POA-1979-234-M4, Beaufort Sea_PN - BP Exploration (Alaska) Incorporated's stated purpose is to
POA-1979-234-M4, Beaufort Sea_PN- BP Exploration (Alaska) Incorporated's stated purpose is to construct a pad expansion to accommodate larger drill rigs and provide appropriate safety for movement of equipment. Please contact Mary Romero at telephone (907) 753-2773, toll free from within Alaska at (800) 478-2712, by fax at (907) 753-5567, or by email at mary.r.romero@usace.army.mil if further information is desired concerning this notice.
US Army Corps
of Engineers
Alaska District
Regulatory Division (1145)
CEPOA-RD
Post Office Box 6898
JBER, Alaska 99506-0898
Public Notice
of Application
for Permit
PUBLIC NOTICE DATE:
December 11, 2012
EXPIRATION DATE:
December 26, 2012
REFERENCE NUMBER:
POA-1979-234-M4
WATERWAY:
Beaufort Sea
Interested parties are hereby notified that a Department of the Army permit
application has been received for work in waters of the United States as described
below and shown on the project drawings available online under POA-1979-234-M4 at
http://www.poa.usace.army.mil/Missions/Regulatory/PublicNotices.aspx.
Comments on the described work, with the reference number, should reach this office
no later than the expiration date of this Public Notice to become part of the
record and be considered in the decision. Please contact Mary Romero at telephone
(907) 753-2773, toll free from within Alaska at (800) 478-2712, by fax at
(907) 753-5567, or by email at mary.r.romero@usace.army.mil if further information
is desired concerning this notice.
APPLICANT: Ms. Janet Sheldon, Permitting Advisor, HSE Alaska, BP Exploration
(Alaska) Inc. (BPXA); (907) 564-4325; Post Office Box 196612, Anchorage, Alaska
99519-6612.
LOCATION: The project site is located within Section 35, T. 11 N., R. 13 E., Umiat
Meridian; USGS Quad Map Beechey Point B-3; Latitude 70.264923º N., Longitude
148.754749º W.; Prudhoe Bay, Alaska.
PURPOSE: The applicant's stated purpose is to construct a pad expansion to
accommodate larger drill rigs and provide appropriate safety for movement of
equipment.
PROPOSED WORK: BPXA is proposing to place up to 8,000 cubic yards of gravel into
0.7 acre of Palustrine wetlands for the expansion of A Pad. All work would be
performed in accordance with the plan (sheets 1-6), dated November 30, 2012.
Drawings for this Public Notice can be viewed online under POA-1979-234-M4 at
http://www.poa.usace.army.mil/Missions/Regulatory/PublicNotices.aspx.
ADDITIONAL INFORMATION:
The original permit POA-1979-234 (then known as 071-OYD-4-790234) was issued on
August 24, 1979, to, " place 97,000 cubic yards of material to construct a
180' x 850' drill pad, a 180' x 590' drill pad, a 225' x 390' manifold pad, a 310'
x 310' flare pit, a 20' x 300' access road, a 24' x 500' access road, a 24' x 125'
access road and a 30' x 1,050' sump dike."
The first modification, POA-1979-234-M1 (originally known as M-790234), was
authorized on August 19, 1987, to, "place an additional 5,816 cubic yards of gravel
fill material in .72 acres of wetlands to allow sufficient operating room around
and in the vicinity of the drilling operations for rig access under the reduced
well spacing program."
The second modification, POA-1979-234-M2 (POA-1979-234-N), was authorized on
August 1, 2005 to, "place clean gravel fill material into waters of the U.S., i.e.,
wetlands, for two stages of work: a) construct a 340-foot long dike with 2,000 cy
gravel fill material to enclose the area of subsiding pipe supports to allow for
dewatering the area and assessing the soil and pipe support problems (shown in
enclosed Figures 1-3), and b) construct a 3 foot thick or deeper gravel pad (up to
330' x 70') beneath the production pipelines and supports to stabilize the pipe
supports and provide access.
POA-1979-234-M3 (known as POA-1979-235-O), was authorized on December 21, 2005, to
modify Special condition 3 of POA- 1979-234 -N to read:
3. The permittee shall pick up gravel from A Pad facilities from a footprint
equal to or larger than the area of new fill ("a" and "b" above) placed in
wetlands, within 1 year of the new fill placement. The gravel removal area
shall be excavated to approximately tundra elevation and treated as necessary
to achieve at least 10% total live vegetative cover, with at least 1% cover
by indigenous species, by the fifth year after gravel removal. The permittee
shall, by March 31, 2006, submit a plan for approval by the Regulatory Branch
describing the location for gravel removal and rehabilitation efforts.
APPLICANT PROPOSED MITIGATION: The applicant proposes the following mitigation
measures to avoid, minimize, and compensate for impacts to waters of the United
States from activities involving discharges of dredged or fill material.
a. Avoidance: Because BPXA already has a pad they are working around the
existing infrastructure instead of constructing a new pad, thereby avoiding a
greater impact to wetlands.
b. Minimization: The applicant has reduced the size of the expansion to the
minimal area needed to accommodate new equipment and still maintain the safety
required to operate.
c. Compensatory Mitigation: The applicant has proposed to pay an in-lieufee if compensatory mitigation is required.
WATER QUALITY CERTIFICATION: A permit for the described work will not be issued
until a certification or waiver of certification, as required under Section 401 of
the Clean Water Act (Public Law 95-217), has been received from the Alaska
Department of Environmental Conservation.
CULTURAL RESOURCES: The latest published version
Survey (AHRS) has been consulted for the presence
properties, including those listed in or eligible
Register of Historic Places. There are no listed
-2-
of the Alaska Heritage Resources
or absence of historic
for inclusion in the National
or eligible properties in the
vicinity of the worksite. Consultation of the AHRS constitutes the extent of
cultural resource investigations by the District Commander at this time, and he is
otherwise unaware of the presence of such resources. This application is being
coordinated with the State Historic Preservation Office (SHPO). Any comments SHPO
may have concerning presently unknown archeological or historic data that may be
lost or destroyed by work under the requested permit will be considered in our
final assessment of the described work.
ENDANGERED SPECIES: The project area is within the known or historic range of the
Polar Bear (Ursus maritimus), Steller's eider (Polysticta stelleri), Spectacled
eider (Somateria fischeri), and Candidate for Listing species Yellow-billed loon
(Gavia adamsii).
We have determined the described activity would have no effect on any listed or
proposed threatened or endangered species, and would have no effect on any
designated or proposed critical habitat, under the Endangered Species Act of 1973
(87 Stat. 844) because this is a minor expansion on an existing pad and the species
do not utilize this area. Therefore, no consultation with the U.S. Fish and
Wildlife Service or the National Marine Fisheries Service is required. However,
any comments they may have concerning endangered or threatened wildlife or plants
or their critical habitat will be considered in our final assessment of the
described work.
ESSENTIAL FISH HABITAT: The Magnuson-Stevens Fishery Conservation and Management
Act, as amended by the Sustainable Fisheries Act of 1996, requires all Federal
agencies to consult with the NMFS on all actions, or proposed actions, permitted,
funded, or undertaken by the agency, that may adversely affect Essential Fish
Habitat (EFH). No EFH species are known to use the project area.
TRIBAL CONSULTATION: The Alaska District fully supports tribal self-governance and
government-to-government relations between Federally recognized Tribes and the
Federal government. Tribes with protected rights or resources that could be
significantly affected by a proposed Federal action (e.g., a permit decision) have
the right to consult with the Alaska District on a government-to-government basis.
Views of each Tribe regarding protected rights and resources will be accorded due
consideration in this process. This Public Notice serves as notification to the
Tribes within the area potentially affected by the proposed work and invites their
participation in the Federal decision-making process regarding the protected Tribal
right or resource. Consultation may be initiated by the affected Tribe upon
written request to the District Commander during the public comment period.
PUBLIC HEARING: Any person may request, in writing, within the comment period
specified in this notice, that a public hearing be held to consider this
application. Requests for public hearings shall state, with particularity, reasons
for holding a public hearing.
EVALUATION: The decision whether to issue a permit will be based on an evaluation
of the probable impacts, including cumulative impacts of the proposed activity and
its intended use on the public interest. Evaluation of the probable impacts, which
the proposed activity may have on the public interest, requires a careful weighing
of all the factors that become relevant in each particular case. The benefits,
which reasonably may be expected to accrue from the proposal, must be balanced
against its reasonably foreseeable detriments. The outcome of the general
balancing process would determine whether to authorize a proposal, and if so, the
-3-
conditions under which it will be allowed to occur. The decision should reflect
the national concern for both protection and utilization of important resources.
All factors, which may be relevant to the proposal, must be considered including
the cumulative effects thereof. Among those are conservation, economics,
aesthetics, general environmental concerns, wetlands, cultural values, fish and
wildlife values, flood hazards, floodplain values, land use, navigation, shore
erosion and accretion, recreation, water supply and conservation, water quality,
energy needs, safety, food and fiber production, mineral needs, considerations of
property ownership, and, in general, the needs and welfare of the people. For
activities involving 404 discharges, a permit will be denied if the discharge that
would be authorized by such permit would not comply with the Environmental
Protection Agency's 404(b)(l) guidelines. Subject to the preceding sentence and
any other applicable guidelines or criteria (see Sections 320.2 and 320.3), a
permit will be granted unless the District Commander determines that it would be
contrary to the public interest.
The Corps of Engineers is soliciting comments from the public; Federal, State, and
local agencies and officials; Indian Tribes; and other interested parties in order
to consider and evaluate the impacts of this proposed activity. Any comments
received will be considered by the Corps of Engineers to determine whether to
issue, modify, condition or deny a permit for this proposal. To make this
decision, comments are used to assess impacts on endangered species, historic
properties, water quality, general environmental effects, and the other public
interest factors listed above. Comments are used in the preparation of an
Environmental Assessment and/or an Environmental Impact Statement pursuant to the
National Environmental Policy Act. Comments are also used to determine the need
for a public hearing and to determine the overall public interest of the proposed
activity.
AUTHORITY:
This permit will be issued or denied under the following authority:
(X) Discharge dredged or fill material into waters of the United States
Section 404 Clean Water Act (33 U.S.C. 1344). Therefore, our public interest
review will consider the guidelines set forth under Section 404(b) of the Clean
Water Act (40 CFR 230).
A Notice of Application for State Water Quality Certification is enclosed with this
Public Notice and project drawings are available online under POA-1979-234-M4 at
http://www.poa.usace.army.mil/Missions/Regulatory/PublicNotices.aspx.
District Commander
U.S. Army, Corps of Engineers
Enclosures
-4-
SEAN PARNELL, GOVERNOR
STATE OF ALASKA
DEPT. OF ENVIRONMENTAL CONSERVATION
DIVISION OF WATER
401 Certification Program
Non-Point Source Water Pollution Control Program
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
WQM/401 CERTIFICATION
555 CORDOVA STREET
ANCHORAGE, ALASKA 99501-2617
PHONE: (907) 269-7564/FAX: (907) 334-2415
NOTICE OF APPLICATION
FOR
STATE WATER QUALITY CERTIFICATION
Any applicant for a federal license or permit to conduct an activity that might
result in a discharge into navigable waters, in accordance with Section 401 of the
Clean Water Act of 1977 (PL95-217), also must apply for and obtain certification
from the Alaska Department of Environmental Conservation that the discharge will
comply with the Clean Water Act, the Alaska Water Quality Standards, and other
applicable State laws. By agreement between the U.S. Army Corps of Engineers and
the Department of Environmental Conservation, application for a Department of the
Army permit to discharge dredged or fill material into navigable waters under
Section 404 of the Clean Water Act also may serve as application for State Water
Quality Certification.
Notice is hereby given that the application for a Department of the Army Permit
described in the Corps of Engineers' Public Notice No. POA-1979-234-M4, Beaufort
Sea, serves as application for State Water Quality Certification from the
Department of Environmental Conservation.
After reviewing the application, the Department may certify there is reasonable
assurance the activity, and any discharge that might result, will comply with the
Clean Water Act, the Alaska Water Quality Standards, and other applicable State
laws. The Department also may deny or waive certification.
Any person desiring to comment on the project, with respect to Water Quality
Certification, may submit written comments to the address above by the expiration
date of the Corps of Engineer's Public Notice.
US Army Corps
of Engineers
Alaska District
Regulatory Division (1145)
CEPOA-RD
Post Office Box 6898
JBER, Alaska 99506-0898
Public Notice
of Application
for Permit
PUBLIC NOTICE DATE:
December 11, 2012
EXPIRATION DATE:
December 26, 2012
REFERENCE NUMBER:
POA-1979-234-M4
WATERWAY:
Beaufort Sea
Interested parties are hereby notified that a Department of the Army permit
application has been received for work in waters of the United States as described
below and shown on the project drawings available online under POA-1979-234-M4 at
http://www.poa.usace.army.mil/Missions/Regulatory/PublicNotices.aspx.
Comments on the described work, with the reference number, should reach this office
no later than the expiration date of this Public Notice to become part of the
record and be considered in the decision. Please contact Mary Romero at telephone
(907) 753-2773, toll free from within Alaska at (800) 478-2712, by fax at
(907) 753-5567, or by email at mary.r.romero@usace.army.mil if further information
is desired concerning this notice.
APPLICANT: Ms. Janet Sheldon, Permitting Advisor, HSE Alaska, BP Exploration
(Alaska) Inc. (BPXA); (907) 564-4325; Post Office Box 196612, Anchorage, Alaska
99519-6612.
LOCATION: The project site is located within Section 35, T. 11 N., R. 13 E., Umiat
Meridian; USGS Quad Map Beechey Point B-3; Latitude 70.264923º N., Longitude
148.754749º W.; Prudhoe Bay, Alaska.
PURPOSE: The applicant's stated purpose is to construct a pad expansion to
accommodate larger drill rigs and provide appropriate safety for movement of
equipment.
PROPOSED WORK: BPXA is proposing to place up to 8,000 cubic yards of gravel into
0.7 acre of Palustrine wetlands for the expansion of A Pad. All work would be
performed in accordance with the plan (sheets 1-6), dated November 30, 2012.
Drawings for this Public Notice can be viewed online under POA-1979-234-M4 at
http://www.poa.usace.army.mil/Missions/Regulatory/PublicNotices.aspx.
ADDITIONAL INFORMATION:
The original permit POA-1979-234 (then known as 071-OYD-4-790234) was issued on
August 24, 1979, to, " place 97,000 cubic yards of material to construct a
180' x 850' drill pad, a 180' x 590' drill pad, a 225' x 390' manifold pad, a 310'
x 310' flare pit, a 20' x 300' access road, a 24' x 500' access road, a 24' x 125'
access road and a 30' x 1,050' sump dike."
The first modification, POA-1979-234-M1 (originally known as M-790234), was
authorized on August 19, 1987, to, "place an additional 5,816 cubic yards of gravel
fill material in .72 acres of wetlands to allow sufficient operating room around
and in the vicinity of the drilling operations for rig access under the reduced
well spacing program."
The second modification, POA-1979-234-M2 (POA-1979-234-N), was authorized on
August 1, 2005 to, "place clean gravel fill material into waters of the U.S., i.e.,
wetlands, for two stages of work: a) construct a 340-foot long dike with 2,000 cy
gravel fill material to enclose the area of subsiding pipe supports to allow for
dewatering the area and assessing the soil and pipe support problems (shown in
enclosed Figures 1-3), and b) construct a 3 foot thick or deeper gravel pad (up to
330' x 70') beneath the production pipelines and supports to stabilize the pipe
supports and provide access.
POA-1979-234-M3 (known as POA-1979-235-O), was authorized on December 21, 2005, to
modify Special condition 3 of POA- 1979-234 -N to read:
3. The permittee shall pick up gravel from A Pad facilities from a footprint
equal to or larger than the area of new fill ("a" and "b" above) placed in
wetlands, within 1 year of the new fill placement. The gravel removal area
shall be excavated to approximately tundra elevation and treated as necessary
to achieve at least 10% total live vegetative cover, with at least 1% cover
by indigenous species, by the fifth year after gravel removal. The permittee
shall, by March 31, 2006, submit a plan for approval by the Regulatory Branch
describing the location for gravel removal and rehabilitation efforts.
APPLICANT PROPOSED MITIGATION: The applicant proposes the following mitigation
measures to avoid, minimize, and compensate for impacts to waters of the United
States from activities involving discharges of dredged or fill material.
a. Avoidance: Because BPXA already has a pad they are working around the
existing infrastructure instead of constructing a new pad, thereby avoiding a
greater impact to wetlands.
b. Minimization: The applicant has reduced the size of the expansion to the
minimal area needed to accommodate new equipment and still maintain the safety
required to operate.
c. Compensatory Mitigation: The applicant has proposed to pay an in-lieufee if compensatory mitigation is required.
WATER QUALITY CERTIFICATION: A permit for the described work will not be issued
until a certification or waiver of certification, as required under Section 401 of
the Clean Water Act (Public Law 95-217), has been received from the Alaska
Department of Environmental Conservation.
CULTURAL RESOURCES: The latest published version
Survey (AHRS) has been consulted for the presence
properties, including those listed in or eligible
Register of Historic Places. There are no listed
-2-
of the Alaska Heritage Resources
or absence of historic
for inclusion in the National
or eligible properties in the
vicinity of the worksite. Consultation of the AHRS constitutes the extent of
cultural resource investigations by the District Commander at this time, and he is
otherwise unaware of the presence of such resources. This application is being
coordinated with the State Historic Preservation Office (SHPO). Any comments SHPO
may have concerning presently unknown archeological or historic data that may be
lost or destroyed by work under the requested permit will be considered in our
final assessment of the described work.
ENDANGERED SPECIES: The project area is within the known or historic range of the
Polar Bear (Ursus maritimus), Steller's eider (Polysticta stelleri), Spectacled
eider (Somateria fischeri), and Candidate for Listing species Yellow-billed loon
(Gavia adamsii).
We have determined the described activity would have no effect on any listed or
proposed threatened or endangered species, and would have no effect on any
designated or proposed critical habitat, under the Endangered Species Act of 1973
(87 Stat. 844) because this is a minor expansion on an existing pad and the species
do not utilize this area. Therefore, no consultation with the U.S. Fish and
Wildlife Service or the National Marine Fisheries Service is required. However,
any comments they may have concerning endangered or threatened wildlife or plants
or their critical habitat will be considered in our final assessment of the
described work.
ESSENTIAL FISH HABITAT: The Magnuson-Stevens Fishery Conservation and Management
Act, as amended by the Sustainable Fisheries Act of 1996, requires all Federal
agencies to consult with the NMFS on all actions, or proposed actions, permitted,
funded, or undertaken by the agency, that may adversely affect Essential Fish
Habitat (EFH). No EFH species are known to use the project area.
TRIBAL CONSULTATION: The Alaska District fully supports tribal self-governance and
government-to-government relations between Federally recognized Tribes and the
Federal government. Tribes with protected rights or resources that could be
significantly affected by a proposed Federal action (e.g., a permit decision) have
the right to consult with the Alaska District on a government-to-government basis.
Views of each Tribe regarding protected rights and resources will be accorded due
consideration in this process. This Public Notice serves as notification to the
Tribes within the area potentially affected by the proposed work and invites their
participation in the Federal decision-making process regarding the protected Tribal
right or resource. Consultation may be initiated by the affected Tribe upon
written request to the District Commander during the public comment period.
PUBLIC HEARING: Any person may request, in writing, within the comment period
specified in this notice, that a public hearing be held to consider this
application. Requests for public hearings shall state, with particularity, reasons
for holding a public hearing.
EVALUATION: The decision whether to issue a permit will be based on an evaluation
of the probable impacts, including cumulative impacts of the proposed activity and
its intended use on the public interest. Evaluation of the probable impacts, which
the proposed activity may have on the public interest, requires a careful weighing
of all the factors that become relevant in each particular case. The benefits,
which reasonably may be expected to accrue from the proposal, must be balanced
against its reasonably foreseeable detriments. The outcome of the general
balancing process would determine whether to authorize a proposal, and if so, the
-3-
conditions under which it will be allowed to occur. The decision should reflect
the national concern for both protection and utilization of important resources.
All factors, which may be relevant to the proposal, must be considered including
the cumulative effects thereof. Among those are conservation, economics,
aesthetics, general environmental concerns, wetlands, cultural values, fish and
wildlife values, flood hazards, floodplain values, land use, navigation, shore
erosion and accretion, recreation, water supply and conservation, water quality,
energy needs, safety, food and fiber production, mineral needs, considerations of
property ownership, and, in general, the needs and welfare of the people. For
activities involving 404 discharges, a permit will be denied if the discharge that
would be authorized by such permit would not comply with the Environmental
Protection Agency's 404(b)(l) guidelines. Subject to the preceding sentence and
any other applicable guidelines or criteria (see Sections 320.2 and 320.3), a
permit will be granted unless the District Commander determines that it would be
contrary to the public interest.
The Corps of Engineers is soliciting comments from the public; Federal, State, and
local agencies and officials; Indian Tribes; and other interested parties in order
to consider and evaluate the impacts of this proposed activity. Any comments
received will be considered by the Corps of Engineers to determine whether to
issue, modify, condition or deny a permit for this proposal. To make this
decision, comments are used to assess impacts on endangered species, historic
properties, water quality, general environmental effects, and the other public
interest factors listed above. Comments are used in the preparation of an
Environmental Assessment and/or an Environmental Impact Statement pursuant to the
National Environmental Policy Act. Comments are also used to determine the need
for a public hearing and to determine the overall public interest of the proposed
activity.
AUTHORITY:
This permit will be issued or denied under the following authority:
(X) Discharge dredged or fill material into waters of the United States
Section 404 Clean Water Act (33 U.S.C. 1344). Therefore, our public interest
review will consider the guidelines set forth under Section 404(b) of the Clean
Water Act (40 CFR 230).
A Notice of Application for State Water Quality Certification is enclosed with this
Public Notice and project drawings are available online under POA-1979-234-M4 at
http://www.poa.usace.army.mil/Missions/Regulatory/PublicNotices.aspx.
District Commander
U.S. Army, Corps of Engineers
Enclosures
-4-
SEAN PARNELL, GOVERNOR
STATE OF ALASKA
DEPT. OF ENVIRONMENTAL CONSERVATION
DIVISION OF WATER
401 Certification Program
Non-Point Source Water Pollution Control Program
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
WQM/401 CERTIFICATION
555 CORDOVA STREET
ANCHORAGE, ALASKA 99501-2617
PHONE: (907) 269-7564/FAX: (907) 334-2415
NOTICE OF APPLICATION
FOR
STATE WATER QUALITY CERTIFICATION
Any applicant for a federal license or permit to conduct an activity that might
result in a discharge into navigable waters, in accordance with Section 401 of the
Clean Water Act of 1977 (PL95-217), also must apply for and obtain certification
from the Alaska Department of Environmental Conservation that the discharge will
comply with the Clean Water Act, the Alaska Water Quality Standards, and other
applicable State laws. By agreement between the U.S. Army Corps of Engineers and
the Department of Environmental Conservation, application for a Department of the
Army permit to discharge dredged or fill material into navigable waters under
Section 404 of the Clean Water Act also may serve as application for State Water
Quality Certification.
Notice is hereby given that the application for a Department of the Army Permit
described in the Corps of Engineers' Public Notice No. POA-1979-234-M4, Beaufort
Sea, serves as application for State Water Quality Certification from the
Department of Environmental Conservation.
After reviewing the application, the Department may certify there is reasonable
assurance the activity, and any discharge that might result, will comply with the
Clean Water Act, the Alaska Water Quality Standards, and other applicable State
laws. The Department also may deny or waive certification.
Any person desiring to comment on the project, with respect to Water Quality
Certification, may submit written comments to the address above by the expiration
date of the Corps of Engineer's Public Notice.
Project Description/Plan of Operations
A Pad Expansion for Rig Access-Revised Scope
Prudhoe Bay Unit
BP Exploration (Alaska) Inc. (BPXA) proposes to expand the gravel pad at A Pad
in the Prudhoe Bay Unit (PBU).
Purpose
The purpose of this project is to increase the pad size in order to accommodate
drill rig access and movement. The rigs used for existing well head work are
larger than the ones used when the pad was constructed.
Scope of Proposed Activities
The project scope will consist of the following:
·
·
·
·
Placing approximately 8,000 cubic yards of gravel off of the existing pad, on
to the tundra (see figures)
The area to be covered by gravel is approximately 0.70 acres
Gravel will be spread by equipment working on the existing pad, therefore
tundra travel will not be necessary
Gravel will come from permitted sources
Schedule
The project is scheduled to begin in December 2012 and will be complete by
June 2013.
POA-1979-234-M4, Beaufort Sea
BPXA - PBU A Pad expansion
Dated November 30, 2012
Sheet 1 of 6
15
16
17
U PAD
Central
Drilling
14
13
D PAD
21
20
H PAD
23
22
18
R13E
R14E
GC2
BOC
24
C PAD
17
16
DS15
21
20
19
Ku
pa
ru
GC3
k
Pi
pe
lin
e
29
26
27
28
THIS PROJECT
Y PAD
B PAD
A PAD
Put River
22-33-11-13
8
4
THIS PROJECT
Placid
State 1
3
^
Nome
(
!
(
!
2
Getty State 1
(02-10-13)
ilig
P1ut
k
ay u
Riv
Anchorage
33
32
Skid 50
T11N
T10N
er
6
PUMP
STA. 1
5
4
X PAD
Fairbanks
R14E
R15E
(
!
(
!
31
36
9
(
!
Juneau
10
11
12
Put River
State 1
7
9
8
R13E
R14E
5
Barrow
35
34
ADL028286
T11N
T10N
Hurl State
"
33
32
28
29 CPS
30
25
This map is based on U.S.G.S quad Beechey Point (B-3)
and on the Unit Operator's Facility Maps.
PROJECT LOCATION:
PRUDHOE BAY UNIT - A PAD
NAD83
LAT. = 70° 15' 53.721" / DD 70.264923
LONG. = -148° 45' 17.096" / DD -149.754749
ALASKA STATE PLANE ZONE 4, NAD83
X = 1,794,419.51 FEET
Y = 5,947,886.11 FEET
SEC. 35 T11N, R13E UMIAT M.
ADL # 028286
DATUM: MEAN SEA LEVEL
PURPOSE: GRAVEL EXPANSION
ADJACENT PROPERTY OWNER:
STATE OF ALASKA
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT
A PAD
POA-1979-234-M4,
Beaufort
Sea
RIG
ACCESS GRAVEL
EXPANSION
BPXA - PBUVICINITY
A Pad expansion
MAP
Dated November 30, 2012
SCALE:
DATE:
Sheet
2 of 6
July 2012
1" = 1 Mile
FIGURE:
1
gp16243-V.mxd
6
See Detail Map
(Fig. 3)
6
"
"
"
"
"
"
"
"
"
"
"
"
A PAD
"
"
"
D
"
"
"
"
"
"
"
D
"
"
"
"
"
"
"
"
"
"
"
"
"
"
D
D
"
"
"
"
"
"
"
"
BP EXPLORATION (ALASKA) INC.
Proposed Location for Gravel Expansion
Impacted Tundra....................0.70 ACRES
Gravel Expansion Volume......8,000 CY
*Calculations are Approximate
PRUDHOE BAY UNIT
A PAD
POA-1979-234-M4,
Beaufort
Sea
RIG ACCESS GRAVEL
EXPANSION
BPXA - PBU
A Pad expansion
LOCATION
MAP
Dated November 30, 2012
DATE:
SCALE:
Sheet
3 of 6
1" = 400'
November 2012
FIGURE:
2
gp16243_Nov-L.mxd
6
B
6
60'
80'
C
C'
B'
A
A'
155' to
New Toe
"
145' to
New Edge
15'-20' for
Emergency
Egress
A PAD
"
135' to
Existing Edge "
130'
"
"
"
New
Rig
"
Old"
Rig
"
"
"
"
Proposed Location for Gravel Expansion
"
Impacted Tundra....................0.70 ACRES
Gravel Expansion Volume......8,000 CY
*Calculations are Approximate
"
"
"
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT
A PAD
POA-1979-234-M4,
Beaufort
Sea
RIG ACCESS GRAVEL
EXPANSION
BPXA - PBUDETAIL
A Pad expansion
MAP
Dated November 30, 2012
DATE:
SCALE:
Sheet
4 of 6
1" = 150'
November 2012
FIGURE:
3
gp16243_Nov-D.mxd
6
390'
270'
B
6
60'
80'
C
B'
A
A'
155' to
New Toe
490'
"
145' to
New Edge
15'-20' for
Emergency
Egress
C'
A PAD
"
135' to
Existing Edge "
130'
"
"
"
New
Rig
"
Old"
Rig
"
"
"
"
Proposed Location for Gravel Expansion
"
Impacted Tundra....................0.70 ACRES
Gravel Expansion Volume......8,000 CY
*Calculations are Approximate
"
"
"
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT
A PAD
POA-1979-234-M4,
Beaufort
Sea
RIG ACCESS GRAVEL
EXPANSION
BPXA - PBU ADETAIL
Pad expansion
MAP
Dated November 30, 2012
DATE:
SCALE:
Sheet
5 of 6
1" = 150'
November 2012
FIGURE:
3
gp16243_Nov-D.mxd
11'
6'
1
24'
1'
12'
2
TUNDRA
21'
4'
EXISTING
GRAVEL
7'
10'
1
TUNDRA
NEW
GRAVEL
7'
EXISTING
GRAVEL
2
NEW
GRAVEL
GRAVEL EXPANSION C-C'
GRAVEL EXPANSION A-A'
Scale: 1" = 20'
Scale: 1" = 17'
62'
20'
10'
1
2
18'
42'
EXISTING
GRAVEL
NEW GRAVEL
TUNDRA
GRAVEL EXPANSION B-B'
Scale: 1" = 30'
BP EXPLORATION (ALASKA) INC.
PRUDHOE BAY UNIT
A PAD
POA-1979-234-M4,
Beaufort
Sea
RIG ACCESS GRAVEL
EXPANSION
BPXA - PBU
A Pad
expansion
CROSS
SECTIONS
ALL DIMENSIONS ARE APPROXIMATE
Dated November 30, 2012
DATE:
SCALE:
Sheet 6 of 6
SEE FIG.
November 2012
FIGURE:
4
gp16243_Nov-Xa.mxd