POA-1991-354-M4, Walker Fork - Ferguson Placer, Inc., stated purpose is to recover economical

POA-1991-354-M4, Walker Fork- Ferguson Placer, Inc., stated purpose is to recover economical alluvial precious metals from the valley floor of Walker Fork. Please contact Leslie W. Tose at (907) 753-5515, toll free from within Alaska at (800) 478-2712, by fax at (907) 753-5567, or by email at leslie.w.tose@usace.army.mil if further information is desired concerning this notice.

US Army Corps of Engineers Alaska District

ANCHORAGE Regulatory Division (1145) CEPOA-RD Post Office Box 6898 JBER, Alaska 99506-0898

Public Notice of Application for Permit PUBLIC NOTICE DATE:

November 28, 2012

EXPIRATION DATE:

December 28, 2012

REFERENCE NUMBER:

POA-1991-354-M4

WATERWAY:

Walker Fork

Interested parties are hereby notified that a Department of the Army permit application has been received for work in waters of the United States as described below and shown on the enclosed project drawings. Comments on the described work, with the reference number, should reach this office no later than the expiration date of this Public Notice to become part of the record and be considered in the decision. Please contact Leslie W. Tose at (907) 753-5515, toll free from within Alaska at (800) 478-2712, by fax at (907) 753-5567, or by email at leslie.w.tose@usace.army.mil if further information is desired concerning this notice. APPLICANT: Mr. Kim Ferguson, Ferguson Placer, Inc., P.O. Box 609, Haines, Alaska 99827 Phone: 1-206-792-9776 Email: kkferguson@me.com LOCATION: The project site is located within Sections 34, 35, and 36, T. 27 N., R. 21 E., and Section 6, T. 26 N., R. 22 E., Copper River Meridian; USGS Quad Map Eagle A-1; Latitude 64.0775º N., Longitude 141.2752 º W.; near Boundary, Alaska. PURPOSE: Mr. Kim Ferguson's stated purpose is to recover economical alluvial precious metals from the valley floor of Walker Fork. PROPOSED WORK: The applicant proposes to impact approximately 252.15 acres of waters of the U.S., including wetlands, over a period of five years, in association with a placer mining operation. Of this area, 166.12 acres would be mined using a floating wash plant, 64.86 acres would be used for temporary stockpile of overburden, and 21.18 acres would be used during temporary and/or permanent stream diversions. The project area would be approximately 16,080 feet long by 700 feet wide. Specifics are as follows: In preparation for mining, the applicant proposes to mechanically clear 957,457 cubic yards (cy) of organic "muck" overburden and 1,898,733 cy gravel overburden from the 166.12 acre mine area. These same

materials would be discharged into 64.86 acres of adjacent wetlands for temporary stockpile. 1,072,000 cy of exposed pay gravels would then be mined and discharged back into the mine pit. Following mining, all stockpiled organic and gravel overburden would be discharged back into the mine pit and re-contoured, for the purpose of reclamation. During the mining operation, nine temporary and/or permanent stream diversions totaling 10,251 linear feet (21.18 acres) would be constructed. All work would be performed in accordance with information available for viewing in Appendices, A through E, found on our web site at: http://www.poa.usace.army.mil/Missions/Regulatory/PublicNotices.aspx Appendix A: reclamation Appendix B: Appendix C: Appendix D: Appendix E:

Project Description and photos of mine operation and typical conducted by Ferguson Placer, Inc., ten pages. Project Plans, thirteen pages. Summary and photos of wetland areas, twelve pages. Mitigation Statement, three pages. Project schedule and phasing, two pages.

ADDITIONAL INFORMATION: Jurisdiction: Walker Fork, a relatively permanent water (RPW), is a 20 mile long tributary of the South Fork of the Fortymile River (RPW) . The South Fork flows into the Mosquito Fork (RPW), which flows into the Forty Mile River, a Traditional Navigable Water. Watershed disturbance: The Walker Fork watershed has been mined historically, starting around the turn of the century, using hydraulic open cut methods and later, bucket dredges. The intensity of mining activities has varied through time, and is correlated with the price of gold. Some areas have been mined more than one time. Intensive mining has occurred for about five miles upstream of the proposed project on Walker Fork, on Cherry Creek, and in headwater streams as well. Below the proposed operation is an approximately one mile reach of placer workings. The proposed operation would mine approximately three miles of Walker Fork, between the two previously mined areas. Previous permitting: This is the fourth permit modification for a mining operation on Walker Fork, started in 1991. Ownership of the claims has changed several times. Work under the current operator, started in 2010, consists of: mine plans and bonding with the Alaska Department of Natural Resources, Division of Mining, and with the Bureau of Land Management; clean up of machinery, debris and camp area of previous mining operations, reclamation of previous mining disturbance, establishment of a new camp and road improvement activities, and some new mining. Wetlands: The area of the proposed mine has a shallow gradient (0.5%) and contains palustrine forested, palustrine scrub shrub and palustrine emergent wetlands, or "muskeg", with high levels of groundwater. Appendix C includes aerial photographs covering some of the area to be mined, and site photographs showing typical wetland types and features in the project area. Using the Alaska Regulatory Best Professional Judgement Wetlands Function Assessment, wetlands at the site scored as high for habitat suitability, moderate for flood flow alteration, sediment removal, production and export of organic matter, and native plant richness, and low for education or scientific value, uniqueness and heritage. Uplands: Some portions of the operation, including the main access road, and camp, are in uplands. APPLICANT PROPOSED MITIGATION:

The applicant proposes mitigation measures to -2-

avoid, minimize, and compensate for impacts to waters of the United States from activities involving discharges of dredged or fill material. Please see Appendix D for this information. WATER QUALITY CERTIFICATION: A permit for the described work will not be issued until a certification or waiver of certification, as required under Section 401 of the Clean Water Act (Public Law 95-217), has been received from the Alaska Department of Environmental Conservation. CULTURAL RESOURCES: The latest published version of the Alaska Heritage Resources Survey (AHRS) has been consulted for the presence or absence of historic properties, including those listed in or eligible for inclusion in the National Register of Historic Places. There is an unevaluated property in the vicinity of the worksite. It has been designated Walker Fork Cabin 2006-1. Because the property has been determined to be outside of the project area, no further action is required. Consultation of the AHRS constitutes the extent of cultural resource investigations by the District Commander at this time. This application is being coordinated with SHPO. Any comments SHPO may have concerning presently unknown archeological or historic data that may be lost or destroyed by work under the requested permit will be considered in our final assessment of the described work. ENDANGERED SPECIES: project area.

No threatened or endangered species are known to use the

We have determined the described activity would have no effect on any listed or proposed threatened or endangered species, and would have no effect on any designated or proposed critical habitat, under the Endangered Species Act of 1973 (87 Stat. 844). Therefore, no consultation with the U.S. Fish and Wildlife Service or the National Marine Fisheries Service is required. However, any comments they may have concerning endangered or threatened wildlife or plants or their critical habitat will be considered in our final assessment of the described work. ESSENTIAL FISH HABITAT: The Magnuson-Stevens Fishery Conservation and Management Act, as amended by the Sustainable Fisheries Act of 1996, requires all Federal agencies to consult with the NMFS on all actions, or proposed actions, permitted, funded, or undertaken by the agency, that may adversely affect Essential Fish Habitat (EFH) . No EFH species are known to use the project area. TRIBAL CONSULTATION: The Alaska District fully supports tribal self-governance and government-to-government relations between Federally recognized Tribes and the Federal government. Tribes with protected rights or resources that could be significantly affected by a proposed Federal action (e.g., a permit decision) have the right to consult with the Alaska District on a government-to-government basis. Views of each Tribe regarding protected rights and resources will be accorded due consideration in this process. This Public Notice serves as notification to the Tribes within the area potentially affected by the proposed work and invites their participation in the Federal decision-making process regarding the protected Tribal right or resource. Consultation may be initiated by the affected Tribe upon written request to the District Commander during the public comment period. PUBLIC HEARING: Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider this -3-

application. Requests for public hearings shall state, with particularity, reasons for holding a public hearing. EVALUATION: The decision whether to issue a permit will be based on an evaluation of the probable impacts, including cumulative impacts of the proposed activity and its intended use on the public interest. Evaluation of the probable impacts, which the proposed activity may have on the public interest, requires a careful weighing of all the factors that become relevant in each particular case. The benefits, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. The outcome of the general balancing process would determine whether to authorize a proposal, and if so, the conditions under which it will be allowed to occur. The decision should reflect the national concern for both protection and utilization of important resources. All factors, which may be relevant to the proposal, must be considered including the cumulative effects thereof. Among those are conservation, economics, aesthetics, general environmental concerns, wetlands, cultural values, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shore erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership, and, in general, the needs and welfare of the people. For activities involving 404 discharges, a permit will be denied if the discharge that would be authorized by such permit would not comply with the Environmental Protection Agency's 404(b) (l) guidelines. Subject to the preceding sentence and any other applicable guidelines or criteria (see Sections 320.2 and 320.3), a permit will be granted unless the District Commander determines that it would be contrary to the public interest. The Corps of Engineers is soliciting comments from the public; Federal, State, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps of Engineers to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. AUTHORITY:

This permit will be issued or denied under the following authority:

(X) Discharge dredged or fill material into waters of the United States Section 404 Clean Water Act (33 U.S.C. 1344). Therefore, our public interest review will consider the guidelines set forth under Section 404(b) of the Clean Water Act (40 CFR 230) . Project drawings and a Notice ~f Application for State Water Quality Certification are enclosed with this Public Notice.

District Commander u.s. Army, Corps of Engineers Attachment -4-

SEAN PARNELL, GOVERNOR

STATE OF ALASKA DEPT. OF ENVIRONMENTAL CONSERVATION DIVISION OF WATER 401 Certification Program Non-Point Source Water Pollution Control Program

JUNEAU DEPARTMENT OF ENVIRONMENTAL CONSERVATION WQM/401 CERTIFICATION 410 WILLOUGHBY AVENUE JUNEAU, ALASKA 99801-1795 PHONE: (907) 465-5321/FAX: (907) 465-5274

NOTICE OF APPLICATION FOR STATE WATER QUALITY CERTIFICATION

Any applicant for a federal license or permit to conduct an activity that might result in a discharge into navigable waters, in accordance with Section 401 of the Clean Water Act of 1977 (PL95-217), also must apply for and obtain certification from the Alaska Department of Environmental Conservation that the discharge will comply with the Clean Water Act, the Alaska Water Quality Standards, and other applicable State laws. By agreement between the U.S. Army Corps of Engineers and the Department of Environmental Conservation, application for a Department of the Army permit to discharge dredged or fill material into navigable waters under Section 404 of the Clean Water Act also may serve as application for State Water Quality Certification. Notice is hereby given that the application for a Department of the Army Permit described in the Corps of Engineers' Public Notice No. 1991-354-M4, Walker Fork, serves as application for State Water Quality Certification from the Department of Environmental Conservation. After reviewing the application, the Department may certify there is reasonable assurance the activity, and any discharge that might result, will comply with the Clean Water Act, the Alaska Water Quality Standards, and other applicable State laws. The Department also may deny or waive certification. Any person desiring to comment on the project, with respect to Water Quality Certification, may submit written comments to the address above by the expiration date of the Corps of Engineer's Public Notice.

U.S. ARMY CORPS OF ENGINEERS APPLICATION FOR DEPARTMENT OF THE ARMY PERMIT

OMB APPROVAL NO. 0710-0003 EXPIRES: 28 FEBRUARY 2013

33 CFR 325. The proponent agency is CECW-CO-R.

Public reporting for this collection of information is estimated to average 11 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of the collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters, Executive Services and Communications Directorate, Information Management Division and to the Office of Management and Budget, Paperwork Reduction Project (071 0-0003). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to either of those addresses. Completed applications must be submitted to the District Engineer having jurisdiction over the location of the proposed activity. PRIVACY ACT STATEMENT Authorities: Rivers and Harbors Act, Section 10, 33 USC 403; Clean Water Act, Section 404, 33 USC 1344; Marine Protection, Research, and Sanctuaries Act, Section 103, 33 USC 1413; Regulatory Programs of the Corps of Engineers; Final Rule 33 CFR 320-332. Principal Purpose: Information provided on this form will be used in evaluating the application for a permit. Routine Uses: This information may be shared with the Department of Justice and other federal, state, and local government agencies, and the public and may be made available as part of a public notice as required by Federal law. Submission of requested information is voluntary, however, if information is not provided the permit application cannot be evaluated nor can a permit be issued. One set of original drawings or good reproducible copies which show the location and character of the proposed activity must be attached to this application (see sample drawings and/or instructions) and be submitted to the District Engineer having jurisdiction over the location of the proposed activity. An application that is not completed in full will be returned. (ITEMS 1 THRU 4 TO BE FILLED BY THE CORPS) 2. FIELD OFFICE CODE

3. DATE RECEIVED

ecroYi- t<'D- N

4. DATE APPLICATION COMPLETE

qJt5{J..ot~

II

I Iff{ 26 I 2.

(ITEMS BELOW TO BE FILLED BY APPLICANT)

5. APPLICANT'S NAME First-Kim

8. AUTHORIZED AGENT'S NAME AND TITLE (agent is not required) Middle -Ronald

Last - Ferguson

First-

Middle-

Company- Ferguson Placer Inc.

Company-

E-mail Address - k:kferguson@me.com

E-mail Address -

6. APPLICANT'S ADDRESS:

9. AGENT'S ADDRESS:

Address- Box 28

AddressState- AK

City - Chicken

Zip -

99732

Country- US

c. Fax

b. Business

Zip-

State-

City-

Country-

10. AGENTS PHONE NOs. w/AREA CODE

7. APPLICANT'S PHONE NOs. w/AREA CODE a. Residence

Last-

b. Business

a. Residence

c. Fax

1(206) 792-9776 STATEMENT OF AUTHORIZATION

11. 1hereby authorize, to act in my behalf as my agent in the processing of this application and to furnish, upon request, supplemental information in support of this permit application.

DATE

SIGNATURE OF APPLICANT

d

NAME, LOCATION, AND DESCRIPTION OF PROJECT OR ACTIVITY

12. PROJECT NAME OR TITLE (see instructions) Walker Fork Placer Mine

13. NAME OF WATERBODY, IF KNOWN (if applicable)

14. PROJECT STREET

WalkerFork

Address

ADbRES~-;ppl~'i) ~ ,$'

l-1-5-.-L-0-CA-T-IO_N_O_F_P_R_O_JE_C_T-----------------j City_ Latitude: ·N 64.07756

\

Longitude: ·W 141.27519

16. OTHER LOCATION DESCRIPTIONS, IF KNOWN (see instructions)

34, 35, 36, (6)

.:';)~p-

__

..;l,_~i ""'-.A K ~

Municipality

State Tax Parcel ID Section-

State-

~ ~

Towryship-

ENG FORM 4345, OCT 2012

27N, (26N)

Range-

21E, (22E)

PREVIOUS EDITIONS ARE OBSOLETE.

Page 1 of 3

24. Is Any Portion ofthe Work Already Complete? !&JYes

QNo

IF YES, DESCRIBE THE COMPLETED WORK

!Auger drill samples have been taken and capped to determine areas viable for economic mining.

25. Addresses of Adjoining Property Owners, Lessees, Etc., Whose Property Adjoins the Waterbody (if more than can be entered here, please attach a supplemental list). a. Address- Mackinaw Productions Inc. , I 0889 County road 320 City- Rifle

State- CO

Zip-81650

b. Address- Harvey Bickle, 280 Ricardo Road City- Gabriela

State- B.C. Canada, VOR

IXJ

Zip-

c. AddressCity-

State-

Zip-

State-

Zip-

State-

Zip-

d. AddressCitye. Address-

City-

26. List of Other Certificates or Approvals/Denials received from other Federal, State, or Local Agencies for Work Described in This Application. IDENTIFICATION TYPE APPROVAL* DATE APPROVED DATE APPLIED DATE DENIED AGENCY NUMBER

BLM

POO

2012-04-30

2012-07-07

DNR

Misc. Land Use

2012-04-30

2012-06-01

Fish and Game

Fish Habitat

2011-05-11

2011-06-10

Alaska DEC

APDES

2012-04-30

2012-07-03

AKG370773

· Would include but is not restricted to zoning, building, and flood plain permits

27. Appli~ti n is he:r:y__ebmade for permit or permits to authorize the work described in this application. I certify that this information in this application is complete a ; ?ac(Acurate. fu.rther certify that I possess the authority to undertake the work described herein or am acting as the duly authorized agent of the applicant.

?

-~

.

P SIGNATIJ~APPLICANT

~.

I

14. NOV/Jt:»z. DATEf

SIGNATURE OF AGENT

DATE

The Application must be signed by the person who desires to undertake the proposed activity (applicant) or it may be signed by a duly authorized agent if the statement in block 11 has been filled out and signed. 18 U .S.C. Section 1001 provides that: Whoever, in any manner within the jurisdiction of any department or agency of the United States knowingly and willfully falsifies, conceals, or covers up any trick, scheme, or disguises a material fact or 11)akes any false, fictitious or fraudulent statements or representations or makes or uses any false writing or document knowing same to contain any false, fictitious or fraudulent statements or entry, shall be fined not more than $10,000 or imprisoned not more than five years or both. ENG FORM 4345, OCT 2012

Page 3 of3

17. DIRECTIONS TO THE SITE

From Chicken Ak, Continue past the turn off to Eagle Ak down the Top of the World Highway for about 5 miles. Turn left (South) onto the mine access road, follow this road to the valley floor. Ferguson Placer Inc.'s camp is located slightly left (East) of where the access road meets the valley floor.

18. Nature of Activity (Description of project, include all features)

-A medium scale placer mine operation using a floating wash plant to mine approximately 166.12 acres over a 5 year period with a total disturbance 252.15 acres in the Walker Fork valley

**See Appendices A and B for a detailed description of project and diagrams respectively**

19. Project Purpose (Describe the reason or purpose of the project, see instructions)

-To recover economic alluvial precious metals.

**See Appendices A and B for a detailed description of project and diagrams respectively**

USE BlOCKS 20-231F DREDGED AND/OR Fill MATERIAl IS TO BE DISCHARGED

20. Reason(s) for Discharge

-Material that is not economic to mine will be stockpiled on previously mined or uneconomic land until the pay material is reached. Once the gold has been removed, the stockpiled material will be backfilled and reclaimed to match the original functionality of the land as close as possible -Washed pay material will be immediately discharged back into the pit in which it came form. All fine tailing and silt will be contained in a series of dams place across the active cut at approximately 1OOyd intervals

21. Type(s) of Material Being Discharged and the Amount of Each Type in Cubic Yards: Type Amount in Cubic Yards

Type Amount in Cubic Yards

Type Amount in Cubic Yards

Organic overburden (957 457)

Sand and gravel overburden (1 898 733)

Pay material (1 072 000)

22. Surface Area in Acres of Wetlands or Other Waters Filled (see instructions) Acres

Approximately 252.15 acres of total disturbance will be seen by four types of wet lands. **see Appendix C for breakdown**

or Linear Feet

Approximately 16080 linear feet

23. Description of Avoidance, Minimization, and Compensation (see instructions)

**See Appendix D for Mitigation Form**

ENG FORM 4345, OCT 2012

Page 2 of3

APPENDIX C

BREAKDOWN OF WETLANDS

1

The proposed area of this project lies on four different types of wetlands

defined by the Hydrogeomorphic method (HGM). These types include: The current

stream channel of Walker Fork (HGM Riverine), The riparian floodplain of Walker

Fork (HGM Riparian), The off channel meanders of Walker Fork (HGM Riverine),

The toe slope (HGM Slope)

The majority of the proposed mine plan lies on the toe slope of the valley.

However, as Ferguson Placer Inc. (FPI) intends to mine all viable ground, some

higher priority wetlands will need to be disturbed. This unavoidable disturbance

will be minimized by the various methods mentioned in Appendix D. FPI will avoid

all chance of discharge into Walker fork by either diverting the stream around the

disturbed area or by leaving a sufficient buffer zone. A break down in acreage of

each type wetlands affected by this project can be found bellow in tables 1,2,3. A

further description of how these disturbances will be minimized and compensated

for can be found in appendix D.

FERGUSON PLACER INC.

POA-1991-354-M4, APMA 9124, Ferguson Placer, Inc., Walker Fork

Downstream view of creek in unmined area

POA-1991-354-M4, APMA 9124, Ferguson Placer, Inc., Walker Fork

Upstream view of creek in unmined area

POA-1991-354-M4, APMA 9124, Ferguson Placer, Inc., Walker Fork

Riparian zone

POA-1991-354-M4, APMA 9124, Ferguson Placer, Inc., Walker Fork

Riparian zone side channel

POA-1991-354-M4, APMA 9124, Ferguson Placer, Inc., Walker Fork

Riparian zone - side channel

POA-1991-354-M4, APMA 9124, Ferguson Placer, Inc., Walker Fork

Typical off-channel feature

POA-1991-354-M4, APMA 9124, Ferguson Placer, Inc., Walker Fork

Toe slope wetlands, side hill drainage

POA-1991-354-M4, APMA 9124, Ferguson Placer, Inc., Walker Fork

Toe slope wetlands and existing disturbance

Walker Fork

N

POA-1991-354-M4, APMA 9124, Ferguson Placer, Inc., Walker Fork

Pennington Creek Aerial 1 ­ Site photos taken in this area

Walker Fork

N

POA-1991-354-M4, APMA 9124, Ferguson Placer, Inc., Walker Fork

Aerial 2

Walker Fork

N

Skukum Creek

POA-1991-354-M4, APMA 9124, Ferguson Placer, Inc., Walker Fork

Aerial 3

APPENDIX A

1. TESTING

DETAILED DISCRIPTION OF PROJECT

1

Although enough prior drilling has been done to approximate the

economically viable deposits suitable for placer mining, further, more concentrated,

drilling will be done before any ground is broken. This additional drilling will help

to locate the limits of all viable deposits more accurately.

By accurately locating

these deposits, Ferguson Placer Inc. (FPI) will be able to minimize their disturbance

by mining only what is viable. No ground will be broken if a suitable grade is not

proven first.

Gravel will be sampled in intervals as the overburden is stripped, to insure

no pay material is accidentally stockpiled as overburden.

2. DIVERSIONS

A total of nine diversions totaling 3417 linear yards have been proposed to

ensure the mining operation is located at a minimum of 25 feet from the flood plane

of Walker Fork. Diagrams showing the location of these can be found in figures 6-8

of Appendix B. The nine proposed diversions would utilize previous abandoned

stream channels and other off channel features where possible (approximately 2753

linear yards). To help keep the stream channel as natural as possible, the abandoned

channels would be cleared of silt and debris with an excavator and re engineered to

insure the same fall rate and flood capacities are kept relative to the existing stream

channel.

Stream meanders that can not be easily diverted using abandoned channels

will be left in place and a 25 foot buffer will be left on each side of the flood plane.

These areas may be mined at a later date, but is outside the scope of this project.

3. REMOVAL OF OVERBURDEN

Once an area has been proven viable and conflicting streams have been

properly diverted, the next stage of the mining process will be the removal of

overburden. This will be carried out in three stages: removal of organic muck with

dozers, removal of gravel with dozer, removal of remaining gravel with excavators.

The proposed mining area is covered in a layer of frozen organic soil/muck

ranging from six inches to twelve feet in depth. The expected average depth

determined from drill data is to be 3.58 feet, resulting in total of 957 467 cubic yards

of organic material to be excavated. A break down of this number in terms of volume

per year can be found in appendix E. The muck will be excavated primarily in the

sub freezing months of the year, March, April, October, and November, when the soft

swampy areas are frozen sufficiently to handle the weight of heavy equipment.

The

frozen material will be ripped into chunks and pushed into stockpiles by a D475 and

FERGUSON PLACER INC.

APPENDIX A

DETAILED DISCRIPTION OF PROJECT

2

a D9L dozer. Due to the lack of moisture in the material, it is possible to stack it

higher and closer to minimize the disturbed area. Initially, on the first pass up the

valley (2013, 2014) this material will be stacked on land proven uneconomic to

mine along the northern boundary of the proposed cut shown in figures 3,4,5 of

Appendix B. This stockpile will reach 40 yards outside the 150 yard pit and reach a

maximum height of 8 yards.

It will be positioned so that it can easily segregated

from the gravel overburden and making it possible to redistribute during the

restoration stage, providing sufficient topsoil to promote vegetation and wetlands

regrowth.

To allow the gravel interval to thaw in time to be processed, a full

seasons cut will need to be stripped to gravel one year in advance (e.g. The

proposed mining area of 2014 will need to be opened to gravel by the spring of

2013). This time delay is why our predicted proposed production starts at 50% and

ramps up to 100% in the third year.

Once the organic overburden is removed in the spring, the remaining gravel

overburden is left to thaw naturally. When enough gravel has thawed it is removed

and stockpiled with D475 and D9L dozers next to and on top of the organic

overburden piles. This allows the ground bellow it to continue to thaw at a faster

rate. A series of ditches and small pumps will also be used to circulate water to

further aid in the thawing. The over burden will continue to be removed as it thaws

to the pay layer determined by testing.

The final step in removing the overburden is to excavate the ramps (toes) left

by the bulldozer. The remaining overburden toes are lifted out of the active cut with

an excavator and stacked along side the pit in piles. These piles will reach a

maximum height of 7 yards and a width of 12 yards.

Approximately 1 898 733 cubic

yards of gravel overburden will be removed in total during the 5 year project. See

appendix E for expected total amounts per year. It is important to have this

overburden removed the fall prior to mining in the following spring (e.g. Material to

be processed in spring of 2014 must be prepared down to pay layer by fall of 2013).

4. PROCCESSING PAY MATERIAL

Once all overburden has been removed and enough time has been allowed

for pay material to thaw sufficiently, the material can then be processed and the

desirable minerals can be removed.

FPI intends to use a 6-foot diameter floating

trommel to process their material. The material is fed into the front (hopper) of the

machine and is then classified down to ½ inch. The larger, coarse tailings are

deposited in the rear by conveyor. The material smaller than ½ inch is passed over a

set of gold catching tables and the fine tailings are then deposited at the rear.

The

floating trommel will progress up the cut as the excavator advances the pond.

Approximately 1 072 000 cubic yards of pay material is expect to be processed over

the 5 year project. All the water used for processing is contained in a closed loop

system, re-circulating in the pond and sealed from seepage by a series of dams

across the cut spaced approximately every 100 yards.

FERGUSON PLACER INC.

APPENDIX A

DETAILED DISCRIPTION OF PROJECT

5. RESTORATION

After the material is processed and stacked, the tailings are leveled off and

capped with the overburden stockpiled on the side.

This process can happen

instantaneously as the ground is mined. The gravel and sand overburden is

backfilled first and the organics last. This allows the layers to be backfilled in the

order they came out. If additional organics are needed for proper re-vegetation,

more can be spread out when they are removed from the adjacent cut.

FERGUSON PLACER INC.

3

Walker Fork

POA-1999-354-M1, APMA 9124, Ferguson Placer, Inc., Walker Fork

Mine area stripped to prepare for mining in 2012/ 2013

POA-1999-354-M1, APMA 9124, Ferguson Placer, Inc., Walker Fork

Site has ample organic overburden for reclamation purposes

Walker Fork

POA-1999-354-M1, APMA 9124, Ferguson Placer, Inc., Walker Fork

Site contains areas that flood and capture sediment during high water events on Walker Fork, due to presence of an abandoned floodgate left by a former operator. Applicant proposes to construct depressions that will function as low velocity off-channel wetlands as they regenerate, similar to features that are currently present at the site.

POA-1999-354-M1, APMA 9124, Ferguson Placer, Inc., Walker Fork

Close-up of high water silt accumulation

Walker Fork

POA-1999-354-M1, APMA 9124, Ferguson Placer, Inc., Walker Fork

Mine cut reclaimed, October2012

POA-1999-354-M1, APMA 9124, Ferguson Placer, Inc., Walker Fork

Ferguson reclamation from previous Canadian operation

POA-1999-354-M1, APMA 9124, Ferguson Placer, Inc., Walker Fork

Ferguson reclamation from previous Canadian operation

POA-1999-354-M1, APMA 9124, Ferguson Placer, Inc., Walker Fork

Ferguson reclamation from previous Canadian operation

APPENDIX B

DIAGRAMS AND FIGURES

Figure 1: Vicinity Map

FERGUSON PLACER INC.

1

APPENDIX B

DIAGRAMS AND FIGURES

2

Figure 2: Legend

FERGUSON PLACER INC.

APPENDIX B

DIAGRAMS AND FIGURES

3

Figure 3: Proposed Mining Area (1 of 3)

FERGUSON PLACER INC.

APPENDIX B

DIAGRAMS AND FIGURES

4

Figure 4: Proposed Mining Area (2 of 3)

FERGUSON PLACER INC.

APPENDIX B

DIAGRAMS AND FIGURES

5

Figure 5: Proposed Mining Area (3 of 3)

FERGUSON PLACER INC.

APPENDIX B

DIAGRAMS AND FIGURES

6

Figure 6: Proposed diversions (1 of 3)

FERGUSON PLACER INC.

APPENDIX B

DIAGRAMS AND FIGURES

7

Figure 7: Proposed Diversions (2 of 3)

FERGUSON PLACER INC.

APPENDIX B

DIAGRAMS AND FIGURES

8

Figure 8: Proposed Diversions (3 of 3)

FERGUSON PLACER INC.

APPENDIX B

DIAGRAMS AND FIGURES

9

Figure 9: Sample Cut (1 of 3)

**NOT TO SCALE**

FERGUSON PLACER INC.

APPENDIX B

DIAGRAMS AND FIGURES

10

Figure 10: Sample Cut (2 of 3)

**NOT TO SCALE**

FERGUSON PLACER INC.

APPENDIX B

DIAGRAMS AND FIGURES

11

Figure 11: Sample Cut (3 of 3)

**NOT TO SCALE**

FERGUSON PLACER INC.

APPENDIX B

DIAGRAMS AND FIGURES

12: Cross Sectional Views

**NOT TO SCALE**

FERGUSON PLACER INC.

12

APPENDIX B

DIAGRAMS AND FIGURES

FERGUSON PLACER INC.

13

APPENDIX D

MITIGATION FORM

1

1. Avoidance of impacts to waters of the U.S., including wetlands:

Please describe how, in your project planning process, you avoided impacts to waters

of the U.S., including wetlands, to the maximum extent practicable. Examples of

avoidance measures include site selection, routes, design configurations, etc...

Main method of avoidance Ferguson Placer Inc (FPI) will utilize is drilling. FPI will

ensure that a viable resource has been proven before any ground is disturbed.

This

allows FPI to avoid disturbing ground that is barren or uneconomic. However,

wetlands that have been found to have viable deposits cannot be avoided, will be

mined and restored with as little impact as possible.

Unless required to undertake the mining plan no disturbance will be made within a

25 ft buffer zone on the banks of Walker Fork.

FPI's method of taking multiple conjoining passes greatly minimizes the amount of

disturbance due to stockpiling overburden. As explained in A, when possible,

overburden is stockpiled on the previously mined conjoining pass.

All temporary access roads are located on previously mined land either on the

tailing behind the wash plant or on the previously mined cut next to the wash plant.

Camp/workshop/fuel storage areas are all located on previously mined land.

FPI operates a closed loop water system. All water used in the production process is

100% recycled and contained in the pond by a series of dams. As the mining

operation progresses a new dam is built and the water is pumped back over as

needed. This eliminates the need for settling ponds and evenly distributes the silt

and sediment along the mined area where it came from.

All fuels and large quantities of harmful chemicals are properly stored with

secondary containment to eliminate spillage into the waterways and wetlands.

FERGUSON PLACER INC.

APPENDIX D

MITIGATION FORM

2

2.Minimization of unavoidable impacts to waters of the U.S., including

wetlands:

Please describe how your project design incorporates measures that minimize the

unavoidable impacts to waters of the U.S., including wetlands, by limiting fill

discharges to the minimum amount/size

As we can choose where economic deposits lie there will be certain unavoidable

impact associated with this project. However, we will do our best to minimize these.

Some ways of minimizing are...

To minimize the disturbance caused by stockpiling overburden on unmined land,

FPI Plans to remove all required organic overburden while it is still frozen. This

prevents the material from thawing once its exposed and while its being handled.

Frozen material can then be stacked in higher piles resulting in less total area

disturbed. Stacking the material while frozen will also prevent the pile melting and

seeping out over a large area. It has been found that the top layer of muck is enough

to insulate the rest of the pile and keep it frozen throughout the summer months.

Due to the permafrost, it is required that an area must be open for a certain amount

of time to thaw before it can be mined. FPI placer plans to minimize the time that

land is left open by practicing continuous restoration. To help lessen the time

between initial disturbance and restoration further, FPI will use various methods to

help speed the thawing process. These have been outlined in Appendix A under the

removal of overburden section. Utilizing these methods FPI expects the time

between initial disturbance and restoration to be no greater than 2 years.

Having a series of dams filtering out sediment minimizes any seepage of water from

the active cut.

The silt will also have time to settle out in the ponds created by each

dam. If any seepage manages to re enter the waterway, it would be sufficiently

filtered and settled in order to pose no harmful effects.

A large portion of all diversions proposed by FPI will utilize existing abandoned

stream channels. These channels will be cleared of silt and debris and re-engineered

to insure that they can handle the flow rate of the stream in a flood with out adding

excess sediment to the waterway.

FPI Plans to minimize the long term effects on the area by reclaiming the disturbed

area to exceed the requirements of the land manager and to meet recommendations

made by the Army Corps of Engineers. They plan to do this by back filing

FERGUSON PLACER INC.

APPENDIX D

MITIGATION FORM

3

overburden and contouring it to provide as much saturated soil as possible. A series

of interconnected shallow ponds will also be created to restore and if possible

enhance the off channel features that were present before mining.

Erosion will be minimized by restoring the disturbed area to a grade capable of

maintaining any surface run off to a low energy flow. Reclaimed stream channels

will also be restored to their natural grade. Low sloping banks will be established to

prevent cutting and to contain the high flows associated with floods. Riprap will be

used to further prevent erosion on high energy corners.

3.Compensation for unavoidable impacts to waters of the U.S., including

wetlands:

Please describe your proposed compensatory mitigation to off set unavoidable impacts

to waters of the U.S., or, alternatively, why compensatory mitigation is not appropriate

or practicable for your project. Compensatory mitigation involves actions taken to

offset unavoidable adverse impacts to waters of the U.S., including wetlands, streams

and other aquatic resources(aquatic sites)authorized by Corps permits. Compensatory

mitigation may involve the restoration, enhancement, establishment (creation),

and/or the preservation of aquatic sites. The three mechanisms for providing

compensatory mitigation are mitigation banks, in-lieu fee of mitigation, and

permittee-responsible mitigation. Please see the attached definitions for additional

Restoration is the method of compensation proposed by FPI.

All disturbed areas

will be restored to the best of their ability. Areas those are not practicable to be

restored to similar functionality as before mining will be compensated by enhancing

the areas that are to exceed their previous functionality. This will be done by

providing a series of connected off channel features to act as a relief to Walker Fork

under flood conditions. These interconnected features will help reduce the energy of

the stream and allow sediments to be deposited. Habitat for wildlife will also

develop over time due to the variety of wetlands restored. Over a 5-10 year period

FPI hopes to see the area restored to its previous functionality.

FERGUSON PLACER INC.

US Army Corps of Engineers Alaska District

ANCHORAGE Regulatory Division (1145) CEPOA-RD Post Office Box 6898 JBER, Alaska 99506-0898

Public Notice of Application for Permit PUBLIC NOTICE DATE:

November 28, 2012

EXPIRATION DATE:

December 28, 2012

REFERENCE NUMBER:

POA-1991-354-M4

WATERWAY:

Walker Fork

Interested parties are hereby notified that a Department of the Army permit application has been received for work in waters of the United States as described below and shown on the enclosed project drawings. Comments on the described work, with the reference number, should reach this office no later than the expiration date of this Public Notice to become part of the record and be considered in the decision. Please contact Leslie W. Tose at (907) 753-5515, toll free from within Alaska at (800) 478-2712, by fax at (907) 753-5567, or by email at leslie.w.tose@usace.army.mil if further information is desired concerning this notice. APPLICANT: Mr. Kim Ferguson, Ferguson Placer, Inc., P.O. Box 609, Haines, Alaska 99827 Phone: 1-206-792-9776 Email: kkferguson@me.com LOCATION: The project site is located within Sections 34, 35, and 36, T. 27 N., R. 21 E., and Section 6, T. 26 N., R. 22 E., Copper River Meridian; USGS Quad Map Eagle A-1; Latitude 64.0775º N., Longitude 141.2752 º W.; near Boundary, Alaska. PURPOSE: Mr. Kim Ferguson's stated purpose is to recover economical alluvial precious metals from the valley floor of Walker Fork. PROPOSED WORK: The applicant proposes to impact approximately 252.15 acres of waters of the U.S., including wetlands, over a period of five years, in association with a placer mining operation. Of this area, 166.12 acres would be mined using a floating wash plant, 64.86 acres would be used for temporary stockpile of overburden, and 21.18 acres would be used during temporary and/or permanent stream diversions. The project area would be approximately 16,080 feet long by 700 feet wide. Specifics are as follows: In preparation for mining, the applicant proposes to mechanically clear 957,457 cubic yards (cy) of organic "muck" overburden and 1,898,733 cy gravel overburden from the 166.12 acre mine area. These same

materials would be discharged into 64.86 acres of adjacent wetlands for temporary stockpile. 1,072,000 cy of exposed pay gravels would then be mined and discharged back into the mine pit. Following mining, all stockpiled organic and gravel overburden would be discharged back into the mine pit and re-contoured, for the purpose of reclamation. During the mining operation, nine temporary and/or permanent stream diversions totaling 10,251 linear feet (21.18 acres) would be constructed. All work would be performed in accordance with information available for viewing in Appendices, A through E, found on our web site at: http://www.poa.usace.army.mil/Missions/Regulatory/PublicNotices.aspx Appendix A: reclamation Appendix B: Appendix C: Appendix D: Appendix E:

Project Description and photos of mine operation and typical conducted by Ferguson Placer, Inc., ten pages. Project Plans, thirteen pages. Summary and photos of wetland areas, twelve pages. Mitigation Statement, three pages. Project schedule and phasing, two pages.

ADDITIONAL INFORMATION: Jurisdiction: Walker Fork, a relatively permanent water (RPW), is a 20 mile long tributary of the South Fork of the Fortymile River (RPW) . The South Fork flows into the Mosquito Fork (RPW), which flows into the Forty Mile River, a Traditional Navigable Water. Watershed disturbance: The Walker Fork watershed has been mined historically, starting around the turn of the century, using hydraulic open cut methods and later, bucket dredges. The intensity of mining activities has varied through time, and is correlated with the price of gold. Some areas have been mined more than one time. Intensive mining has occurred for about five miles upstream of the proposed project on Walker Fork, on Cherry Creek, and in headwater streams as well. Below the proposed operation is an approximately one mile reach of placer workings. The proposed operation would mine approximately three miles of Walker Fork, between the two previously mined areas. Previous permitting: This is the fourth permit modification for a mining operation on Walker Fork, started in 1991. Ownership of the claims has changed several times. Work under the current operator, started in 2010, consists of: mine plans and bonding with the Alaska Department of Natural Resources, Division of Mining, and with the Bureau of Land Management; clean up of machinery, debris and camp area of previous mining operations, reclamation of previous mining disturbance, establishment of a new camp and road improvement activities, and some new mining. Wetlands: The area of the proposed mine has a shallow gradient (0.5%) and contains palustrine forested, palustrine scrub shrub and palustrine emergent wetlands, or "muskeg", with high levels of groundwater. Appendix C includes aerial photographs covering some of the area to be mined, and site photographs showing typical wetland types and features in the project area. Using the Alaska Regulatory Best Professional Judgement Wetlands Function Assessment, wetlands at the site scored as high for habitat suitability, moderate for flood flow alteration, sediment removal, production and export of organic matter, and native plant richness, and low for education or scientific value, uniqueness and heritage. Uplands: Some portions of the operation, including the main access road, and camp, are in uplands. APPLICANT PROPOSED MITIGATION:

The applicant proposes mitigation measures to -2-

avoid, minimize, and compensate for impacts to waters of the United States from activities involving discharges of dredged or fill material. Please see Appendix D for this information. WATER QUALITY CERTIFICATION: A permit for the described work will not be issued until a certification or waiver of certification, as required under Section 401 of the Clean Water Act (Public Law 95-217), has been received from the Alaska Department of Environmental Conservation. CULTURAL RESOURCES: The latest published version of the Alaska Heritage Resources Survey (AHRS) has been consulted for the presence or absence of historic properties, including those listed in or eligible for inclusion in the National Register of Historic Places. There is an unevaluated property in the vicinity of the worksite. It has been designated Walker Fork Cabin 2006-1. Because the property has been determined to be outside of the project area, no further action is required. Consultation of the AHRS constitutes the extent of cultural resource investigations by the District Commander at this time. This application is being coordinated with SHPO. Any comments SHPO may have concerning presently unknown archeological or historic data that may be lost or destroyed by work under the requested permit will be considered in our final assessment of the described work. ENDANGERED SPECIES: project area.

No threatened or endangered species are known to use the

We have determined the described activity would have no effect on any listed or proposed threatened or endangered species, and would have no effect on any designated or proposed critical habitat, under the Endangered Species Act of 1973 (87 Stat. 844). Therefore, no consultation with the U.S. Fish and Wildlife Service or the National Marine Fisheries Service is required. However, any comments they may have concerning endangered or threatened wildlife or plants or their critical habitat will be considered in our final assessment of the described work. ESSENTIAL FISH HABITAT: The Magnuson-Stevens Fishery Conservation and Management Act, as amended by the Sustainable Fisheries Act of 1996, requires all Federal agencies to consult with the NMFS on all actions, or proposed actions, permitted, funded, or undertaken by the agency, that may adversely affect Essential Fish Habitat (EFH) . No EFH species are known to use the project area. TRIBAL CONSULTATION: The Alaska District fully supports tribal self-governance and government-to-government relations between Federally recognized Tribes and the Federal government. Tribes with protected rights or resources that could be significantly affected by a proposed Federal action (e.g., a permit decision) have the right to consult with the Alaska District on a government-to-government basis. Views of each Tribe regarding protected rights and resources will be accorded due consideration in this process. This Public Notice serves as notification to the Tribes within the area potentially affected by the proposed work and invites their participation in the Federal decision-making process regarding the protected Tribal right or resource. Consultation may be initiated by the affected Tribe upon written request to the District Commander during the public comment period. PUBLIC HEARING: Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider this -3-

application. Requests for public hearings shall state, with particularity, reasons for holding a public hearing. EVALUATION: The decision whether to issue a permit will be based on an evaluation of the probable impacts, including cumulative impacts of the proposed activity and its intended use on the public interest. Evaluation of the probable impacts, which the proposed activity may have on the public interest, requires a careful weighing of all the factors that become relevant in each particular case. The benefits, which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. The outcome of the general balancing process would determine whether to authorize a proposal, and if so, the conditions under which it will be allowed to occur. The decision should reflect the national concern for both protection and utilization of important resources. All factors, which may be relevant to the proposal, must be considered including the cumulative effects thereof. Among those are conservation, economics, aesthetics, general environmental concerns, wetlands, cultural values, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shore erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership, and, in general, the needs and welfare of the people. For activities involving 404 discharges, a permit will be denied if the discharge that would be authorized by such permit would not comply with the Environmental Protection Agency's 404(b) (l) guidelines. Subject to the preceding sentence and any other applicable guidelines or criteria (see Sections 320.2 and 320.3), a permit will be granted unless the District Commander determines that it would be contrary to the public interest. The Corps of Engineers is soliciting comments from the public; Federal, State, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps of Engineers to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. AUTHORITY:

This permit will be issued or denied under the following authority:

(X) Discharge dredged or fill material into waters of the United States Section 404 Clean Water Act (33 U.S.C. 1344). Therefore, our public interest review will consider the guidelines set forth under Section 404(b) of the Clean Water Act (40 CFR 230) . Project drawings and a Notice ~f Application for State Water Quality Certification are enclosed with this Public Notice.

District Commander u.s. Army, Corps of Engineers Attachment -4-

SEAN PARNELL, GOVERNOR

STATE OF ALASKA DEPT. OF ENVIRONMENTAL CONSERVATION DIVISION OF WATER 401 Certification Program Non-Point Source Water Pollution Control Program

JUNEAU DEPARTMENT OF ENVIRONMENTAL CONSERVATION WQM/401 CERTIFICATION 410 WILLOUGHBY AVENUE JUNEAU, ALASKA 99801-1795 PHONE: (907) 465-5321/FAX: (907) 465-5274

NOTICE OF APPLICATION FOR STATE WATER QUALITY CERTIFICATION

Any applicant for a federal license or permit to conduct an activity that might result in a discharge into navigable waters, in accordance with Section 401 of the Clean Water Act of 1977 (PL95-217), also must apply for and obtain certification from the Alaska Department of Environmental Conservation that the discharge will comply with the Clean Water Act, the Alaska Water Quality Standards, and other applicable State laws. By agreement between the U.S. Army Corps of Engineers and the Department of Environmental Conservation, application for a Department of the Army permit to discharge dredged or fill material into navigable waters under Section 404 of the Clean Water Act also may serve as application for State Water Quality Certification. Notice is hereby given that the application for a Department of the Army Permit described in the Corps of Engineers' Public Notice No. 1991-354-M4, Walker Fork, serves as application for State Water Quality Certification from the Department of Environmental Conservation. After reviewing the application, the Department may certify there is reasonable assurance the activity, and any discharge that might result, will comply with the Clean Water Act, the Alaska Water Quality Standards, and other applicable State laws. The Department also may deny or waive certification. Any person desiring to comment on the project, with respect to Water Quality Certification, may submit written comments to the address above by the expiration date of the Corps of Engineer's Public Notice.

U.S. ARMY CORPS OF ENGINEERS APPLICATION FOR DEPARTMENT OF THE ARMY PERMIT

OMB APPROVAL NO. 0710-0003 EXPIRES: 28 FEBRUARY 2013

33 CFR 325. The proponent agency is CECW-CO-R.

Public reporting for this collection of information is estimated to average 11 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of the collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters, Executive Services and Communications Directorate, Information Management Division and to the Office of Management and Budget, Paperwork Reduction Project (071 0-0003). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to either of those addresses. Completed applications must be submitted to the District Engineer having jurisdiction over the location of the proposed activity. PRIVACY ACT STATEMENT Authorities: Rivers and Harbors Act, Section 10, 33 USC 403; Clean Water Act, Section 404, 33 USC 1344; Marine Protection, Research, and Sanctuaries Act, Section 103, 33 USC 1413; Regulatory Programs of the Corps of Engineers; Final Rule 33 CFR 320-332. Principal Purpose: Information provided on this form will be used in evaluating the application for a permit. Routine Uses: This information may be shared with the Department of Justice and other federal, state, and local government agencies, and the public and may be made available as part of a public notice as required by Federal law. Submission of requested information is voluntary, however, if information is not provided the permit application cannot be evaluated nor can a permit be issued. One set of original drawings or good reproducible copies which show the location and character of the proposed activity must be attached to this application (see sample drawings and/or instructions) and be submitted to the District Engineer having jurisdiction over the location of the proposed activity. An application that is not completed in full will be returned. (ITEMS 1 THRU 4 TO BE FILLED BY THE CORPS) 2. FIELD OFFICE CODE

3. DATE RECEIVED

ecroYi- t<'D- N

4. DATE APPLICATION COMPLETE

qJt5{J..ot~

II

I Iff{ 26 I 2.

(ITEMS BELOW TO BE FILLED BY APPLICANT)

5. APPLICANT'S NAME First-Kim

8. AUTHORIZED AGENT'S NAME AND TITLE (agent is not required) Middle -Ronald

Last - Ferguson

First-

Middle-

Company- Ferguson Placer Inc.

Company-

E-mail Address - k:kferguson@me.com

E-mail Address -

6. APPLICANT'S ADDRESS:

9. AGENT'S ADDRESS:

Address- Box 28

AddressState- AK

City - Chicken

Zip -

99732

Country- US

c. Fax

b. Business

Zip-

State-

City-

Country-

10. AGENTS PHONE NOs. w/AREA CODE

7. APPLICANT'S PHONE NOs. w/AREA CODE a. Residence

Last-

b. Business

a. Residence

c. Fax

1(206) 792-9776 STATEMENT OF AUTHORIZATION

11. 1hereby authorize, to act in my behalf as my agent in the processing of this application and to furnish, upon request, supplemental information in support of this permit application.

DATE

SIGNATURE OF APPLICANT

d

NAME, LOCATION, AND DESCRIPTION OF PROJECT OR ACTIVITY

12. PROJECT NAME OR TITLE (see instructions) Walker Fork Placer Mine

13. NAME OF WATERBODY, IF KNOWN (if applicable)

14. PROJECT STREET

WalkerFork

Address

ADbRES~-;ppl~'i) ~ ,$'

l-1-5-.-L-0-CA-T-IO_N_O_F_P_R_O_JE_C_T-----------------j City_ Latitude: ·N 64.07756

\

Longitude: ·W 141.27519

16. OTHER LOCATION DESCRIPTIONS, IF KNOWN (see instructions)

34, 35, 36, (6)

.:';)~p-

__

..;l,_~i ""'-.A K ~

Municipality

State Tax Parcel ID Section-

State-

~ ~

Towryship-

ENG FORM 4345, OCT 2012

27N, (26N)

Range-

21E, (22E)

PREVIOUS EDITIONS ARE OBSOLETE.

Page 1 of 3

24. Is Any Portion ofthe Work Already Complete? !&JYes

QNo

IF YES, DESCRIBE THE COMPLETED WORK

!Auger drill samples have been taken and capped to determine areas viable for economic mining.

25. Addresses of Adjoining Property Owners, Lessees, Etc., Whose Property Adjoins the Waterbody (if more than can be entered here, please attach a supplemental list). a. Address- Mackinaw Productions Inc. , I 0889 County road 320 City- Rifle

State- CO

Zip-81650

b. Address- Harvey Bickle, 280 Ricardo Road City- Gabriela

State- B.C. Canada, VOR

IXJ

Zip-

c. AddressCity-

State-

Zip-

State-

Zip-

State-

Zip-

d. AddressCitye. Address-

City-

26. List of Other Certificates or Approvals/Denials received from other Federal, State, or Local Agencies for Work Described in This Application. IDENTIFICATION TYPE APPROVAL* DATE APPROVED DATE APPLIED DATE DENIED AGENCY NUMBER

BLM

POO

2012-04-30

2012-07-07

DNR

Misc. Land Use

2012-04-30

2012-06-01

Fish and Game

Fish Habitat

2011-05-11

2011-06-10

Alaska DEC

APDES

2012-04-30

2012-07-03

AKG370773

· Would include but is not restricted to zoning, building, and flood plain permits

27. Appli~ti n is he:r:y__ebmade for permit or permits to authorize the work described in this application. I certify that this information in this application is complete a ; ?ac(Acurate. fu.rther certify that I possess the authority to undertake the work described herein or am acting as the duly authorized agent of the applicant.

?

-~

.

P SIGNATIJ~APPLICANT

~.

I

14. NOV/Jt:»z. DATEf

SIGNATURE OF AGENT

DATE

The Application must be signed by the person who desires to undertake the proposed activity (applicant) or it may be signed by a duly authorized agent if the statement in block 11 has been filled out and signed. 18 U .S.C. Section 1001 provides that: Whoever, in any manner within the jurisdiction of any department or agency of the United States knowingly and willfully falsifies, conceals, or covers up any trick, scheme, or disguises a material fact or 11)akes any false, fictitious or fraudulent statements or representations or makes or uses any false writing or document knowing same to contain any false, fictitious or fraudulent statements or entry, shall be fined not more than $10,000 or imprisoned not more than five years or both. ENG FORM 4345, OCT 2012

Page 3 of3

17. DIRECTIONS TO THE SITE

From Chicken Ak, Continue past the turn off to Eagle Ak down the Top of the World Highway for about 5 miles. Turn left (South) onto the mine access road, follow this road to the valley floor. Ferguson Placer Inc.'s camp is located slightly left (East) of where the access road meets the valley floor.

18. Nature of Activity (Description of project, include all features)

-A medium scale placer mine operation using a floating wash plant to mine approximately 166.12 acres over a 5 year period with a total disturbance 252.15 acres in the Walker Fork valley

**See Appendices A and B for a detailed description of project and diagrams respectively**

19. Project Purpose (Describe the reason or purpose of the project, see instructions)

-To recover economic alluvial precious metals.

**See Appendices A and B for a detailed description of project and diagrams respectively**

USE BlOCKS 20-231F DREDGED AND/OR Fill MATERIAl IS TO BE DISCHARGED

20. Reason(s) for Discharge

-Material that is not economic to mine will be stockpiled on previously mined or uneconomic land until the pay material is reached. Once the gold has been removed, the stockpiled material will be backfilled and reclaimed to match the original functionality of the land as close as possible -Washed pay material will be immediately discharged back into the pit in which it came form. All fine tailing and silt will be contained in a series of dams place across the active cut at approximately 1OOyd intervals

21. Type(s) of Material Being Discharged and the Amount of Each Type in Cubic Yards: Type Amount in Cubic Yards

Type Amount in Cubic Yards

Type Amount in Cubic Yards

Organic overburden (957 457)

Sand and gravel overburden (1 898 733)

Pay material (1 072 000)

22. Surface Area in Acres of Wetlands or Other Waters Filled (see instructions) Acres

Approximately 252.15 acres of total disturbance will be seen by four types of wet lands. **see Appendix C for breakdown**

or Linear Feet

Approximately 16080 linear feet

23. Description of Avoidance, Minimization, and Compensation (see instructions)

**See Appendix D for Mitigation Form**

ENG FORM 4345, OCT 2012

Page 2 of3

APPENDIX E

TENTATIVE SCHEDULE

1

2013

-Diversions A-E will be completed as needed

-2200 linear yards are to mined and reclaimed of first pass by end of season, (1)

figure 4.

-5360 linear yards of first pass are to be partially stripped for following seasons, (2)

figure 5.

2014

-3160 linear yards of first pass are to be mined and reclaimed by end of season, (2)

figure 5.

-3800 linear yards of second pass are to be stripped for following season, (3) figure

4.

2015

-3800 linear yards are to be mined and reclaimed by end of season, (3) figure 4.

-Diversions F-I will be completed as needed for stripping

-1560 linear yards of second pass and 2240 linear yards of third pass are to stripped

for following season, (4) figure 4.

2016

-1560 linear yards of second pass and 2240 linear yards of third pass are to be

mined and reclaimed by end of season, (4) figure 4.

-Diversions F, G, H ,A ,B ,C are to be reclaimed and stream returned to original

channel

-3120 linear yards of third pass are to be stripped for following season, (5) figure 5.

FERGUSON PLACER INC.

APPENDIX E

TENTATIVE SCHEDULE

2

2017

-3120 linear yards are to be mined and reclaimed by end of season, (5) figure 5.

-Diversion D, I, E are to be reclaimed and stream returned to original channel

FERGUSON PLACER INC.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas