Home

Alaska District

Run scraper

Mr. Larry Stauffer

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

POA-2012-920, Womens Bay - Northland Services’s stated purpose is to construct a new freight

POA-2012-920, Womens Bay- Northland Services’s stated purpose is to construct a new freight facility with a flat upland operations area. Please contact Heather Boyer at (907) 753-2877, toll free from within Alaska at (800) 478-2712, by fax at(907) 753-5567, or by email at heather.l.boyer@usace.army.mil if further information is desired concerning this notice.

US Army Corps of Engineers Alaska District

Regulatory Division (1145) CEPOA-RD Post Office Box 6898 JBER, Alaska 99506-0898

Public Notice of Application for Permit PUBLIC NOTICE DATE:

December 26, 2012

EXPIRATION DATE:

January 28, 2013

REFERENCE NUMBER:

POA-2012-920

WATERWAY:

Womens Bay

Interested parties are hereby notified that a Department of the Army permit application has been received for work in waters of the United States as described below and shown on the enclosed project drawings. Comments on the described work, with the reference number, should reach this office no later than the expiration date of this Public Notice to become part of the record and be considered in the decision. Please contact Heather Boyer at (907) 753-2877, toll free from within Alaska at (800) 478-2712, by fax at (907) 753-5567, or by email at heather.l.boyer@usace.army.mil if further information is desired concerning this notice. APPLICANT: Mr. Larry Stauffer, Northland Services, Post Office Box 24527, Seattle, Washington 98124. AGENT: Ms. Laura Gurley, PND Engineers, Inc., 811 First Avenue, Suite 570, Seattle, Washington 98104, 206-624-1387. LOCATION: The project site is located within Sections 21 and 28, T. , R. W., Seward Meridian; USGS Quad Map Kodiak C-2; Latitude 57.7274º N., Longitude 152.5308º W.; Kodiak Island Borough; Shannon Point, 7205 Rezanof Drive, in Kodiak, Alaska. PURPOSE: The applicant's stated purpose is to construct a new freight facility with a flat upland operations area. PROPOSED WORK: The applicant proposes to place 60,000 cubic yards of fill into 3.2 acres of tidelands. Project components include demolition of existing upland structures; fill placement for the upland operation area and a gravel ramp; a 23-foot by 43-foot approach pier supported by 6 steel piles connecting to a 19-foot by 120-foot transfer bridge stabilized by two 30-inch steel guide piles; and four mooring dolphins each consisting of one vertical 48-inch steel pile and two 24-inch

batter piles. All work would be performed in accordance with the enclosed plan (sheets 1-9), dated November 16, 2012. ADDITIONAL INFORMATION: For a more detailed project description and other information provided by the applicant see sheets 1-4 of the attached project drawings dated November 16, 2012. APPLICANT PROPOSED MITIGATION: The applicant proposes the following mitigation measures to avoid, minimize, and compensate for impacts to waters of the United States from activities involving discharges of dredged or fill material. a. Avoidance: The applicant stated that the area of fill required has been minimized by identifying a site with two natural points extending into Womens Bay that can be incorporated into the workable upland area. b. Minimization: The applicant stated that the area of fill has been further minimized by extending the transfer bridge to reach deeper water required to meet the vessel draft instead of expanding the fill area footprint. This would decrease the potential environmental impact of the project to fish and other wildlife as well as decrease the amount of affected navigable waters of the United States. Fill limits were set at elevation -6-feet Mean Low Low Water (MLLW) which are capable of being clearly viewed at low water. Low water viewing did not identify any significant habitat that could be affected by fill placement. The minimum number and size of piles have been used in the design to reduce noise impacts to aquatic organisms during construction. Best Management Practices (detailed on the attached sheet 4 of 9, dated November 16, 2012) would be employed to minimize impacts to water quality, fish life, and the environment during construction. c. Compensatory Mitigation: The applicant stated that the project would result in the loss of fairly low quality habitat and has not proposed compensatory mitigation at this time. WATER QUALITY CERTIFICATION: A permit for the described work will not be issued until a certification or waiver of certification, as required under Section 401 of the Clean Water Act (Public Law 95-217), has been received from the Alaska Department of Environmental Conservation. CULTURAL RESOURCES: The latest published version of the Alaska Heritage Resources Survey (AHRS) has been consulted for the presence or absence of historic properties, including those listed in or eligible for inclusion in the National Register of Historic Places. There are no listed or eligible properties in the vicinity of the worksite. Consultation of the AHRS constitutes the extent of cultural resource investigations by the District Commander at this time, and he is otherwise unaware of the presence of such resources. This application is being coordinated with the State Historic Preservation Office (SHPO). Any comments SHPO may have concerning presently unknown archeological or historic data that may be lost or destroyed by work under the requested permit will be considered in our final assessment of the described work. ENDANGERED SPECIES: The project area is within the known or historic range of the following species listed as threatened: northern sea otter (Enhydra lutris kenyoni) and its designated critical habitat, Steller's eider (Polysticta stelleri), and the endangered Steller sea lion (Eumetopias jubatus). Although likely rare in the

-2-

project area it is also within the range of the following whales listed as endangered: fin whale (Balaenoptera physalus), humpback whale (Megaptera novaeangliae), sperm whale (Physeter macrocephalus), blue whale (Balaenoptera musculus), north Pacific right whale (Eubalaena japonica) and Sei whale (Balaenoptera borealis). We are currently gathering information regarding these species and have yet to make a determination of effect. Should we find that the described activity may affect any of the species listed above, and/or their designated critical habitat, we will follow the appropriate consultation procedures under section 7 of the Endangered Species Act of 1973 (87 Stat. 844). Any comments the U.S. Fish and Wildlife Service or the National Marine Fisheries Service may have concerning endangered or threatened wildlife or plants or their critical habitat will be considered in our final assessment of the described work. ESSENTIAL FISH HABITAT: The Magnuson-Stevens Fishery Conservation and Management Act, as amended by the Sustainable Fisheries Act of 1996, requires all Federal agencies to consult with the NMFS on all actions, or proposed actions, permitted, funded, or undertaken by the agency, that may adversely affect Essential Fish Habitat (EFH). The project area is within the known range of the The project area is within the known range of the Chinook salmon (Oncorhynchus tshawytscha), chum salmon (Oncorhynchus keta), Coho salmon (Oncorhynchus kisutch), sockeye salmon (Oncorhynchus nerka), and pink salmon (Oncorhynchus gorbuscha). We are currently gathering information regarding these species and have yet to make a determination of effect. Should we find that the described activity may affect the species listed above, we will follow the appropriate course of action under Section 305(b)(2) of the Magnuson-Stevens Act. Any comments the National Marine Fisheries Service may have concerning essential fish habitat will be considered in our final assessment of the described work. TRIBAL CONSULTATION: The Alaska District fully supports tribal self-governance and government-to-government relations between Federally recognized Tribes and the Federal government. Tribes with protected rights or resources that could be significantly affected by a proposed Federal action (e.g., a permit decision) have the right to consult with the Alaska District on a government-to-government basis. Views of each Tribe regarding protected rights and resources will be accorded due consideration in this process. This Public Notice serves as notification to the Tribes within the area potentially affected by the proposed work and invites their participation in the Federal decision-making process regarding the protected Tribal right or resource. Consultation may be initiated by the affected Tribe upon written request to the District Commander during the public comment period. PUBLIC HEARING: Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider this application. Requests for public hearings shall state, with particularity, reasons for holding a public hearing. EVALUATION: The decision whether to issue a permit will be based on an evaluation of the probable impacts, including cumulative impacts of the proposed activity and its intended use on the public interest. Evaluation of the probable impacts, which the proposed activity may have on the public interest, requires a careful weighing of all the factors that become relevant in each particular case. The benefits, -3-

which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. The outcome of the general balancing process would determine whether to authorize a proposal, and if so, the conditions under which it will be allowed to occur. The decision should reflect the national concern for both protection and utilization of important resources. All factors, which may be relevant to the proposal, must be considered including the cumulative effects thereof. Among those are conservation, economics, aesthetics, general environmental concerns, wetlands, cultural values, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shore erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership, and, in general, the needs and welfare of the people. For activities involving 404 discharges, a permit will be denied if the discharge that would be authorized by such permit would not comply with the Environmental Protection Agency's 404(b)(l) guidelines. Subject to the preceding sentence and any other applicable guidelines or criteria (see Sections 320.2 and 320.3), a permit will be granted unless the District Commander determines that it would be contrary to the public interest. The Corps of Engineers is soliciting comments from the public; Federal, State, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps of Engineers to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. AUTHORITY:

This permit will be issued or denied under the following authorities:

(X) Perform work in or affecting navigable waters of the United States ­ Section 10 Rivers and Harbors Act 1899 (33 U.S.C. 403). (X) Discharge dredged or fill material into waters of the United States ­ Section 404 Clean Water Act (33 U.S.C. 1344). Therefore, our public interest review will consider the guidelines set forth under Section 404(b) of the Clean Water Act (40 CFR 230). Project drawings and a Notice of Application for State Water Quality Certification are enclosed with this Public Notice.

District Commander U.S. Army, Corps of Engineers Enclosures

-4-

SEAN PARNELL, GOVERNOR

STATE OF ALASKA DEPT. OF ENVIRONMENTAL CONSERVATION DIVISION OF WATER 401 Certification Program Non-Point Source Water Pollution Control Program DEPARTMENT OF ENVIRONMENTAL CONSERVATION WQM/401 CERTIFICATION 555 CORDOVA STREET ANCHORAGE, ALASKA 99501-2617 PHONE: (907) 269-7564/FAX: (907) 334-2415

NOTICE OF APPLICATION FOR STATE WATER QUALITY CERTIFICATION

Any applicant for a federal license or permit to conduct an activity that might result in a discharge into navigable waters, in accordance with Section 401 of the Clean Water Act of 1977 (PL95-217), also must apply for and obtain certification from the Alaska Department of Environmental Conservation that the discharge will comply with the Clean Water Act, the Alaska Water Quality Standards, and other applicable State laws. By agreement between the U.S. Army Corps of Engineers and the Department of Environmental Conservation, application for a Department of the Army permit to discharge dredged or fill material into navigable waters under Section 404 of the Clean Water Act also may serve as application for State Water Quality Certification. Notice is hereby given that the application for a Department of the Army Permit described in the Corps of Engineers' Public Notice No. POA-2012-920, Womens Bay, serves as application for State Water Quality Certification from the Department of Environmental Conservation. After reviewing the application, the Department may certify there is reasonable assurance the activity, and any discharge that might result, will comply with the Clean Water Act, the Alaska Water Quality Standards, and other applicable State laws. The Department also may deny or waive certification. Any person desiring to comment on the project, with respect to Water Quality Certification, may submit written comments to the address above by the expiration date of the Corps of Engineer's Public Notice.

PROPOSED ACTIVITY: TO CONS TRUCT A FILL, RAMPS & DOLPHIN S TIDAL DATUM : MLLW= 0.0'

VICINITY AND LOCATION

NORTHLAND KODIAK TERMINAL

ADJACENT OWNERS: SEE SITE PLAN LAT/ LON: 57. 72 74 / - 152.5308

NORTH LAND SERVICES, INC. P.O. Box 24527 SEA TTLE , WA 98124

NC

Northland Services, Inc. POA-20 12-920 Womens Bay November 16, 2012 Sheet 1 of 9 -'

WAREHOUSE

I

I

I I I I

........

___ ___ _ /

/ /

------....

\

LEGEND

-----

100

0

HTL

SCALE IN FEET

MHW 200

300

400

PROPOSED ACTIVITY: TO CONSTRUC T A FILL, RAMPS & DOLPHINS TIDAL DATUM: MLLW= 0.0'

MLLW =0'

EXISTING CONDITIONS

ADJACENT OWNERS: SEE Sl TE PLAN LAT / LON: 57.7274/-152.5308

= 10.7' = 7.6'

NORTHLAND SERVICES, INC. P.O. Box 24527 SEATTLE, WA 98124

NORTHLAND KODIAK TERMINAL Northland Services , Inc. POA-2012-920 Womens Bay November 16, 2012 Sheet 2 of 9

\ \

\

--

LOT 8

'

_,......./

'

\

./

- ___ __ --....... ....

--

---- --,_...

-- ------ ...

A

'

STEEL QUANTITIES ITEM

#

FILL QUANTITIES DIM

APPROACH SLAB

23'x43'

TRAN SFER BRIDGE

19'x120'

FLOATA TI ON CHAMBER

19' x45'

PILES

3.6

4

DOLPHIN BATTER

30" 0

ABUTM ENT PILE

8 2 3

APPROACH PILE

3

12"¢

BELOWMHW

BELOW HTL

35,000

60,000

12"0

PROPOSED ACTIVI TY: TO CON STRUCT A FILL, RAMPS & DOLPH INS

-----

100

0

200

300

~~~~~~~~

FILL AREA

~

ARM OR SLOPE

-

HTL = 10.7'

· - ·· - ··-

-- - --

MHW

=

7.6'

MLLW = 0'

SITE PLAN

NORTHLAND KODIAK TERMINAL

TIDAL DATUM: MLL W= 0.0' ADJACENT OWNERS: SE E Sl TE PLAN LAT/ LON: 57.72 74 / -15 2.5308

400

LEGEND

3. 1 VOLUME (CUBIC YDS)

70,000

DOLPHIN VER TI CAL GU IDE PILE

PROJECT TOTAL

SCALE IN FEET

NORTHLAND SERVICES, IN C. P.O. Box 24527 SEATTLE, WA 98124

Northland Services , Inc. POA-2012-920 Womens Bay November 16, 20 12 Sheet 3 of 9

NEAR GUIDE PILE FILL

FAR DOLPHIN

PILE SUPPORTED APPROACH DOCK

FLOATION ,, CHAMBER ,/

,, ,,,,

,,,;/ ,,,,

i

''

ORIGINAL GRADE

'''' '' ''

' '

'' '' ''

' '

~.l',i ~~"

SECTION A-A

20' x IBS' GRAVEL RAMP

~~~>?0B~d§~~~~~~ 2~%~S~LO~P~E~~~~~~~~~~~~

~

~-

'"

LEGEND HTL = 10.7'

'

~

SECTION B-8

MHW = 7.6' MLLW =0'

PROPOSED ACTIVITY: TO CONS TRUCT A FILL, RAMP S & DOLPHINS

SECTIONS

NORTHLAND KODIAK TERMINAL

TIDAL DATUM: MLLW= 0.0' ADJACENT OWNERS: SEE SITE PLAN LAT/LON : 57.7274/- 152.5308

NORTHLAND SER VICES, INC. P.O. Box 24527 SEATTLE, WA 98 124

Northland Services , Inc. POA-2012-920 Womens Bay November 16, 20 12 Sheet 4 of 9

ELEV. +20'~9 STEEL PIPE PILE

~ TOP OF TIRE FENDER (MIN.)

STE EL PIPE BATTER PILE

ELEV. + 18.5'

/

~

ELEV. -10' BOTTOM OF FENDER

ORIGINAL GRADE VARIES

I

I

I I ~ -)

PROPOSED ACTIVITY: TO CONS TRUCT A FILL, RAMPS & DOLPHIN S TIDAL DATUM: MLLW= 0.0'

DOLPHIN ELEVATION

ADJACENT OWNERS : SEE Sl TE PLAN LAT/LON: 57.7274/-152 .5308

NORTHLAND SERVICES, IN C. P.O. Box 24527 SEA TTLE , WA 98 124

NORTHLAND KODIAK TERMINAL Northland Services, Inc. POA-2012-920 Womens Bay November 16, 2012 Sheet 5 of 9

NORTHLAND KODIAK TERMINAL Project Summary Location: Shannon Point, Kodiak, Alaska Prepared: November 2012 For: Northland Services, Inc., Seattle, Washington By: PND Engineers, Inc.

Northland Services leases the upland properties between Shannon Point and Rezanof Drive West on Women's Bay. Northland desires to construct a freight handling operation at this location. The project consists of filling approximately 3.0 acres below Mean High Water (MHW), installing fou~: multi-pile dolphins for mooring and breasting barges, a transfer bridge for roll on/ roll off (Ro-Ro) cargo ope~:ations, and a gravel landing craft ramp. The total project area encompasses both uplands and tidelands. Details of the project are described below. Project Location: The project is located at Shannon Point on the north shore of Women's Bay on Kodiak Island within Township 28 S, Range 20 W, Sections 21 and 28, Seward Meridian, USGS Quad Map Kodiak C-2. The project is at approximate Latitude N. 57.7274, Longitude W. 152.5308. The project area includes area for a proposed state of Alaska tidelands lease extending approximately 450 feet off shore and approximately 850 feet long. Existing Conditions: The site features a gently sloping shoreline consisting of coarse gravel, with some cobbles and silty sand up to approximately + 10 feet elevation (MLLW). Portions of the site have previously been filled as indicated by the steep, unnatural slope between +10 feet and +18 feet elevation (MLLW). Most of the slope is armored with rock estimated to have been installed during the 1940s or 1950s. A site visit at a +1 foot tide on November 15, 2012 revealed linuted aquatic vegetation on the exposed shoreline and below water to a depth of -1 foot. The relatively flat upland area is currently used for storage of semi trailers and other equipment, a truck scale and one shed structure on blocks. The entire upland area between the rock slope and Rezanof Drive West is gmveled parking and drive area with small patches of grasses. The topography on the north side of Rezanof Drive West quickly transitions into steep rolling hills. Purpose and Need: In anticipation of supporting the fast growing industries in northern Alaska, the applicant proposes to provide a strategically placed cargo ternlinal. Approximately 3.0 acres of flat operating area is needed to accommodate the anticipated cargo volumes. Expansion o f the site into the uplands is limited due to the Rezanof Drive West Right-of-Way and the steep terrain on the north side of the road. Therefore, the necessary area must be gained on the waterward portion of the site. In order to avoid dredging and accommodate a minimum vessel draft of 20 feet (at all tides) the moorage must be located at approximately -35.0 feet elev. (MLLW). Several options for waterward expansion were considered and are described in the Alternatives Analysis below. The landing craft ramp is for transshipment of cargo to service smaller commmuties in area Project Description: The work is intended to be constructed in one season. There is no dredging proposed for this project. 1.

Demolition: Demolition of some upland structures will occur, but there is no in-water demolition. Existing armor will be left in place and incorporated into the proposed fill area.

Northland Services, Inc. POA-2012-920 Womens Bay November 16, 2012 Sheet 6 of 9

2.

Fill Area Including Gravel Landing Craft Ramp: Fill of approximately 3.2 acres below the High Tide Line (HTL) is proposed (equates to 3.1 acres below Mean High Water (MHW)) to create the upland cargo working space. The fill area will be surrounded by and protected from wave and ice forces by approximately 1,085 lf of armored revetment at a 2:1 slope starting from the apex of Shannon Point, extending 185 lf feet southeast into Women's Bay, then 800 lf southwest, and back to shore for another 100 lf. A gravel ramp for landing craft will be incorporated into the armored revetment on the north side of the project. The proposed fill area will require approximately 60,000 CY of fill below HTL (equates to 35,000 CY below MHW). It is anticipated that fill material will consist of shot rock material excavated from adjacent upland properties. Additional borrow material will be supplemented as needed and be procured by the contractor from an approved source, likely an upland quarry. Armor rock will come .from the same locations.

3.

Transfer Bridge and Approach Pier: A pile supported approach pier (23 feet by 43 feet) will be installed at the mid-point of the east side of the armored revetment. This pier will be supported by six 12-inch diameter steel piles. T he piles will be installed using a barge mounted vibratory hammer with an impact hammer used for proofing. T he approach pier connects to the transfer bridge (19 feet by 120 feet). The floating end of the transfer bridge is supported on a floatation chamber (19 feet by 45 feet) that is situated beneath and perpendicular to the transfer bridge. Therefore, portions of the floatation chamber extend beyond the overhead foo tprint of the transfer bridge (see drawing sheet 3. The transfer bridge is stabilized by two 30-inch diameter steel guide piles.

4.

Dolphins: Four m ooring/ breasting dolphins will be installed parallel to the east facing revetment. Each dolphin consists of one vertical 48-inch diameter steel pile and two 24-inch diameter batter piles. The piles will be installed using a barge mounted vibratory hammer with and impact hammer used for proofing. Each dolphin features a loader tire fender on the vertical pile.

Project Schedule: The project will be completed by January 2015 pending permit and tideland lease approvals. Best Management Practices (BMPs) will be implemented to reduce potential erosion impacts during winter months. Analysis of Project Alternatives: Multiple designs were considered for this project to determine the best engineering design capable of meeting the needs o f a cargo dock facility while minimizing both financial and environmental costs. Environmental impacts, no required dredging, the types and sizes of vessels calling, the weight, volume and size of the materials to be handled, vessel draft requirements, the necessary cargo handling equipment, upland storage facilities, and costs were all measured. Design options considered included: 1.

Fill area surrounded by sheet pile bulkhead. T his option involved considerable cost to construct a bulkhead in water deep enough to accommodate anticipated vessels and avoid dredging while providing an area large enough to create an upland area large enough to accommodate the cargo handling facility. The time necessary for fabrication of materials would also add to the total duration of the project schedule. Sheet pile driving duration and resulting noise impacts would be signilicantly

2.

longer than the chosen option. Pile supported dock. This option involved the highest cost to construct a concrete, heavy duty, pile

3.

supported dock large enough to accommodate the cargo handling facility. The time necessary for fabrication of materials would also add to the total duration of the project schedule. Pile driving duration and resulting noise in1pacts would be significantly longer than the chosen option. Fill area surrounded by an armored revetment (chosen design). This option allows the owner to take advantage of available materials and lower costs while achieving the required upland space, berthing

Northland Services, Inc. POA-20 12-920 Womens Bay November 16, 2012 Sheet 7 of 9

depths, and gravel landing craft area necessary for the project while minimizing pile driving noise impacts. T he armored revetment shown in the chosen design was deemed most flexible in allowing Northland to respond to various u sers' need s. This choice will eliminate the need for dredging at the site. Providing an operating area that is on fill instead of overwater allows for better direction of drainage and less opportunity for stray materials or contaminants to enter the waterway during operations. This armored revetment design is structurally, economically, and operationally the m ost efficient structure for this location and use. Following are some of the reasons for this, in addition to the points already made:

1) Very high load capacity for variety of uses 2) Creates upland area for cargo storage and manuevering 3) Easier to protect from homeland security risks - difficult target for terrorism 4) Low maintenance costs compared to platform dock structures 5) Ease of construction allows shorter construction window for lower cost, environmental impacts, etc. 6) Environmentally responsible use of natural resources - construction method uses less energy and resources to create a usable surface area compared to other common types of structure (i.e. platform dock) All options above would require a DNR lease or conveyance. This process will be started following this application, and will continue with the chosen revised layout.

Biological Consultation: A query was run through NOAA's Essential Fish Habitat (EFH) Mapper and no Habitat Areas of Particular Concern (HAPC) nor Essential Fish Habitat (EFH) were identified at the project lo cation. Work will be scheduled to adhere to allowable windows of work as prescribed by state and federal agenc1es. Minor, temporary impacts to water quality may occur during construction, but will adhere to tolerances set forth under the Section 401 Water Quality Certification requirements. The project is not within a FEMA regulated floodplain. There are no endangered, threatened, or sensitive species found on the site. Temporary construction impacts may include minor, direct, short term effects on air quality from construction equipment, turbidity during fill operations, and noise impacts during pile driving.

Mitigation Statement: The project results in loss of fairly low quality habitat. The existing shore protection and gravel beach is not high value aquatic ecosystem. As such, no compensatory mitigation is proposed. The following describes the measures taken by Northland to avoid and minimize impacts to waters of the United States relative to the proposed construction of the project. 1. 2.

3. 4.

Area of fill required has been minimized by identifying a site with two natural points extending into Women's Bay that can be incorporated into the workable upland area. Area of fill has been further minimized by extending the transfer bridge to reach deeper water required to meet the vessel draft instead of expanding the fill area footprint. This will decrease the potential environmental impact of the project to fish and other wildlife as well as decrease the amount of affected navigable waters of the United States. Fill limits were set at elevation -6-feet MLLW which are capable of being clearly viewed at low water. Low water viewing did not identify any significant habitat that could be affected by fill placement. The minimum number and size of pile have been used in the design to reduce noise impacts to aquatic organisms during construction.

Northland Services , Inc. POA-2012-920 Womens Bay November 16, 2012 Sheet 8 of 9

5.

In order to minlmize the unavoidable impacts, Best Management Practices (BMPs) will be employed to minimize impacts on water quality, fish life, and the environment during construction. Such practices include: Impact driving will be required on all bearing piles. Vibratory tnethods may be used for initial setting and driving of all of the piles. Fender pin piles may be installed using a vibratory hammer exclusively, if possible. b. Shot rock fill be clean with relatively few fines that would cause turbidity. c. Agency imposed timing restrictions would be stricdy observed. d. The contractor will be required to capture any falling debris associated with project construction; such methods will not allow any debris to enter the Womens Bay. e. Excess or waste materials will not be allowed to enter waters of the state. All such materials will be collected and recycled or disposed of at an approved facility. f. The contractor will comply with water quality restrictions as required by law and implement corrective measures if temporary water quality standards are exceeded. g. Care will be taken to prevent any petroleum products or other toxic or deleterious materials from entering the waters of the state. Fuel hoses, oil drums, oil or fuel transfer valves and fittings, etc., will be checked regularly for drips or leaks, and shall be maintained and stored properly on secondary containment pallets to prevent spills. h. The contractor will have a spill kit with oil-absorbent materials on site to be used in the event of a spill or if any oil product is observed in the water. 1. The contractor is responsible for the preparation of a Spill Prevention, Control, and Countermeasures (SPCC) plan to be used for the duration of the project as required by permitting agencies.

a.

Northland Services, Inc. POA-20 12-920 Womens Bay November 16, 2012 Sheet 9 of 9

US Army Corps of Engineers Alaska District

Regulatory Division (1145) CEPOA-RD Post Office Box 6898 JBER, Alaska 99506-0898

Public Notice of Application for Permit PUBLIC NOTICE DATE:

December 26, 2012

EXPIRATION DATE:

January 28, 2013

REFERENCE NUMBER:

POA-2012-920

WATERWAY:

Womens Bay

Interested parties are hereby notified that a Department of the Army permit application has been received for work in waters of the United States as described below and shown on the enclosed project drawings. Comments on the described work, with the reference number, should reach this office no later than the expiration date of this Public Notice to become part of the record and be considered in the decision. Please contact Heather Boyer at (907) 753-2877, toll free from within Alaska at (800) 478-2712, by fax at (907) 753-5567, or by email at heather.l.boyer@usace.army.mil if further information is desired concerning this notice. APPLICANT: Mr. Larry Stauffer, Northland Services, Post Office Box 24527, Seattle, Washington 98124. AGENT: Ms. Laura Gurley, PND Engineers, Inc., 811 First Avenue, Suite 570, Seattle, Washington 98104, 206-624-1387. LOCATION: The project site is located within Sections 21 and 28, T. , R. W., Seward Meridian; USGS Quad Map Kodiak C-2; Latitude 57.7274º N., Longitude 152.5308º W.; Kodiak Island Borough; Shannon Point, 7205 Rezanof Drive, in Kodiak, Alaska. PURPOSE: The applicant's stated purpose is to construct a new freight facility with a flat upland operations area. PROPOSED WORK: The applicant proposes to place 60,000 cubic yards of fill into 3.2 acres of tidelands. Project components include demolition of existing upland structures; fill placement for the upland operation area and a gravel ramp; a 23-foot by 43-foot approach pier supported by 6 steel piles connecting to a 19-foot by 120-foot transfer bridge stabilized by two 30-inch steel guide piles; and four mooring dolphins each consisting of one vertical 48-inch steel pile and two 24-inch

batter piles. All work would be performed in accordance with the enclosed plan (sheets 1-9), dated November 16, 2012. ADDITIONAL INFORMATION: For a more detailed project description and other information provided by the applicant see sheets 1-4 of the attached project drawings dated November 16, 2012. APPLICANT PROPOSED MITIGATION: The applicant proposes the following mitigation measures to avoid, minimize, and compensate for impacts to waters of the United States from activities involving discharges of dredged or fill material. a. Avoidance: The applicant stated that the area of fill required has been minimized by identifying a site with two natural points extending into Womens Bay that can be incorporated into the workable upland area. b. Minimization: The applicant stated that the area of fill has been further minimized by extending the transfer bridge to reach deeper water required to meet the vessel draft instead of expanding the fill area footprint. This would decrease the potential environmental impact of the project to fish and other wildlife as well as decrease the amount of affected navigable waters of the United States. Fill limits were set at elevation -6-feet Mean Low Low Water (MLLW) which are capable of being clearly viewed at low water. Low water viewing did not identify any significant habitat that could be affected by fill placement. The minimum number and size of piles have been used in the design to reduce noise impacts to aquatic organisms during construction. Best Management Practices (detailed on the attached sheet 4 of 9, dated November 16, 2012) would be employed to minimize impacts to water quality, fish life, and the environment during construction. c. Compensatory Mitigation: The applicant stated that the project would result in the loss of fairly low quality habitat and has not proposed compensatory mitigation at this time. WATER QUALITY CERTIFICATION: A permit for the described work will not be issued until a certification or waiver of certification, as required under Section 401 of the Clean Water Act (Public Law 95-217), has been received from the Alaska Department of Environmental Conservation. CULTURAL RESOURCES: The latest published version of the Alaska Heritage Resources Survey (AHRS) has been consulted for the presence or absence of historic properties, including those listed in or eligible for inclusion in the National Register of Historic Places. There are no listed or eligible properties in the vicinity of the worksite. Consultation of the AHRS constitutes the extent of cultural resource investigations by the District Commander at this time, and he is otherwise unaware of the presence of such resources. This application is being coordinated with the State Historic Preservation Office (SHPO). Any comments SHPO may have concerning presently unknown archeological or historic data that may be lost or destroyed by work under the requested permit will be considered in our final assessment of the described work. ENDANGERED SPECIES: The project area is within the known or historic range of the following species listed as threatened: northern sea otter (Enhydra lutris kenyoni) and its designated critical habitat, Steller's eider (Polysticta stelleri), and the endangered Steller sea lion (Eumetopias jubatus). Although likely rare in the

-2-

project area it is also within the range of the following whales listed as endangered: fin whale (Balaenoptera physalus), humpback whale (Megaptera novaeangliae), sperm whale (Physeter macrocephalus), blue whale (Balaenoptera musculus), north Pacific right whale (Eubalaena japonica) and Sei whale (Balaenoptera borealis). We are currently gathering information regarding these species and have yet to make a determination of effect. Should we find that the described activity may affect any of the species listed above, and/or their designated critical habitat, we will follow the appropriate consultation procedures under section 7 of the Endangered Species Act of 1973 (87 Stat. 844). Any comments the U.S. Fish and Wildlife Service or the National Marine Fisheries Service may have concerning endangered or threatened wildlife or plants or their critical habitat will be considered in our final assessment of the described work. ESSENTIAL FISH HABITAT: The Magnuson-Stevens Fishery Conservation and Management Act, as amended by the Sustainable Fisheries Act of 1996, requires all Federal agencies to consult with the NMFS on all actions, or proposed actions, permitted, funded, or undertaken by the agency, that may adversely affect Essential Fish Habitat (EFH). The project area is within the known range of the The project area is within the known range of the Chinook salmon (Oncorhynchus tshawytscha), chum salmon (Oncorhynchus keta), Coho salmon (Oncorhynchus kisutch), sockeye salmon (Oncorhynchus nerka), and pink salmon (Oncorhynchus gorbuscha). We are currently gathering information regarding these species and have yet to make a determination of effect. Should we find that the described activity may affect the species listed above, we will follow the appropriate course of action under Section 305(b)(2) of the Magnuson-Stevens Act. Any comments the National Marine Fisheries Service may have concerning essential fish habitat will be considered in our final assessment of the described work. TRIBAL CONSULTATION: The Alaska District fully supports tribal self-governance and government-to-government relations between Federally recognized Tribes and the Federal government. Tribes with protected rights or resources that could be significantly affected by a proposed Federal action (e.g., a permit decision) have the right to consult with the Alaska District on a government-to-government basis. Views of each Tribe regarding protected rights and resources will be accorded due consideration in this process. This Public Notice serves as notification to the Tribes within the area potentially affected by the proposed work and invites their participation in the Federal decision-making process regarding the protected Tribal right or resource. Consultation may be initiated by the affected Tribe upon written request to the District Commander during the public comment period. PUBLIC HEARING: Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider this application. Requests for public hearings shall state, with particularity, reasons for holding a public hearing. EVALUATION: The decision whether to issue a permit will be based on an evaluation of the probable impacts, including cumulative impacts of the proposed activity and its intended use on the public interest. Evaluation of the probable impacts, which the proposed activity may have on the public interest, requires a careful weighing of all the factors that become relevant in each particular case. The benefits, -3-

which reasonably may be expected to accrue from the proposal, must be balanced against its reasonably foreseeable detriments. The outcome of the general balancing process would determine whether to authorize a proposal, and if so, the conditions under which it will be allowed to occur. The decision should reflect the national concern for both protection and utilization of important resources. All factors, which may be relevant to the proposal, must be considered including the cumulative effects thereof. Among those are conservation, economics, aesthetics, general environmental concerns, wetlands, cultural values, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shore erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership, and, in general, the needs and welfare of the people. For activities involving 404 discharges, a permit will be denied if the discharge that would be authorized by such permit would not comply with the Environmental Protection Agency's 404(b)(l) guidelines. Subject to the preceding sentence and any other applicable guidelines or criteria (see Sections 320.2 and 320.3), a permit will be granted unless the District Commander determines that it would be contrary to the public interest. The Corps of Engineers is soliciting comments from the public; Federal, State, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps of Engineers to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. AUTHORITY:

This permit will be issued or denied under the following authorities:

(X) Perform work in or affecting navigable waters of the United States ­ Section 10 Rivers and Harbors Act 1899 (33 U.S.C. 403). (X) Discharge dredged or fill material into waters of the United States ­ Section 404 Clean Water Act (33 U.S.C. 1344). Therefore, our public interest review will consider the guidelines set forth under Section 404(b) of the Clean Water Act (40 CFR 230). Project drawings and a Notice of Application for State Water Quality Certification are enclosed with this Public Notice.

District Commander U.S. Army, Corps of Engineers Enclosures

-4-

SEAN PARNELL, GOVERNOR

STATE OF ALASKA DEPT. OF ENVIRONMENTAL CONSERVATION DIVISION OF WATER 401 Certification Program Non-Point Source Water Pollution Control Program DEPARTMENT OF ENVIRONMENTAL CONSERVATION WQM/401 CERTIFICATION 555 CORDOVA STREET ANCHORAGE, ALASKA 99501-2617 PHONE: (907) 269-7564/FAX: (907) 334-2415

NOTICE OF APPLICATION FOR STATE WATER QUALITY CERTIFICATION

Any applicant for a federal license or permit to conduct an activity that might result in a discharge into navigable waters, in accordance with Section 401 of the Clean Water Act of 1977 (PL95-217), also must apply for and obtain certification from the Alaska Department of Environmental Conservation that the discharge will comply with the Clean Water Act, the Alaska Water Quality Standards, and other applicable State laws. By agreement between the U.S. Army Corps of Engineers and the Department of Environmental Conservation, application for a Department of the Army permit to discharge dredged or fill material into navigable waters under Section 404 of the Clean Water Act also may serve as application for State Water Quality Certification. Notice is hereby given that the application for a Department of the Army Permit described in the Corps of Engineers' Public Notice No. POA-2012-920, Womens Bay, serves as application for State Water Quality Certification from the Department of Environmental Conservation. After reviewing the application, the Department may certify there is reasonable assurance the activity, and any discharge that might result, will comply with the Clean Water Act, the Alaska Water Quality Standards, and other applicable State laws. The Department also may deny or waive certification. Any person desiring to comment on the project, with respect to Water Quality Certification, may submit written comments to the address above by the expiration date of the Corps of Engineer's Public Notice.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas