POA-2006-312_Cook Inlet - Furie Operating Alaska, LLC's, stated purpose is the installation,
POA-2006-312_Cook Inlet- Furie Operating Alaska, LLC's, stated purpose is the installation, operation, and maintenance of a platform structure for the long-term production of natural gas from the Kitchen Lights Unit Well #1 reservoir area, transport of natural gas to an onshore production facility, and transport to CIGGS to bring natural gas to energy suppliers.Please contact Heather Boyer at (907) 753-2877, toll free from within Alaska at (800) 478-2712, by fax at (907) 753-5567, or by email at heather.l.boyer@usace.army.mil if further information is desired concerning this notice.
US Army Corps
of Engineers
Alaska District
Regulatory Division (1145)
CEPOA-RD
Post Office Box 6898
JBER, Alaska 99506-0898
Public Notice
of Application
for Permit
PUBLIC NOTICE DATE:
December 4, 2012
EXPIRATION DATE:
January 4, 2013
REFERENCE NUMBER:
POA-2006-312
WATERWAY:
Cook Inlet
Interested parties are hereby notified that a Department of the Army permit
application has been received for work in waters of the United States as described
below and shown on the enclosed project drawings.
Comments on the described work, with the reference number, should reach this office
no later than the expiration date of this Public Notice to become part of the
record and be considered in the decision.
Please contact Heather Boyer at (907)
753-2877, toll free from within Alaska at (800) 478-2712, by fax at (907) 753-5567,
or by email at heather.l.boyer®usace.army.mil if further information is desired
concerning this notice.
APPLICANT: Furie Operating Alaska, LLC, 1029 West 3rd Avenue, Suite 500, Anchorage,
Alaska 99501,
907-277-3726
AGENT: Stoel Rives LLP, Ms. Ramona Monroe, 510 L Street, Suite 500, Anchorage,
Alaska 99501, 907-263-8445.
LOCATION: Approximate geographic coordinates of the project structures are
provided below. Although Furie plans to erect the Kitchen Lights KLU Platform A
over the existing Unit KLU Well #1, the actual location would depend on
construction limitations, would be within approximately 1,000 feet of the location
described herein, and would be determined by post-installation as-built survey.
Offshore Production KLU Platform A: Section 25, T.10 N., R. 11 W.,
151.1517°W
Onshore Production Facility: Section 35, T. 8 N., R. 12 W.,
60.9344°N,
60.7358°N, 151.3306°W
Marine Gathering Pipelines: Section varies with location, T. 8 N.,
N., R. 11 W. and 12 W.
9 N., and 10
PURPOSE: The applicant's stated purpose is the installation, operation, and
maintenance of a platform structure for the long-term production of natural gas
from the Kitchen Lights Unit Well #1 reservoir area, transport of natural gas to an
onshore production facility, and transport to CIGGS to bring natural gas to energy
suppliers.
PROPOSED WORK: The applicant proposes to install and operate an offshore natural
gas platform and two marine gathering pipelines in Upper Cook Inlet, Alaska. In
addition, the applicant proposes to construct an onshore production facility and an
onshore tie-in pipeline in the area of Nikiski, Alaska to support natural gas
production operations.
There are four major structural activities to the proposed project with both
permanent and temporary structures to be situated both onshore and offshore, as
follows:
1) Natural gas production platform (permanent offshore structure)
2) Jack-up drilling rig and/or platform rig for well support and intervention
(temporary offshore structures)
3) Natural gas marine gathering pipelines and onshore tie-in pipeline (permanent
offshore and onshore structures, respectively)
4) Natural gas production facility (permanent onshore structure)
Natural Gas Production Platform Design
KLU Platform A would have the following approximate structural dimensions (Sheet 2
of 9 and Sheet 3 of 9) :
·
64.5-foot x 72-foot production deck and main deck
·
30-foot x 72-foot living quarters and helicopter deck extending from one side
of the platform
·
100-foot boom crane
·
18-foot diameter caisson designed to sit vertically in the water to reach
approximately 62 feet above Mean Sea Level
· At the base of the caisson, there are eight 51-inch diameter skirt pile
sleeves for 42-inch diameter piles with grouted annuli.
Natural Gas Production Platform Installation and Activities
The pre-fabricated platform, deck, and components would be shipped to one of three
ports (Homer, Nikiski, or Anchorage) from an out-of-state fabrication center. Two
tug barges will "wet tow" the lower portion of the platform (including the caisson)
to the project site. The platform would be submerged through a controlled process
so that it is positioned vertically in the vicinity of the existing Kitchen Lights
Unit (KLU) Well #1 location, using a derrick barge to support the installation
process. To secure the platform, the derrick barge would drive eight support piles
(the platform support footing) . An impact driver would drive each pile to a depth
of approximately 120 feet below the seafloor, and the piles would be filled with
grout. Alternately, holes for the piles may be pre-drilled and the piles lowered
into place and grouted. The derrick barge would install the deck pieces once the
platform support footing is secured. The structure would be finalized by completing
all connections, piping, and other service units among the deck pieces.
Jack-up Drilling Rig and/or Platform Rig Design
The Spartan 151 jack-up drilling rig (jack-up rig), or a similar rig, would be used
for drilling activities. Spartan 151 is an A-1 self-elevating mobile drilling unit
-2-
with the following structural dimensions (Sheet 4 of 9 and Sheet 5 of 9) :
· Three triangular truss-type legs, 250-feet long
· One triangular shaped main deck, approximately 162-foot x 174-foot maximum
length and width
·
Cantilever drilling derrick extending 58 feet from one end of the main deck
to a height of 147 feet
· Helicopter landing deck extending 62 feet from the other end of the main deck
· Two boom cranes at heights of 100 and 120 feet
A temporary platform rig may be employed for some well completion and maintenance
activities as a supplement to the jack-up rig activities. The platform rig is a
smaller drilling rig that would sit directly on top of KLU Platform A instead of
creating its own footprint on the seafloor. Structural details of the platform rig
are yet to be determined.
Jack-up Drilling Rig and/or Platform Rig Installation and Activities
After KLU Platform A installation is complete, drilling operations would begin. The
production wells would be drilled using the jack-up rig (or similar) cantilevered
over the platform. The jack-up rig would be temporarily located onsite to perform
the production-related drilling activities and then demobilize upon completion.
The platform rig (if used) would be barged to the KLU Well #1 reservoir area,
raised onto KLU Platform A with the platform crane, and left in place during well
completion and maintenance activities. At completion of drilling activities at KLU
Platform A, the platform rig would be barged to another offshore platform site,
onshore drilling site, or demobilized for storage onshore.
Marine Gathering Pipelines and Onshore Tie-in Pipeline Design
The marine gathering pipelines would run from the production platform to the
onshore production facility, following the existing Cook Inlet Gas Gathering System
(CIGGS) corridor, operated by Marathon Pipeline Company. The proposed pipeline
would have the following structural design (Sheet 6 of 9 and Sheet 7 of 9) :
·
Two concrete coated steel pipelines of approximately 10-inch diameter (Sheet
6 of 9)
·
If necessary, vibration dampers would be installed beneath the lines along
the aboveground section.
· Onshore and above sea level, pipeline sections would be insulated, and a
sheet metal jacket may be used to protect the insulated lines.
A single subsurface 10-inch to 12-inch tie-in pipeline would carry processed
natural gas from the onshore production facility to tie into the CIGGS East
Foreland Facility owned cooperatively by Hilcorp and Marathon Oil Corporation
(Sheet 8 of 9). This tie-in pipeline is in a preliminary design stage, and subject
to design changes.
Marine Gathering Pipelines and Onshore Tie-in Pipeline Installation and Activities
At the onshore production facility, the pipeline would exit the structure to run
aboveground for approximately 52 feet and then would enter the ground at
approximately 25 feet from the northern property boundary and approximately 630
feet from mean high water to run below the coastal bluff and emerge onto the seabed
floor (Sheet 7 of 9) . Horizontal directional drilling would be used to create a
subsurface corridor beneath the bluff to approximately 2,500 feet beyond the
-3-
intertidal zone. Installation of the marine gathering pipeline would begin by
pulling the pipe through the subsurface corridor from two offshore barges. Beyond
the intertidal zone, each new segment of concrete-encased pipe would be welded to
the pipeline on a lay barge and allowed to settle onto the seafloor. Flanged
sections would be attached by divers to connect the marine gathering pipelines to
the platform structure.
The onshore tie-in pipeline would connect to CIGGS approximately BOO feet west of
the onshore property (Sheet 8 of 9) .
Natural Gas Production Facility Design
The proposed onshore production facility would be located southwest of the proposed
KLU Platform Ai approximately 630 feet from mean high water of Cook Inlet on
currently undeveloped land (Sheet 9 of 9) . Under the current preliminary design,
approximately 6 acres of fill/excavation is anticipated from the facility and
related infrastructure. However, a total of about 8 acres may be disturbed by
construction-related activities including development of laydown areas and
vegetation clearing for utility installation. An approximately 30-foot wide access
road would be extended from Rodney and Shelly's Avenue, heading east towards the
onshore property.
Natural Gas Production Facility Installation and Activities
The facility and all related infrastructure would be constructed in upland areas
without using fill in wetland areas. Nearby wetlands would be flagged and avoided
(Sheet 9 of 9) . Vessels containing process liquids would be contained with curbed
concrete foundations to prevent runoff and drainage. All work would be performed
in accordance with the enclosed plan (sheets 1-9), dated November 15, 2012.
ADDITIONAL INFORMATION: A permit was issued to Furie Operating Alaska, LLC on
November 13, 2006 for exploratory gas wells in the Kitchen Lights Unit.
APPLICANT PROPOSED MITIGATION: The applicant proposes the following mitigation
measures to avoid, minimize, and compensate for impacts to waters of the United
States from activities involving discharges of dredged or fill material.
a. Avoidance: No discharge of dredged or fill material is proposed. There
is a nearby emergent wetland that would be flagged and completely avoided (shown on
sheet 8 of 9) .
CULTURAL RESOURCES: The latest published version of the Alaska Heritage Resources
Survey (AHRS) has been consulted for the presence or absence of historic
properties, including those listed in or eligible for inclusion in the National
Register of Historic Places. There are no listed or eligible properties in the
vicinity of the worksite.
Consultation of the AHRS constitutes the extent of
cultural resource investigations by the District Commander at this time, and he is
otherwise unaware of the presence of such resources. This application is being
coordinated with the State Historic Preservation Office (SHPO) . Any comments SHPO
may have concerning presently unknown archeological or historic data that may be
lost or destroyed by work under the requested permit will be considered in our
final assessment of the described work.
ENDANGERED SPECIES:
The project area is within the known or historic range of the
-4-
Cook Inlet beluga whale (Delphinapterus leucas) and its designated critical
habitat, and Steller sea lion (Eumetopias jubatus) and it's designated critical
habitat. Both species are listed as endangered.
We have determined the described activity may affect the Cook Inlet beluga whale,
beluga whale designated critical habitat, and Steller sea lion.
We will initiate
the appropriate consultation procedures under section 7 of the Endangered Species
Act with the National Marine Fisheries Service. Any comments they may have
concerning endangered or threatened wildlife or plants or their critical habitat
will be considered in our final assessment of the described work.
ESSENTIAL FISH HABITAT: The Magnuson-Stevens Fishery Conservation and Management
Act, as amended by the Sustainable Fisheries Act of 1996, requires all Federal
agencies to consult with the NMFS on all actions, or proposed actions, permitted,
funded, or undertaken by the agency, that may adversely affect Essential Fish
Habitat (EFH). The project area is within the known range of Chinook salmon
(Oncorhynchus tshawytscha), chum salmon (Oncorhynchus keta), Coho salmon
(Oncorhynchus kisutch), sockeye salmon (Oncorhynchus nerka), and pink salmon
(Oncorhynchus gorbuscha).
We are currently gathering information regarding these
species and have yet to make a determination of effect.
Should we find that the
described activity may affect the species listed above, we will follow the
appropriate course of action under Section 305(b) (2) of the Magnuson-Stevens Act.
Any comments the National Marine Fisheries Service may have concerning essential
fish habitat will be considered in our final assessment of the described work.
TRIBAL CONSULTATION: The Alaska District fully supports tribal self-governance and
government-to-government relations between Federally recognized Tribes and the
Federal government.
Tribes with protected rights or resources that could be
significantly affected by a proposed Federal action (e.g., a permit decision) have
the right to consult with the Alaska District on a government-to~government basis.
Views of each Tribe regarding protected rights and resources will be accorded due
consideration in this process. This Public Notice serves as notification to the
Tribes within the area potentially affected by the proposed work and invites their
participation in the Federal decision-making process regarding the protected Tribal
right or resource.
Consultation may be initiated by the affected Tribe upon
written request to the District Commander during the public comment period.
PUBLIC HEARING: Any person may request, in writing, within the comment period
specified in this notice, that a public hearing be held to consider this
application. Requests for public hearings shall state, with particularity, reasons
for holding a public hearing.
EVALUATION: The decision whether to issue a permit will be based on an evaluation
of the probable impacts, including cumulative impacts of the proposed activity and
its intended use on the public interest. Evaluation of the probable impacts, which
the proposed activity may have on the public interest, requires a careful weighing
of all the factors that become relevant in each particular case. The benefits,
which reasonably may be expected to accrue from the proposal, must be balanced
against its reasonably foreseeable detriments. The outcome of the general
balancing process would determine whether to authorize a proposal, and if so, the
conditions under which it will be allowed to occur.
The decision should reflect
the national concern for both protection and utilization of important resources.
All factors, which may be relevant to the proposal, must be considered including
-5-
the cumulative effects thereof. Among those are conservation, economics,
aesthetics, general environmental concerns, wetlands, cultural values, fish and
wildlife values, flood hazards, floodplain values, land use, navigation, shore
erosion and accretion, recreation, water supply and conservation, water quality,
energy needs, safety, food and fiber production, mineral needs, considerations of
property ownership, and, in general, the needs and welfare of the people.
For
activities involving 404 discharges, a permit will be denied if the discharge that
would be authorized by such permit would not comply with the Environmental
Protection Agency's 404(b) (l) guidelines. Subject to the preceding sentence and
any other applicable guidelines or criteria (see Sections 320.2 and 320.3), a
permit will be granted unless the District Commander determines that it would be
contrary to the public interest.
The Corps of Engineers is soliciting comments from the public; Federal, State, and
local agencies and officials; Indian Tribes; and other interested parties in order
to consider and evaluate the impacts of this proposed activity. Any comments
received will be considered by the Corps of Engineers to determine whether to
issue, modify, condition or deny a permit for this proposal. To make this
decision, comments are used to assess impacts on endangered species, historic
properties, water quality, general environmental effects, and the other public
interest factors listed above. Comments are used in the preparation of an
Environmental Assessment and/or an Environmental Impact Statement pursuant to the
National Environmental Policy Act.
Comments are also used to determine the need
for a public hearing and to determine the overall public interest of the proposed
activity.
AUTHORITY: This permit will .be issued or denied under the following authorities:
(X)
Perform work in or affecting navigable waters of the United States Section 10 Rivers and Harbors Act 1899 (33 U.S.C. 403).
Project drawings are enclosed with this Public Notice.
District Commander
U.S. Army, Corps of Engineers
Enclosures
-6-
Q
*
·
Kitchen Lights Unit
KLU#1
Proposed Onshore Facility
-
CIGGS Pipeline
Proposed Pipeline
Major Roads
All Locations Are Approximate
0
5
10
15
Miles
NAD 1983 State Plane Alaska 4, Feet
Furie Operating Alaska LLC
POA-2006-312
Cook Inlet
November 15, 2012
Sheet 1 of 9
20
~
~
;:
Cll
>c:
ro
rl
)...j
r<)
.w
Q)
I
Q)
0.,\.Dr-i
~
oo
Q)
U]
rl
)...j
Q)
OH~
0J
!\!
4-l
0
0J
.w
·rl
I
~
Q) Q)
1r)...l~O:>GJ
@
E
0
I
:::1 0
!i-. 0..
0
0 ...ci
u ;z;
CJ)
~
0:::
~
~
0
~
~
~
.
f
...........
.
.. ·· .. · ... ··k
.
··
.........
,
I
I
I
I
.... ~
1r . J
0
,~;..,.
llii>IPEUIIIIEII
0
/
~
, "'
r
/
I
I
l
I
\
lo
I
I
I
I
\ I
I
I
I
I
\I
~0
.................
I /\
I«I'
i / \ :!
Jl !i /'
: /
1
I
I
\
.:
·
\i~
L __ ----w
..... ~
SYMBOL
lin' IHJIII:M.CMO
'VtiELUIIT
ali¥('t'EIT
'am=
eo r:r:f IMI¥
-=~
MAIN
!lED(
1~nE
!'IAN
T.G. tn£L n. rlt-d
W1WA11.ltam
-~-
LEGEND
iLl·""""'
PI! l:lliC1'1'1TD't
0~
~~Am
·~
~~
_.,tiCJEIL.c.t.IC
PIIIT'AaLI.MlT
~-I.JIP
--=r
-
~::;.
...
-
·r-sm.
64'-6"
T.D. HELIDECI( EL. UlD'-0'
LOCATION OF JACK-UP RIG
POSITIONED OVER PLATFORM
DURING PRODUCTION DRILLING
/
CD
T.C. MAIN
DECk EL
82'-0'
T,C, PRCDUCT!DN DEI:K EL 62'-Q'
30'
M.$1.. EL.
D'-D'I~)
18'
60'
45'
lUI L1IE EL <-liiB'-Q'
'
1 1 1H
8 skirt piles
driven to 120'
'
'
:
.1.
Production Platform Elevation View
Elevation Looking west
Furie Operating Alaska LLC
POA-2006-312
Cook Inlet
November 15, 2012
Sheet 3 of 9
)...j
(])
(')
.w
I
(])
0...
\.0
0
r-1
0
!=!
rl
N
0
H
~
(])
OH~
(])
-rl
4-l
.W
I
~ (]) (])
H~O!>(])
~,;:::$000~
40'
>
17
lic:
Cll
0:::
32'-6'--l
~I
c.
f-27'-9'
~
26'-31'
4
::I
BAKI
MODi=
wm- 1:
1
I·
16'-0 1/4'
~
l
ORILUNG
~
ll
10'
j
I
Il
D
1 10'
l
\i,
~
'
I '\
Iii
u
t::::J ~ ~~
~~~
i oi ~~
l
1
1'\....~
min
3
~oOAvr~
PIPE RACK P/S
0
32'
r-----1
~~
---·~
~----Jil.----~
,....,
25'
55'
·I~
·I
;z
25'
1..
162'-62
~I
-,
w
26'-31·
4
55'
...:::
\./
--r-1
0
~
64'
32'
CJ
')I
~s
~g~
.
v;,~
~:5
1
30'
;::::
'
·~§\
0
wo:c
26'-3~·
;~"= Wl.U I·
HYDRAUUC
Zzo.
\e/\
§g~
""' ,.,w "'
s~6
PUMP HOUSE
P/S
IUIDIIUPfllllllD~lOIIffi.Ecr'SW.M"ANRr~H.we:~
WIG71
Q)fD
m::·Qwas PER REO.IeSf. tlfftl
jiQ
OIQ&IRS'I..ACEDTmSIII..Oai:Wini~DE!IION
~~:
""
DIEO
!.U.s.
QW£1
A.C.S.
I
A.C.S. I
JUI,
a.s..
M."lfl'liN"t'Dirf:
~=c:.:-~~~=-"1.=:.!-"'e'~·
9IMWt OR'!ID'E
1 hm
DRECO
KINGPOST CRANE
WITH 120' BOOM
~Q.
F'ARTAN
"Ei--o!£ offLUNQ
T1li> ~-y Plaza
36110 Jol- C4UBe""Y Blvd.
Suite 1180
l!el.alrls, Louilliana
Sf'ARTAN .151
7'-6'
MAIN DECK AARANGEMENf
;ros
1"=1'
3
1 OF 1
6 JOg l884S
C:~OG 'g~
JeqweAON
:J.81Ui
)j008
G~£-G~OG-\/Od
Bi\f BuneJedo epn.:J
~
~~ I i~~~·.~fil----1-----1--"':li-L:a:
.'h·
~ .::::..
~--------------------------~---------~------~
APPROXIMATELY 10"
DIAMETER STEEL PIPE
APPROXIMATELY 10"
DIAMETER STEEL PIPE
. .·· ... ; ..
"!
·
"'."' . . ' ..
· .'II
'
Proposed Marine Gathering
Furie Operating Alaska LLC
POA-2012-312
Cook Inlet
November 15, 2012
Sheet 6 of 9
I
6 JO L :}88L!S
:~oz ·s~
JeqweAON
l81Ul )jOO:)
z~ £- z~ oz-vod
:?1\f Bun.eJedo epn.:J
...
111
08
...
...~
~
...iii
..:
..:
ffiz
3::
111
c
111
~
:!Q
~i
~fu
t-O)
~
F
:I:
Cl
:r:
s:~
c
F
~
~~
!f:!S
§~
S3Nil3dld 03SOdOn.Si!
w
~
m
NOI18nOOI
1l>l 03SOdO03SOdONOil::JnOOH81H Nlf3v-J
I!
/ ...
l'
;;:-·
/''
l'
;/'
/''
;/
Nikishka Bay
~~~~:
;;'-'
~
..-----
I!
//'
;;"'
;;'-'
l'
;/'
/ ...
;;'-'
;
Proposed Tie-in Pipeline Route
;/
~::---:---=-"===~·=-::---:-::::::;::-::---:-. =.~;.;"·;j;;'''';;·~/;;;::::':....;;;,.;;;;.;;:;:;;;.:.:·
.I· ~/;' .· ==+i
I
: / /'(>:>Approximately 630'
..:'I / .// from Facility to :1
Mean Htgh Water /
:l ( ,:;:/
~~r(j;;
y!:;,'.
i'·'
,
I
f
I
,L~--.......
Proposed Road Extension
~============================~· :::~::::::::::::::::::::::::::::::r::---·
"!
'~-.J/ /~
~
'h-... "·
, ,
:6
\4/
2
J~
~
~~
t-
0
Rodney and Shelly's Ave.
""
UNDJ\
;[
~
g
~
-"
]l
~I
&
:L
·
lr-----------------------------------------------------------------------------------------------------------------------------~
r---..-----...,.....,..-----.,.,.._,.------. -- Proposed Access Road
, 1
~
,/ Project Location
Cook Inlet/
·
;
- ·
Approximate Location of Onshore
Production Facility Components
Proposed Tie-in Pipeline Route
<"7'-.
L/
1
::
~
···- Proposed Maline Gatheling Pipelines
1
-
~
-
6
"~
:
~
160
r:;ijj CIGGS Facility Location
320
·
r~ Production Facility Conceptual Pad Extent
Mean High Water
Q
"'K ·
1 ena1
Approximate CIGGS
Tie-In Location
$N
~L------------~---------------------------~~----------
480
Feet
CIGGS Pipeline
NAD 1983 StatePianeAiaska 4, Feet
Production Facility Conceptual Cut and Fill Extent
[:J P:rcels
c
i "''"
All Locations Are Approximate
Emergent Wetland (Jacobs 2012)
Proposed Pipeline Tie-in Location Plan View
Furie Operating Alaska LLC
POA-2012-312
Cook Inlet
November 15, 2012
Sheet 8 of 9
640
r~/~/
Subsurface
------------------
Surface
/. /.
I
KENAI PENINSULA BOROUGH
/
HILCORP
Q_
z
<(
I
~
z
I
q
w
0::
0
0
::;;
-...... -- -......... -··
-·
-.. -.................... .. .-· -··
,,,.,_ ""'"M<
-·
~
Within Property is 0.06 Acres
VLIET MARTY & TUACA
- - Proposed Tie-in Pipeline Route
[ } Emergent Wetland (Jacobs 2012)
·
. p·
.
,..r; Approximate Location of Onshore
·.. - Propose Manne Gathenng 1pellnes V Production Facility Components
d
· · · Proposed Access Road
All Locations Are Approximate
0
r~.? Production Facility Conceptual Pad Extent
Q
Production Facility Conceptual Cut and Fill Extent
25
50
75
100
Feet
NAD 1983 StatePianeAiaska 4, Feet
Proposed Onshore Production Facility Plan View
Furie Operating Alaska LLC
POA-2012-312
Cook Inlet
November 15, 2012
Sheet 9 of 9
US Army Corps
of Engineers
Alaska District
Regulatory Division (1145)
CEPOA-RD
Post Office Box 6898
JBER, Alaska 99506-0898
Public Notice
of Application
for Permit
PUBLIC NOTICE DATE:
December 4, 2012
EXPIRATION DATE:
January 4, 2013
REFERENCE NUMBER:
POA-2006-312
WATERWAY:
Cook Inlet
Interested parties are hereby notified that a Department of the Army permit
application has been received for work in waters of the United States as described
below and shown on the enclosed project drawings.
Comments on the described work, with the reference number, should reach this office
no later than the expiration date of this Public Notice to become part of the
record and be considered in the decision.
Please contact Heather Boyer at (907)
753-2877, toll free from within Alaska at (800) 478-2712, by fax at (907) 753-5567,
or by email at heather.l.boyer®usace.army.mil if further information is desired
concerning this notice.
APPLICANT: Furie Operating Alaska, LLC, 1029 West 3rd Avenue, Suite 500, Anchorage,
Alaska 99501,
907-277-3726
AGENT: Stoel Rives LLP, Ms. Ramona Monroe, 510 L Street, Suite 500, Anchorage,
Alaska 99501, 907-263-8445.
LOCATION: Approximate geographic coordinates of the project structures are
provided below. Although Furie plans to erect the Kitchen Lights KLU Platform A
over the existing Unit KLU Well #1, the actual location would depend on
construction limitations, would be within approximately 1,000 feet of the location
described herein, and would be determined by post-installation as-built survey.
Offshore Production KLU Platform A: Section 25, T.10 N., R. 11 W.,
151.1517°W
Onshore Production Facility: Section 35, T. 8 N., R. 12 W.,
60.9344°N,
60.7358°N, 151.3306°W
Marine Gathering Pipelines: Section varies with location, T. 8 N.,
N., R. 11 W. and 12 W.
9 N., and 10
PURPOSE: The applicant's stated purpose is the installation, operation, and
maintenance of a platform structure for the long-term production of natural gas
from the Kitchen Lights Unit Well #1 reservoir area, transport of natural gas to an
onshore production facility, and transport to CIGGS to bring natural gas to energy
suppliers.
PROPOSED WORK: The applicant proposes to install and operate an offshore natural
gas platform and two marine gathering pipelines in Upper Cook Inlet, Alaska. In
addition, the applicant proposes to construct an onshore production facility and an
onshore tie-in pipeline in the area of Nikiski, Alaska to support natural gas
production operations.
There are four major structural activities to the proposed project with both
permanent and temporary structures to be situated both onshore and offshore, as
follows:
1) Natural gas production platform (permanent offshore structure)
2) Jack-up drilling rig and/or platform rig for well support and intervention
(temporary offshore structures)
3) Natural gas marine gathering pipelines and onshore tie-in pipeline (permanent
offshore and onshore structures, respectively)
4) Natural gas production facility (permanent onshore structure)
Natural Gas Production Platform Design
KLU Platform A would have the following approximate structural dimensions (Sheet 2
of 9 and Sheet 3 of 9) :
·
64.5-foot x 72-foot production deck and main deck
·
30-foot x 72-foot living quarters and helicopter deck extending from one side
of the platform
·
100-foot boom crane
·
18-foot diameter caisson designed to sit vertically in the water to reach
approximately 62 feet above Mean Sea Level
· At the base of the caisson, there are eight 51-inch diameter skirt pile
sleeves for 42-inch diameter piles with grouted annuli.
Natural Gas Production Platform Installation and Activities
The pre-fabricated platform, deck, and components would be shipped to one of three
ports (Homer, Nikiski, or Anchorage) from an out-of-state fabrication center. Two
tug barges will "wet tow" the lower portion of the platform (including the caisson)
to the project site. The platform would be submerged through a controlled process
so that it is positioned vertically in the vicinity of the existing Kitchen Lights
Unit (KLU) Well #1 location, using a derrick barge to support the installation
process. To secure the platform, the derrick barge would drive eight support piles
(the platform support footing) . An impact driver would drive each pile to a depth
of approximately 120 feet below the seafloor, and the piles would be filled with
grout. Alternately, holes for the piles may be pre-drilled and the piles lowered
into place and grouted. The derrick barge would install the deck pieces once the
platform support footing is secured. The structure would be finalized by completing
all connections, piping, and other service units among the deck pieces.
Jack-up Drilling Rig and/or Platform Rig Design
The Spartan 151 jack-up drilling rig (jack-up rig), or a similar rig, would be used
for drilling activities. Spartan 151 is an A-1 self-elevating mobile drilling unit
-2-
with the following structural dimensions (Sheet 4 of 9 and Sheet 5 of 9) :
· Three triangular truss-type legs, 250-feet long
· One triangular shaped main deck, approximately 162-foot x 174-foot maximum
length and width
·
Cantilever drilling derrick extending 58 feet from one end of the main deck
to a height of 147 feet
· Helicopter landing deck extending 62 feet from the other end of the main deck
· Two boom cranes at heights of 100 and 120 feet
A temporary platform rig may be employed for some well completion and maintenance
activities as a supplement to the jack-up rig activities. The platform rig is a
smaller drilling rig that would sit directly on top of KLU Platform A instead of
creating its own footprint on the seafloor. Structural details of the platform rig
are yet to be determined.
Jack-up Drilling Rig and/or Platform Rig Installation and Activities
After KLU Platform A installation is complete, drilling operations would begin. The
production wells would be drilled using the jack-up rig (or similar) cantilevered
over the platform. The jack-up rig would be temporarily located onsite to perform
the production-related drilling activities and then demobilize upon completion.
The platform rig (if used) would be barged to the KLU Well #1 reservoir area,
raised onto KLU Platform A with the platform crane, and left in place during well
completion and maintenance activities. At completion of drilling activities at KLU
Platform A, the platform rig would be barged to another offshore platform site,
onshore drilling site, or demobilized for storage onshore.
Marine Gathering Pipelines and Onshore Tie-in Pipeline Design
The marine gathering pipelines would run from the production platform to the
onshore production facility, following the existing Cook Inlet Gas Gathering System
(CIGGS) corridor, operated by Marathon Pipeline Company. The proposed pipeline
would have the following structural design (Sheet 6 of 9 and Sheet 7 of 9) :
·
Two concrete coated steel pipelines of approximately 10-inch diameter (Sheet
6 of 9)
·
If necessary, vibration dampers would be installed beneath the lines along
the aboveground section.
· Onshore and above sea level, pipeline sections would be insulated, and a
sheet metal jacket may be used to protect the insulated lines.
A single subsurface 10-inch to 12-inch tie-in pipeline would carry processed
natural gas from the onshore production facility to tie into the CIGGS East
Foreland Facility owned cooperatively by Hilcorp and Marathon Oil Corporation
(Sheet 8 of 9). This tie-in pipeline is in a preliminary design stage, and subject
to design changes.
Marine Gathering Pipelines and Onshore Tie-in Pipeline Installation and Activities
At the onshore production facility, the pipeline would exit the structure to run
aboveground for approximately 52 feet and then would enter the ground at
approximately 25 feet from the northern property boundary and approximately 630
feet from mean high water to run below the coastal bluff and emerge onto the seabed
floor (Sheet 7 of 9) . Horizontal directional drilling would be used to create a
subsurface corridor beneath the bluff to approximately 2,500 feet beyond the
-3-
intertidal zone. Installation of the marine gathering pipeline would begin by
pulling the pipe through the subsurface corridor from two offshore barges. Beyond
the intertidal zone, each new segment of concrete-encased pipe would be welded to
the pipeline on a lay barge and allowed to settle onto the seafloor. Flanged
sections would be attached by divers to connect the marine gathering pipelines to
the platform structure.
The onshore tie-in pipeline would connect to CIGGS approximately BOO feet west of
the onshore property (Sheet 8 of 9) .
Natural Gas Production Facility Design
The proposed onshore production facility would be located southwest of the proposed
KLU Platform Ai approximately 630 feet from mean high water of Cook Inlet on
currently undeveloped land (Sheet 9 of 9) . Under the current preliminary design,
approximately 6 acres of fill/excavation is anticipated from the facility and
related infrastructure. However, a total of about 8 acres may be disturbed by
construction-related activities including development of laydown areas and
vegetation clearing for utility installation. An approximately 30-foot wide access
road would be extended from Rodney and Shelly's Avenue, heading east towards the
onshore property.
Natural Gas Production Facility Installation and Activities
The facility and all related infrastructure would be constructed in upland areas
without using fill in wetland areas. Nearby wetlands would be flagged and avoided
(Sheet 9 of 9) . Vessels containing process liquids would be contained with curbed
concrete foundations to prevent runoff and drainage. All work would be performed
in accordance with the enclosed plan (sheets 1-9), dated November 15, 2012.
ADDITIONAL INFORMATION: A permit was issued to Furie Operating Alaska, LLC on
November 13, 2006 for exploratory gas wells in the Kitchen Lights Unit.
APPLICANT PROPOSED MITIGATION: The applicant proposes the following mitigation
measures to avoid, minimize, and compensate for impacts to waters of the United
States from activities involving discharges of dredged or fill material.
a. Avoidance: No discharge of dredged or fill material is proposed. There
is a nearby emergent wetland that would be flagged and completely avoided (shown on
sheet 8 of 9) .
CULTURAL RESOURCES: The latest published version of the Alaska Heritage Resources
Survey (AHRS) has been consulted for the presence or absence of historic
properties, including those listed in or eligible for inclusion in the National
Register of Historic Places. There are no listed or eligible properties in the
vicinity of the worksite.
Consultation of the AHRS constitutes the extent of
cultural resource investigations by the District Commander at this time, and he is
otherwise unaware of the presence of such resources. This application is being
coordinated with the State Historic Preservation Office (SHPO) . Any comments SHPO
may have concerning presently unknown archeological or historic data that may be
lost or destroyed by work under the requested permit will be considered in our
final assessment of the described work.
ENDANGERED SPECIES:
The project area is within the known or historic range of the
-4-
Cook Inlet beluga whale (Delphinapterus leucas) and its designated critical
habitat, and Steller sea lion (Eumetopias jubatus) and it's designated critical
habitat. Both species are listed as endangered.
We have determined the described activity may affect the Cook Inlet beluga whale,
beluga whale designated critical habitat, and Steller sea lion.
We will initiate
the appropriate consultation procedures under section 7 of the Endangered Species
Act with the National Marine Fisheries Service. Any comments they may have
concerning endangered or threatened wildlife or plants or their critical habitat
will be considered in our final assessment of the described work.
ESSENTIAL FISH HABITAT: The Magnuson-Stevens Fishery Conservation and Management
Act, as amended by the Sustainable Fisheries Act of 1996, requires all Federal
agencies to consult with the NMFS on all actions, or proposed actions, permitted,
funded, or undertaken by the agency, that may adversely affect Essential Fish
Habitat (EFH). The project area is within the known range of Chinook salmon
(Oncorhynchus tshawytscha), chum salmon (Oncorhynchus keta), Coho salmon
(Oncorhynchus kisutch), sockeye salmon (Oncorhynchus nerka), and pink salmon
(Oncorhynchus gorbuscha).
We are currently gathering information regarding these
species and have yet to make a determination of effect.
Should we find that the
described activity may affect the species listed above, we will follow the
appropriate course of action under Section 305(b) (2) of the Magnuson-Stevens Act.
Any comments the National Marine Fisheries Service may have concerning essential
fish habitat will be considered in our final assessment of the described work.
TRIBAL CONSULTATION: The Alaska District fully supports tribal self-governance and
government-to-government relations between Federally recognized Tribes and the
Federal government.
Tribes with protected rights or resources that could be
significantly affected by a proposed Federal action (e.g., a permit decision) have
the right to consult with the Alaska District on a government-to~government basis.
Views of each Tribe regarding protected rights and resources will be accorded due
consideration in this process. This Public Notice serves as notification to the
Tribes within the area potentially affected by the proposed work and invites their
participation in the Federal decision-making process regarding the protected Tribal
right or resource.
Consultation may be initiated by the affected Tribe upon
written request to the District Commander during the public comment period.
PUBLIC HEARING: Any person may request, in writing, within the comment period
specified in this notice, that a public hearing be held to consider this
application. Requests for public hearings shall state, with particularity, reasons
for holding a public hearing.
EVALUATION: The decision whether to issue a permit will be based on an evaluation
of the probable impacts, including cumulative impacts of the proposed activity and
its intended use on the public interest. Evaluation of the probable impacts, which
the proposed activity may have on the public interest, requires a careful weighing
of all the factors that become relevant in each particular case. The benefits,
which reasonably may be expected to accrue from the proposal, must be balanced
against its reasonably foreseeable detriments. The outcome of the general
balancing process would determine whether to authorize a proposal, and if so, the
conditions under which it will be allowed to occur.
The decision should reflect
the national concern for both protection and utilization of important resources.
All factors, which may be relevant to the proposal, must be considered including
-5-
the cumulative effects thereof. Among those are conservation, economics,
aesthetics, general environmental concerns, wetlands, cultural values, fish and
wildlife values, flood hazards, floodplain values, land use, navigation, shore
erosion and accretion, recreation, water supply and conservation, water quality,
energy needs, safety, food and fiber production, mineral needs, considerations of
property ownership, and, in general, the needs and welfare of the people.
For
activities involving 404 discharges, a permit will be denied if the discharge that
would be authorized by such permit would not comply with the Environmental
Protection Agency's 404(b) (l) guidelines. Subject to the preceding sentence and
any other applicable guidelines or criteria (see Sections 320.2 and 320.3), a
permit will be granted unless the District Commander determines that it would be
contrary to the public interest.
The Corps of Engineers is soliciting comments from the public; Federal, State, and
local agencies and officials; Indian Tribes; and other interested parties in order
to consider and evaluate the impacts of this proposed activity. Any comments
received will be considered by the Corps of Engineers to determine whether to
issue, modify, condition or deny a permit for this proposal. To make this
decision, comments are used to assess impacts on endangered species, historic
properties, water quality, general environmental effects, and the other public
interest factors listed above. Comments are used in the preparation of an
Environmental Assessment and/or an Environmental Impact Statement pursuant to the
National Environmental Policy Act.
Comments are also used to determine the need
for a public hearing and to determine the overall public interest of the proposed
activity.
AUTHORITY: This permit will .be issued or denied under the following authorities:
(X)
Perform work in or affecting navigable waters of the United States Section 10 Rivers and Harbors Act 1899 (33 U.S.C. 403).
Project drawings are enclosed with this Public Notice.
District Commander
U.S. Army, Corps of Engineers
Enclosures
-6-
Q
*
·
Kitchen Lights Unit
KLU#1
Proposed Onshore Facility
-
CIGGS Pipeline
Proposed Pipeline
Major Roads
All Locations Are Approximate
0
5
10
15
Miles
NAD 1983 State Plane Alaska 4, Feet
Furie Operating Alaska LLC
POA-2006-312
Cook Inlet
November 15, 2012
Sheet 1 of 9
20
~
~
;:
Cll
>c:
ro
rl
)...j
r<)
.w
Q)
I
Q)
0.,\.Dr-i
~
oo
Q)
U]
rl
)...j
Q)
OH~
0J
!\!
4-l
0
0J
.w
·rl
I
~
Q) Q)
1r)...l~O:>GJ
@
E
0
I
:::1 0
!i-. 0..
0
0 ...ci
u ;z;
CJ)
~
0:::
~
~
0
~
~
~
.
f
...........
.
.. ·· .. · ... ··k
.
··
.........
,
I
I
I
I
.... ~
1r . J
0
,~;..,.
llii>IPEUIIIIEII
0
/
~
, "'
r
/
I
I
l
I
\
lo
I
I
I
I
\ I
I
I
I
I
\I
~0
.................
I /\
I«I'
i / \ :!
Jl !i /'
: /
1
I
I
\
.:
·
\i~
L __ ----w
..... ~
SYMBOL
lin' IHJIII:M.CMO
'VtiELUIIT
ali¥('t'EIT
'am=
eo r:r:f IMI¥
-=~
MAIN
!lED(
1~nE
!'IAN
T.G. tn£L n. rlt-d
W1WA11.ltam
-~-
LEGEND
iLl·""""'
PI! l:lliC1'1'1TD't
0~
~~Am
·~
~~
_.,tiCJEIL.c.t.IC
PIIIT'AaLI.MlT
~-I.JIP
--=r
-
~::;.
...
-
·r-sm.
64'-6"
T.D. HELIDECI( EL. UlD'-0'
LOCATION OF JACK-UP RIG
POSITIONED OVER PLATFORM
DURING PRODUCTION DRILLING
/
CD
T.C. MAIN
DECk EL
82'-0'
T,C, PRCDUCT!DN DEI:K EL 62'-Q'
30'
M.$1.. EL.
D'-D'I~)
18'
60'
45'
lUI L1IE EL <-liiB'-Q'
'
1 1 1H
8 skirt piles
driven to 120'
'
'
:
.1.
Production Platform Elevation View
Elevation Looking west
Furie Operating Alaska LLC
POA-2006-312
Cook Inlet
November 15, 2012
Sheet 3 of 9
)...j
(])
(')
.w
I
(])
0...
\.0
0
r-1
0
!=!
rl
N
0
H
~
(])
OH~
(])
-rl
4-l
.W
I
~ (]) (])
H~O!>(])
~,;:::$000~
40'
>
17
lic:
Cll
0:::
32'-6'--l
~I
c.
f-27'-9'
~
26'-31'
4
::I
BAKI
MODi=
wm- 1:
1
I·
16'-0 1/4'
~
l
ORILUNG
~
ll
10'
j
I
Il
D
1 10'
l
\i,
~
'
I '\
Iii
u
t::::J ~ ~~
~~~
i oi ~~
l
1
1'\....~
min
3
~oOAvr~
PIPE RACK P/S
0
32'
r-----1
~~
---·~
~----Jil.----~
,....,
25'
55'
·I~
·I
;z
25'
1..
162'-62
~I
-,
w
26'-31·
4
55'
...:::
\./
--r-1
0
~
64'
32'
CJ
')I
~s
~g~
.
v;,~
~:5
1
30'
;::::
'
·~§\
0
wo:c
26'-3~·
;~"= Wl.U I·
HYDRAUUC
Zzo.
\e/\
§g~
""' ,.,w "'
s~6
PUMP HOUSE
P/S
IUIDIIUPfllllllD~lOIIffi.Ecr'SW.M"ANRr~H.we:~
WIG71
Q)fD
m::·Qwas PER REO.IeSf. tlfftl
jiQ
OIQ&IRS'I..ACEDTmSIII..Oai:Wini~DE!IION
~~:
""
DIEO
!.U.s.
QW£1
A.C.S.
I
A.C.S. I
JUI,
a.s..
M."lfl'liN"t'Dirf:
~=c:.:-~~~=-"1.=:.!-"'e'~·
9IMWt OR'!ID'E
1 hm
DRECO
KINGPOST CRANE
WITH 120' BOOM
~Q.
F'ARTAN
"Ei--o!£ offLUNQ
T1li> ~-y Plaza
36110 Jol- C4UBe""Y Blvd.
Suite 1180
l!el.alrls, Louilliana
Sf'ARTAN .151
7'-6'
MAIN DECK AARANGEMENf
;ros
1"=1'
3
1 OF 1
6 JOg l884S
C:~OG 'g~
JeqweAON
:J.81Ui
)j008
G~£-G~OG-\/Od
Bi\f BuneJedo epn.:J
~
~~ I i~~~·.~fil----1-----1--"':li-L:a:
.'h·
~ .::::..
~--------------------------~---------~------~
APPROXIMATELY 10"
DIAMETER STEEL PIPE
APPROXIMATELY 10"
DIAMETER STEEL PIPE
. .·· ... ; ..
"!
·
"'."' . . ' ..
· .'II
'
Proposed Marine Gathering
Furie Operating Alaska LLC
POA-2012-312
Cook Inlet
November 15, 2012
Sheet 6 of 9
I
6 JO L :}88L!S
:~oz ·s~
JeqweAON
l81Ul )jOO:)
z~ £- z~ oz-vod
:?1\f Bun.eJedo epn.:J
...
111
08
...
...~
~
...iii
..:
..:
ffiz
3::
111
c
111
~
:!Q
~i
~fu
t-O)
~
F
:I:
Cl
:r:
s:~
c
F
~
~~
!f:!S
§~
S3Nil3dld 03SOdOn.Si!
w
~
m
NOI18nOOI
1l>l 03SOdO03SOdONOil::JnOOH81H Nlf3v-J
I!
/ ...
l'
;;:-·
/''
l'
;/'
/''
;/
Nikishka Bay
~~~~:
;;'-'
~
..-----
I!
//'
;;"'
;;'-'
l'
;/'
/ ...
;;'-'
;
Proposed Tie-in Pipeline Route
;/
~::---:---=-"===~·=-::---:-::::::;::-::---:-. =.~;.;"·;j;;'''';;·~/;;;::::':....;;;,.;;;;.;;:;:;;;.:.:·
.I· ~/;' .· ==+i
I
: / /'(>:>Approximately 630'
..:'I / .// from Facility to :1
Mean Htgh Water /
:l ( ,:;:/
~~r(j;;
y!:;,'.
i'·'
,
I
f
I
,L~--.......
Proposed Road Extension
~============================~· :::~::::::::::::::::::::::::::::::r::---·
"!
'~-.J/ /~
~
'h-... "·
, ,
:6
\4/
2
J~
~
~~
t-
0
Rodney and Shelly's Ave.
""
UNDJ\
;[
~
g
~
-"
]l
~I
&
:L
·
lr-----------------------------------------------------------------------------------------------------------------------------~
r---..-----...,.....,..-----.,.,.._,.------. -- Proposed Access Road
, 1
~
,/ Project Location
Cook Inlet/
·
;
- ·
Approximate Location of Onshore
Production Facility Components
Proposed Tie-in Pipeline Route
<"7'-.
L/
1
::
~
···- Proposed Maline Gatheling Pipelines
1
-
~
-
6
"~
:
~
160
r:;ijj CIGGS Facility Location
320
·
r~ Production Facility Conceptual Pad Extent
Mean High Water
Q
"'K ·
1 ena1
Approximate CIGGS
Tie-In Location
$N
~L------------~---------------------------~~----------
480
Feet
CIGGS Pipeline
NAD 1983 StatePianeAiaska 4, Feet
Production Facility Conceptual Cut and Fill Extent
[:J P:rcels
c
i "''"
All Locations Are Approximate
Emergent Wetland (Jacobs 2012)
Proposed Pipeline Tie-in Location Plan View
Furie Operating Alaska LLC
POA-2012-312
Cook Inlet
November 15, 2012
Sheet 8 of 9
640
r~/~/
Subsurface
------------------
Surface
/. /.
I
KENAI PENINSULA BOROUGH
/
HILCORP
Q_
z
<(
I
~
z
I
q
w
0::
0
0
::;;
-...... -- -......... -··
-·
-.. -.................... .. .-· -··
,,,.,_ ""'"M<
-·
~
Within Property is 0.06 Acres
VLIET MARTY & TUACA
- - Proposed Tie-in Pipeline Route
[ } Emergent Wetland (Jacobs 2012)
·
. p·
.
,..r; Approximate Location of Onshore
·.. - Propose Manne Gathenng 1pellnes V Production Facility Components
d
· · · Proposed Access Road
All Locations Are Approximate
0
r~.? Production Facility Conceptual Pad Extent
Q
Production Facility Conceptual Cut and Fill Extent
25
50
75
100
Feet
NAD 1983 StatePianeAiaska 4, Feet
Proposed Onshore Production Facility Plan View
Furie Operating Alaska LLC
POA-2012-312
Cook Inlet
November 15, 2012
Sheet 9 of 9