mitigation Statement, three pages.
Project schedule and phasing, two pages.
ADDITIONAL INFORMATION:
Jurisdiction: Walker Fork, a relatively permanent water (RPW), is a 20 mile long
tributary of the South Fork of the Fortymile River (RPW) . The South Fork flows
into the Mosquito Fork (RPW), which flows into the Forty Mile River, a Traditional
Navigable Water.
Watershed disturbance: The Walker Fork watershed has been mined historically,
starting around the turn of the century, using hydraulic open cut methods and
later, bucket dredges. The intensity of mining activities has varied through time,
and is correlated with the price of gold.
Some areas have been mined more than one
time.
Intensive mining has occurred for about five miles upstream of the proposed
project on Walker Fork, on Cherry Creek, and in headwater streams as well.
Below
the proposed operation is an approximately one mile reach of placer workings. The
proposed operation would mine approximately three miles of Walker Fork, between the
two previously mined areas.
Previous permitting: This is the fourth permit modification for a mining operation
on Walker Fork, started in 1991. Ownership of the claims has changed several
times. Work under the current operator, started in 2010, consists of: mine plans
and bonding with the Alaska Department of Natural Resources, Division of Mining,
and with the Bureau of Land Management; clean up of machinery, debris and camp area
of previous mining operations, reclamation of previous mining disturbance,
establishment of a new camp and road improvement activities, and some new mining.
Wetlands: The area of the proposed mine has a shallow gradient (0.5%) and contains
palustrine forested, palustrine scrub shrub and palustrine emergent wetlands, or
"muskeg", with high levels of groundwater. Appendix C includes aerial photographs
covering some of the area to be mined, and site photographs showing typical wetland
types and features in the project area. Using the Alaska Regulatory Best
Professional Judgement Wetlands Function Assessment, wetlands at the site scored as
high for habitat suitability, moderate for flood flow alteration, sediment removal,
production and export of organic matter, and native plant richness, and low for
education or scientific value, uniqueness and heritage.
Uplands: Some portions of the operation, including the main access road, and camp,
are in uplands.
APPLICANT PROPOSED MITIGATION:
The applicant proposes mitigation measures to
-2-
avoid, minimize, and compensate for impacts to waters of the United States from
activities involving discharges of dredged or fill material.
Please see Appendix D for this information.
WATER QUALITY CERTIFICATION: A permit for the described work will not be issued
until a certification or waiver of certification, as required under Section 401 of
the Clean Water Act (Public Law 95-217), has been received from the Alaska
Department of Environmental Conservation.
CULTURAL RESOURCES: The latest published version of the Alaska Heritage Resources
Survey (AHRS) has been consulted for the presence or absence of historic
properties, including those listed in or eligible for inclusion in the National
Register of Historic Places.
There is an unevaluated property in the vicinity of
the worksite.
It has been designated Walker Fork Cabin 2006-1. Because the
property has been determined to be outside of the project area, no further action
is required.
Consultation of the AHRS constitutes the extent of cultural resource
investigations by the District Commander at this time. This application is being
coordinated with SHPO. Any comments SHPO may have concerning presently unknown
archeological or historic data that may be lost or destroyed by work under the
requested permit will be considered in our final assessment of the described work.
ENDANGERED SPECIES:
project area.
No threatened or endangered species are known to use the
We have determined the described activity would have no effect on any listed or
proposed threatened or endangered species, and would have no effect on any
designated or proposed critical habitat, under the Endangered Species Act of 1973
(87 Stat. 844). Therefore, no consultation with the U.S. Fish and Wildlife Service
or the National Marine Fisheries Service is required.
However, any comments they
may have concerning endangered or threatened wildlife or plants or their critical
habitat will be considered in our final assessment of the described work.
ESSENTIAL FISH HABITAT: The Magnuson-Stevens Fishery Conservation and Management
Act, as amended by the Sustainable Fisheries Act of 1996, requires all Federal
agencies to consult with the NMFS on all actions, or proposed actions, permitted,
funded, or undertaken by the agency, that may adversely affect Essential Fish
Habitat (EFH) .
No EFH species are known to use the project area.
TRIBAL CONSULTATION: The Alaska District fully supports tribal self-governance and
government-to-government relations between Federally recognized Tribes and the
Federal government.
Tribes with protected rights or resources that could be
significantly affected by a proposed Federal action (e.g., a permit decision) have
the right to consult with the Alaska District on a government-to-government basis.
Views of each Tribe regarding protected rights and resources will be accorded due
consideration in this process.
This Public Notice serves as notification to the
Tribes within the area potentially affected by the proposed work and invites their
participation in the Federal decision-making process regarding the protected Tribal
right or resource.
Consultation may be initiated by the affected Tribe upon
written request to the District Commander during the public comment period.
PUBLIC HEARING: Any person may request, in writing, within the comment period
specified in this notice, that a public hearing be held to consider this
-3-
application. Requests for public hearings shall state, with particularity, reasons
for holding a public hearing.
EVALUATION: The decision whether to issue a permit will be based on an evaluation
of the probable impacts, including cumulative impacts of the proposed activity and
its intended use on the public interest.
Evaluation of the probable impacts, which
the proposed activity may have on the public interest, requires a careful weighing
of all the factors that become relevant in each particular case.
The benefits,
which reasonably may be expected to accrue from the proposal, must be balanced
against its reasonably foreseeable detriments. The outcome of the general
balancing process would determine whether to authorize a proposal, and if so, the
conditions under which it will be allowed to occur. The decision should reflect
the national concern for both protection and utilization of important resources.
All factors, which may be relevant to the proposal, must be considered including
the cumulative effects thereof. Among those are conservation, economics,
aesthetics, general environmental concerns, wetlands, cultural values, fish and
wildlife values, flood hazards, floodplain values, land use, navigation, shore
erosion and accretion, recreation, water supply and conservation, water quality,
energy needs, safety, food and fiber production, mineral needs, considerations of
property ownership, and, in general, the needs and welfare of the people.
For
activities involving 404 discharges, a permit will be denied if the discharge that
would be authorized by such permit would not comply with the Environmental
Protection Agency's 404(b) (l) guidelines. Subject to the preceding sentence and
any other applicable guidelines or criteria (see Sections 320.2 and 320.3), a
permit will be granted unless the District Commander determines that it would be
contrary to the public interest.
The Corps of Engineers is soliciting comments from the public; Federal, State, and
local agencies and officials; Indian Tribes; and other interested parties in order
to consider and evaluate the impacts of this proposed activity. Any comments
received will be considered by the Corps of Engineers to determine whether to
issue, modify, condition or deny a permit for this proposal.
To make this
decision, comments are used to assess impacts on endangered species, historic
properties, water quality, general environmental effects, and the other public
interest factors listed above. Comments are used in the preparation of an
Environmental Assessment and/or an Environmental Impact Statement pursuant to the
National Environmental Policy Act.
Comments are also used to determine the need
for a public hearing and to determine the overall public interest of the proposed
activity.
AUTHORITY:
This permit will be issued or denied under the following authority:
(X)
Discharge dredged or fill material into waters of the United States Section 404 Clean Water Act (33 U.S.C. 1344). Therefore, our public interest
review will consider the guidelines set forth under Section 404(b) of the Clean
Water Act (40 CFR 230) .
Project drawings and a Notice ~f Application for State Water Quality Certification
are enclosed with this Public Notice.
District Commander
u.s. Army, Corps of Engineers
Attachment
-4-
SEAN PARNELL, GOVERNOR
STATE OF ALASKA
DEPT. OF ENVIRONMENTAL CONSERVATION
DIVISION OF WATER
401 Certification Program
Non-Point Source Water Pollution Control Program
JUNEAU
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
WQM/401 CERTIFICATION
410 WILLOUGHBY AVENUE
JUNEAU, ALASKA 99801-1795
PHONE: (907) 465-5321/FAX: (907) 465-5274
NOTICE OF APPLICATION
FOR
STATE WATER QUALITY CERTIFICATION
Any applicant for a federal license or permit to conduct an activity that might
result in a discharge into navigable waters, in accordance with Section 401 of the
Clean Water Act of 1977 (PL95-217), also must apply for and obtain certification
from the Alaska Department of Environmental Conservation that the discharge will
comply with the Clean Water Act, the Alaska Water Quality Standards, and other
applicable State laws. By agreement between the U.S. Army Corps of Engineers and
the Department of Environmental Conservation, application for a Department of the
Army permit to discharge dredged or fill material into navigable waters under
Section 404 of the Clean Water Act also may serve as application for State Water
Quality Certification.
Notice is hereby given that the application for a Department of the Army Permit
described in the Corps of Engineers' Public Notice No. 1991-354-M4, Walker Fork,
serves as application for State Water Quality Certification from the Department of
Environmental Conservation.
After reviewing the application, the Department may certify there is reasonable
assurance the activity, and any discharge that might result, will comply with the
Clean Water Act, the Alaska Water Quality Standards, and other applicable State
laws. The Department also may deny or waive certification.
Any person desiring to comment on the project, with respect to Water Quality
Certification, may submit written comments to the address above by the expiration
date of the Corps of Engineer's Public Notice.
U.S. ARMY CORPS OF ENGINEERS
APPLICATION FOR DEPARTMENT OF THE ARMY PERMIT
OMB APPROVAL NO. 0710-0003
EXPIRES: 28 FEBRUARY 2013
33 CFR 325. The proponent agency is CECW-CO-R.
Public reporting for this collection of information is estimated to average 11 hours per response, including the time for reviewing instructions, searching
existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding
this burden estimate or any other aspect of the collection of information, including suggestions for reducing this burden, to Department of Defense,
Washington Headquarters, Executive Services and Communications Directorate, Information Management Division and to the Office of Management and
Budget, Paperwork Reduction Project (071 0-0003). Respondents should be aware that notwithstanding any other provision of law, no person shall be
subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT
RETURN your form to either of those addresses. Completed applications must be submitted to the District Engineer having jurisdiction over the location of
the proposed activity.
PRIVACY ACT STATEMENT
Authorities: Rivers and Harbors Act, Section 10, 33 USC 403; Clean Water Act, Section 404, 33 USC 1344; Marine Protection, Research, and Sanctuaries
Act, Section 103, 33 USC 1413; Regulatory Programs of the Corps of Engineers; Final Rule 33 CFR 320-332. Principal Purpose: Information provided on
this form will be used in evaluating the application for a permit. Routine Uses: This information may be shared with the Department of Justice and other
federal, state, and local government agencies, and the public and may be made available as part of a public notice as required by Federal law. Submission
of requested information is voluntary, however, if information is not provided the permit application cannot be evaluated nor can a permit be issued. One set
of original drawings or good reproducible copies which show the location and character of the proposed activity must be attached to this application (see
sample drawings and/or instructions) and be submitted to the District Engineer having jurisdiction over the location of the proposed activity. An application
that is not completed in full will be returned.
(ITEMS 1 THRU 4 TO BE FILLED BY THE CORPS)
2. FIELD OFFICE CODE
3. DATE RECEIVED
ecroYi- t<'D- N
4. DATE APPLICATION COMPLETE
qJt5{J..ot~
II
I Iff{ 26 I 2.
(ITEMS BELOW TO BE FILLED BY APPLICANT)
5. APPLICANT'S NAME
First-Kim
8. AUTHORIZED AGENT'S NAME AND TITLE (agent is not required)
Middle -Ronald
Last - Ferguson
First-
Middle-
Company- Ferguson Placer Inc.
Company-
E-mail Address - k:kferguson@me.com
E-mail Address -
6. APPLICANT'S ADDRESS:
9. AGENT'S ADDRESS:
Address- Box 28
AddressState- AK
City - Chicken
Zip -
99732
Country- US
c. Fax
b. Business
Zip-
State-
City-
Country-
10. AGENTS PHONE NOs. w/AREA CODE
7. APPLICANT'S PHONE NOs. w/AREA CODE
a. Residence
Last-
b. Business
a. Residence
c. Fax
1(206) 792-9776
STATEMENT OF AUTHORIZATION
11. 1hereby authorize,
to act in my behalf as my agent in the processing of this application and to furnish, upon request,
supplemental information in support of this permit application.
DATE
SIGNATURE OF APPLICANT
d
NAME, LOCATION, AND DESCRIPTION OF PROJECT OR ACTIVITY
12. PROJECT NAME OR TITLE (see instructions)
Walker Fork Placer Mine
13. NAME OF WATERBODY, IF KNOWN (if applicable)
14. PROJECT STREET
WalkerFork
Address
ADbRES~-;ppl~'i)
~ ,$'
l-1-5-.-L-0-CA-T-IO_N_O_F_P_R_O_JE_C_T-----------------j City_
Latitude: ·N 64.07756
\
Longitude: ·W 141.27519
16. OTHER LOCATION DESCRIPTIONS, IF KNOWN (see instructions)
34, 35, 36, (6)
.:';)~p-
__
..;l,_~i
""'-.A K ~
Municipality
State Tax Parcel ID
Section-
State-
~
~
Towryship-
ENG FORM 4345, OCT 2012
27N, (26N)
Range-
21E, (22E)
PREVIOUS EDITIONS ARE OBSOLETE.
Page 1 of 3
24. Is Any Portion ofthe Work Already Complete? !&JYes
QNo
IF YES, DESCRIBE THE COMPLETED WORK
!Auger drill samples have been taken and capped to determine areas viable for economic mining.
25. Addresses of Adjoining Property Owners, Lessees, Etc., Whose Property Adjoins the Waterbody (if more than can be entered here, please attach a supplemental list).
a. Address- Mackinaw Productions Inc. , I 0889 County road 320
City- Rifle
State- CO
Zip-81650
b. Address- Harvey Bickle, 280 Ricardo Road
City- Gabriela
State- B.C. Canada, VOR
IXJ
Zip-
c. AddressCity-
State-
Zip-
State-
Zip-
State-
Zip-
d. AddressCitye. Address-
City-
26. List of Other Certificates or Approvals/Denials received from other Federal, State, or Local Agencies for Work Described in This Application.
IDENTIFICATION
TYPE APPROVAL*
DATE APPROVED
DATE APPLIED
DATE DENIED
AGENCY
NUMBER
BLM
POO
2012-04-30
2012-07-07
DNR
Misc. Land Use
2012-04-30
2012-06-01
Fish and Game
Fish Habitat
2011-05-11
2011-06-10
Alaska DEC
APDES
2012-04-30
2012-07-03
AKG370773
· Would include but is not restricted to zoning, building, and flood plain permits
27. Appli~ti n is he:r:y__ebmade for permit or permits to authorize the work described in this application. I certify that this information in this application is
complete a ; ?ac(Acurate. fu.rther certify that I possess the authority to undertake the work described herein or am acting as the duly authorized agent of the
applicant.
?
-~
.
P SIGNATIJ~APPLICANT
~.
I
14. NOV/Jt:»z.
DATEf
SIGNATURE OF AGENT
DATE
The Application must be signed by the person who desires to undertake the proposed activity (applicant) or it may be signed by a duly
authorized agent if the statement in block 11 has been filled out and signed.
18 U .S.C. Section 1001 provides that: Whoever, in any manner within the jurisdiction of any department or agency of the United States
knowingly and willfully falsifies, conceals, or covers up any trick, scheme, or disguises a material fact or 11)akes any false, fictitious or
fraudulent statements or representations or makes or uses any false writing or document knowing same to contain any false, fictitious or
fraudulent statements or entry, shall be fined not more than $10,000 or imprisoned not more than five years or both.
ENG FORM 4345, OCT 2012
Page 3 of3
17. DIRECTIONS TO THE SITE
From Chicken Ak, Continue past the turn off to Eagle Ak down the Top of the World Highway for about 5 miles. Turn left (South) onto the
mine access road, follow this road to the valley floor. Ferguson Placer Inc.'s camp is located slightly left (East) of where the access road
meets the valley floor.
18. Nature of Activity (Description of project, include all features)
-A medium scale placer mine operation using a floating wash plant to mine approximately 166.12 acres over a 5 year period with a total
disturbance 252.15 acres in the Walker Fork valley
**See Appendices A and B for a detailed description of project and diagrams respectively**
19. Project Purpose (Describe the reason or purpose of the project, see instructions)
-To recover economic alluvial precious metals.
**See Appendices A and B for a detailed description of project and diagrams respectively**
USE BlOCKS 20-231F DREDGED AND/OR Fill MATERIAl IS TO BE DISCHARGED
20. Reason(s) for Discharge
-Material that is not economic to mine will be stockpiled on previously mined or uneconomic land until the pay material is reached. Once
the gold has been removed, the stockpiled material will be backfilled and reclaimed to match the original functionality of the land as close
as possible
-Washed pay material will be immediately discharged back into the pit in which it came form. All fine tailing and silt will be contained in a
series of dams place across the active cut at approximately 1OOyd intervals
21. Type(s) of Material Being Discharged and the Amount of Each Type in Cubic Yards:
Type
Amount in Cubic Yards
Type
Amount in Cubic Yards
Type
Amount in Cubic Yards
Organic overburden (957 457)
Sand and gravel overburden (1 898 733)
Pay material (1 072 000)
22. Surface Area in Acres of Wetlands or Other Waters Filled (see instructions)
Acres
Approximately 252.15 acres of total disturbance will be seen by four types of wet lands. **see Appendix C for breakdown**
or
Linear Feet
Approximately 16080 linear feet
23. Description of Avoidance, Minimization, and Compensation (see instructions)
**See Appendix D for Mitigation Form**
ENG FORM 4345, OCT 2012
Page 2 of3
APPENDIX
C
BREAKDOWN
OF
WETLANDS
1
The
proposed
area
of
this
project
lies
on
four
different
types
of
wetlands
defined
by
the
Hydrogeomorphic
method
(HGM).
These
types
include:
The
current
stream
channel
of
Walker
Fork
(HGM
Riverine),
The
riparian
floodplain
of
Walker
Fork
(HGM
Riparian),
The
off
channel
meanders
of
Walker
Fork
(HGM
Riverine),
The
toe
slope
(HGM
Slope)
The
majority
of
the
proposed
mine
plan
lies
on
the
toe
slope
of
the
valley.
However,
as
Ferguson
Placer
Inc.
(FPI)
intends
to
mine
all
viable
ground,
some
higher
priority
wetlands
will
need
to
be
disturbed.
This
unavoidable
disturbance
will
be
minimized
by
the
various
methods
mentioned
in
Appendix
D.
FPI
will
avoid
all
chance
of
discharge
into
Walker
fork
by
either
diverting
the
stream
around
the
disturbed
area
or
by
leaving
a
sufficient
buffer
zone.
A
break
down
in
acreage
of
each
type
wetlands
affected
by
this
project
can
be
found
bellow
in
tables
1,2,3.
A
further
description
of
how
these
disturbances
will
be
minimized
and
compensated
for
can
be
found
in
appendix
D.
FERGUSON
PLACER
INC.
POA-1991-354-M4, APMA 9124, Ferguson Placer, Inc., Walker Fork
Downstream view of creek in unmined area
POA-1991-354-M4, APMA 9124, Ferguson Placer, Inc., Walker Fork
Upstream view of creek in unmined area
POA-1991-354-M4, APMA 9124, Ferguson Placer, Inc., Walker Fork
Riparian zone
POA-1991-354-M4, APMA 9124, Ferguson Placer, Inc., Walker Fork
Riparian zone side channel
POA-1991-354-M4, APMA 9124, Ferguson Placer, Inc., Walker Fork
Riparian zone - side channel
POA-1991-354-M4, APMA 9124, Ferguson Placer, Inc., Walker Fork
Typical off-channel feature
POA-1991-354-M4, APMA 9124, Ferguson Placer, Inc., Walker Fork
Toe slope wetlands, side hill drainage
POA-1991-354-M4, APMA 9124, Ferguson Placer, Inc., Walker Fork
Toe slope wetlands and existing disturbance
Walker Fork
N
POA-1991-354-M4, APMA 9124, Ferguson Placer, Inc., Walker Fork
Pennington Creek
Aerial 1 Site photos taken in this area
Walker Fork
N
POA-1991-354-M4, APMA 9124, Ferguson Placer, Inc., Walker Fork
Aerial 2
Walker Fork
N
Skukum Creek
POA-1991-354-M4, APMA 9124, Ferguson Placer, Inc., Walker Fork
Aerial 3
APPENDIX
A
1. TESTING
DETAILED
DISCRIPTION
OF
PROJECT
1
Although
enough
prior
drilling
has
been
done
to
approximate
the
economically
viable
deposits
suitable
for
placer
mining,
further,
more
concentrated,
drilling
will
be
done
before
any
ground
is
broken.
This
additional
drilling
will
help
to
locate
the
limits
of
all
viable
deposits
more
accurately.
By
accurately
locating
these
deposits,
Ferguson
Placer
Inc.
(FPI)
will
be
able
to
minimize
their
disturbance
by
mining
only
what
is
viable.
No
ground
will
be
broken
if
a
suitable
grade
is
not
proven
first.
Gravel
will
be
sampled
in
intervals
as
the
overburden
is
stripped,
to
insure
no
pay
material
is
accidentally
stockpiled
as
overburden.
2. DIVERSIONS
A
total
of
nine
diversions
totaling
3417
linear
yards
have
been
proposed
to
ensure
the
mining
operation
is
located
at
a
minimum
of
25
feet
from
the
flood
plane
of
Walker
Fork.
Diagrams
showing
the
location
of
these
can
be
found
in
figures
6-8
of
Appendix
B.
The
nine
proposed
diversions
would
utilize
previous
abandoned
stream
channels
and
other
off
channel
features
where
possible
(approximately
2753
linear
yards).
To
help
keep
the
stream
channel
as
natural
as
possible,
the
abandoned
channels
would
be
cleared
of
silt
and
debris
with
an
excavator
and
re
engineered
to
insure
the
same
fall
rate
and
flood
capacities
are
kept
relative
to
the
existing
stream
channel.
Stream
meanders
that
can
not
be
easily
diverted
using
abandoned
channels
will
be
left
in
place
and
a
25
foot
buffer
will
be
left
on
each
side
of
the
flood
plane.
These
areas
may
be
mined
at
a
later
date,
but
is
outside
the
scope
of
this
project.
3. REMOVAL
OF
OVERBURDEN
Once
an
area
has
been
proven
viable
and
conflicting
streams
have
been
properly
diverted,
the
next
stage
of
the
mining
process
will
be
the
removal
of
overburden.
This
will
be
carried
out
in
three
stages:
removal
of
organic
muck
with
dozers,
removal
of
gravel
with
dozer,
removal
of
remaining
gravel
with
excavators.
The
proposed
mining
area
is
covered
in
a
layer
of
frozen
organic
soil/muck
ranging
from
six
inches
to
twelve
feet
in
depth.
The
expected
average
depth
determined
from
drill
data
is
to
be
3.58
feet,
resulting
in
total
of
957
467
cubic
yards
of
organic
material
to
be
excavated.
A
break
down
of
this
number
in
terms
of
volume
per
year
can
be
found
in
appendix
E.
The
muck
will
be
excavated
primarily
in
the
sub
freezing
months
of
the
year,
March,
April,
October,
and
November,
when
the
soft
swampy
areas
are
frozen
sufficiently
to
handle
the
weight
of
heavy
equipment.
The
frozen
material
will
be
ripped
into
chunks
and
pushed
into
stockpiles
by
a
D475
and
FERGUSON
PLACER
INC.
APPENDIX
A
DETAILED
DISCRIPTION
OF
PROJECT
2
a
D9L
dozer.
Due
to
the
lack
of
moisture
in
the
material,
it
is
possible
to
stack
it
higher
and
closer
to
minimize
the
disturbed
area.
Initially,
on
the
first
pass
up
the
valley
(2013,
2014)
this
material
will
be
stacked
on
land
proven
uneconomic
to
mine
along
the
northern
boundary
of
the
proposed
cut
shown
in
figures
3,4,5
of
Appendix
B.
This
stockpile
will
reach
40
yards
outside
the
150
yard
pit
and
reach
a
maximum
height
of
8
yards.
It
will
be
positioned
so
that
it
can
easily
segregated
from
the
gravel
overburden
and
making
it
possible
to
redistribute
during
the
restoration
stage,
providing
sufficient
topsoil
to
promote
vegetation
and
wetlands
regrowth.
To
allow
the
gravel
interval
to
thaw
in
time
to
be
processed,
a
full
seasons
cut
will
need
to
be
stripped
to
gravel
one
year
in
advance
(e.g.
The
proposed
mining
area
of
2014
will
need
to
be
opened
to
gravel
by
the
spring
of
2013).
This
time
delay
is
why
our
predicted
proposed
production
starts
at
50%
and
ramps
up
to
100%
in
the
third
year.
Once
the
organic
overburden
is
removed
in
the
spring,
the
remaining
gravel
overburden
is
left
to
thaw
naturally.
When
enough
gravel
has
thawed
it
is
removed
and
stockpiled
with
D475
and
D9L
dozers
next
to
and
on
top
of
the
organic
overburden
piles.
This
allows
the
ground
bellow
it
to
continue
to
thaw
at
a
faster
rate.
A
series
of
ditches
and
small
pumps
will
also
be
used
to
circulate
water
to
further
aid
in
the
thawing.
The
over
burden
will
continue
to
be
removed
as
it
thaws
to
the
pay
layer
determined
by
testing.
The
final
step
in
removing
the
overburden
is
to
excavate
the
ramps
(toes)
left
by
the
bulldozer.
The
remaining
overburden
toes
are
lifted
out
of
the
active
cut
with
an
excavator
and
stacked
along
side
the
pit
in
piles.
These
piles
will
reach
a
maximum
height
of
7
yards
and
a
width
of
12
yards.
Approximately
1
898
733
cubic
yards
of
gravel
overburden
will
be
removed
in
total
during
the
5
year
project.
See
appendix
E
for
expected
total
amounts
per
year.
It
is
important
to
have
this
overburden
removed
the
fall
prior
to
mining
in
the
following
spring
(e.g.
Material
to
be
processed
in
spring
of
2014
must
be
prepared
down
to
pay
layer
by
fall
of
2013).
4. PROCCESSING
PAY
MATERIAL
Once
all
overburden
has
been
removed
and
enough
time
has
been
allowed
for
pay
material
to
thaw
sufficiently,
the
material
can
then
be
processed
and
the
desirable
minerals
can
be
removed.
FPI
intends
to
use
a
6-foot
diameter
floating
trommel
to
process
their
material.
The
material
is
fed
into
the
front
(hopper)
of
the
machine
and
is
then
classified
down
to
½
inch.
The
larger,
coarse
tailings
are
deposited
in
the
rear
by
conveyor.
The
material
smaller
than
½
inch
is
passed
over
a
set
of
gold
catching
tables
and
the
fine
tailings
are
then
deposited
at
the
rear.
The
floating
trommel
will
progress
up
the
cut
as
the
excavator
advances
the
pond.
Approximately
1
072
000
cubic
yards
of
pay
material
is
expect
to
be
processed
over
the
5
year
project.
All
the
water
used
for
processing
is
contained
in
a
closed
loop
system,
re-circulating
in
the
pond
and
sealed
from
seepage
by
a
series
of
dams
across
the
cut
spaced
approximately
every
100
yards.
FERGUSON
PLACER
INC.
APPENDIX
A
DETAILED
DISCRIPTION
OF
PROJECT
5. RESTORATION
After
the
material
is
processed
and
stacked,
the
tailings
are
leveled
off
and
capped
with
the
overburden
stockpiled
on
the
side.
This
process
can
happen
instantaneously
as
the
ground
is
mined.
The
gravel
and
sand
overburden
is
backfilled
first
and
the
organics
last.
This
allows
the
layers
to
be
backfilled
in
the
order
they
came
out.
If
additional
organics
are
needed
for
proper
re-vegetation,
more
can
be
spread
out
when
they
are
removed
from
the
adjacent
cut.
FERGUSON
PLACER
INC.
3
Walker Fork
POA-1999-354-M1, APMA 9124, Ferguson Placer, Inc., Walker Fork
Mine area stripped to prepare for mining in 2012/ 2013
POA-1999-354-M1, APMA 9124, Ferguson Placer, Inc., Walker Fork
Site has ample organic overburden for reclamation purposes
Walker Fork
POA-1999-354-M1, APMA 9124, Ferguson Placer, Inc., Walker Fork
Site contains areas that flood and capture
sediment during high water events on Walker
Fork, due to presence of an abandoned floodgate left by a former operator. Applicant
proposes to construct depressions that will
function as low velocity off-channel wetlands as
they regenerate, similar to features that are
currently present at the site.
POA-1999-354-M1, APMA 9124, Ferguson Placer, Inc., Walker Fork
Close-up of high water silt accumulation
Walker Fork
POA-1999-354-M1, APMA 9124, Ferguson Placer, Inc., Walker Fork
Mine cut reclaimed, October2012
POA-1999-354-M1, APMA 9124, Ferguson Placer, Inc., Walker Fork
Ferguson reclamation from previous Canadian operation
POA-1999-354-M1, APMA 9124, Ferguson Placer, Inc., Walker Fork
Ferguson reclamation from previous Canadian operation
POA-1999-354-M1, APMA 9124, Ferguson Placer, Inc., Walker Fork
Ferguson reclamation from previous Canadian operation
APPENDIX
B
DIAGRAMS
AND
FIGURES
Figure
1:
Vicinity
Map
FERGUSON
PLACER
INC.
1
APPENDIX
B
DIAGRAMS
AND
FIGURES
2
Figure
2:
Legend
FERGUSON
PLACER
INC.
APPENDIX
B
DIAGRAMS
AND
FIGURES
3
Figure
3:
Proposed
Mining
Area
(1
of
3)
FERGUSON
PLACER
INC.
APPENDIX
B
DIAGRAMS
AND
FIGURES
4
Figure
4:
Proposed
Mining
Area
(2
of
3)
FERGUSON
PLACER
INC.
APPENDIX
B
DIAGRAMS
AND
FIGURES
5
Figure
5:
Proposed
Mining
Area
(3
of
3)
FERGUSON
PLACER
INC.
APPENDIX
B
DIAGRAMS
AND
FIGURES
6
Figure
6:
Proposed
diversions
(1
of
3)
FERGUSON
PLACER
INC.
APPENDIX
B
DIAGRAMS
AND
FIGURES
7
Figure
7:
Proposed
Diversions
(2
of
3)
FERGUSON
PLACER
INC.
APPENDIX
B
DIAGRAMS
AND
FIGURES
8
Figure
8:
Proposed
Diversions
(3
of
3)
FERGUSON
PLACER
INC.
APPENDIX
B
DIAGRAMS
AND
FIGURES
9
Figure
9:
Sample
Cut
(1
of
3)
**NOT
TO
SCALE**
FERGUSON
PLACER
INC.
APPENDIX
B
DIAGRAMS
AND
FIGURES
10
Figure
10:
Sample
Cut
(2
of
3)
**NOT
TO
SCALE**
FERGUSON
PLACER
INC.
APPENDIX
B
DIAGRAMS
AND
FIGURES
11
Figure
11:
Sample
Cut
(3
of
3)
**NOT
TO
SCALE**
FERGUSON
PLACER
INC.
APPENDIX
B
DIAGRAMS
AND
FIGURES
12:
Cross
Sectional
Views
**NOT
TO
SCALE**
FERGUSON
PLACER
INC.
12
APPENDIX
B
DIAGRAMS
AND
FIGURES
FERGUSON
PLACER
INC.
13
APPENDIX
D
MITIGATION
FORM
1
1.
Avoidance
of
impacts
to
waters
of
the
U.S.,
including
wetlands:
Please
describe
how,
in
your
project
planning
process,
you
avoided
impacts
to
waters
of
the
U.S.,
including
wetlands,
to
the
maximum
extent
practicable.
Examples
of
avoidance
measures
include
site
selection,
routes,
design
configurations,
etc...
Main
method
of
avoidance
Ferguson
Placer
Inc
(FPI)
will
utilize
is
drilling.
FPI
will
ensure
that
a
viable
resource
has
been
proven
before
any
ground
is
disturbed.
This
allows
FPI
to
avoid
disturbing
ground
that
is
barren
or
uneconomic.
However,
wetlands
that
have
been
found
to
have
viable
deposits
cannot
be
avoided,
will
be
mined
and
restored
with
as
little
impact
as
possible.
Unless
required
to
undertake
the
mining
plan
no
disturbance
will
be
made
within
a
25
ft
buffer
zone
on
the
banks
of
Walker
Fork.
FPI's
method
of
taking
multiple
conjoining
passes
greatly
minimizes
the
amount
of
disturbance
due
to
stockpiling
overburden.
As
explained
in
A,
when
possible,
overburden
is
stockpiled
on
the
previously
mined
conjoining
pass.
All
temporary
access
roads
are
located
on
previously
mined
land
either
on
the
tailing
behind
the
wash
plant
or
on
the
previously
mined
cut
next
to
the
wash
plant.
Camp/workshop/fuel
storage
areas
are
all
located
on
previously
mined
land.
FPI
operates
a
closed
loop
water
system.
All
water
used
in
the
production
process
is
100%
recycled
and
contained
in
the
pond
by
a
series
of
dams.
As
the
mining
operation
progresses
a
new
dam
is
built
and
the
water
is
pumped
back
over
as
needed.
This
eliminates
the
need
for
settling
ponds
and
evenly
distributes
the
silt
and
sediment
along
the
mined
area
where
it
came
from.
All
fuels
and
large
quantities
of
harmful
chemicals
are
properly
stored
with
secondary
containment
to
eliminate
spillage
into
the
waterways
and
wetlands.
FERGUSON
PLACER
INC.
APPENDIX
D
MITIGATION
FORM
2
2.Minimization
of
unavoidable
impacts
to
waters
of
the
U.S.,
including
wetlands:
Please
describe
how
your
project
design
incorporates
measures
that
minimize
the
unavoidable
impacts
to
waters
of
the
U.S.,
including
wetlands,
by
limiting
fill
discharges
to
the
minimum
amount/size
As
we
can
choose
where
economic
deposits
lie
there
will
be
certain
unavoidable
impact
associated
with
this
project.
However,
we
will
do
our
best
to
minimize
these.
Some
ways
of
minimizing
are...
To
minimize
the
disturbance
caused
by
stockpiling
overburden
on
unmined
land,
FPI
Plans
to
remove
all
required
organic
overburden
while
it
is
still
frozen.
This
prevents
the
material
from
thawing
once
its
exposed
and
while
its
being
handled.
Frozen
material
can
then
be
stacked
in
higher
piles
resulting
in
less
total
area
disturbed.
Stacking
the
material
while
frozen
will
also
prevent
the
pile
melting
and
seeping
out
over
a
large
area.
It
has
been
found
that
the
top
layer
of
muck
is
enough
to
insulate
the
rest
of
the
pile
and
keep
it
frozen
throughout
the
summer
months.
Due
to
the
permafrost,
it
is
required
that
an
area
must
be
open
for
a
certain
amount
of
time
to
thaw
before
it
can
be
mined.
FPI
placer
plans
to
minimize
the
time
that
land
is
left
open
by
practicing
continuous
restoration.
To
help
lessen
the
time
between
initial
disturbance
and
restoration
further,
FPI
will
use
various
methods
to
help
speed
the
thawing
process.
These
have
been
outlined
in
Appendix
A
under
the
removal
of
overburden
section.
Utilizing
these
methods
FPI
expects
the
time
between
initial
disturbance
and
restoration
to
be
no
greater
than
2
years.
Having
a
series
of
dams
filtering
out
sediment
minimizes
any
seepage
of
water
from
the
active
cut.
The
silt
will
also
have
time
to
settle
out
in
the
ponds
created
by
each
dam.
If
any
seepage
manages
to
re
enter
the
waterway,
it
would
be
sufficiently
filtered
and
settled
in
order
to
pose
no
harmful
effects.
A
large
portion
of
all
diversions
proposed
by
FPI
will
utilize
existing
abandoned
stream
channels.
These
channels
will
be
cleared
of
silt
and
debris
and
re-engineered
to
insure
that
they
can
handle
the
flow
rate
of
the
stream
in
a
flood
with
out
adding
excess
sediment
to
the
waterway.
FPI
Plans
to
minimize
the
long
term
effects
on
the
area
by
reclaiming
the
disturbed
area
to
exceed
the
requirements
of
the
land
manager
and
to
meet
recommendations
made
by
the
Army
Corps
of
Engineers.
They
plan
to
do
this
by
back
filing
FERGUSON
PLACER
INC.
APPENDIX
D
MITIGATION
FORM
3
overburden
and
contouring
it
to
provide
as
much
saturated
soil
as
possible.
A
series
of
interconnected
shallow
ponds
will
also
be
created
to
restore
and
if
possible
enhance
the
off
channel
features
that
were
present
before
mining.
Erosion
will
be
minimized
by
restoring
the
disturbed
area
to
a
grade
capable
of
maintaining
any
surface
run
off
to
a
low
energy
flow.
Reclaimed
stream
channels
will
also
be
restored
to
their
natural
grade.
Low
sloping
banks
will
be
established
to
prevent
cutting
and
to
contain
the
high
flows
associated
with
floods.
Riprap
will
be
used
to
further
prevent
erosion
on
high
energy
corners.
3.Compensation
for
unavoidable
impacts
to
waters
of
the
U.S.,
including
wetlands:
Please
describe
your
proposed
compensatory
mitigation
to
off
set
unavoidable
impacts
to
waters
of
the
U.S.,
or,
alternatively,
why
compensatory
mitigation
is
not
appropriate
or
practicable
for
your
project.
Compensatory
mitigation
involves
actions
taken
to
offset
unavoidable
adverse
impacts
to
waters
of
the
U.S.,
including
wetlands,
streams
and
other
aquatic
resources(aquatic
sites)authorized
by
Corps
permits.
Compensatory
mitigation
may
involve
the
restoration,
enhancement,
establishment
(creation),
and/or
the
preservation
of
aquatic
sites.
The
three
mechanisms
for
providing
compensatory
mitigation
are
mitigation
banks,
in-lieu
fee
of
mitigation,
and
permittee-responsible
mitigation.
Please
see
the
attached
definitions
for
additional
Restoration
is
the
method
of
compensation
proposed
by
FPI.
All
disturbed
areas
will
be
restored
to
the
best
of
their
ability.
Areas
those
are
not
practicable
to
be
restored
to
similar
functionality
as
before
mining
will
be
compensated
by
enhancing
the
areas
that
are
to
exceed
their
previous
functionality.
This
will
be
done
by
providing
a
series
of
connected
off
channel
features
to
act
as
a
relief
to
Walker
Fork
under
flood
conditions.
These
interconnected
features
will
help
reduce
the
energy
of
the
stream
and
allow
sediments
to
be
deposited.
Habitat
for
wildlife
will
also
develop
over
time
due
to
the
variety
of
wetlands
restored.
Over
a
5-10
year
period
FPI
hopes
to
see
the
area
restored
to
its
previous
functionality.
FERGUSON
PLACER
INC.
US Army Corps
of Engineers
Alaska District
ANCHORAGE
Regulatory Division (1145)
CEPOA-RD
Post Office Box 6898
JBER, Alaska 99506-0898
Public Notice
of Application
for Permit
PUBLIC NOTICE DATE:
November 28, 2012
EXPIRATION DATE:
December 28, 2012
REFERENCE NUMBER:
POA-1991-354-M4
WATERWAY:
Walker Fork
Interested parties are hereby notified that a Department of the Army permit
application has been received for work in waters of the United States as described
below and shown on the enclosed project drawings.
Comments on the described work, with the reference number, should reach this office
no later than the expiration date of this Public Notice to become part of the
record and be considered in the decision. Please contact Leslie W. Tose at (907)
753-5515, toll free from within Alaska at (800) 478-2712, by fax at (907) 753-5567,
or by email at leslie.w.tose@usace.army.mil if further information is desired
concerning this notice.
APPLICANT:
Mr. Kim Ferguson, Ferguson Placer, Inc., P.O. Box 609, Haines, Alaska
99827 Phone: 1-206-792-9776 Email: kkferguson@me.com
LOCATION: The project site is located within Sections 34, 35, and 36, T. 27 N., R.
21 E., and Section 6, T. 26 N., R. 22 E., Copper River Meridian; USGS Quad Map
Eagle A-1; Latitude 64.0775º N., Longitude 141.2752 º W.; near Boundary, Alaska.
PURPOSE: Mr. Kim Ferguson's stated purpose is to recover economical alluvial
precious metals from the valley floor of Walker Fork.
PROPOSED WORK: The applicant proposes to impact approximately 252.15 acres of
waters of the U.S., including wetlands, over a period of five years, in association
with a placer mining operation. Of this area, 166.12 acres would be mined using a
floating wash plant, 64.86 acres would be used for temporary stockpile of
overburden, and 21.18 acres would be used during temporary and/or permanent stream
diversions. The project area would be approximately 16,080 feet long by 700 feet
wide.
Specifics are as follows: In preparation for mining, the applicant proposes to
mechanically clear 957,457 cubic yards (cy) of organic "muck" overburden and
1,898,733 cy gravel overburden from the 166.12 acre mine area. These same
materials would be discharged into 64.86 acres of adjacent wetlands for temporary
stockpile.
1,072,000 cy of exposed pay gravels would then be mined and discharged
back into the mine pit. Following mining, all stockpiled organic and gravel
overburden would be discharged back into the mine pit and re-contoured, for the
purpose of reclamation. During the mining operation, nine temporary and/or
permanent stream diversions totaling 10,251 linear feet (21.18 acres) would be
constructed. All work would be performed in accordance with information available
for viewing in Appendices, A through E, found on our web site at:
http://www.poa.usace.army.mil/Missions/Regulatory/PublicNotices.aspx
Appendix A:
reclamation
Appendix B:
Appendix C:
Appendix D:
Appendix E:
Project Description and photos of mine operation and typical
conducted by Ferguson Placer, Inc., ten pages.
Project Plans, thirteen pages.
Summary and photos of wetland areas, twelve pages.
Mitigation Statement, three pages.
Project schedule and phasing, two pages.
ADDITIONAL INFORMATION:
Jurisdiction: Walker Fork, a relatively permanent water (RPW), is a 20 mile long
tributary of the South Fork of the Fortymile River (RPW) . The South Fork flows
into the Mosquito Fork (RPW), which flows into the Forty Mile River, a Traditional
Navigable Water.
Watershed disturbance: The Walker Fork watershed has been mined historically,
starting around the turn of the century, using hydraulic open cut methods and
later, bucket dredges. The intensity of mining activities has varied through time,
and is correlated with the price of gold.
Some areas have been mined more than one
time.
Intensive mining has occurred for about five miles upstream of the proposed
project on Walker Fork, on Cherry Creek, and in headwater streams as well.
Below
the proposed operation is an approximately one mile reach of placer workings. The
proposed operation would mine approximately three miles of Walker Fork, between the
two previously mined areas.
Previous permitting: This is the fourth permit modification for a mining operation
on Walker Fork, started in 1991. Ownership of the claims has changed several
times. Work under the current operator, started in 2010, consists of: mine plans
and bonding with the Alaska Department of Natural Resources, Division of Mining,
and with the Bureau of Land Management; clean up of machinery, debris and camp area
of previous mining operations, reclamation of previous mining disturbance,
establishment of a new camp and road improvement activities, and some new mining.
Wetlands: The area of the proposed mine has a shallow gradient (0.5%) and contains
palustrine forested, palustrine scrub shrub and palustrine emergent wetlands, or
"muskeg", with high levels of groundwater. Appendix C includes aerial photographs
covering some of the area to be mined, and site photographs showing typical wetland
types and features in the project area. Using the Alaska Regulatory Best
Professional Judgement Wetlands Function Assessment, wetlands at the site scored as
high for habitat suitability, moderate for flood flow alteration, sediment removal,
production and export of organic matter, and native plant richness, and low for
education or scientific value, uniqueness and heritage.
Uplands: Some portions of the operation, including the main access road, and camp,
are in uplands.
APPLICANT PROPOSED MITIGATION:
The applicant proposes mitigation measures to
-2-
avoid, minimize, and compensate for impacts to waters of the United States from
activities involving discharges of dredged or fill material.
Please see Appendix D for this information.
WATER QUALITY CERTIFICATION: A permit for the described work will not be issued
until a certification or waiver of certification, as required under Section 401 of
the Clean Water Act (Public Law 95-217), has been received from the Alaska
Department of Environmental Conservation.
CULTURAL RESOURCES: The latest published version of the Alaska Heritage Resources
Survey (AHRS) has been consulted for the presence or absence of historic
properties, including those listed in or eligible for inclusion in the National
Register of Historic Places.
There is an unevaluated property in the vicinity of
the worksite.
It has been designated Walker Fork Cabin 2006-1. Because the
property has been determined to be outside of the project area, no further action
is required.
Consultation of the AHRS constitutes the extent of cultural resource
investigations by the District Commander at this time. This application is being
coordinated with SHPO. Any comments SHPO may have concerning presently unknown
archeological or historic data that may be lost or destroyed by work under the
requested permit will be considered in our final assessment of the described work.
ENDANGERED SPECIES:
project area.
No threatened or endangered species are known to use the
We have determined the described activity would have no effect on any listed or
proposed threatened or endangered species, and would have no effect on any
designated or proposed critical habitat, under the Endangered Species Act of 1973
(87 Stat. 844). Therefore, no consultation with the U.S. Fish and Wildlife Service
or the National Marine Fisheries Service is required.
However, any comments they
may have concerning endangered or threatened wildlife or plants or their critical
habitat will be considered in our final assessment of the described work.
ESSENTIAL FISH HABITAT: The Magnuson-Stevens Fishery Conservation and Management
Act, as amended by the Sustainable Fisheries Act of 1996, requires all Federal
agencies to consult with the NMFS on all actions, or proposed actions, permitted,
funded, or undertaken by the agency, that may adversely affect Essential Fish
Habitat (EFH) .
No EFH species are known to use the project area.
TRIBAL CONSULTATION: The Alaska District fully supports tribal self-governance and
government-to-government relations between Federally recognized Tribes and the
Federal government.
Tribes with protected rights or resources that could be
significantly affected by a proposed Federal action (e.g., a permit decision) have
the right to consult with the Alaska District on a government-to-government basis.
Views of each Tribe regarding protected rights and resources will be accorded due
consideration in this process.
This Public Notice serves as notification to the
Tribes within the area potentially affected by the proposed work and invites their
participation in the Federal decision-making process regarding the protected Tribal
right or resource.
Consultation may be initiated by the affected Tribe upon
written request to the District Commander during the public comment period.
PUBLIC HEARING: Any person may request, in writing, within the comment period
specified in this notice, that a public hearing be held to consider this
-3-
application. Requests for public hearings shall state, with particularity, reasons
for holding a public hearing.
EVALUATION: The decision whether to issue a permit will be based on an evaluation
of the probable impacts, including cumulative impacts of the proposed activity and
its intended use on the public interest.
Evaluation of the probable impacts, which
the proposed activity may have on the public interest, requires a careful weighing
of all the factors that become relevant in each particular case.
The benefits,
which reasonably may be expected to accrue from the proposal, must be balanced
against its reasonably foreseeable detriments. The outcome of the general
balancing process would determine whether to authorize a proposal, and if so, the
conditions under which it will be allowed to occur. The decision should reflect
the national concern for both protection and utilization of important resources.
All factors, which may be relevant to the proposal, must be considered including
the cumulative effects thereof. Among those are conservation, economics,
aesthetics, general environmental concerns, wetlands, cultural values, fish and
wildlife values, flood hazards, floodplain values, land use, navigation, shore
erosion and accretion, recreation, water supply and conservation, water quality,
energy needs, safety, food and fiber production, mineral needs, considerations of
property ownership, and, in general, the needs and welfare of the people.
For
activities involving 404 discharges, a permit will be denied if the discharge that
would be authorized by such permit would not comply with the Environmental
Protection Agency's 404(b) (l) guidelines. Subject to the preceding sentence and
any other applicable guidelines or criteria (see Sections 320.2 and 320.3), a
permit will be granted unless the District Commander determines that it would be
contrary to the public interest.
The Corps of Engineers is soliciting comments from the public; Federal, State, and
local agencies and officials; Indian Tribes; and other interested parties in order
to consider and evaluate the impacts of this proposed activity. Any comments
received will be considered by the Corps of Engineers to determine whether to
issue, modify, condition or deny a permit for this proposal.
To make this
decision, comments are used to assess impacts on endangered species, historic
properties, water quality, general environmental effects, and the other public
interest factors listed above. Comments are used in the preparation of an
Environmental Assessment and/or an Environmental Impact Statement pursuant to the
National Environmental Policy Act.
Comments are also used to determine the need
for a public hearing and to determine the overall public interest of the proposed
activity.
AUTHORITY:
This permit will be issued or denied under the following authority:
(X)
Discharge dredged or fill material into waters of the United States Section 404 Clean Water Act (33 U.S.C. 1344). Therefore, our public interest
review will consider the guidelines set forth under Section 404(b) of the Clean
Water Act (40 CFR 230) .
Project drawings and a Notice ~f Application for State Water Quality Certification
are enclosed with this Public Notice.
District Commander
u.s. Army, Corps of Engineers
Attachment
-4-
SEAN PARNELL, GOVERNOR
STATE OF ALASKA
DEPT. OF ENVIRONMENTAL CONSERVATION
DIVISION OF WATER
401 Certification Program
Non-Point Source Water Pollution Control Program
JUNEAU
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
WQM/401 CERTIFICATION
410 WILLOUGHBY AVENUE
JUNEAU, ALASKA 99801-1795
PHONE: (907) 465-5321/FAX: (907) 465-5274
NOTICE OF APPLICATION
FOR
STATE WATER QUALITY CERTIFICATION
Any applicant for a federal license or permit to conduct an activity that might
result in a discharge into navigable waters, in accordance with Section 401 of the
Clean Water Act of 1977 (PL95-217), also must apply for and obtain certification
from the Alaska Department of Environmental Conservation that the discharge will
comply with the Clean Water Act, the Alaska Water Quality Standards, and other
applicable State laws. By agreement between the U.S. Army Corps of Engineers and
the Department of Environmental Conservation, application for a Department of the
Army permit to discharge dredged or fill material into navigable waters under
Section 404 of the Clean Water Act also may serve as application for State Water
Quality Certification.
Notice is hereby given that the application for a Department of the Army Permit
described in the Corps of Engineers' Public Notice No. 1991-354-M4, Walker Fork,
serves as application for State Water Quality Certification from the Department of
Environmental Conservation.
After reviewing the application, the Department may certify there is reasonable
assurance the activity, and any discharge that might result, will comply with the
Clean Water Act, the Alaska Water Quality Standards, and other applicable State
laws. The Department also may deny or waive certification.
Any person desiring to comment on the project, with respect to Water Quality
Certification, may submit written comments to the address above by the expiration
date of the Corps of Engineer's Public Notice.
U.S. ARMY CORPS OF ENGINEERS
APPLICATION FOR DEPARTMENT OF THE ARMY PERMIT
OMB APPROVAL NO. 0710-0003
EXPIRES: 28 FEBRUARY 2013
33 CFR 325. The proponent agency is CECW-CO-R.
Public reporting for this collection of information is estimated to average 11 hours per response, including the time for reviewing instructions, searching
existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding
this burden estimate or any other aspect of the collection of information, including suggestions for reducing this burden, to Department of Defense,
Washington Headquarters, Executive Services and Communications Directorate, Information Management Division and to the Office of Management and
Budget, Paperwork Reduction Project (071 0-0003). Respondents should be aware that notwithstanding any other provision of law, no person shall be
subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT
RETURN your form to either of those addresses. Completed applications must be submitted to the District Engineer having jurisdiction over the location of
the proposed activity.
PRIVACY ACT STATEMENT
Authorities: Rivers and Harbors Act, Section 10, 33 USC 403; Clean Water Act, Section 404, 33 USC 1344; Marine Protection, Research, and Sanctuaries
Act, Section 103, 33 USC 1413; Regulatory Programs of the Corps of Engineers; Final Rule 33 CFR 320-332. Principal Purpose: Information provided on
this form will be used in evaluating the application for a permit. Routine Uses: This information may be shared with the Department of Justice and other
federal, state, and local government agencies, and the public and may be made available as part of a public notice as required by Federal law. Submission
of requested information is voluntary, however, if information is not provided the permit application cannot be evaluated nor can a permit be issued. One set
of original drawings or good reproducible copies which show the location and character of the proposed activity must be attached to this application (see
sample drawings and/or instructions) and be submitted to the District Engineer having jurisdiction over the location of the proposed activity. An application
that is not completed in full will be returned.
(ITEMS 1 THRU 4 TO BE FILLED BY THE CORPS)
2. FIELD OFFICE CODE
3. DATE RECEIVED
ecroYi- t<'D- N
4. DATE APPLICATION COMPLETE
qJt5{J..ot~
II
I Iff{ 26 I 2.
(ITEMS BELOW TO BE FILLED BY APPLICANT)
5. APPLICANT'S NAME
First-Kim
8. AUTHORIZED AGENT'S NAME AND TITLE (agent is not required)
Middle -Ronald
Last - Ferguson
First-
Middle-
Company- Ferguson Placer Inc.
Company-
E-mail Address - k:kferguson@me.com
E-mail Address -
6. APPLICANT'S ADDRESS:
9. AGENT'S ADDRESS:
Address- Box 28
AddressState- AK
City - Chicken
Zip -
99732
Country- US
c. Fax
b. Business
Zip-
State-
City-
Country-
10. AGENTS PHONE NOs. w/AREA CODE
7. APPLICANT'S PHONE NOs. w/AREA CODE
a. Residence
Last-
b. Business
a. Residence
c. Fax
1(206) 792-9776
STATEMENT OF AUTHORIZATION
11. 1hereby authorize,
to act in my behalf as my agent in the processing of this application and to furnish, upon request,
supplemental information in support of this permit application.
DATE
SIGNATURE OF APPLICANT
d
NAME, LOCATION, AND DESCRIPTION OF PROJECT OR ACTIVITY
12. PROJECT NAME OR TITLE (see instructions)
Walker Fork Placer Mine
13. NAME OF WATERBODY, IF KNOWN (if applicable)
14. PROJECT STREET
WalkerFork
Address
ADbRES~-;ppl~'i)
~ ,$'
l-1-5-.-L-0-CA-T-IO_N_O_F_P_R_O_JE_C_T-----------------j City_
Latitude: ·N 64.07756
\
Longitude: ·W 141.27519
16. OTHER LOCATION DESCRIPTIONS, IF KNOWN (see instructions)
34, 35, 36, (6)
.:';)~p-
__
..;l,_~i
""'-.A K ~
Municipality
State Tax Parcel ID
Section-
State-
~
~
Towryship-
ENG FORM 4345, OCT 2012
27N, (26N)
Range-
21E, (22E)
PREVIOUS EDITIONS ARE OBSOLETE.
Page 1 of 3
24. Is Any Portion ofthe Work Already Complete? !&JYes
QNo
IF YES, DESCRIBE THE COMPLETED WORK
!Auger drill samples have been taken and capped to determine areas viable for economic mining.
25. Addresses of Adjoining Property Owners, Lessees, Etc., Whose Property Adjoins the Waterbody (if more than can be entered here, please attach a supplemental list).
a. Address- Mackinaw Productions Inc. , I 0889 County road 320
City- Rifle
State- CO
Zip-81650
b. Address- Harvey Bickle, 280 Ricardo Road
City- Gabriela
State- B.C. Canada, VOR
IXJ
Zip-
c. AddressCity-
State-
Zip-
State-
Zip-
State-
Zip-
d. AddressCitye. Address-
City-
26. List of Other Certificates or Approvals/Denials received from other Federal, State, or Local Agencies for Work Described in This Application.
IDENTIFICATION
TYPE APPROVAL*
DATE APPROVED
DATE APPLIED
DATE DENIED
AGENCY
NUMBER
BLM
POO
2012-04-30
2012-07-07
DNR
Misc. Land Use
2012-04-30
2012-06-01
Fish and Game
Fish Habitat
2011-05-11
2011-06-10
Alaska DEC
APDES
2012-04-30
2012-07-03
AKG370773
· Would include but is not restricted to zoning, building, and flood plain permits
27. Appli~ti n is he:r:y__ebmade for permit or permits to authorize the work described in this application. I certify that this information in this application is
complete a ; ?ac(Acurate. fu.rther certify that I possess the authority to undertake the work described herein or am acting as the duly authorized agent of the
applicant.
?
-~
.
P SIGNATIJ~APPLICANT
~.
I
14. NOV/Jt:»z.
DATEf
SIGNATURE OF AGENT
DATE
The Application must be signed by the person who desires to undertake the proposed activity (applicant) or it may be signed by a duly
authorized agent if the statement in block 11 has been filled out and signed.
18 U .S.C. Section 1001 provides that: Whoever, in any manner within the jurisdiction of any department or agency of the United States
knowingly and willfully falsifies, conceals, or covers up any trick, scheme, or disguises a material fact or 11)akes any false, fictitious or
fraudulent statements or representations or makes or uses any false writing or document knowing same to contain any false, fictitious or
fraudulent statements or entry, shall be fined not more than $10,000 or imprisoned not more than five years or both.
ENG FORM 4345, OCT 2012
Page 3 of3
17. DIRECTIONS TO THE SITE
From Chicken Ak, Continue past the turn off to Eagle Ak down the Top of the World Highway for about 5 miles. Turn left (South) onto the
mine access road, follow this road to the valley floor. Ferguson Placer Inc.'s camp is located slightly left (East) of where the access road
meets the valley floor.
18. Nature of Activity (Description of project, include all features)
-A medium scale placer mine operation using a floating wash plant to mine approximately 166.12 acres over a 5 year period with a total
disturbance 252.15 acres in the Walker Fork valley
**See Appendices A and B for a detailed description of project and diagrams respectively**
19. Project Purpose (Describe the reason or purpose of the project, see instructions)
-To recover economic alluvial precious metals.
**See Appendices A and B for a detailed description of project and diagrams respectively**
USE BlOCKS 20-231F DREDGED AND/OR Fill MATERIAl IS TO BE DISCHARGED
20. Reason(s) for Discharge
-Material that is not economic to mine will be stockpiled on previously mined or uneconomic land until the pay material is reached. Once
the gold has been removed, the stockpiled material will be backfilled and reclaimed to match the original functionality of the land as close
as possible
-Washed pay material will be immediately discharged back into the pit in which it came form. All fine tailing and silt will be contained in a
series of dams place across the active cut at approximately 1OOyd intervals
21. Type(s) of Material Being Discharged and the Amount of Each Type in Cubic Yards:
Type
Amount in Cubic Yards
Type
Amount in Cubic Yards
Type
Amount in Cubic Yards
Organic overburden (957 457)
Sand and gravel overburden (1 898 733)
Pay material (1 072 000)
22. Surface Area in Acres of Wetlands or Other Waters Filled (see instructions)
Acres
Approximately 252.15 acres of total disturbance will be seen by four types of wet lands. **see Appendix C for breakdown**
or
Linear Feet
Approximately 16080 linear feet
23. Description of Avoidance, Minimization, and Compensation (see instructions)
**See Appendix D for Mitigation Form**
ENG FORM 4345, OCT 2012
Page 2 of3
APPENDIX
E
TENTATIVE
SCHEDULE
1
2013
-Diversions
A-E
will
be
completed
as
needed
-2200
linear
yards
are
to
mined
and
reclaimed
of
first
pass
by
end
of
season,
(1)
figure
4.
-5360
linear
yards
of
first
pass
are
to
be
partially
stripped
for
following
seasons,
(2)
figure
5.
2014
-3160
linear
yards
of
first
pass
are
to
be
mined
and
reclaimed
by
end
of
season,
(2)
figure
5.
-3800
linear
yards
of
second
pass
are
to
be
stripped
for
following
season,
(3)
figure
4.
2015
-3800
linear
yards
are
to
be
mined
and
reclaimed
by
end
of
season,
(3)
figure
4.
-Diversions
F-I
will
be
completed
as
needed
for
stripping
-1560
linear
yards
of
second
pass
and
2240
linear
yards
of
third
pass
are
to
stripped
for
following
season,
(4)
figure
4.
2016
-1560
linear
yards
of
second
pass
and
2240
linear
yards
of
third
pass
are
to
be
mined
and
reclaimed
by
end
of
season,
(4)
figure
4.
-Diversions
F,
G,
H
,A
,B
,C
are
to
be
reclaimed
and
stream
returned
to
original
channel
-3120
linear
yards
of
third
pass
are
to
be
stripped
for
following
season,
(5)
figure
5.
FERGUSON
PLACER
INC.
APPENDIX
E
TENTATIVE
SCHEDULE
2
2017
-3120
linear
yards
are
to
be
mined
and
reclaimed
by
end
of
season,
(5)
figure
5.
-Diversion
D,
I,
E
are
to
be
reclaimed
and
stream
returned
to
original
channel
FERGUSON
PLACER
INC.