POA-2009-1228, Swanson River - NordAq Energy, Incorporated's stated purpose is to bring new natural
POA-2009-1228, Swanson River- NordAq Energy, Incorporated's stated purpose is tobring new natural gas reserves (Shadura Natural Gas Development) into production to meet the energy needs of the Cook Inlet region. The Corps has determined the Applicant’s stated purpose will be used as the ‘overall project purpose’ and thus, will also be used for the Corps alternative analysis. Please contact Jen Martin at (907) 283-3519, by fax at (907) 283-3981, or by email at jen.l.martin@usace.army.mil if further information is desired concerning this notice.
US Army Corps
of Engineers
Alaska District
Regulatory Division (1145)
CEPOA-RD
805 Frontage Road, Suite 200C
Kenai, Alaska 99611-7755
Public Notice
of Application
for Permit
PUBLIC NOTICE DATE:
December 21, 2012
EXPIRATION DATE:
January 22, 2013
REFERENCE NUMBER:
POA-2009-1228
WATERWAY:
Swanson River
Interested parties are hereby notified that a Department of the Army permit
application has been received for work in waters of the United States as described
below and shown on the enclosed project drawings.
Comments on the described work, with the reference number, should reach this office
no later than the expiration date of this Public Notice to become part of the
record and be considered in the decision. Please contact Jen Martin at
(907) 283-3519, by fax at (907) 283-3981, or by email at
jen.l.martin@usace.army.mil if further information is desired concerning this
notice.
APPLICANT: Mr. Robert Warthen, NordAq Energy, Inc., 3000 A Street, Suite 410,
Anchorage, AK 99503.
AGENT:
99501.
Ms. Cynthia Trapp, ARCADIS-US, 420 L Street, Suite 100, Anchorage, AK
LOCATION: The project site is located within Sections 11, 13, 14 and 24, T. 8 N.,
R. 10 W., Seward Meridian; USGS Quad Map Kenai D-3; beginning at the Shadura
Appraisal Well Pad - Latitude - 60.7912º N., Longitude 150.9950º W., and ending in
the Kenai National Wildlife Refuge Latitude - 60.7661º N., Longitude 150.9474º W.;
near Nikiski, Alaska; Kenai Peninsula Borough (KPB) Parcel numbers 025-081-01 and
025-080-11.
SPECIAL AREA DESIGNATION:
Wildlife Refuge (KNWR).
The project is located within the Kenai National
PURPOSE: Applicant's stated purpose: To bring new natural gas reserves (Shadura
Natural Gas Development) into production to meet the energy needs of the Cook Inlet
region. The Corps has determined the Applicant's stated purpose will be used as
the `overall project purpose' and thus, will also be used for the Corps alternative
analysis.
PROPOSED WORK: The proposed project is to construct a 2.78-mile-long road partially
located through 5,660 linear feet (lf) of wetlands (Phase 1) and also to construct
2.78 miles of utility line through 5,206 lf of wetlands (Phase 2). The road and
utility lines would originate at the Shadura Appraisal Well Pad and terminate at an
upland drilling and production pad (Shadura Natural Gas Development). Phase 2 would
be constructed if the applicant determines that sufficient quantities of natural gas
are present to make production economically viable
Road Construction (Phase 1) Discharge 14,613 cubic yards (cy) of gravel fill
material into 3.61 acres (5,660 lf) of 16 wetlands (see Sheet 2-3 of 9) to
construct a gravel service road underlain by geotextile fabric. Road dimensions
would be 28' wide by 30" deep with an 18' wide driving surface.
Utility Installation (Phase 2) Two 6" gathering lines and one fiber optic cable
would be installed within a 4' wide, 3.5' deep trench located within 10' of the toe
of the service road. Trenching is proposed through 0.53 acres (5,206 lf) of 13
wetlands with 2,851 cy of excavated trench material temporarily sidecast into 1.20
acres of wetlands. If the frost line is deep enough, trenching methods would
include removing frozen blocks of frost susceptible soil up to 4' thick to be set
aside and reused in the same location. In thawed ground, the vegetation from the
trench would be removed and stockpiled separately from underlying non-organic
silts, sands and gravels, with a total sidecast width of ten feet (see Sheet 8 of
9). The trench would be backfilled in the opposite order of excavation, with the
vegetative layer replaced on the surface.
All work would be performed in accordance with the enclosed plan (sheets 1-9),
dated March 16, 2012, August 6, 2012, August 29, 2012, and October 26, 2012.
ADDITIONAL INFORMATION:
A Public Notice was originally issued January 3, 2012, for POA-2009-1228, Swanson
River, however, the application was withdrawn. A revised proposal was submitted,
which includes a modified road alignment and drilling/production pad location, as
reflected above, and on the attached drawings.
The following information is provided for clarity, however, these proposed
activities are not subject to DA jurisdiction, and do not require a DA permit:
A 6.31-acre gravel drill and production pad would be located in uplands.
One meter pad would be located in uplands.
Four temporary turn-arounds and up to eleven permanent pullouts would be
constructed in uplands.
During Phase I, there would be a 40' vegetation clearing limit, with
vegetation only cleared if it is an impediment to the operation of
equipment or construction. Little, or no, clearing would occur in
wetlands. If necessary, clearing in wetlands would be accomplished with a
HydroAxe.
Two stream crossings would occur along the proposed service road by
installing a single lane, 16' by 16' clear span bridge with gravel
embankments at each location. There would be no discharge of fill
material below the ordinary high water mark of the streams, therefore, the
stream crossings would not be regulated by the DA. The approaches in
wetlands have been calculated above.
-2-
During Phase II, the vegetation clearing limit would be expanded to 80',
with vegetation only cleared if it is an impediment to the operation of
equipment and construction. Little, or no, clearing would occur in
wetlands. If necessary, clearing in wetlands would be accomplished with a
HydroAxe.
The gathering lines and fiber optic cable would be horizontally,
directionally drilled beneath the two streams in the project area with
entry bore holes located entirely in uplands. Therefore, a trench would
not be constructed through wetland 2-26, 2-27, and 75 linear feet of
wetland 2-25 (125 linear foot total) and through wetland 2-33 (328 linear
foot).
Project life is estimated at 30 years. Post production, all fill material would be
removed, and the site would be returned to pre-existing contours, as required by
USFWS right-of-way permits, if issued.
Cook Inlet Region Inc. (CIRI) owns the coal, oil and gas estate in the project
area. CIRI leased the lands to NordAq for the purpose of realizing an economic
benefit.
The DA permit application was submitted concurrently with a permit application
under Title XI of the Alaska National Interest Lands Conservation Act (ANILCA) to
the Corps of Engineers and the U.S. Fish and Wildlife Service (USFWS). Pursuant to
the provisions of Title XI of ANILCA, the USFWS is the lead agency. The USFWS is
currently preparing a Draft Environmental Impact Statement (DEIS) for the proposed
project, with the Corps of Engineers acting as a commenting agency during the EIS
process. The DEIS should be posted in the Federal Register on December 21, 2012,
with a comment closing period of February 4, 2013. A DA permit decision will not
be made until after the Final Environmental Impact Statement (EIS), is prepared.
This public notice reflects the applicant's preferred alternative only. Additional
alternatives are included as Attachment A. Each alternative will be evaluated to
determine if it meets the overall project purpose. If the overall project purpose
is met, those alternatives, and the applicant's preferred alternative, will be
evaluated under the Environmental Protection Agency's 404(b)(1) guidelines to
determine which is the least environmentally damaging practicable alternative
(LEDPA).
A separate DA permit authorization was issued July 20, 2012, (POA-2011-1143,
Swanson River) to NordAq to construct a 1.5-mile long service road to develop the
Shadura Appraisal Well located entirely on Alaska Department of Natural Resources
land. For the current proposal, the applicant's preferred alternative begins at
the Shadura Appraisal Well. If the applicant pursues an irreversible and
irretrievable commitment of resources to develop the Shadura Appraisal Well, this
will not limit the DA's examination of alternatives of the current proposal.
APPLICANT PROPOSED MITIGATION: The applicant proposes the following mitigation
measures to avoid, minimize, and compensate for impacts to waters of the United
States from activities involving discharges of dredged or fill material.
a. Avoidance: The proposed route best traverses the upland/wetland fringes;
avoids the largest amount of wetland and forested habitats; avoids the greatest
potential for bear denning and fishing areas; utilizes the greatest amount of the
previously permitted ice road; and, uses single clear span bridges to cross the two
streams present in the project area.
-3-
b. Minimization: To minimize impacts to wetlands, the project includes the
following measures: Use earth fill or sand bags to fill in the open trench during
construction; remove water accumulated while the trench is open; adopt buoyancycontrol measures for gathering lines installed in wetlands; use the push-pull
technique to install gathering lines in saturated or inundated wetland soil areas;
service road would utilize existing ice road pathway whenever practicable; when
practical, construction would occur during winter months to reduce wetland impacts;
and, when practical, vegetation would be cleared in the fall and early winter so it
would not destroy bird nests with eggs or young or disturb denning animals during
hibernation.
c. Compensatory Mitigation: As compensation for unavoidable impacts to
wetlands, mitigation would be provided at a 2:1 ratio, through In Lieu Fee.
WATER QUALITY CERTIFICATION: A permit for the described work will not be issued
until a certification or waiver of certification, as required under Section 401 of
the Clean Water Act (Public Law 95-217), has been received from the Alaska
Department of Environmental Conservation.
CULTURAL RESOURCES: The lead Federal agency, U.S. Fish and Wildlife Service, is
responsible for compliance with the requirements of Section 106 of the National
Historic Preservation Act. A permit for the described work will not be issued
until the Section 106 process has been completed.
ENDANGERED SPECIES:
project area.
No threatened or endangered species are known to use the
ESSENTIAL FISH HABITAT: The Magnuson-Stevens Fishery Conservation and Management
Act, as amended by the Sustainable Fisheries Act of 1996, requires all Federal
agencies to consult with the NMFS on all actions, or proposed actions, permitted,
funded, or undertaken by the agency, that may adversely affect Essential Fish
Habitat (EFH). No EFH species are known to use the project area.
TRIBAL CONSULTATION: The Alaska District fully supports tribal self-governance and
government-to-government relations between Federally recognized Tribes and the
Federal government. Tribes with protected rights or resources that could be
significantly affected by a proposed Federal action (e.g., a permit decision) have
the right to consult with the Alaska District on a government-to-government basis.
Views of each Tribe regarding protected rights and resources will be accorded due
consideration in this process. This Public Notice serves as notification to the
Tribes within the area potentially affected by the proposed work and invites their
participation in the Federal decision-making process regarding the protected Tribal
right or resource. Consultation may be initiated by the affected Tribe upon
written request to the District Commander during the public comment period.
PUBLIC HEARING: Any person may request, in writing, within the comment period
specified in this notice, that a public hearing be held to consider this
application. Requests for public hearings shall state, with particularity, reasons
for holding a public hearing.
EVALUATION: The decision whether to issue a permit will be based on an evaluation
of the probable impacts, including cumulative impacts of the proposed activity and
its intended use on the public interest. Evaluation of the probable impacts, which
the proposed activity may have on the public interest, requires a careful weighing
of all the factors that become relevant in each particular case. The benefits,
-4-
which reasonably may be expected to accrue from the proposal, must be balanced
against its reasonably foreseeable detriments. The outcome of the general
balancing process would determine whether to authorize a proposal, and if so, the
conditions under which it will be allowed to occur. The decision should reflect
the national concern for both protection and utilization of important resources.
All factors, which may be relevant to the proposal, must be considered including
the cumulative effects thereof. Among those are conservation, economics,
aesthetics, general environmental concerns, wetlands, cultural values, fish and
wildlife values, flood hazards, floodplain values, land use, navigation, shore
erosion and accretion, recreation, water supply and conservation, water quality,
energy needs, safety, food and fiber production, mineral needs, considerations of
property ownership, and, in general, the needs and welfare of the people. For
activities involving 404 discharges, a permit will be denied if the discharge that
would be authorized by such permit would not comply with the Environmental
Protection Agency's 404(b)(l) guidelines. Subject to the preceding sentence and
any other applicable guidelines or criteria (see Sections 320.2 and 320.3), a
permit will be granted unless the District Commander determines that it would be
contrary to the public interest.
The Corps of Engineers is soliciting comments from the public; Federal, State, and
local agencies and officials; Indian Tribes; and other interested parties in order
to consider and evaluate the impacts of this proposed activity. Any comments
received will be considered by the Corps of Engineers to determine whether to
issue, modify, condition or deny a permit for this proposal. To make this
decision, comments are used to assess impacts on endangered species, historic
properties, water quality, general environmental effects, and the other public
interest factors listed above. Comments are used in the preparation of an
Environmental Assessment and/or an Environmental Impact Statement pursuant to the
National Environmental Policy Act. Comments are also used to determine the need
for a public hearing and to determine the overall public interest of the proposed
activity.
AUTHORITY: This permit will be issued or denied under the following authority:
(X) Discharge dredged or fill material into waters of the United States
Section 404 Clean Water Act (33 U.S.C. 1344). Therefore, our public interest
review will consider the guidelines set forth under Section 404(b) of the Clean
Water Act (40 CFR 230).
(X) Transportation and utility systems in and across, and access into,
conservation system units Title XI, Alaska National Interests Lands Conservation
Act (PL 96-487; 94 Stat. 2371).
Project drawings and a Notice of Application for State Water Quality Certification
are enclosed with this Public Notice.
District Commander
U.S. Army, Corps of Engineers
Enclosures
-5-
SEAN PARNELL, GOVERNOR
STATE OF ALASKA
DEPT. OF ENVIRONMENTAL CONSERVATION
DIVISION OF WATER
401 Certification Program
Non-Point Source Water Pollution Control Program
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
WQM/401 CERTIFICATION
410 WILLOUGHBY AVENUE
JUNEAU, ALASKA 99801-1795
PHONE: (907) 465-5321/FAX: (907) 465-5274
NOTICE OF APPLICATION
FOR
STATE WATER QUALITY CERTIFICATION
Any applicant for a federal license or permit to conduct an activity that might
result in a discharge into navigable waters, in accordance with Section 401 of the
Clean Water Act of 1977 (PL95-217), also must apply for and obtain certification
from the Alaska Department of Environmental Conservation that the discharge will
comply with the Clean Water Act, the Alaska Water Quality Standards, and other
applicable State laws. By agreement between the U.S. Army Corps of Engineers and
the Department of Environmental Conservation, application for a Department of the
Army permit to discharge dredged or fill material into navigable waters under
Section 404 of the Clean Water Act also may serve as application for State Water
Quality Certification.
Notice is hereby given that the application for a Department of the Army Permit
described in the Corps of Engineers' Public Notice No. POA-2009-1228, Swanson
River, serves as application for State Water Quality Certification from the
Department of Environmental Conservation.
After reviewing the application, the Department may certify there is reasonable
assurance the activity, and any discharge that might result, will comply with the
Clean Water Act, the Alaska Water Quality Standards, and other applicable State
laws. The Department also may deny or waive certification.
Any person desiring to comment on the project, with respect to Water Quality
Certification, may submit written comments to the address above by the expiration
date of the Corps of Engineer's Public Notice.
3
2
CCSRA
KPB
1
Dunlin Lake
6
11
ADNR
Beginning of
proposed project
15
12
7
Crane Lake
14
T8N, R9W
10
Previously
authorized project
(POA-2011-1143)
T8N, R10W
KE
N
AI
SP
U
R
HW
Y
Salmo Lake
13
KNWR
18
a
Sw
ns o
nR
r
ive
22
23
End of
19
proposed project
24
Proposed
Pad Location
ADNR Active State Lease
Proposed Route / Alternative-2
Wetlands
Captain Cook State Recreation Area
Existing Pipelines
Proposed Pad Location
Kenai National Wildlife Refuge
Kenai Borough Parcel
0
0.1
0
0.175
0.2
0.35
0.4 Mi
0.7 Km
Projection: State Plane Alaska Zone 4 (feet), NAD83
Seward Meridian
PREPARED FOR:
SHADURA NATURAL GAS DEVELOPMENT PROJECT
ALASKA
NORDAQ ENERGY, INC.
3000 A Street, Suite 410
Anchorage, AK 99503
SCALE:
Project
Location
FIGURE:
GENERAL LOCATION MAP
POA-2009-1228, Swanson River
Sheet 1 of 9
1
ARCADIS: NOREIS0098.mxd, 10/26/12, R01
POA-2009-1228, Swanson River
Sheet 2 of 9 October 26, 2012
Total:
5659.98
157541.24
3.61
14411.55
Preferred Route - Service Road Construction - Permanent Wetland Impacts - KNWR Land*
Wetland area
Crossing
Linear Length
Wetland area impacted
impacted
Fill amount
width (ft)
(ft)
(ft2)
(Acres)
(cy)
28
297.34
7821.52
0.18
548.61
28
93.93
2631.44
0.06
243.65
28
137.17
3848.75
0.09
356.37
28
173.95
4876.28
0.11
451.51
28
1234.86
34278.28
0.79
3173.92
28
61.06
1536.62
0.04
142.28
28
428.99
12047.14
0.27
1115.48
28
185.72
5137.13
0.12
475.66
28
328.45
9969.27
0.23
923.08
6.60
28
186.36
0.004
17.26
28
43.77
1227.99
0.03
113.70
28
235.49
6591.69
0.15
610.34
28
0.20
0.001
Trace
0.0001
28
1813.40
49807.03
1.14
4611.76
28
328.29
8895.61
0.20
823.67
28
308.75
8686.12
0.20
804.27
* Wetland 2-14 spans KNWR and ADNR administered lands.
** 2-26: location of stream 1
*** 2-33: location of stream 2
2-14
2-15
2-16
2-17
2-18
2-19
2-21
2-22
2-25
2-26**
2-27
2-28
2-29
2-30
2-33***
2-34
Wetland #
Table 1
KPB
3
HW
Y
CCSRA
6
R
11
AI
SP
U
KE
N
Dunlin Lake
1
2
10
12
7
2-14, 2-15 ADNR
Crane Lake
2-16, 2-17
2-19
15
14
T8N, R9W
SEE FIGURE 4
T8N, R10W
2-18
13
2-21, 2-22
KNWR
2-25
18
2-26, 2-27
a
Sw
2-28
ns o
nR
2-29
r
ive
2-33
2-30
22
23
24
2-34
Proposed
Pad Location
SEE FIGURE 5
ADNR Active State Lease
Proposed Route / Alternative-2
Wetlands
Captain Cook State Recreation Area
Existing Pipelines
Proposed Pad Location
Kenai National Wildlife Refuge
Stream Crossing
Kenai Borough Parcel
Pullout
PREPARED FOR:
Wetland #
and location
SCALE:
0
0.1
0
0.175
0.2
0.35
0.4 Mi
0.7 Km
Projection: State Plane Alaska Zone 4 (feet), NAD83
Seward Meridian
SHADURA NATURAL GAS DEVELOPMENT PROJECT
ALASKA
NORDAQ ENERGY, INC.
3000 A Street, Suite 410
Anchorage, AK 99503
2-14
19
Project
Location
PREFERRED ROUTE
PULLOUT LOCATIONS
OVERVIEW
POA-2009-1228, Swanson River
Sheet 3 of 9
FIGURE:
3
ARCADIS: NOREIS0101.mxd, 10/26/12, R01
3
KPB
2
KE
N
AI
SP
U
R
HW
Y
Salmo Lake
10
ADNR
CCSRA
11
Swanson River
15
14
ADNR Active State Lease
Proposed Route / Alternative-2
Wetland
Captain Cook State Recreation Area
Existing Pipelines
Upland
Kenai National Wildlife Refuge
Stream Crossing
Proposed Pad Location
Kenai Borough Parcel
Pullout
SCALE:
0
0
0.05
0.1
0.075 0.15
0.2 Mi
0.3 Km
Projection: State Plane Alaska Zone 4 (feet), NAD83
Seward Meridian
PREPARED FOR:
SHADURA NATURAL GAS DEVELOPMENT PROJECT
ALASKA
NORDAQ ENERGY, INC.
3000 A Street, Suite 410
Anchorage, AK 99503
KNWR
Project
Location
PREFERRED ROUTE
PULLOUT LOCATIONS
POA-2009-1228, Swanson River
Sheet 4 of 9
FIGURE:
4
ARCADIS: NOREIS0126.mxd, 10/26/12, R00
14
T8N, R10W
13
23
24
Proposed
Pad Location
Proposed Route / Alternative-2
Wetland
Existing Pipelines
Upland
Stream Crossing
Proposed Pad Location
Pullout
0
0
0.05
0.1
0.075 0.15
0.2 Mi
0.3 Km
Projection: State Plane Alaska Zone 4 (feet), NAD83
Seward Meridian
PREPARED FOR:
SHADURA NATURAL GAS DEVELOPMENT PROJECT
ALASKA
NORDAQ ENERGY, INC.
3000 A Street, Suite 410
Anchorage, AK 99503
SCALE:
Project
Location
PREFERRED ROUTE
PULLOUT LOCATIONS
POA-2009-1228, Swanson River
Sheet 5 of 9
FIGURE:
5
ARCADIS: NOREIS0127.mxd, 10/26/12, R00
POA-2009-1228, Swanson River
Sheet 6 of 9
-~-
TYPICAL ACCESS ROAD PLAN VIEW IN UPLANDS
-··
-
. ··ttj·· .. -
.. -
.
...
......
··-r .... - .. - .. - .. - .. - ... ·---
!·-,··~·+
.
.
~
··~··-·-----··~··~··~
~-
~~~--------~
5!'
'~18'
-··-
--
---
~ss~
-
TYPICAL ACCESS ROAD & PIPE TRENCH PLAN VIEW IN WETLANDS
SCALE: AS SHOWN
PREPARED FOR:
SHADURA NATURAL GAS DEVELOPMENT PROJECT
FIGURE:
NORDAQ ENERGY, INC.
3000A Street, Suite 410
Anchorage, AK 00503
~~INC.
-----
SEVICE ROAD
PLAN VIEW
7
POA-2009-1228, Swanson River
Sheet 7 of 9
POA-2009-1228, Swanson River
Sheet 8 of 9
en
;
a
I
z
0
~
en
J:
(.)
zw
0::
1-
w
a..
a..
~
~
6'
en
en
w
(.)
~
~
(.)
~
POA-2009-1228, Swanson River
Sheet 9 of 9
~~
(l)u
r
3WMINj
~w~
----
-
I
I
i
I
!
I
!
i
I
I
I
I
I
I
I
I
I
I
I
!
~----~···---··
l
!
i
I
!
--'''---
l
I
i~ ~
16'
18' SERVICE ROAD
J_
-,~-·--
___
·=r~
------------~---~
~12" X 30" X 18'
(I)~
BULKHEAD FOOTINGS (TYP.)
NOTES.
1. USE MATERIAlS APPROVED BY AOFG FOR OVER STREAM
CONSTRUCTION.
2. MAINTAIN CLEARANCE ABOVE STREAM SIDE VEGETATION.
OHWM
-
~CLEAR SPAN BRIDGE
SCALE: 1· · 10'
3WMIN
r-w
-I
I
STREAM CHANNEL
~
1---'-- BRIDGE DECK
&GIRDERS
I
J
I
\
\_ 12" X 30" X 18'
BULKHEAD FOOTINGS (TYP.)
NOTE:
1.NO IN-WATER WORK OR FLOW RESTRICTION DURING CONSTRUCTION
(!)
CLEAR SPAN BRIDGE
Scale 1" ·5'
FIGURE:
SINGLE LANE CLEAR SPAN
BRIDGE PLAN VIEW
6
PLAN OF DEVELOPMENT
ARCADIS: NORfJ104.mxd, 3116112, ROO
US Army Corps
of Engineers
Alaska District
Regulatory Division (1145)
CEPOA-RD
805 Frontage Road, Suite 200C
Kenai, Alaska 99611-7755
Public Notice
of Application
for Permit
PUBLIC NOTICE DATE:
December 21, 2012
EXPIRATION DATE:
January 22, 2013
REFERENCE NUMBER:
POA-2009-1228
WATERWAY:
Swanson River
Interested parties are hereby notified that a Department of the Army permit
application has been received for work in waters of the United States as described
below and shown on the enclosed project drawings.
Comments on the described work, with the reference number, should reach this office
no later than the expiration date of this Public Notice to become part of the
record and be considered in the decision. Please contact Jen Martin at
(907) 283-3519, by fax at (907) 283-3981, or by email at
jen.l.martin@usace.army.mil if further information is desired concerning this
notice.
APPLICANT: Mr. Robert Warthen, NordAq Energy, Inc., 3000 A Street, Suite 410,
Anchorage, AK 99503.
AGENT:
99501.
Ms. Cynthia Trapp, ARCADIS-US, 420 L Street, Suite 100, Anchorage, AK
LOCATION: The project site is located within Sections 11, 13, 14 and 24, T. 8 N.,
R. 10 W., Seward Meridian; USGS Quad Map Kenai D-3; beginning at the Shadura
Appraisal Well Pad - Latitude - 60.7912º N., Longitude 150.9950º W., and ending in
the Kenai National Wildlife Refuge Latitude - 60.7661º N., Longitude 150.9474º W.;
near Nikiski, Alaska; Kenai Peninsula Borough (KPB) Parcel numbers 025-081-01 and
025-080-11.
SPECIAL AREA DESIGNATION:
Wildlife Refuge (KNWR).
The project is located within the Kenai National
PURPOSE: Applicant's stated purpose: To bring new natural gas reserves (Shadura
Natural Gas Development) into production to meet the energy needs of the Cook Inlet
region. The Corps has determined the Applicant's stated purpose will be used as
the `overall project purpose' and thus, will also be used for the Corps alternative
analysis.
PROPOSED WORK: The proposed project is to construct a 2.78-mile-long road partially
located through 5,660 linear feet (lf) of wetlands (Phase 1) and also to construct
2.78 miles of utility line through 5,206 lf of wetlands (Phase 2). The road and
utility lines would originate at the Shadura Appraisal Well Pad and terminate at an
upland drilling and production pad (Shadura Natural Gas Development). Phase 2 would
be constructed if the applicant determines that sufficient quantities of natural gas
are present to make production economically viable
Road Construction (Phase 1) Discharge 14,613 cubic yards (cy) of gravel fill
material into 3.61 acres (5,660 lf) of 16 wetlands (see Sheet 2-3 of 9) to
construct a gravel service road underlain by geotextile fabric. Road dimensions
would be 28' wide by 30" deep with an 18' wide driving surface.
Utility Installation (Phase 2) Two 6" gathering lines and one fiber optic cable
would be installed within a 4' wide, 3.5' deep trench located within 10' of the toe
of the service road. Trenching is proposed through 0.53 acres (5,206 lf) of 13
wetlands with 2,851 cy of excavated trench material temporarily sidecast into 1.20
acres of wetlands. If the frost line is deep enough, trenching methods would
include removing frozen blocks of frost susceptible soil up to 4' thick to be set
aside and reused in the same location. In thawed ground, the vegetation from the
trench would be removed and stockpiled separately from underlying non-organic
silts, sands and gravels, with a total sidecast width of ten feet (see Sheet 8 of
9). The trench would be backfilled in the opposite order of excavation, with the
vegetative layer replaced on the surface.
All work would be performed in accordance with the enclosed plan (sheets 1-9),
dated March 16, 2012, August 6, 2012, August 29, 2012, and October 26, 2012.
ADDITIONAL INFORMATION:
A Public Notice was originally issued January 3, 2012, for POA-2009-1228, Swanson
River, however, the application was withdrawn. A revised proposal was submitted,
which includes a modified road alignment and drilling/production pad location, as
reflected above, and on the attached drawings.
The following information is provided for clarity, however, these proposed
activities are not subject to DA jurisdiction, and do not require a DA permit:
A 6.31-acre gravel drill and production pad would be located in uplands.
One meter pad would be located in uplands.
Four temporary turn-arounds and up to eleven permanent pullouts would be
constructed in uplands.
During Phase I, there would be a 40' vegetation clearing limit, with
vegetation only cleared if it is an impediment to the operation of
equipment or construction. Little, or no, clearing would occur in
wetlands. If necessary, clearing in wetlands would be accomplished with a
HydroAxe.
Two stream crossings would occur along the proposed service road by
installing a single lane, 16' by 16' clear span bridge with gravel
embankments at each location. There would be no discharge of fill
material below the ordinary high water mark of the streams, therefore, the
stream crossings would not be regulated by the DA. The approaches in
wetlands have been calculated above.
-2-
During Phase II, the vegetation clearing limit would be expanded to 80',
with vegetation only cleared if it is an impediment to the operation of
equipment and construction. Little, or no, clearing would occur in
wetlands. If necessary, clearing in wetlands would be accomplished with a
HydroAxe.
The gathering lines and fiber optic cable would be horizontally,
directionally drilled beneath the two streams in the project area with
entry bore holes located entirely in uplands. Therefore, a trench would
not be constructed through wetland 2-26, 2-27, and 75 linear feet of
wetland 2-25 (125 linear foot total) and through wetland 2-33 (328 linear
foot).
Project life is estimated at 30 years. Post production, all fill material would be
removed, and the site would be returned to pre-existing contours, as required by
USFWS right-of-way permits, if issued.
Cook Inlet Region Inc. (CIRI) owns the coal, oil and gas estate in the project
area. CIRI leased the lands to NordAq for the purpose of realizing an economic
benefit.
The DA permit application was submitted concurrently with a permit application
under Title XI of the Alaska National Interest Lands Conservation Act (ANILCA) to
the Corps of Engineers and the U.S. Fish and Wildlife Service (USFWS). Pursuant to
the provisions of Title XI of ANILCA, the USFWS is the lead agency. The USFWS is
currently preparing a Draft Environmental Impact Statement (DEIS) for the proposed
project, with the Corps of Engineers acting as a commenting agency during the EIS
process. The DEIS should be posted in the Federal Register on December 21, 2012,
with a comment closing period of February 4, 2013. A DA permit decision will not
be made until after the Final Environmental Impact Statement (EIS), is prepared.
This public notice reflects the applicant's preferred alternative only. Additional
alternatives are included as Attachment A. Each alternative will be evaluated to
determine if it meets the overall project purpose. If the overall project purpose
is met, those alternatives, and the applicant's preferred alternative, will be
evaluated under the Environmental Protection Agency's 404(b)(1) guidelines to
determine which is the least environmentally damaging practicable alternative
(LEDPA).
A separate DA permit authorization was issued July 20, 2012, (POA-2011-1143,
Swanson River) to NordAq to construct a 1.5-mile long service road to develop the
Shadura Appraisal Well located entirely on Alaska Department of Natural Resources
land. For the current proposal, the applicant's preferred alternative begins at
the Shadura Appraisal Well. If the applicant pursues an irreversible and
irretrievable commitment of resources to develop the Shadura Appraisal Well, this
will not limit the DA's examination of alternatives of the current proposal.
APPLICANT PROPOSED MITIGATION: The applicant proposes the following mitigation
measures to avoid, minimize, and compensate for impacts to waters of the United
States from activities involving discharges of dredged or fill material.
a. Avoidance: The proposed route best traverses the upland/wetland fringes;
avoids the largest amount of wetland and forested habitats; avoids the greatest
potential for bear denning and fishing areas; utilizes the greatest amount of the
previously permitted ice road; and, uses single clear span bridges to cross the two
streams present in the project area.
-3-
b. Minimization: To minimize impacts to wetlands, the project includes the
following measures: Use earth fill or sand bags to fill in the open trench during
construction; remove water accumulated while the trench is open; adopt buoyancycontrol measures for gathering lines installed in wetlands; use the push-pull
technique to install gathering lines in saturated or inundated wetland soil areas;
service road would utilize existing ice road pathway whenever practicable; when
practical, construction would occur during winter months to reduce wetland impacts;
and, when practical, vegetation would be cleared in the fall and early winter so it
would not destroy bird nests with eggs or young or disturb denning animals during
hibernation.
c. Compensatory Mitigation: As compensation for unavoidable impacts to
wetlands, mitigation would be provided at a 2:1 ratio, through In Lieu Fee.
WATER QUALITY CERTIFICATION: A permit for the described work will not be issued
until a certification or waiver of certification, as required under Section 401 of
the Clean Water Act (Public Law 95-217), has been received from the Alaska
Department of Environmental Conservation.
CULTURAL RESOURCES: The lead Federal agency, U.S. Fish and Wildlife Service, is
responsible for compliance with the requirements of Section 106 of the National
Historic Preservation Act. A permit for the described work will not be issued
until the Section 106 process has been completed.
ENDANGERED SPECIES:
project area.
No threatened or endangered species are known to use the
ESSENTIAL FISH HABITAT: The Magnuson-Stevens Fishery Conservation and Management
Act, as amended by the Sustainable Fisheries Act of 1996, requires all Federal
agencies to consult with the NMFS on all actions, or proposed actions, permitted,
funded, or undertaken by the agency, that may adversely affect Essential Fish
Habitat (EFH). No EFH species are known to use the project area.
TRIBAL CONSULTATION: The Alaska District fully supports tribal self-governance and
government-to-government relations between Federally recognized Tribes and the
Federal government. Tribes with protected rights or resources that could be
significantly affected by a proposed Federal action (e.g., a permit decision) have
the right to consult with the Alaska District on a government-to-government basis.
Views of each Tribe regarding protected rights and resources will be accorded due
consideration in this process. This Public Notice serves as notification to the
Tribes within the area potentially affected by the proposed work and invites their
participation in the Federal decision-making process regarding the protected Tribal
right or resource. Consultation may be initiated by the affected Tribe upon
written request to the District Commander during the public comment period.
PUBLIC HEARING: Any person may request, in writing, within the comment period
specified in this notice, that a public hearing be held to consider this
application. Requests for public hearings shall state, with particularity, reasons
for holding a public hearing.
EVALUATION: The decision whether to issue a permit will be based on an evaluation
of the probable impacts, including cumulative impacts of the proposed activity and
its intended use on the public interest. Evaluation of the probable impacts, which
the proposed activity may have on the public interest, requires a careful weighing
of all the factors that become relevant in each particular case. The benefits,
-4-
which reasonably may be expected to accrue from the proposal, must be balanced
against its reasonably foreseeable detriments. The outcome of the general
balancing process would determine whether to authorize a proposal, and if so, the
conditions under which it will be allowed to occur. The decision should reflect
the national concern for both protection and utilization of important resources.
All factors, which may be relevant to the proposal, must be considered including
the cumulative effects thereof. Among those are conservation, economics,
aesthetics, general environmental concerns, wetlands, cultural values, fish and
wildlife values, flood hazards, floodplain values, land use, navigation, shore
erosion and accretion, recreation, water supply and conservation, water quality,
energy needs, safety, food and fiber production, mineral needs, considerations of
property ownership, and, in general, the needs and welfare of the people. For
activities involving 404 discharges, a permit will be denied if the discharge that
would be authorized by such permit would not comply with the Environmental
Protection Agency's 404(b)(l) guidelines. Subject to the preceding sentence and
any other applicable guidelines or criteria (see Sections 320.2 and 320.3), a
permit will be granted unless the District Commander determines that it would be
contrary to the public interest.
The Corps of Engineers is soliciting comments from the public; Federal, State, and
local agencies and officials; Indian Tribes; and other interested parties in order
to consider and evaluate the impacts of this proposed activity. Any comments
received will be considered by the Corps of Engineers to determine whether to
issue, modify, condition or deny a permit for this proposal. To make this
decision, comments are used to assess impacts on endangered species, historic
properties, water quality, general environmental effects, and the other public
interest factors listed above. Comments are used in the preparation of an
Environmental Assessment and/or an Environmental Impact Statement pursuant to the
National Environmental Policy Act. Comments are also used to determine the need
for a public hearing and to determine the overall public interest of the proposed
activity.
AUTHORITY: This permit will be issued or denied under the following authority:
(X) Discharge dredged or fill material into waters of the United States
Section 404 Clean Water Act (33 U.S.C. 1344). Therefore, our public interest
review will consider the guidelines set forth under Section 404(b) of the Clean
Water Act (40 CFR 230).
(X) Transportation and utility systems in and across, and access into,
conservation system units Title XI, Alaska National Interests Lands Conservation
Act (PL 96-487; 94 Stat. 2371).
Project drawings and a Notice of Application for State Water Quality Certification
are enclosed with this Public Notice.
District Commander
U.S. Army, Corps of Engineers
Enclosures
-5-
SEAN PARNELL, GOVERNOR
STATE OF ALASKA
DEPT. OF ENVIRONMENTAL CONSERVATION
DIVISION OF WATER
401 Certification Program
Non-Point Source Water Pollution Control Program
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
WQM/401 CERTIFICATION
410 WILLOUGHBY AVENUE
JUNEAU, ALASKA 99801-1795
PHONE: (907) 465-5321/FAX: (907) 465-5274
NOTICE OF APPLICATION
FOR
STATE WATER QUALITY CERTIFICATION
Any applicant for a federal license or permit to conduct an activity that might
result in a discharge into navigable waters, in accordance with Section 401 of the
Clean Water Act of 1977 (PL95-217), also must apply for and obtain certification
from the Alaska Department of Environmental Conservation that the discharge will
comply with the Clean Water Act, the Alaska Water Quality Standards, and other
applicable State laws. By agreement between the U.S. Army Corps of Engineers and
the Department of Environmental Conservation, application for a Department of the
Army permit to discharge dredged or fill material into navigable waters under
Section 404 of the Clean Water Act also may serve as application for State Water
Quality Certification.
Notice is hereby given that the application for a Department of the Army Permit
described in the Corps of Engineers' Public Notice No. POA-2009-1228, Swanson
River, serves as application for State Water Quality Certification from the
Department of Environmental Conservation.
After reviewing the application, the Department may certify there is reasonable
assurance the activity, and any discharge that might result, will comply with the
Clean Water Act, the Alaska Water Quality Standards, and other applicable State
laws. The Department also may deny or waive certification.
Any person desiring to comment on the project, with respect to Water Quality
Certification, may submit written comments to the address above by the expiration
date of the Corps of Engineer's Public Notice.